Loading...
2021.0626.ST0068 Permit Issue Pckg 12.14.2021Est. Start Date: & & & & MDPE - 2" IPS - (DIA) 1-1/4"IPS 9999548 Job #:106381787 Date:8/18/21 Address:1002 RHOTON RD SE Puget Sound Energy Gas Pre-Inspect Form 1/31/22 PM / Inspector:Peter deGraaf (253) 579-5076 Est. Duration:2 Days (16 Hours) Jurisdiction:YELM City / Zip:YELM, 98597 ROW Permit:Yes Customer:Jason McLauchlin 206 300 7812 Work Location Size of Cut Surface Type Job Description / ROW Scope of Work New Construction: Yes Construction Method Scat ROW / Plat Property PLAT Map:282.045 N Project Scope: LONG SIDE 2" PE MAIN, SCAT STUB 50' 1-1/4" PE, 2600 EFV, 1-1/4" POLYVALUE, PLAT EXT 100' 1- 1/4" PE A425 AMR 6" WC, CONTACT JASON MCLAUCHLIN 206.300.7812, PM PETE DE GRAAF 253.579.5076 Service Information Street Information Job Type New Commercial Svc EFV:1-1/4" - 2600 - 9996744 Police #:TCP:Yes Diameter:1-1/4" PE Flaggers #:Arterial:Yes Tie-In Fitting Trolley Lines:Mtr Hoods #: Meter:A425 Speed Limit: Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:Bus Stop: No Parks #: Meter Loc:03 - OL of CL of CL North of CL QUAIL MEADOWS CT SE 20'West of CL NW RHOTON RD 3X4 LAK - Lakewood of CL of CL GRASS 143'North of CL QUAIL MEADOWS CT SE 50'East of CL NW RHOTON RD 3X4 GRASS 143' 1002 NW Rhoton Rd Yelm WA 98597 USA 16 10 1414QUAIL MEADOWS CT SE RHOTON RD SEPLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP FLAGGERW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANE ROAD AHEAD 100'100'100'ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1 100' WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Yelm standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 143' NCL of Quail Meadows Ct SE @ 20' WCL and 50' ECL of NW Rhoton Rd. Project Address: Page PSE PUGET SOUNDENERGY Designer: Job # REV 12/09/2021 106381787 0 1002 Rhoton Rd SE, Yelm, WA Kaitlynn Davis 209-456-0264 kaitlynn.davis@pse.com 1 OF 2 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 1002 NW Rhoton Rd Yelm WA 98597 USA 16 10 1414QUAIL MEADOWS CT SERHOTON RD SEW20-7AW20-4ONE LANE ROAD AHEAD 100'100'100'ROAD WORK AHEAD W20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1STOP FLAGGER ROADWORKAHEADW20-1 100' PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKRESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Yelm standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 143' NCL of Quail Meadows Ct SE @ 20' WCL and 50' ECL of NW Rhoton Rd. Project Address: Page PSE PUGET SOUNDENERGY Designer: Job # REV 12/09/2021 106381787 0 1002 Rhoton Rd SE, Yelm, WA Kaitlynn Davis 209-456-0264 kaitlynn.davis@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40