Loading...
186058267 WORK SKETCHCØAAX021 CØABX079 CØUNK SUN D A N C E A V E S E MI D D L E S T S ECASCADIAN AVE SER I C HM O N T C T S E O A K R I D G E C T S E CAS C A DI A N A V E S E GREENLEAF LOOP SE"16416" "16402" "16408" "16414" 510032683 186058267 111026119 PROJECT PHASE PWR NOTIF#ORDER# Superior Sub Order 108124599 N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186058267FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. SCALE: 1:100 SITE PLAN P01 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP W. VILLANUEVA 253-285-6201 10/16/20 W. VILLANUEVA 253-285-6201 10/16/20 N/A N/A N/A C. ROATE 253-841-6283 10/16/20 N/A CITY OF YELM ENGR1 COMCAST TK#4430134 REPLACE 1 TRANSMISSION POLE 16416 SUNDANCE AVE SE, YELM, WA 98597 POTELCO N/A N/A N/A 186058267 AS NOTED 1/1 THURSTON N/A N/A QSTHLE T17-R02E-S19 N/A N/A 1702E076 1702E116 1702E076 YEL-27 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A THIS PAGE PERTAINS TO DISTRIBUTION UNDERBUILD SEE ADDITIONAL PRINT FOR TRANSMISSION NOTES SITE SPECIFIC NOTES P01 (559409-147769) -REPLACE EXIST 75' CL1 POLE W/ NEW 75' CLH2 POLE PER TRANSMISSION W/O# 111026119 -INST SGL ARM UNDERBUILD (6034.1010 TANU315) -TRANSFER EXIST 15kVA 120/240v XF W/POLE MOUNTED LB C/O FUSED AT 6T (3412100) -TRANSFER JUMPER -INST 1Ø TERM OH-UG (6043.1000 TSU1C1) W/LB C/O FUSED AT 40T (3412500) -INSTALL NEW 2" RISER ON S/O BKTS(6042.1000RIS2CSS) APPROX 50' ( ') UP POLE -REPULL NEW 1/0 UG PRI APPROX 320'(_______') FROM EXISTING PAD MOUNT XF -INST EXIST SW #Y1591 -INST SEC FG HH (6050.2000 HH14350) SEE HH NOTES -TRANSFER EXISTING OVERHEAD TPX -TOP POLE TO COMMS UG CIRCUIT MAP: 1702E076 SCALE 1:100 HANDHOLE NOTES HH01 -INST NEW 13x24 SEC FG HH (6050.2000 HH14350) AT BASE OF P01 -INST 3 POS FARGOS -INST 1 45' ± (_________) 1/0 UG TPX IN NEW 2" RISER (6042.1000 RIS2CSS) -INST 1 2" PVC CONDUIT 5' ± (________) TO P01 -RE-ROUTE & RECONNECT EXIST CUSTOMER WIRE TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. OH CIRCUIT MAP: 1702E116 SCALE 6" = 1 MILE JOB SITE VICINITY MAP JOB SITE New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P01 559409-147769 15kVA 120/240v SIDE VIEW 15" 23-1/4"32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 24" Approx Approx 13" Customer's service conductors Conductors enter from beneath and shall be folded back with handhole TOP VIEW 5'-0" 4'-0" HH1: 1Ø SECONDARY HANDHOLE SCALE: NONE 6050.2000