2021.0586.ST0059 Permit Issue Pckg 3.02.2022OVERHEAD APPARATUS
"When performing planned work on a pole with an existing transformer or device, the Service
Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge
time.
If you are working on a pole with the pole ground connected with a hot tap, replace it. If the
transformer has split bolts on the secondary neutral or services, replace them. If the primary
neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on
the neutral bus, replace it.
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All
copper shall be coiled and returned the day it is removed from the poles. Remove all unused
pins and insulators.
- Return all Street lights, area lights and floodlights.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re-issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
Traffic /Pedestrian control notes
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs, barricades, and traffic control in conformance with local permit regulations.
-Provide route for pedestrians when working on or near sidewalks.
-Maintain traffic flow as required by permitting agency.
NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS
UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT.
REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE
J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0
JACKETED CABLE.
UNDERGROUND CONSTRUCTION
Additional notes to standards.
-Erosion control must be placed before construction starts. Silt bags must be installed in
downstream catch basins.
Existing Utilities:
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
structures to support and protect underground utilities while exposed during construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings. Maintain
24" minimum separation between new trench or tunnel and parallel existing utilities or as
required by the permit agency.
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
36" of cover for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
- No rocks larger than 8" shall be included in backfill.
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
as required by the permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Hand holes
- Refer to PSE standard 6775.0040 "Vault and Hand hole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with
final grade when placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- Civil crew to install Conduit plug on each end until new cable to be installed.
- All "spare" conduits shall be capped at each end.
Surface Restoration
Restore ground surface to original contour and original condition or better. Restore asphalt
and concrete in accordance with requirements of local permitting agency. Cold patch or plate
trench when necessary. Leave area in its original state or better at the end of construction.
SCOPE OF WORK
The general scope of this project is to remediate primary cables within the project area by the most economic
means possible using replacement, or abandonment.
The project involves replacing existing electrical cables in new conduit.
Project type : Planned
Project location :
Number of Cables : 3
Cable Footage Estimated : 762'
Cable Numbers Injected : 0
Cable Numbers Repaired : 0
Cable Numbers Abandoned : 0
Cable Numbers Replaced : 9216,9217,9218
Trench Footage Estimated : 762'
There will be an advance notice provided by the contractor
24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their
driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to
manage access.
Traffic Revisions
Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work
hours.
For more information on the project
24-hour project information (888) 471-7339, (360) 825-5236
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
JOB SITE
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
Trench Method:
CABLE REPLACEMENT
Approximate Trench Footage:
Abandon Cable Segments:
Approximate New 1Ø pri. Cable Footage:
Approximate 2" SCH80 Conduit Footage:
Replaced Cable Segments:
Vaults:
TRENCH
675'
0
3
775'
715'
0
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11463350 101117129R2
N/A
108110834
VICINITY MAP
OVERHEAD CIRCUIT: MAP # .
SCALE 6" = 1 MILE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 07/09/19
N. COSME 253-569-6158 07/09/19
N/A N/A N/A
M.POMEROY 253-234-6560 07/09/19
REQ-CITY YELM
YEL-25 CRYSTAL CT CRP 2020
CABLE REMEDIATION PROGRAM
1212 CRYSTAL CT NW YELM WA 98597
N/A N/A
N/A 101117129R2
N/A 1 OF 2
THRUSTON N/A N/A QSEPRE
SE 18-17-02 N/A N/A
1702E072 1702E068 1702E071 YEL-25
9/24/19 N. RAFEEQ CHANGE TO BORE
2/16/22 C. CHAVEZ REDESIGN AS TRENCH
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101117129R21212 CRYSTAL CT NW YELM WA 98597
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM & EXISTING CABLE MAPPING
Overflow
Filter fabric walls for
Catch Basin Grate
dewatering sedimentCollected Sediment
Catch Basin Insert
MID 9995728
Filter fabric skirt
Secured with grate.
EROSION CONTROL
NOT TO SCALE
1702E068
LEGEND
SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV
THREE PHASE WIRE/CABLE - 12.5 KV
CABLE TERMINATION BUS (J-BOX)
NEW OVERHEAD TO UNDERGROUND CABLE
OVERHEAD TO UNDERGROUND CABLE TERM.
10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE
TOTAL UNDERGROUND XFMR (T.U.T.)
NEW COMBINATION J-BOX/PADMOUNT XFMR
UNDERGROUND COMBINATION J-BOX/XFMR
N.T.S. = NOT TO SCALE
X.F.M.R. = TRANSFORMER
P.E. = POLYETHYLENE
ABBREVIATIONS
PRIMARY METERING
CABLE SPLICE
FAULT INDICATOR
WILL NOT PHASE (WNØ)
NORMAL OPEN (N.O.)
FUSED DISCONNECT:
SOLID BLADE DISCONNECT
HANDHOLE
PULL VAULT
UNDERGROUND SWITCH
UNDERGROUND J-BOX
NEW PADMOUNT XFMR
NEW UNDERGROUND XFMR
PAD MOUNT XFMR
ELECTRONIC MARKER
COMBINATION J-BOX/PADMOUNT XFMR
NEW UNDERGROUND COMBINATION J-BOX/XFMR
TERMINATION
CABLE TO REPLACE
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
EASEMENT
CL
Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
(ROW) 36" MIN Cover
(PVT PROP)
36" MIN
48"
Max
Backfill
(No rocks over 8" diameter)
3" Bedding Clean Native Soil, Sand or 5/8" Minus
12" Typical
TRENCH DETAIL
NOT TO SCALE
12" Min Shading Clean Native Soil, Sand or 5/8" Minus
- A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter.
FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL
PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN
12"
MIN
48" MAX
36" MIN
EXISTING
PAVEMENT / SIDEWALK
VERTICAL SAW
CUT LINE
CRUSHED SURFACING
MATERIAL COMPACT
TO 95% MAX DENSITY.
EXCAVATION AND HARD RESTORATION DETAIL
NOT TO SCALE
12" MIN
3" Sand Bedding or 5/8" Minus
12" Min Sand Shading or 5/8" Minus
12" MIN
ASPHALT PATCH, 2" MIN
MATCH EXISTING
Conduit
(ROW) 36" MIN
(PVT PROP)
36" MIN
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
PSE: PLANNER
22884 RYEN DR NW
POULSBO, WA 98370
DOUG JONES
360-394-6636
ABANDONING PRIMARY CABLES PSE std. 6825.6200
In a Vault if the cable is
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot
from the vault wall. Install a cap on the tail.
-When practical, attach the old cable
number to the cable stub.
______________________________________________________________________________________
In a Minipad hand hole
______________________________________________________________________________________
In conduit, -Remove the cable
______________________________________________________________________________________
Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical. Install a cap on the tail.
-When practical, attach the old cable number to
the cable stub.
-Stuff the tail into the bottom of the
handhole. Be sure the new cables are not
trapped by the old cables or the concentric
neutrals.
______________________________________________________________________________________
At Risers if the cable is
______________________________________________________________________________________
In Conduit -Remove Cable
______________________________________________________________________________________
Direct buried or it cannot be pulled out, -Cut off the cable at the top of the riser. Install a cap on the tail.
and the pole will remain. -When practical, attach the old cable number to the cable stub.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Remove the riser.
and the pole will be replaced -Cut off old cable just below grade.
-Re-fill ground back to existing grade.
______________________________________________________________________________________
DIRECT BURIED
Direct buried or it cannot be pulled out, -Cut off the cable just below grade.
and the pole will be removed
______________________________________________________________________________________
NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets
(unless they support other conduits).
NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000,
"Transite Pipe Removal and Disposal."
_______________________________________________________________________________________
-Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in
place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant
to moisture, low temperature, and corrosive agents).
-For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager
(206-994-3186) to have a contractor dispatched.
Procedure to Abandon Primary Cables:
1. Call the Systems Operator to request a clearance.
2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice
0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator.
3. Obtain a clearance from the Systems Operator on the cable to be abandoned.
4. Cut the ends of the cable.
5. The cable number tag may be left on the abandoned cable.
NOTE: The cable number shall not be reused.
6. Call the Systems Operator and release the clearance.
7. Remove all "Danger Do Not Operate" tags.
8. The System Operator will then close the O# (Operations number).
Existing System:
Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable
existing system only to make cutovers and connections as directed by PSE System Operator.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
25T
Y599
CL
CL
CL
CL CL CL
1212
1211
1210 1209 1208
1207
1206
1205
12041203
12021201CRYSTAL SPRINGS ST NW (PAVED)CRYSTAL CT NW (PAVED)
ROW=60'
ROW=50'
EOP=32'
P# 43390000100
P# 43390000200
P# 43390000300 P# 43390000400
P# 43390000500
P# 43390000600
P# 43390000700
125
127 113
1199
15718
OPEN TRENCH ~ 220'
OPEN TRENCH ~ 210'
OPEN TRENCH ~ 245'
EOP =24'
25T
Y599
CRYSTAL SPRINGS ST NWCRYSTAL CT NW
EHY937 - CØ
1-2" - L______'
EHY938- CØ
1-2" - L______'
EHY939 - CØ
1-2" - L______'
2-2" - L______'2-2" - L______'209.1 lbs 178.3 lbs112.1 lbs 111.6 lbs 96.4 l
b
s
8
3
.
9
l
b
s
25T
Y599
CØ9216
CØ9217
CØ9218
25T
Y599
CL
CL
CL CL CL
1212
1211
1210 1209 1208
1207
1206
1205
12041203
12021201CRYSTAL SPRINGS ST NW (PAVED)CRYSTAL CT NW (PAVED)
125
127 113
1199
15718
EXISTING 18' N CLP
PROPOSED 15' N CLP
BUILT ___' N CLP
EXISTING16' N CLP
PROPOSED 13' N CLP
BUILT ___' N CLP
EXISTING 14' E CLP
PROPOSED 17' E CLP
BUILT ___' E CLP
EXISTING CABLES LOCATION PROVIDED BY:
LOCATES TICKET # 19268329
LEGEND
CLP= CENTER LINE OF PAVEMENT
EOB= EDGE OF BUILDING
PROP= EDGE OF PROPERTY LINE
RM= ROAD MONUMENT
EOR= EDGE OF ROAD
SITE PLAN
SCALE: 1:50
CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY.
CIRCUIT FEET REMOVED: 762'
CIRCUIT FEET ADDED: 715'
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT
LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED
UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT
INDICATORS ON "CABLE DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL
WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT
ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE
RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS
(FOREMAN'S COPIES) AT THE END OF THE JOB.
PRIMARY CABLE & CONDUIT DIAGRAM
NOT TO SCALE
EXISTING UNDERGROUND MAP: # .
SCALE: 1:100
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. YLENNI 253-720-9700 07/09/19
N. COSME 253-569-6158 07/09/19
N/A N/A N/A
M.POMEROY 253-234-6560 07/09/19
REQ-CITY YELM
YEL-25 CRYSTAL CT CRP 2020
CABLE REMEDIATION PROGRAM
1212 CRYSTAL CT NW YELM WA 98597
N/A N/A
N/A 101117129R2
N/A 2 OF 2
THRUSTON N/A N/A QSEPRE
SE 18-17-02 N/A N/A
1702E072 1702E068 1702E071 YEL-25
9/24/19 N. RAFEEQ CHANGE TO BORE
2/16/22 C. CHAVEZ REDESIGN AS TRENCH
N/A N/A N/A
1702E071
101117129R2CONSTRUCTION NOTES
P01
-CUT OFF CABLES AT TOP OF RISER
-INSTALL A CAP ON THE TAIL
-ATTACH OLD CABLE # TO CABLE STUB
-REMOVE OLD C/O & TERM
-INST 1Ø LB C/O TERM F:25T STD 6043.1000 (TSU1C1)
-INST 1-2" L_____' RISER ON STAND-OFF BRKTS STD 6042.1000 (RIS2CSS)
-INST SW# Y599 STD 6300.0750
-INST SWITCHBOARD 12' ABOVE GROUND STD 6300.4000
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
TOP VIEW
CONDUIT RISER REPLACEMENT DETAIL @ P01
NOT TO SCALE
FOREMAN NOTE:
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7
BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE
TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS &
BODILY INJURY.
Potelco, Inc.DESIGNED BY
CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC
ALL 2" - 45° BENDS SCH-80 PVC
- ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL
CABLE IS INTALLED
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
P01 V01 2 1 225 178.3 209.1 1/0 AL JKT 265 --EHY937 0.7
V01 V02 2 1 245 111.6 112.1 1/0 AL JKT 255 --EHY938 0.8
V02 V03 2 1 245 83.9 96.4 1/0 AL JKT 255 --EHY939 0.8
TOTAL 2"715'TOTAL 1Ø 775'TOTAL LUBE 2.3
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
ABANDONED
CABLE LEFT IN
PLACE
ABANDON
CIRCUITRYFROMTO
9216 10585717 P01 V01 222 YES NO
9217 10585729 V01 V02 263 YES NO
9218 10585737 V02 V03 277 YES NO
TOTAL CIRCUIT FEET 762'
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
V01 559805
147438
EXISTING
VAULT
25kVA PM XFMR
120/240v
EXISTING
2 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V02 559805
147460
EXISTING
VAULT
25kVA PM XFMR
120/240v
EXISTING
2 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
V03 559803
147481
EXISTING
VAULT
25kVA PM XFMR
120/240v
EXISTING
1 - REPLACE ELBOWS & CONDUCTORS
WIRE CREW TO INSTALL GRID NUMBERS
TOTALS :5 -
EXISTING CABLE MAPPING
SCALE: 1:50
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION PROPERTY
CLASSIFCATION
SIZE (FT)REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
TYPE OF SURFACE REMARKS
OPEN TRENCH TRENCH ROW 1 X 255 28.3 28.3 HARD
OPEN TRENCH TRENCH ROW 1 X 420 46.7 46.7 SOFT
TOTAL PVT PROP CU YDS (APPX)0.0 0.0
TOTAL ROW CU YDS (APPX)75.0 75.0
TOTAL CU YDS (APPX)75.0 75.0
25T
Y599
CØ9216
CØ9217
CØ9218
101117129R2FOREMAN MAP: U MAP # / UG MAP # .
SCALE: 1" = 100'
1702E072 1702E071