Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Truss Layout
Truss Connector Total List Manuf Product Qty MiTek JUS24 12 TTC 2X4 Vented Blocks* 43 TTC 2X4 Solid Blocks* 42 FOLLOW ALL BRACING REQUIREMENTS AS SPECIFIIED IN THE TRUSS ENGINEERING SEALS PACKET GARAGE 2018 UBC HVAC PLATFORM TOTAL BLOCK COUNT =85 FOR BIDDING ONLY LAYOUT FOR VERIFICATION & PRICING A01 R01R0 1 J64J64AJ21 J22 J21 J22A A06 B01 JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS246/12 6/12 4/12 6/12 J66(3) J67(6)A02(8) A03(9) A03(3)A05(2)A04(4)2-00-0053-00-002-00-00 61-00-0037-06-00 19-06-0057-00-0024-00-00 10-00-00 14-00-00 24-00-00 4-00-0014-00-0010-00-00 14-00-0010-00-006-00-0011-06-006-00-001-00-001-00-001-00-001-00-001-00-001-00-001-00-001-00-00 Sales Rep: Estimate By: Kelly Finelli Customer: Ryan Kittelson Sheet Number:1of1Drawing Type: Roof Trusses Soundbuilt NW, LLC Plan: 997B Job Name: Date: 7/14/2022 Tahoma Terra - Garage Alley J1122624 Job Number: Loading TC/LL = 25.0 lb TC/DL= 8.0 lb BC/DL= 7.0 lb WIND = 110 mph 'B' Finalized By: Kelly Finelli ** IMPORTANT ** = INDICATES LEFT ENDAddress:,Yelm,WA 98597