101117129 YEL-25 CRYSTAL CT CRP 2020 R2OVERHEAD APPARATUS "When performing planned work on a pole with an existing transformer or device, the Service Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge time. If you are working on a pole with the pole ground connected with a hot tap, replace it. If the transformer has split bolts on the secondary neutral or services, replace them. If the primary neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on the neutral bus, replace it. PSE GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials, equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all Street lights, area lights and floodlights. - All fault indicators will be maintained in their current location on the 1/0 cables upon completion of the job. If it is noted to remove any of the indicators they shall be returned to local PSE first response department for re-issue. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. - Return one Foreman's copy of work sketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. Traffic /Pedestrian control notes - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -The uniform code of traffic control shall be adhered to at all times.. -Provide signs, barricades, and traffic control in conformance with local permit regulations. -Provide route for pedestrians when working on or near sidewalks. -Maintain traffic flow as required by permitting agency. NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 JACKETED CABLE. UNDERGROUND CONSTRUCTION Additional notes to standards. -Erosion control must be placed before construction starts. Silt bags must be installed in downstream catch basins. Existing Utilities: Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage to existing utilities. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - No rocks larger than 8" shall be included in backfill. - Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Hand holes - Refer to PSE standard 6775.0040 "Vault and Hand hole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - Civil crew to install Conduit plug on each end until new cable to be installed. - All "spare" conduits shall be capped at each end. Surface Restoration Restore ground surface to original contour and original condition or better. Restore asphalt and concrete in accordance with requirements of local permitting agency. Cold patch or plate trench when necessary. Leave area in its original state or better at the end of construction. SCOPE OF WORK The general scope of this project is to remediate primary cables within the project area by the most economic means possible using replacement, or abandonment. The project involves replacing existing electrical cables in new conduit. Project type : Planned Project location : Number of Cables : 3 Cable Footage Estimated : 762' Cable Numbers Injected : 0 Cable Numbers Repaired : 0 Cable Numbers Abandoned : 0 Cable Numbers Replaced : 9216,9217,9218 Trench Footage Estimated : 762' There will be an advance notice provided by the contractor 24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to manage access. Traffic Revisions Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work hours. For more information on the project 24-hour project information (888) 471-7339, (360) 825-5236 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________ JOB SITE JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages Trench Method: CABLE REPLACEMENT Approximate Trench Footage: Abandon Cable Segments: Approximate New 1Ø pri. Cable Footage: Approximate 2" SCH80 Conduit Footage: Replaced Cable Segments: Vaults: TRENCH 675' 0 3 775' 715' 0 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11463350 101117129R2 N/A 108110834 VICINITY MAP OVERHEAD CIRCUIT: MAP # . SCALE 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 07/09/19 N. COSME 253-569-6158 07/09/19 N/A N/A N/A M.POMEROY 253-234-6560 07/09/19 REQ-CITY YELM YEL-25 CRYSTAL CT CRP 2020 CABLE REMEDIATION PROGRAM 1212 CRYSTAL CT NW YELM WA 98597 N/A N/A N/A 101117129R2 N/A 1 OF 2 THRUSTON N/A N/A QSEPRE SE 18-17-02 N/A N/A 1702E072 1702E068 1702E071 YEL-25 9/24/19 N. RAFEEQ CHANGE TO BORE 2/16/22 C. CHAVEZ REDESIGN AS TRENCH N/A N/A N/A Potelco, Inc.DESIGNED BY 101117129R21212 CRYSTAL CT NW YELM WA 98597 INDEX PAGE 1 - GENERAL NOTES PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM & EXISTING CABLE MAPPING Overflow Filter fabric walls for Catch Basin Grate dewatering sedimentCollected Sediment Catch Basin Insert MID 9995728 Filter fabric skirt Secured with grate. EROSION CONTROL NOT TO SCALE 1702E068 LEGEND SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV THREE PHASE WIRE/CABLE - 12.5 KV CABLE TERMINATION BUS (J-BOX) NEW OVERHEAD TO UNDERGROUND CABLE OVERHEAD TO UNDERGROUND CABLE TERM. 10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE TOTAL UNDERGROUND XFMR (T.U.T.) NEW COMBINATION J-BOX/PADMOUNT XFMR UNDERGROUND COMBINATION J-BOX/XFMR N.T.S. = NOT TO SCALE X.F.M.R. = TRANSFORMER P.E. = POLYETHYLENE ABBREVIATIONS PRIMARY METERING CABLE SPLICE FAULT INDICATOR WILL NOT PHASE (WNØ) NORMAL OPEN (N.O.) FUSED DISCONNECT: SOLID BLADE DISCONNECT HANDHOLE PULL VAULT UNDERGROUND SWITCH UNDERGROUND J-BOX NEW PADMOUNT XFMR NEW UNDERGROUND XFMR PAD MOUNT XFMR ELECTRONIC MARKER COMBINATION J-BOX/PADMOUNT XFMR NEW UNDERGROUND COMBINATION J-BOX/XFMR TERMINATION CABLE TO REPLACE PROPERTY LINE RIGHT OF WAY CENTERLINE EASEMENT CL Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min (ROW) 36" MIN Cover (PVT PROP) 36" MIN 48" Max Backfill (No rocks over 8" diameter) 3" Bedding Clean Native Soil, Sand or 5/8" Minus 12" Typical TRENCH DETAIL NOT TO SCALE 12" Min Shading Clean Native Soil, Sand or 5/8" Minus - A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches - A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter. FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN 12" MIN 48" MAX 36" MIN EXISTING PAVEMENT / SIDEWALK VERTICAL SAW CUT LINE CRUSHED SURFACING MATERIAL COMPACT TO 95% MAX DENSITY. EXCAVATION AND HARD RESTORATION DETAIL NOT TO SCALE 12" MIN 3" Sand Bedding or 5/8" Minus 12" Min Sand Shading or 5/8" Minus 12" MIN ASPHALT PATCH, 2" MIN MATCH EXISTING Conduit (ROW) 36" MIN (PVT PROP) 36" MIN For contacts below dial 1-888-CALL PSE (225-5773) Contact Information PSE: PLANNER 22884 RYEN DR NW POULSBO, WA 98370 DOUG JONES 360-394-6636 ABANDONING PRIMARY CABLES PSE std. 6825.6200 In a Vault if the cable is ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot from the vault wall. Install a cap on the tail. -When practical, attach the old cable number to the cable stub. ______________________________________________________________________________________ In a Minipad hand hole ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical. Install a cap on the tail. -When practical, attach the old cable number to the cable stub. -Stuff the tail into the bottom of the handhole. Be sure the new cables are not trapped by the old cables or the concentric neutrals. ______________________________________________________________________________________ At Risers if the cable is ______________________________________________________________________________________ In Conduit -Remove Cable ______________________________________________________________________________________ Direct buried or it cannot be pulled out, -Cut off the cable at the top of the riser. Install a cap on the tail. and the pole will remain. -When practical, attach the old cable number to the cable stub. ______________________________________________________________________________________ DIRECT BURIED Direct buried or it cannot be pulled out, -Remove the riser. and the pole will be replaced -Cut off old cable just below grade. -Re-fill ground back to existing grade. ______________________________________________________________________________________ DIRECT BURIED Direct buried or it cannot be pulled out, -Cut off the cable just below grade. and the pole will be removed ______________________________________________________________________________________ NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets (unless they support other conduits). NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000, "Transite Pipe Removal and Disposal." _______________________________________________________________________________________ -Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant to moisture, low temperature, and corrosive agents). -For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager (206-994-3186) to have a contractor dispatched. Procedure to Abandon Primary Cables: 1. Call the Systems Operator to request a clearance. 2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice 0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator. 3. Obtain a clearance from the Systems Operator on the cable to be abandoned. 4. Cut the ends of the cable. 5. The cable number tag may be left on the abandoned cable. NOTE: The cable number shall not be reused. 6. Call the Systems Operator and release the clearance. 7. Remove all "Danger Do Not Operate" tags. 8. The System Operator will then close the O# (Operations number). Existing System: Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by PSE System Operator. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 25T Y599 CL CL CL CL CL CL 1212 1211 1210 1209 1208 1207 1206 1205 12041203 12021201CRYSTAL SPRINGS ST NW (PAVED)CRYSTAL CT NW (PAVED) ROW=60' ROW=50' EOP=32' P# 43390000100 P# 43390000200 P# 43390000300 P# 43390000400 P# 43390000500 P# 43390000600 P# 43390000700 125 127 113 1199 15718 OPEN TRENCH ~ 220' OPEN TRENCH ~ 210' OPEN TRENCH ~ 245' EOP =24' 25T Y599 CRYSTAL SPRINGS ST NWCRYSTAL CT NW EHY937 - CØ 1-2" - L______' EHY938- CØ 1-2" - L______' EHY939 - CØ 1-2" - L______' 2-2" - L______'2-2" - L______'209.1 lbs 178.3 lbs112.1 lbs 111.6 lbs 96.4 l b s 8 3 . 9 l b s 25T Y599 CØ9216 CØ9217 CØ9218 25T Y599 CL CL CL CL CL 1212 1211 1210 1209 1208 1207 1206 1205 12041203 12021201CRYSTAL SPRINGS ST NW (PAVED)CRYSTAL CT NW (PAVED) 125 127 113 1199 15718 EXISTING 18' N CLP PROPOSED 15' N CLP BUILT ___' N CLP EXISTING16' N CLP PROPOSED 13' N CLP BUILT ___' N CLP EXISTING 14' E CLP PROPOSED 17' E CLP BUILT ___' E CLP EXISTING CABLES LOCATION PROVIDED BY: LOCATES TICKET # 19268329 LEGEND CLP= CENTER LINE OF PAVEMENT EOB= EDGE OF BUILDING PROP= EDGE OF PROPERTY LINE RM= ROAD MONUMENT EOR= EDGE OF ROAD SITE PLAN SCALE: 1:50 CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY. CIRCUIT FEET REMOVED: 762' CIRCUIT FEET ADDED: 715' WIRE CREW FOREMAN NOTE: ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING. CIVIL CREW FOREMAN NOTE: MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE. CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S COPIES) AT THE END OF THE JOB. PRIMARY CABLE & CONDUIT DIAGRAM NOT TO SCALE EXISTING UNDERGROUND MAP: # . SCALE: 1:100 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 07/09/19 N. COSME 253-569-6158 07/09/19 N/A N/A N/A M.POMEROY 253-234-6560 07/09/19 REQ-CITY YELM YEL-25 CRYSTAL CT CRP 2020 CABLE REMEDIATION PROGRAM 1212 CRYSTAL CT NW YELM WA 98597 N/A N/A N/A 101117129R2 N/A 2 OF 2 THRUSTON N/A N/A QSEPRE SE 18-17-02 N/A N/A 1702E072 1702E068 1702E071 YEL-25 9/24/19 N. RAFEEQ CHANGE TO BORE 2/16/22 C. CHAVEZ REDESIGN AS TRENCH N/A N/A N/A 1702E071 101117129R2CONSTRUCTION NOTES P01 -CUT OFF CABLES AT TOP OF RISER -INSTALL A CAP ON THE TAIL -ATTACH OLD CABLE # TO CABLE STUB -REMOVE OLD C/O & TERM -INST 1Ø LB C/O TERM F:25T STD 6043.1000 (TSU1C1) -INST 1-2" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS2CSS) -INST SW# Y599 STD 6300.0750 -INST SWITCHBOARD 12' ABOVE GROUND STD 6300.4000 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW CONDUIT RISER REPLACEMENT DETAIL @ P01 NOT TO SCALE FOREMAN NOTE: CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. Potelco, Inc.DESIGNED BY CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC ALL 2" - 45° BENDS SCH-80 PVC - ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL CABLE IS INTALLED PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT P01 V01 2 1 225 178.3 209.1 1/0 AL JKT 265 --EHY937 0.7 V01 V02 2 1 245 111.6 112.1 1/0 AL JKT 255 --EHY938 0.8 V02 V03 2 1 245 83.9 96.4 1/0 AL JKT 255 --EHY939 0.8 TOTAL 2"715'TOTAL 1Ø 775'TOTAL LUBE 2.3 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE ABANDONED CABLE LEFT IN PLACE ABANDON CIRCUITRYFROMTO 9216 10585717 P01 V01 222 YES NO 9217 10585729 V01 V02 263 YES NO 9218 10585737 V02 V03 277 YES NO TOTAL CIRCUIT FEET 762' VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC V01 559805 147438 EXISTING VAULT 25kVA PM XFMR 120/240v EXISTING 2 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V02 559805 147460 EXISTING VAULT 25kVA PM XFMR 120/240v EXISTING 2 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V03 559803 147481 EXISTING VAULT 25kVA PM XFMR 120/240v EXISTING 1 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS TOTALS :5 - EXISTING CABLE MAPPING SCALE: 1:50 VOLUME OF DISTURBANCE TABLE TYPE DESCRIPTION PROPERTY CLASSIFCATION SIZE (FT)REM CU YD (APPX) GRAVEL FILL CU YD (APPX) TYPE OF SURFACE REMARKS OPEN TRENCH TRENCH ROW 1 X 255 28.3 28.3 HARD OPEN TRENCH TRENCH ROW 1 X 420 46.7 46.7 SOFT TOTAL PVT PROP CU YDS (APPX)0.0 0.0 TOTAL ROW CU YDS (APPX)75.0 75.0 TOTAL CU YDS (APPX)75.0 75.0 25T Y599 CØ9216 CØ9217 CØ9218 101117129R2FOREMAN MAP: U MAP # / UG MAP # . SCALE: 1" = 100' 1702E072 1702E071