Truss EngineeringJob
J1122624
Truss
A01
Truss Type
GABLE
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:19 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-8E7t388NvXo0dLFb7K6MwDzD?Xa8RsXB5cPfqXyy9fE
Scale = 1:52.7
T1 T1
B2
W1
W3 W5
W7
W9
W10
W12
W14
W2 W4 W6 W8 W6 W11 W13
T3
T2
T3
T4ST5
ST4
ST3ST2
ST1
ST6 ST7 ST8
ST1
B11
2
3
4
5
6
7
8
9
14 13 12 11 10
31
32
33 34
35
36 37 38 39 40 41 42
9x12 MT18HS
3x10
4x4 4x4
7x8 3x4 3x4
4x8
4x12
1.5x4
3x4
3x4
4x10
1.5x4
3x4
3x4
5x8
3x6
3x6
3x4
3x6
3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
3x4
3-2-11
3-2-11
5-10-7
2-7-12
10-2-12
4-4-5
13-9-7
3-6-11
17-8-6
3-10-14
20-6-11
2-10-6
24-0-0
3-5-5
-1-0-0
1-0-0
4-4-10
4-4-10
8-2-5
3-9-11
12-0-0
3-9-11
15-9-11
3-9-11
19-7-6
3-9-11
24-0-0
4-4-10
25-0-0
1-0-0
0-5-156-5-156-9-150-5-156.00 12
Plate Offsets (X,Y)-- [3:0-2-4,0-1-8], [4:0-5-4,0-2-0], [5:0-5-0,0-4-7], [6:0-4-0,0-2-0], [7:0-2-0,0-2-4], [10:0-1-8,0-1-8], [11:0-3-8,0-4-8], [13:0-1-12,0-1-8], [14:0-1-12,0-1-8],
[15:0-1-0,0-0-5], [16:0-3-0,0-1-4], [16:0-2-0,0-0-4], [18:0-3-0,0-1-4], [18:0-1-9,0-1-0], [20:0-1-15,0-1-0]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-SH
0.43
0.23
0.45
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.05
-0.06
0.01
(loc)
8-10
8-10
8
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
MT18HS
Weight: 194 lb FT = 20%
GRIP
185/148
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x6 DF SS
WEBS 2x4 HF Stud *Except*
W2,W4,W6,W8,W11,W13: 2x6 DF SS
OTHERS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-6-5 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)8=845/0-5-8 (min. 0-1-8), 13=2285/0-5-8 (min. 0-3-12), 2=503/0-5-8 (min. 0-1-8)
Max Horz 2=-72(LC 38)
Max Uplift8=-151(LC 11), 13=-216(LC 10), 2=-21(LC 10)
Max Grav 8=919(LC 18), 13=2285(LC 1), 2=551(LC 17)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-31=-609/11, 31-32=-409/0, 3-32=-308/0, 3-33=-256/0, 4-5=-44/767, 5-6=-258/125,
6-34=-976/214, 7-34=-1093/200, 7-35=-1227/229, 8-35=-1427/238
BOT CHORD 2-36=-32/476, 36-37=-32/476, 14-37=-32/476, 14-38=-369/145, 13-38=-369/145,
11-12=-35/570, 11-40=-35/570, 10-40=-35/570, 10-41=-172/1205, 41-42=-172/1205,
8-42=-172/1205
WEBS 3-14=-580/138, 4-14=-19/775, 4-13=-784/88, 5-13=-1580/187, 5-12=-188/1060,
6-12=-875/168, 6-10=-145/869, 7-10=-436/118
NOTES-(15)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
3) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
6) All plates are MT20 plates unless otherwise indicated.
7) All plates are 2x4 MT20 unless otherwise indicated.
8) Gable studs spaced at 1-4-0 oc.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2 except (jt=lb)
8=151, 13=216.
12) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.Continued on page 2
Job
J1122624
Truss
A01
Truss Type
GABLE
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:19 2022 Page 2 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-8E7t388NvXo0dLFb7K6MwDzD?Xa8RsXB5cPfqXyy9fE
NOTES-(15)
13) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 253 lb down and 76 lb up at 3-8-0, and 209 lb down and 59 lb up at
4-0-12, and 253 lb down and 76 lb up at 20-4-0 on top chord, and 44 lb down at 2-0-12, 67 lb down at 4-0-12, 67 lb down at 6-0-12, 67 lb down at 8-0-12, 155 lb down
and 41 lb up at 12-0-0, 155 lb down and 41 lb up at 13-11-4, 155 lb down and 41 lb up at 15-11-4, 155 lb down and 41 lb up at 17-11-4, and 155 lb down and 41 lb up at
19-11-4, and 26 lb up at 21-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
14) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
15) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-66, 5-9=-66, 2-8=-14
Concentrated Loads (lb)
Vert: 14=-67(F) 12=-155(F) 10=-155(F) 31=-210(F) 32=-174(F) 35=-210(F) 36=-29(F) 37=-67(F) 38=-67(F) 39=-155(F) 40=-155(F) 41=-155(F) 42=13(F)
Job
J1122624
Truss
A02
Truss Type
Roof Special
Qty
8
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:22 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-Ypp?i9BGCSAbUozAoTg3XrbeskVee8JenadJRsyy9fB
Scale = 1:47.1
T1 T1
B1
B2 B3W1W2
W3
W4
W5
W6
HW2HW11
2
3
4
5
6
7 8
11 10
9
18
19
20 21
22
23
4x8
4x5 5x8
6x8
5x6
3x8
3x4
1.5x4
1.5x4
1.5x4
6-0-11
6-0-11
10-5-8
4-4-13
17-0-0
6-6-8
24-0-0
7-0-0
-1-0-0
1-0-0
6-0-11
6-0-11
10-5-8
4-4-13
12-0-0
1-6-8
17-0-0
5-0-0
24-0-0
7-0-0
25-0-0
1-0-0
0-5-156-5-156-9-150-5-151-7-106.00 12
3.00 12
Plate Offsets (X,Y)-- [2:0-0-8,0-0-8], [3:0-1-12,0-1-8], [5:0-3-12,0-1-0], [7:0-3-1,0-9-15], [7:0-1-7,0-1-14], [9:0-3-12,0-3-0], [10:0-3-0,0-2-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MSH
0.78
0.69
0.76
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.23
-0.38
0.16
(loc)
9-10
9-10
7
l/defl
>999
>762
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 97 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud
WEDGE
Left: 2x4 HF Stud , Right: 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)2=1026/0-5-8 (min. 0-1-12), 7=1026/0-5-8 (min. 0-1-12)
Max Horz 2=-74(LC 13)
Max Uplift2=-69(LC 12), 7=-69(LC 13)
Max Grav 2=1053(LC 19), 7=1053(LC 20)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-18=-1705/133, 3-18=-1618/155, 3-19=-1291/144, 19-20=-1280/146, 4-20=-1169/163,
4-5=-1232/195, 5-21=-2746/288, 6-21=-2864/268, 6-22=-2686/213, 22-23=-2817/200,
7-23=-2839/191
BOT CHORD 2-11=-97/1447, 10-11=-97/1447, 9-10=-9/1033, 7-9=-119/2534
WEBS 3-10=-474/94, 4-10=-314/61, 5-10=-72/462, 5-9=-145/2028, 6-9=-457/145
NOTES-(10)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) -1-0-0 to 2-0-0, Interior(1) 2-0-0 to 9-0-0, Exterior(2R) 9-0-0 to 15-0-0,
Interior(1) 15-0-0 to 22-0-0, Exterior(2E) 22-0-0 to 25-0-0 zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify
capacity of bearing surface.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 7.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
A03
Truss Type
Common
Qty
12
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:24 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-UCwm7rCWk4QJj67ZwuiXdGh_?YEi68OwEu6QWkyy9f9
Scale = 1:43.5
T1 T1
B2
W4
W5
W3
HW1B1
W2
HW1
W1
1
2
3
4
5
6 7
11 10 9 8
18
19 20
21
22
4x6
3x6 4x5 3x4
1.5x4
3x4 4x5
3x4
1.5x4
6-1-15
6-1-15
8-3-5
2-1-6
10-2-12
1-11-7
15-8-11
5-5-15
24-0-0
8-3-5
-1-0-0
1-0-0
6-1-15
6-1-15
12-0-0
5-10-1
17-10-1
5-10-1
24-0-0
6-1-15
25-0-0
1-0-0
0-5-156-5-156-9-150-5-156.00 12
Plate Offsets (X,Y)-- [2:0-0-8,0-0-8], [3:0-1-12,0-1-8], [6:0-0-12,0-0-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MSH
0.74
0.46
0.34
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.11
-0.20
0.05
(loc)
8-14
8-14
6
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 92 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud
WEDGE
Left: 2x4 HF Stud , Right: 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-9-3 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)6=1026/0-5-8 (min. 0-1-12), 2=1026/0-5-8 (min. 0-1-12)
Max Horz 2=-74(LC 13)
Max Uplift6=-69(LC 13), 2=-69(LC 12)
Max Grav 6=1053(LC 20), 2=1060(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-18=-1738/136, 3-18=-1581/159, 3-19=-1298/157, 4-19=-1164/170, 4-20=-1335/181,
20-21=-1470/169, 5-21=-1480/156, 5-22=-1563/171, 6-22=-1718/148
BOT CHORD 2-11=-101/1484, 10-11=-101/1484, 9-10=-3/941, 8-9=-3/941, 6-8=-82/1469
WEBS 4-8=-60/573, 5-8=-487/135, 4-10=-38/454, 3-10=-584/112
NOTES-(9)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) -1-0-0 to 2-0-0, Interior(1) 2-0-0 to 9-0-0, Exterior(2R) 9-0-0 to 15-0-0,
Interior(1) 15-0-0 to 22-0-0, Exterior(2E) 22-0-0 to 25-0-0 zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 2.
8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
9) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
A04
Truss Type
Common
Qty
4
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:26 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-Ra2WYXEmFhg1yQHx1Jk?ihmMkLsbavwDiCbXadyy9f7
Scale = 1:46.5
T1 T1
B1 W5 W6 W7
W8
W9 W10
W4
W2
W3
W1
B21
2
3
4
5
6
7 8
13 12 11 10 9
14
15 16
17
24
25
26 27
28
29
30
4x5
4x4
3x6 4x5
5x6 4x4
4x8
3x4
1.5x4
1.5x4
3x4
3x4
1.5x4 1.5x4
4x4
4-9-5
2-6-123-3-3
3-3-3
6-9-7
3-6-4
9-1-0
2-3-9
10-2-12
1-1-12
12-0-0
1-9-4
17-2-11
5-2-11
24-0-0
6-9-5
-1-0-0
1-0-0
3-3-3
3-3-3
10-2-12
6-11-9
12-0-0
1-9-4
17-2-11
5-2-11
24-0-0
6-9-5
25-0-0
1-0-0
0-5-156-5-156-9-150-5-156.00 12
Plate Offsets (X,Y)-- [2:0-0-8,0-1-0], [4:0-1-12,0-1-8], [5:0-2-12,Edge], [6:0-1-12,0-1-8], [7:0-0-8,0-0-8], [11:0-2-8,0-2-0], [12:0-2-0,0-1-8], [15:0-1-12,0-1-12]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MSH
0.59
0.69
0.92
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.16
-0.25
0.02
(loc)
13-20
13-20
7
l/defl
>757
>487
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 105 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud *Except*
W4,W3: 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-2-7 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
4-2-3 oc bracing: 11-12.
JOINTS 1 Brace at Jt(s): 17
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)2=533/0-5-8 (min. 0-1-8), 12=1067/0-5-8 (min. 0-1-14), 7=652/0-5-8 (min. 0-1-8)
Max Horz 2=-74(LC 13)
Max Uplift2=-25(LC 12), 7=-80(LC 13)
Max Grav 2=533(LC 1), 12=1127(LC 19), 7=756(LC 20)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-24=-693/57, 3-24=-626/68, 3-25=-446/56, 4-25=-363/58, 4-26=-380/106,
5-26=-317/125, 5-27=-360/107, 6-27=-498/87, 6-28=-877/117, 28-29=-902/116,
7-29=-1075/97
BOT CHORD 2-13=-56/598, 13-30=-44/719, 12-30=-44/719, 11-12=-1287/146, 10-11=-36/883,
9-10=-36/883, 7-9=-36/883
WEBS 12-14=-2038/187, 12-15=-309/25, 11-15=-90/1238, 16-17=-264/35, 5-17=-261/35,
6-11=-686/111, 14-15=-110/1538, 15-16=-46/326, 4-14=-286/96, 3-13=-272/80
NOTES-(11)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2) C-C wind load user defined.
3) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 7.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) Load case(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 has/have been modified.
Building designer must review loads to verify that they are correct for the intended use of this truss.
11) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Continued on page 2
Job
J1122624
Truss
A04
Truss Type
Common
Qty
4
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:27 2022 Page 2 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-vmcultFO0?ouaas8b0GEEvJXUlCqJLANxsL473yy9f6
LOAD CASE(S)
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-66, 5-8=-66, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
2) Dead + 0.75 Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-53, 5-8=-53, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
3) Dead + 0.75 Snow (Unbal. Left): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-25=-53, 5-25=-82, 5-8=-27, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
4) Dead + 0.75 Snow (Unbal. Right): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-27, 5-28=-82, 8-28=-53, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
5) Dead + Uninhabitable Attic Without Storage: Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (plf)
Vert: 1-5=-16, 5-8=-16, 18-21=-34
Concentrated Loads (lb)
Vert: 12=-100 30=-100
6) Dead + 0.6 C-C Wind (Pos. Internal) Case 1: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=33, 2-24=15, 24-26=13, 5-26=19, 5-27=19, 27-29=13, 7-29=15, 7-8=33, 18-21=-8
Horz: 1-2=-42, 2-24=-25, 24-26=-23, 5-26=-29, 5-27=29, 27-29=23, 7-29=25, 7-8=42
Concentrated Loads (lb)
Vert: 12=-100 30=-100
7) Dead + 0.6 C-C Wind (Neg. Internal) Case 1: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-10, 2-5=-26, 5-7=-26, 7-8=-10, 18-21=-14
Horz: 1-2=-6, 2-5=10, 5-7=-10, 7-8=6
Concentrated Loads (lb)
Vert: 12=-100 30=-100
8) Dead + 0.6 MWFRS Wind (Pos. Internal) Left: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=7, 2-5=-2, 5-7=6, 7-8=3, 18-21=-8
Horz: 1-2=-17, 2-5=-8, 5-7=16, 7-8=12
Concentrated Loads (lb)
Vert: 12=-100 30=-100
9) Dead + 0.6 MWFRS Wind (Pos. Internal) Right: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=3, 2-5=6, 5-7=-2, 7-8=7, 18-21=-8
Horz: 1-2=-12, 2-5=-16, 5-7=8, 7-8=17
Concentrated Loads (lb)
Vert: 12=-100 30=-100
10) Dead + 0.6 MWFRS Wind (Neg. Internal) Left: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-12, 2-5=-16, 5-7=-7, 7-8=-4, 18-21=-14
Horz: 1-2=-4, 2-5=-0, 5-7=9, 7-8=12
Concentrated Loads (lb)
Vert: 12=-100 30=-100
11) Dead + 0.6 MWFRS Wind (Neg. Internal) Right: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-4, 2-5=-7, 5-7=-16, 7-8=-12, 18-21=-14
Horz: 1-2=-12, 2-5=-9, 5-7=0, 7-8=4
Concentrated Loads (lb)
Vert: 12=-100 30=-100
12) Dead + 0.6 MWFRS Wind (Pos. Internal) 1st Parallel: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=13, 2-5=17, 5-7=5, 7-8=2, 18-21=-8
Horz: 1-2=-22, 2-5=-26, 5-7=15, 7-8=11
Concentrated Loads (lb)
Vert: 12=-100 30=-100
13) Dead + 0.6 MWFRS Wind (Pos. Internal) 2nd Parallel: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=2, 2-5=5, 5-7=17, 7-8=13, 18-21=-8
Horz: 1-2=-11, 2-5=-15, 5-7=26, 7-8=22
Concentrated Loads (lb)
Vert: 12=-100 30=-100
14) Dead + 0.6 MWFRS Wind (Pos. Internal) 3rd Parallel: Lumber Increase=1.60, Plate Increase=1.60
Continued on page 3
Job
J1122624
Truss
A04
Truss Type
Common
Qty
4
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:27 2022 Page 3 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-vmcultFO0?ouaas8b0GEEvJXUlCqJLANxsL473yy9f6
LOAD CASE(S)
Uniform Loads (plf)
Vert: 1-2=5, 2-5=9, 5-7=2, 7-8=-2, 18-21=-8
Horz: 1-2=-14, 2-5=-18, 5-7=12, 7-8=8
Concentrated Loads (lb)
Vert: 12=-100 30=-100
15) Dead + 0.6 MWFRS Wind (Pos. Internal) 4th Parallel: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-2, 2-5=2, 5-7=9, 7-8=5, 18-21=-8
Horz: 1-2=-8, 2-5=-12, 5-7=18, 7-8=14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
16) Dead + 0.6 MWFRS Wind (Neg. Internal) 1st Parallel: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=6, 2-5=3, 5-7=-9, 7-8=-5, 18-21=-14
Horz: 1-2=-22, 2-5=-19, 5-7=7, 7-8=11
Concentrated Loads (lb)
Vert: 12=-100 30=-100
17) Dead + 0.6 MWFRS Wind (Neg. Internal) 2nd Parallel: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-5, 2-5=-9, 5-7=3, 7-8=6, 18-21=-14
Horz: 1-2=-11, 2-5=-7, 5-7=19, 7-8=22
Concentrated Loads (lb)
Vert: 12=-100 30=-100
18) Dead + Snow on Overhangs: Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-66, 2-5=-16, 5-7=-16, 7-8=-66, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
19) Dead + Snow (Unbal. Left): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-25=-66, 5-25=-104, 5-8=-31, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
20) Dead + Snow (Unbal. Right): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-31, 5-28=-104, 8-28=-66, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
21) Dead: Lumber Increase=0.90, Plate Increase=0.90 Plt. metal=0.90
Uniform Loads (plf)
Vert: 1-5=-16, 5-8=-16, 18-21=-14
Concentrated Loads (lb)
Vert: 12=-100 30=-100
22) Dead + 0.75 Snow (bal.) + 0.75(0.6 MWFRS Wind (Neg. Int) Left): Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-50, 2-5=-53, 5-7=-47, 7-8=-44, 18-21=-14
Horz: 1-2=-3, 2-5=-0, 5-7=6, 7-8=9
Concentrated Loads (lb)
Vert: 12=-100 30=-100
23) Dead + 0.75 Snow (bal.) + 0.75(0.6 MWFRS Wind (Neg. Int) Right): Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-44, 2-5=-47, 5-7=-53, 7-8=-50, 18-21=-14
Horz: 1-2=-9, 2-5=-6, 5-7=0, 7-8=3
Concentrated Loads (lb)
Vert: 12=-100 30=-100
24) Dead + 0.75 Snow (bal.) + 0.75(0.6 MWFRS Wind (Neg. Int) 1st Parallel): Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-37, 2-5=-39, 5-7=-48, 7-8=-45, 18-21=-14
Horz: 1-2=-17, 2-5=-14, 5-7=6, 7-8=8
Concentrated Loads (lb)
Vert: 12=-100 30=-100
25) Dead + 0.75 Snow (bal.) + 0.75(0.6 MWFRS Wind (Neg. Int) 2nd Parallel): Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=-45, 2-5=-48, 5-7=-39, 7-8=-37, 18-21=-14
Horz: 1-2=-8, 2-5=-6, 5-7=14, 7-8=17
Concentrated Loads (lb)
Vert: 12=-100 30=-100
26) Dead + 0.6 C-C Wind Min. Down: Lumber Increase=1.60, Plate Increase=1.60
Uniform Loads (plf)
Vert: 1-2=7, 2-5=-26, 5-7=-26, 7-8=7, 18-21=-8
Horz: 1-2=-16, 2-5=16, 5-7=-16, 7-8=16
Concentrated Loads (lb)
Vert: 12=-100 30=-100
27) Dead + 0.6 C-C Wind Min. Upward: Lumber Increase=1.60, Plate Increase=1.60
Continued on page 4
Job
J1122624
Truss
A04
Truss Type
Common
Qty
4
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:27 2022 Page 4 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-vmcultFO0?ouaas8b0GEEvJXUlCqJLANxsL473yy9f6
LOAD CASE(S)
Uniform Loads (plf)
Vert: 1-5=7, 5-8=7, 18-21=-8
Horz: 1-5=-16, 5-8=16
Concentrated Loads (lb)
Vert: 12=-100 30=-100
Job
J1122624
Truss
A05
Truss Type
Common
Qty
2
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:29 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-r9kfAYGfYc2bpt0WjRIiKKOtcZy_nJ4gOAqBByyy9f4
Scale = 1:43.5
T1 T1
B2
W4
W5
W3
B1
W2W1
1
2
3
4
5
6 7
11 10
9 8
18
19 20
21
22
4x6
3x6 4x4 3x4
1.5x4
3x4 3x4
3x4
1.5x4
6-1-15
6-1-15
8-3-5
2-1-6
10-2-12
1-11-7
15-8-11
5-5-15
24-0-0
8-3-5
-1-0-0
1-0-0
6-1-15
6-1-15
12-0-0
5-10-1
17-10-1
5-10-1
24-0-0
6-1-15
25-0-0
1-0-0
0-5-156-5-156-9-150-5-156.00 12
Plate Offsets (X,Y)-- [2:0-0-8,0-0-4], [3:0-1-12,0-1-8], [6:0-0-8,0-1-0]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MSH
0.62
0.39
0.70
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.11
-0.19
0.01
(loc)
8-14
8-14
2
l/defl
>999
>865
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 91 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-11-3 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)6=570/0-5-8 (min. 0-1-8), 10=1070/0-5-8 (min. 0-1-12), 2=412/0-5-8 (min. 0-1-8)
Max Horz 2=-74(LC 13)
Max Uplift6=-62(LC 13), 10=-52(LC 12), 2=-39(LC 12)
Max Grav 6=625(LC 20), 10=1070(LC 1), 2=449(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-18=-471/22, 3-18=-314/40, 4-19=0/288, 4-20=-430/102, 20-21=-568/89, 5-21=-578/77,
5-22=-664/95, 6-22=-819/72
BOT CHORD 2-11=-46/360, 10-11=-46/360, 6-8=-22/673
WEBS 4-8=-60/617, 5-8=-511/135, 4-10=-810/81, 3-10=-656/115
NOTES-(9)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) -1-0-0 to 2-0-0, Interior(1) 2-0-0 to 9-0-0, Exterior(2R) 9-0-0 to 15-0-0,
Interior(1) 15-0-0 to 22-0-0, Exterior(2E) 22-0-0 to 25-0-0 zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 10, 2.
8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
9) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
A06
Truss Type
GABLE
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:31 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-nYrPbEIv4DJJ3B9vqsKAPlTE2MeXFCtyrTJIGqyy9f2
Scale = 1:56.3
T1 T1
B1
W4
W6
W2
T4
W1 W3
W5
T3
T2
ST9
ST8
ST7ST5
ST6
ST4ST3ST2
ST1
ST10
ST11
ST12
B112
3
4
5
6
7 8
16 15 14 13 12 11
10 9
34
35 36
37
38
10x10
5x16
4x5
4x5
4x4
4x4 3x6 3x4 3x4
2x4
4x6 4x10
4x4
2x4
2x4 2x4
2x4
7x8
7x8
2x4
2x4
4x4
10-2-12
10-2-12
10-5-8
0-2-12
15-8-11
5-3-3
24-0-0
8-3-5
-1-0-0
1-0-0
6-1-8
6-1-8
12-0-0
5-10-8
17-10-8
5-10-8
24-0-0
6-1-8
25-0-0
1-0-0
0-5-156-5-156-9-150-5-156.00 12
Plate Offsets (X,Y)-- [2:0-0-1,0-1-12], [3:0-2-8,0-1-12], [4:0-7-8,0-2-8], [4:0-8-0,0-6-5], [5:0-2-0,0-1-8], [7:0-0-8,0-1-0], [17:0-1-9,0-1-0], [27:3-8-10,0-1-8], [29:3-0-9,0-1-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-SH
0.56
0.39
0.74
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.11
-0.20
0.01
(loc)
7-9
7-9
7
l/defl
>999
>819
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 154 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud *Except*
W3,W5: 2x6 DF SS
OTHERS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except:
10-0-0 oc bracing: 7-9.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.All bearings 10-5-8 except (jt=length) 7=0-5-8.
(lb) - Max Horz 2=-72(LC 13)
Max Uplift All uplift 100 lb or less at joint(s) 2, 11, 15, 16, 7
Max Grav All reactions 250 lb or less at joint(s) 12, 13, 14, 15, 16 except 2=329(LC 19), 11=1117(LC 1),
11=1117(LC 1), 7=608(LC 20)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-34=-312/66, 3-35=-17/257, 4-35=-2/397, 4-36=-356/97, 5-36=-367/85, 5-37=-488/76,
6-37=-498/73, 6-38=-664/89, 7-38=-742/65
BOT CHORD 7-9=-17/581
WEBS 4-9=-51/571, 6-9=-453/125, 4-11=-862/83, 3-11=-582/158
NOTES-(12)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) -1-0-0 to 2-0-0, Interior(1) 2-0-0 to 9-0-9, Exterior(2R) 9-0-9 to 15-0-9,
Interior(1) 15-0-9 to 22-0-0, Exterior(2E) 22-0-0 to 25-0-0 zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
3) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
6) All plates are 1.5x4 MT20 unless otherwise indicated.
7) Gable studs spaced at 1-4-0 oc.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 11, 15, 16, 7.
11) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
12) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
B01
Truss Type
GABLE
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:34 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-C7XXDGKnN8huwfuUV_ut1N5tzal2SkbPYRXys9yy9f?
Scale = 1:26.1
T1 T1
B1
ST5
ST4
ST3
ST2
ST1
ST4
ST3
ST2
ST1
1
2
3
4
5
6
7
8
9
10
11
12
13
22 21 20 19 18 17 16 15 14
23 24
4x4
3x4 3x4
14-0-0
14-0-0
-1-0-0
1-0-0
7-0-0
7-0-0
14-0-0
7-0-0
15-0-0
1-0-0
0-5-153-11-154-3-150-5-156.00 12
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.06
0.02
0.04
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
0.00
0.00
(loc)
13
12
12
l/defl
n/r
n/r
n/a
L/d
120
90
n/a
PLATES
MT20
Weight: 58 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
OTHERS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.All bearings 14-0-0.
(lb) - Max Horz 2=45(LC 12)
Max Uplift All uplift 100 lb or less at joint(s) 2, 12, 19, 20, 21, 22, 17, 16, 15, 14
Max Grav All reactions 250 lb or less at joint(s) 2, 12, 18, 19, 20, 21, 22, 17, 16, 15, 14
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(13)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3E) -1-0-0 to 2-0-0, Exterior(2N) 2-0-0 to 4-0-0, Corner(3R) 4-0-0 to 10-0-0,
Exterior(2N) 10-0-0 to 12-0-0, Corner(3E) 12-0-0 to 15-0-0 zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
3) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
6) All plates are 1.5x4 MT20 unless otherwise indicated.
7) Gable requires continuous bottom chord bearing.
8) Gable studs spaced at 1-4-0 oc.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 12, 19, 20, 21,
22, 17, 16, 15, 14.
12) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
13) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
J21
Truss Type
Jack-Open
Qty
2
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:37 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-ciDgrIMgg33Tn6d3B6Rae0jNrnnjf5xrEPmcSUyy9ey
Scale = 1:7.6
T1
B11
2
3
4
3x4
2-0-0
2-0-0
-1-0-0
1-0-0
0-11-2
0-11-2
0-5-150-11-81-3-70-3-86.00 12
Plate Offsets (X,Y)-- [2:0-0-8,0-0-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.09
0.02
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.00
-0.00
-0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 5 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 0-11-2 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)3=7/Mechanical, 2=139/0-3-8 (min. 0-1-8), 4=7/Mechanical
Max Horz 2=23(LC 12)
Max Uplift3=-13(LC 18), 2=-17(LC 12)
Max Grav 3=17(LC 5), 2=185(LC 19), 4=24(LC 5)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(10)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
J22
Truss Type
Jack-Open
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:39 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-Y4KQGzOwBhJB0QnRIXT2kRoiDbS37?R8hjFjXNyy9ew
Scale = 1:11.0
T1
B11
2
3
4
3x4
2-0-0
2-0-0
-1-0-0
1-0-0
2-0-0
2-0-0
2-3-2
0-3-2
0-5-151-7-81-11-71-7-86.00 12
Plate Offsets (X,Y)-- [2:0-1-0,0-1-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.09
0.03
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
-0.00
0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 7 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)3=55/Mechanical, 2=167/0-3-8 (min. 0-1-8), 4=17/Mechanical
Max Horz 2=40(LC 12)
Max Uplift3=-20(LC 12), 2=-16(LC 12)
Max Grav 3=79(LC 19), 2=238(LC 19), 4=30(LC 5)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(10)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
J22A
Truss Type
Jack-Open Supported Gable
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:41 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-UTSBhfPAjIZuFjwqQyWWpsu2lO8WbvxR91kqbFyy9eu
Scale = 1:11.0
T1
W1
B11
2
3
4
5
3x4
3x4 3x4
-1-0-0
1-0-0
2-0-0
2-0-0
2-3-2
0-3-2
0-5-151-7-81-11-71-5-156.00 12
Plate Offsets (X,Y)-- [2:0-1-0,0-1-8], [3:0-2-0,0-1-4], [5:0-2-0,0-0-0]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.09
0.03
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
0.00
0.00
0.00
(loc)
3
3
5
l/defl
n/r
n/r
n/a
L/d
120
90
n/a
PLATES
MT20
Weight: 8 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)5=86/2-0-0 (min. 0-1-8), 2=155/2-0-0 (min. 0-1-8)
Max Horz 2=39(LC 9)
Max Uplift5=-17(LC 12), 2=-17(LC 12)
Max Grav 5=120(LC 19), 2=222(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(12)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
3) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
6) Gable requires continuous bottom chord bearing.
7) Gable studs spaced at 2-0-0 oc.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 2.
11) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
12) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
J64
Truss Type
Jack-Open
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:43 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-Rrax6LRRFvpcV14CXNY_uHzM3CoP3pQjcLDxg8yy9es
Scale = 1:13.6
T1
B11
2
3
8 9 4
3x4
6-0-0
6-0-0
-1-0-0
1-0-0
3-4-10
3-4-10
0-3-151-5-81-9-40-3-84.00 12
Plate Offsets (X,Y)-- [2:0-1-2,0-0-0]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.23
0.19
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.04
-0.07
0.00
(loc)
4-7
4-7
2
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 12 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-4-10 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)3=180/Mechanical, 2=225/0-3-8 (min. 0-1-8), 4=40/Mechanical
Max Horz 2=41(LC 8)
Max Uplift3=-34(LC 12), 2=-33(LC 8)
Max Grav 3=215(LC 19), 2=309(LC 19), 4=78(LC 5)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(13)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2.
10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 75 lb down and 24 lb up at
4-0-12 on top chord, and 2 lb down and 3 lb up at 2-0-12, and 7 lb down and 7 lb up at 4-0-12 on bottom chord. The
design/selection of such connection device(s) is the responsibility of others.
12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
13) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-3=-66, 4-5=-14
Continued on page 2
Job
J1122624
Truss
J64
Truss Type
Jack-Open
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:44 2022 Page 2 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-v28JJhS30DxT7BfP543DQUWXpc7eoGgtr?yUCayy9er
LOAD CASE(S)Standard
Concentrated Loads (lb)
Vert: 3=-71(B) 8=1(B) 9=-6(B)
Job
J1122624
Truss
J64A
Truss Type
Jack-Open
Qty
1
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:46 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-rQF4kMTJYqCBMVpnCV5hWvbuNPpyG9AAIJRbHTyy9ep
Scale = 1:13.6
T1
B11
2
3
9
5
43x4
4-5-8
4-5-8
6-0-0
1-6-8
-1-0-0
1-0-0
3-4-10
3-4-10
0-3-151-5-81-9-40-3-84.00 12
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.16
0.14
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.01
-0.02
0.00
(loc)
5-8
5-8
2
l/defl
>999
>999
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 12 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-4-10 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.All bearings Mechanical except (jt=length) 2=0-3-8, 4=Mechanical, 5=0-5-8.
(lb) - Max Horz 2=41(LC 8)
Max Uplift All uplift 100 lb or less at joint(s) 3, 2, 4
Max Grav All reactions 250 lb or less at joint(s) 3, 4, 5 except 2=291(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(13)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2 lb down and 3 lb up at
2-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
13) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-3=-66, 4-6=-14
Concentrated Loads (lb)
Vert: 9=1(F)
Job
J1122624
Truss
J66
Truss Type
Jack-Open
Qty
3
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:49 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-F?xCMOWBrlamDyXMuefO7YDHgdlFTWvc_HgFtoyy9em
Scale = 1:14.3
T1
B11
2
3
44x4
6-0-0
6-0-0
-1-0-0
1-0-0
6-0-0
6-0-0
0-3-152-3-152-7-112-3-154.00 12
Plate Offsets (X,Y)-- [2:0-3-2,Edge]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.67
0.55
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.12
-0.18
0.00
(loc)
4-7
4-7
2
l/defl
>584
>398
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 16 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)3=166/Mechanical, 2=309/0-3-8 (min. 0-1-8), 4=66/Mechanical
Max Horz 2=64(LC 8)
Max Uplift3=-43(LC 12), 2=-43(LC 8)
Max Grav 3=240(LC 19), 2=435(LC 19), 4=92(LC 5)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(11)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2.
10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
11) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
J67
Truss Type
Jack-Open
Qty
6
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:51 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-CO3zn4XSNNqUSGhl?3hsDzIfTQPWxQEvSb9Mygyy9ek
Scale = 1:15.0
T1
W2
B1
W1
1
2
3
5 4
3x4
3x8
3x4
1.5x4
4-5-8
4-5-8
6-0-0
1-6-8
-1-0-0
1-0-0
6-0-0
6-0-0
0-3-152-3-152-7-114.00 12
Plate Offsets (X,Y)-- [2:0-3-3,0-1-8]
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-MP
0.53
0.62
0.01
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.05
-0.06
0.00
(loc)
5-8
5-8
2
l/defl
>999
>778
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 21 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF No.2
BOT CHORD 2x4 HF No.2
WEBS 2x4 HF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)4=115/Mechanical, 2=254/0-3-8 (min. 0-1-8), 5=165/0-5-8 (min. 0-1-8)
Max Horz 2=61(LC 11)
Max Uplift4=-29(LC 8), 2=-49(LC 8)
Max Grav 4=167(LC 19), 2=361(LC 19), 5=220(LC 19)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(10)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
Job
J1122624
Truss
R01
Truss Type
Corner Rafter
Qty
2
Ply
1
Soundbuilt NW, LLC
Job Reference (optional)
8.530 s Jun 10 2022 MiTek Industries, Inc. Thu Jul 14 09:41:53 2022 Page 1 Truss Co, Sumner, WA, Kelly Finelli ID:TVoit5oqP_Bf1pIlNVaWDMyyAo_-8nBjCmZiu_4BiZr77TjKIONwsEEjPKvCvveS0Zyy9ei
Scale = 1:16.3
T1
T2
1
2
3
5
6
4
4x4
4x4
4x4
3-5-0
3-5-0
6-5-11
3-0-11
-1-9-10
1-9-10
3-5-0
3-5-0
6-5-11
3-0-11
0-5-152-3-82-7-33.33 12
LOADING (psf)
TCLL
(Roof Snow=25.0)
TCDL
BCLL
BCDL
25.0
8.0
0.0 *
7.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IRC2018/TPI2014
CSI.
TC
BC
WB
Matrix-P
0.85
0.00
0.00
DEFL.
Vert(LL)
Vert(CT)
Horz(CT)
in
-0.18
-0.22
-0.00
(loc)
2-4
2-4
4
l/defl
>423
>353
n/a
L/d
360
240
n/a
PLATES
MT20
Weight: 16 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 DF No.1&Btr *Except*
T2: 2x4 HF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-5-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS.(lb/size)4=204/Mechanical, 2=347/0-4-11 (min. 0-1-8)
Max Horz 2=64(LC 6)
Max Uplift4=-57(LC 10), 2=-97(LC 6)
Max Grav 4=290(LC 16), 2=465(LC 16)
FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-(12)
1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=4.8psf; BCDL=4.2psf; h=25ft; Cat. II; Exp B; Enclosed;
MWFRS (envelope) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-16; Pf=25.0 psf (Lum DOL=1.15 Plate DOL=1.15); Is=1.0; Rough Cat B; Partially Exp.; Ce=1.0; Cs=1.00; Ct=1.10
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) * This truss has been designed for a live load of 23.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide
will fit between the bottom chord and any other members.
6) Refer to girder(s) for truss to truss connections.
7) Bearing at joint(s) 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify
capacity of bearing surface.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2.
9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and
referenced standard ANSI/TPI 1.
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 39 lb down and 7 lb up at
1-8-15, and 72 lb down and 35 lb up at 3-6-6 on top chord. The design/selection of such connection device(s) is the responsibility
of others.
11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
12) All dimensions given in feet-inches-sixteenths (FFIISS) format.
LOAD CASE(S)Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-4=-66
Concentrated Loads (lb)
Vert: 3=-8(B)