Loading...
2021.0504.ST0054 ROW Permit Issue 10.20.2021ROW Permit Date Issued: 10/19/2021 Permit #: 2021.0504.ST0054 Applied Date:10/06/2021 Issue Date:10/19/2021 Expiration Date 04/17/2022 Proposed Use:Work in ROW to install underground electric service and replace existing riser & overhead termination on pole. Asphalt cuts (2)- 8'x2' JOB # 101116911 Physical Address:9102 CANAL RD SE Require Sprinklers:No Parcel #:63520001500 Structures:Heating: Subdivision:Stories:Roofing: Zoning:Bedrooms:Bathrooms: Load:Construction Type: Use:Code Edition: Occupancy:Service Location:02-4515.0 Applicant Contractor PUGET SOUND ENERGY,PUGET SOUND ENERGY, 2711 PACIFIC AVENUE SE 2711 PACIFIC AVENUE SE OLYMPIA, WA 98501 OLYMPIA, WA 98501 Contact:Contact: Phone:(253) 306-2255 Phone:(253) 306-2255 Fax:( ) -Fax:( ) - Email:SARAWATTENBERG@PSE.COM Bus Lic: Cont Lic: UBI: Fees Qty Rate Amount Date Fully Paid Invoice #Amount v Standard ROW Permit 1.00 250.00 250.00 10/19/2021 2846 450.00 v Street Cut Up To 50 Sq. Ft.1.00 200.00 200.00 450.00 450.00 Estimated Balance Due: Conditions Set By:DerekM The contractor shall be responsible for all traffic control in accordance with MUTCD. No work shall commence until all approved traffic control is in place.Resolved Date:Resolved By: Set By:DerekM Trench - Pavement Restoration shall conform to specifications found in Chapter 2.10.140 of City of Yelm Development Guidelines and Standard Details Dwg 2-10Resolved Date:Resolved By: Set By:DerekM Temporary Street Patching shall conform to specifications found in Chapter 2.10.130 of City of Yelm Development GuidelinesResolved Date:Resolved By: Inspections FINAL Initials ______Page 1 City of Yelm, Washington 106 2nd Street SE | Yelm, WA 98597 To Schedule Inspections Please Call: (360) 458-8410 | www.yelmwa.gov ROW Permit Date Issued: 10/19/2021 Permit #: 2021.0504.ST0054 Initials ______Page 2 City of Yelm, Washington 106 2nd Street SE | Yelm, WA 98597 To Schedule Inspections Please Call: (360) 458-8410 | www.yelmwa.gov All work will comply with terms as described in Chapter 15.72 YMC "Conditions for Use of Right-of-Way" and Chapter 18.28 YMC : Engineering Specifications and Standard Details" = = The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. = Notify the City of Yelm Inspection Hotline @ (360) 458-8410 at least 24 hours before work commences and to coordinate final inspection. =