Loading...
Blue Fern Railway Road - Traffic Impact Analysis 2-22-2023 Blue Fern Railway Road Yelm WA Traffic Impact Analysis February 22, 2023 Prepared for: Blue Fern Development 18300 Redmond Way, Suite 120 Redmond, WA 98052 Prepared by: TENW Transportation Engineering NorthWest 11400 SE 8th Street, Suite 200 Bellevue, WA 98004 Office: (425) 889-6747 Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page i Table of Contents FINDINGS/CONCLUSIONS .....................................................................................................1 INTRODUCTION ....................................................................................................................2 Project Description...............................................................................................................2 Project Approach ................................................................................................................2 Primary Data and Information Sources.....................................................................................3 EXISTING CONDITIONS .........................................................................................................5 Roadway Network..............................................................................................................6 Peak-Hour Traffic Volumes.....................................................................................................6 Intersection Levels of Service..................................................................................................8 FUTURE CONDITIONS AND PROJECT IMPACT ANALYSIS ........................................................10 Planned Transportation Improvements....................................................................................10 Project Trip Generation.......................................................................................................10 Project Trip Distribution and Assignment.................................................................................11 Future Traffic Volumes.........................................................................................................11 Future Level of Service........................................................................................................15 Site Access Assessment ......................................................................................................15 MITIGATION .......................................................................................................................16 Off-Site Improvements.........................................................................................................16 Transportation Impact Fees..................................................................................................16 Appendices Appendix A – Existing Traffic Count Sheets Appendix B – Level of Service Calculations (LOS) at Study Intersections Appendix C – Trip Generation Calculations Appendix D – TRPC Model Distribution Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page ii List of Figures and Tables Figure 1 Project Site Vicinity......................................................................................................4 Figure 2 Preliminary Site Plan....................................................................................................5 Figure 3 2023 Existing Weekday PM Peak Hour Traffic Volumes ....................................................7 Figure 4 Weekday PM Peak Hour Trip Assignment .....................................................................12 Figure 5 2026 Baseline PM Peak Hour Traffic Volumes................................................................13 Figure 6 2026 With Project PM Peak Hour Traffic Volumes ..........................................................14 Table 1 Existing Roadway Network Summary – Project Site Vicinity.................................................6 Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 .............................................8 Table 3 2023 Existing Weekday PM Peak Hour LOS Summary .....................................................9 Table 4 Collision Data Summary, January 1, 2017 to December 31, 2021.....................................9 Table 5 Blue Fern Railway Road – Trip Generation Summary .......................................................11 Table 6 Year 2026 Weekday PM Peak Hour Level of Service Summary........................................15 Table 7 Site Access Peak Hour LOS & Queue Summary..............................................................16 Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 1 FINDINGS/CONCLUSIONS This traffic impact analysis has been prepared for the proposed Blue Fern Railway Road residential project located at 16314 and 16330 Railway Road SE in Yelm, WA. Project Proposal. The project would include the development of up to 90 single-family detached homes. The existing site is currently occupied by two (2) single-family detached homes, which will be removed as part of the proposed project. Vehicular access to and from the site is proposed via two (2) full access driveways on Railway Road SE. For this analysis, a 2026 horizon year was used. Trip Generation. The proposed Blue Fern Railway Road project is estimated to generate 888 net new weekday daily trips with 66 trips occurring during the weekday AM peak hour (17 in, 49 out) and 87 trips during the weekday PM peak hour (55 in, 32 out). Future Year LOS. Weekday PM peak hour LOS analysis was conducted at three (3) off-site study intersections. All study intersections are anticipated to operate at LOS A during the weekday PM peak hour in 2026 without or with the proposed Blue Fern Railway Road project. Site Access Analysis. The controlled movements at the two site access driveways on Railway Road SE are expected to operate at LOS A in 2026 with 95th percentile queues anticipated to be less than 25 feet during the PM peak hour. Mitigation Off-Site Improvements Based on the results of the analysis shown in this report, no project-specific off-site transportation mitigation is proposed for concurrency or SEPA purposes. Transportation Impact Fees Transportation impacts fees in the City of Yelm are assessed upon new development based on a cost per PM peak hour trip. The current transportation impact fee is $1,497 per PM peak hour trip. The final impact fee calculation will be based on the impact fee rate and project size in effect at the time of building permit issuance. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 2 INTRODUCTION This Traffic Impact Analysis (TIA) has been prepared for the proposed Blue Fern Railway Road project located at 16314 and 16330 Railway Road SE in Yelm, WA as shown in Figure 1. Project Description The project would include the development of up to 90 single-family detached homes. The existing site is currently occupied by two (2) single-family detached homes, which will be removed as part of the proposed project. Vehicular access to and from the site is proposed via two (2) full access driveways on Railway Road SE. For this analysis, a 2026 horizon year was used. A preliminary site plan is included in Figure 2. Project Approach To analyze the traffic impacts from the proposed Blue Fern Railway Road project, the following tasks were undertaken: Assessed existing conditions through field reconnaissance and reviewed existing planning documents; Documented existing traffic volumes and intersection LOS during the weekday PM peak hour. Documented future planned roadway improvements in the project vicinity. Developed weekday daily, AM, and PM peak hour trip generation estimates. Assigned weekday PM peak hour project-generated trips. Analyzed weekday PM peak hour LOS for future conditions without and with the project at the following study intersections: 1. Rhoton Road NW / Railway Road SE 2. Middle Road SE / Railway Road SE 3. Canal Road SE / Railway Road SE Assessed operations at the two (2) proposed site access driveways including LOS and queuing. Documented proposed traffic mitigation including off-site improvements and payment of transportation impact fees. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 3 Primary Data and Information Sources Institute of Transportation Engineers (ITE), Trip Generation Manual, 11th Edition, 2021. Institute of Transportation Engineers (ITE), Trip Generation Handbook, 3rd Edition, 2017. City of Yelm Engineering Specifications and Standard Details Chapter 2 Transportation, December 2, 2021. 2023 PM peak hour traffic counts, All Traffic Data. SR 510 Yelm Loop - New Alignment Phase 2 Supplemental Environmental Assessment, WSDOT, May 2021. Highway Capacity Manual (HCM 6th Edition), 2016. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 4 Figure 1 Project Site Vicinity Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 5 Figure 2 Preliminary Site Plan EE Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 6 EXISTING CONDITIONS Roadway Network Table 1 describes the existing characteristics of the streets that would be used as primary routes to and from the site. Roadway characteristics are described in terms of orientation, arterial classification, number of lanes, posted speed limits, parking, pedestrian facilities, and bicycle facilities. The relationship of these roadways to the project site is shown in Figure 1. Table 1 Existing Roadway Network Summary – Project Site Vicinity Roadway General Orientation Functional Classification Speed Limit Number of Travel Lanes Street Parking Sidewalks Railway Road SE East-West Local Access Residential 25 2 No Intermittent Rhoton Rd NW North-South Commercial Collector 25 2 No No Wilkensen Road North-South Neighborhood Collector 25 2 No Yes Peak-Hour Traffic Volumes Existing weekday PM peak hour traffic volumes at the study intersections were based on counts collected by All Traffic Data in January 2023. The PM peak hour traffic volumes represent the highest hour of traffic between 4:00 and 6:00 p.m. Figure 3 illustrates the existing 2023 PM peak hour traffic volumes at the study intersections. The 2023 traffic count sheets are included in Appendix A. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 7 Figure 3 2023 Existing Weekday PM Peak Hour Traffic Volumes Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 8 Intersection Levels of Service Weekday PM peak hour level of service (LOS) analysis was conducted at the following three (3) off- site study intersections: 1. Rhoton Road NW / Railway Road SE 2. Middle Road SE / Railway Road SE 3. Canal Road SE / Railway Road SE LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported for signalized intersections represents the average control delay (sec/veh) and can be reported for the overall intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to lane group LOS only). The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major- street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 2 outlines the HCM 6th Edition LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 SIGNALIZED INTERSECTIONS UNSIGNALIZED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio Control Delay (sec/veh) 1.0 > 1.0 Control Delay (sec/veh) 1.0 > 1.0  10 A F  10 A F > 10 to  20 B F > 10 to  15 B F > 20 to  35 C F > 15 to  25 C F > 35 to  55 D F > 25 to  35 D F > 55 to  80 E F > 35 to  50 E F > 80 F F > 50 F F 1 Source: Highway Capacity Manual (6th Edition), Transportation Research Board, 2016. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. Intersection LOS was calculated using the methodology and procedures outlined in the Highway Capacity Manual (HCM 6th Edition), Transportation Research Board (TRB), using the Synchro 11 software program. The 2023 existing PM peak hour LOS analysis results for the study intersections are summarized in Table 3. The 2023 Existing LOS worksheets are included in Appendix B. It should be noted that the LOS reported at the stop-controlled study intersections was based on the average delay of all legs per Yelm Municipal Code section 18.16.030. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 9 Table 3 2023 Existing Weekday PM Peak Hour LOS Summary PM Peak Hour Study Intersection LOS1 Delay (sec)2 Two-Way Stop Controlled Intersections 1. Rhoton Road NW / Railway Road SE A 2.5 2. Middle Road SE / Railway Road SE A 4.0 All-Way Stop Controlled Intersection 3. Canal Road SE / Railway Road SE A 8.0 1. LOS = Level of Service 2. Delay refers to average control delay of all legs at the intersection per Yelm Municipal Code section 18.16.030, expressed in seconds per vehicle. As shown in Table 3, the study intersections currently operate at LOS A during the weekday PM peak hour. Collision History Historic collisions at the study intersections and along the project frontage were analyzed for the five- year period from 2017 to 2021. Collision data was provided by WSDOT. Summaries of the total and yearly average collisions during this period are provided in Table 4. Table 4 Collision Data Summary, January 1, 2017 to December 31, 2021 Number of Collisions Location 2017 2018 2019 2020 2021 5-Year Total Average Annual Intersection 1. NW Rhoton Rd / Railway Rd SE 0 1 1 0 1 3 0.60 2. Middle Rd SE / Railway Rd SE 0 1 1 0 1 3 0.60 3. Canal Rd SE / Railway Rd SE 0 0 0 0 0 0 0.00 Segment Railway Rd SE between Middle Rd SE to Canal Rd SE 1 0 0 0 0 1 0.20 Source: WSDOT Collision Records. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 10 FUTURE CONDITIONS AND PROJECT IMPACT ANALYSIS Planned Transportation Improvements Future planned roadway capacity improvements in the project vicinity include the SR 510 Yelm Loop Phase 2 project. The project involves the completion of the Yelm Loop bypass, a two-phased limited access highway intended to provide an alternate route for regional traffic around Yelm’s congested downtown core. Phase 1 of the bypass was constructed in 2010. Phase 2 would complete the Yelm Loop bypass, from its existing terminus at Cullens Road to the intersection of 170th Street and SR 507. Phase 2 improvements include construction of approximately 3 miles of new highway with one travel lane in each direction; a shared-use bicycle and pedestrian pathway; and sidewalks and bike lanes in the more urbanized portion of the corridor. The anticipated project is anticipated to be completed in Fall 2026. Below is a graphic illustrating the Phase 2 Improvements. Project Trip Generation The new weekday daily, AM, and PM peak hour trip generation estimates were based on methodology documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition for Land Use Code (LUC) 210 (Single-Family Detached Housing). Table 5 summarizes the trip generation estimate for the proposed Blue Fern Railway Road project. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 11 Table 5 Blue Fern Railway Road – Trip Generation Summary Net New Trips Generated Time Period In Out Total Weekday Daily 444 444 888 Weekday AM Peak Hour 17 49 66 Weekday PM Peak Hour 55 32 87 As shown in Table 5, the currently proposed 90-lot Blue Fern Railway Road project is estimated to generate 888 net new weekday daily trips with 66 net new trips occurring during the weekday AM peak hour (17 in, 49 out) and 87 net new trips during the weekday PM peak hour (55 in, 32 out). Detailed trip generation calculations are included in Appendix C. It should be noted that the reported trip generation estimates include trip credit for the two single family homes currently on the site that will be removed. Project Trip Distribution and Assignment The distribution of project-generated traffic to the adjacent road network was based on a model distribution provided by the Thurston Reginal Planning Council (TRPC). A copy of the TRPC model distribution output is included in Appendix D. It should be noted that the traffic modeling assumes the completion of the SR 510 Yelm Loop Phase 2 project. The TRPC modeling was used to assign the net new weekday PM peak hour trips (55 inbound and 32 outbound) trips generated by the proposed project to the adjacent street network. The resulting assignment of the net new weekday PM peak hour project trips through the study intersections and site access driveways is shown in Figure 4. The new weekday PM peak hour project-generated trips were generally distributed to the vicinity street system as follows: 40 percent to/from the north on SR 510 Extension (via Wilkensen Road SE) 30 percent to/from the west on 1st Street 20 percent to/from the south on Canal Rd SE 10 percent to/from the south on Middle Rd SE Future Traffic Volumes To estimate the future 2026 Baseline PM peak hour traffic volumes, a 2.0 percent annual growth rate was applied to the 2023 existing traffic volumes. The resulting future 2026 Baseline PM peak hour traffic volumes at the study intersections are shown in Figure 5. The 2026 With Project traffic volumes were determined by adding the trip assignment from the proposed development (shown in Figure 4) to the future 2026 Baseline traffic volumes (shown in Figure 5). The 2026 With Project traffic volumes are shown in Figure 6. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 12 Figure 4 Weekday PM Peak Hour Trip Assignment Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 13 Figure 5 2026 Baseline PM Peak Hour Traffic Volumes Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 14 Figure 6 2026 With Project PM Peak Hour Traffic Volumes Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 15 Future Level of Service Future year (2026) PM peak hour LOS analyses were conducted at the study intersections under without and with project conditions. The LOS results at the study intersections without and with the proposed project are summarized in Table 6. The detailed LOS worksheets are included in Appendix B. It should be noted that the LOS reported at the stop-controlled study intersections was based on the average delay of all legs per Yelm Municipal Code section 18.16.030. Table 6 Year 2026 Weekday PM Peak Hour Level of Service Summary 2026 Baseline 2026 With Project Study Intersection LOS1 Delay (sec)2 LOS1 Delay (sec)2 Two-Way Stop Controlled Intersections 1. Rhoton Road NW / Railway Road SE A 2.5 A 2.7 2. Middle Road SE / Railway Road SE A 4.0 A 3.8 All-Way Stop Controlled Intersection 3. Canal Road SE / Railway Road SE A 8.1 A 8.2 1. LOS = Level of Service 2. Delay refers to average control delay of all legs at the intersection per Yelm Municipal Code section 18.16.030, expressed in seconds per vehicle. As shown in Table 6, all study intersections are anticipated to operate at LOS A during the weekday PM peak hour in 2026 without or with the proposed Blue Fern Railway Road project. Site Access Assessment Vehicle access to the site will be provided by two full access driveways on Railway Road SE. To assess operations of the proposed site access locations, level of service (LOS) and queuing were analyzed. The LOS and queue calculations were conducted using Synchro 11 software based on methodology outlined in the Highway Capacity Manual (6th Edition). The reported queues are estimated 95th percentile queues that are exceeded only 5 percent of the time. Table 7 summarizes the results of the 2026 with project LOS and queue analyses. The LOS and queue calculation sheets are included in Appendix B. Traffic Impact Analysis Blue Fern Railway Road TENW February 22, 2023 Page 16 Table 7 Site Access Peak Hour LOS & Queue Summary PM Peak Hour Site Access LOS Delay (sec) 95th % Queue A. Railway Road SE / East Driveway Eastbound Left-Turn A 7.3 0’ Southbound Shared Left-Right A 9.0 < 25’ B. Railway Road SE / West Driveway Eastbound Left-Turn A 7.3 0’ Southbound Shared Left-Right A 8.8 0’ 1. Results based on HCM Methodologies (6th Edition). As shown in Table 7, all turn movements entering and exiting the proposed site access driveways are expected to operate at LOS A during the weekday PM peak hour in 2026. Vehicle queues are all estimated to be statistically 1 vehicle or less. MITIGATION Off-Site Improvements Based on the results of the analysis, the existing transportation facilities are anticipated to accommodate the additional traffic generated by the proposed project. No project-specific off-site transportation improvements are proposed. Transportation Impact Fees Transportation impacts fees in the City of Yelm are assessed upon new development based on a cost per PM peak hour trip. The current transportation impact fee is $1,497 per PM peak hour trip. The final impact fee calculation will be based on the impact fee rate and project size in effect at the time of building permit issuance. Traffic Impact Analysis Blue Fern Railway Road Appendix B Level of Service (LOS) Calculations at Study Intersections Traffic Impact Analysis Blue Fern Railway Road 2023 Existing Lanes, Volumes, Timings 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 1 0 0 83 0 5 1 144 85 4 134 0 Future Volume (vph) 1 0 0 83 0 5 1 144 85 4 134 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 25 Link Distance (ft) 283 729 720 662 Travel Time (s) 7.7 19.9 19.6 18.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 0% 0% 11% 0% 0% 0% 4% 2% 0% 5% 0% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 2 Intersection Int Delay, s/veh 2.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 1 0 0 83 0 5 1 144 85 4 134 0 Future Vol, veh/h 1 0 0 83 0 5 1 144 85 4 134 0 Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 0 0 0 11 0 0 0 4 2 0 5 0 Mvmt Flow 1 0 0 89 0 5 1 155 91 4 144 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 357 400 146 357 355 201 144 0 0 246 0 0 Stage 1 152 152 - 203 203 - - - - - - - Stage 2 205 248 - 154 152 - - - - - - - Critical Hdwy 7.1 6.5 6.2 7.21 6.5 6.2 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.1 5.5 - 6.21 5.5 - - - - - - - Critical Hdwy Stg 2 6.1 5.5 - 6.21 5.5 - - - - - - - Follow-up Hdwy 3.5 4 3.3 3.599 4 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 602 541 906 582 574 845 1451 - - 1332 - - Stage 1 855 775 - 779 737 - - - - - - - Stage 2 802 705 - 827 775 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 597 539 904 579 572 845 1451 - - 1332 - - Mov Cap-2 Maneuver 597 539 - 579 572 - - - - - - - Stage 1 854 773 - 778 736 - - - - - - - Stage 2 796 704 - 823 773 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 11 12.3 0 0.2 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR Capacity (veh/h) 1451 - - 597 590 1332 - - HCM Lane V/C Ratio 0.001 - - 0.002 0.16 0.003 - - HCM Control Delay (s) 7.5 0 - 11 12.3 7.7 0 - HCM Lane LOS A A - B B A A - HCM 95th %tile Q(veh) 0 - - 0 0.6 0 - - Lanes, Volumes, Timings 2: Middle Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 3 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 21 62 5 21 67 4 Future Volume (vph) 21 62 5 21 67 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 Link Distance (ft) 430 457 547 Travel Time (s) 11.7 12.5 14.9 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 5% 2% 20% 5% 15% 25% Shared Lane Traffic (%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: Middle Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 4 Intersection Int Delay, s/veh 4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 21 62 5 21 67 4 Future Vol, veh/h 21 62 5 21 67 4 Conflicting Peds, #/hr 0 1 1 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 5 2 20 5 15 25 Mvmt Flow 23 69 6 23 74 4 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 93 0 94 59 Stage 1 - - - - 59 - Stage 2 - - - - 35 - Critical Hdwy - - 4.3 - 6.55 6.45 Critical Hdwy Stg 1 - - - - 5.55 - Critical Hdwy Stg 2 - - - - 5.55 - Follow-up Hdwy - - 2.38 - 3.635 3.525 Pot Cap-1 Maneuver - - 1396 - 875 946 Stage 1 - - - - 931 - Stage 2 - - - - 955 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1395 - 871 945 Mov Cap-2 Maneuver - - - - 871 - Stage 1 - - - - 930 - Stage 2 - - - - 951 - Approach EB WB NB HCM Control Delay, s 0 1.5 9.5 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 875 - - 1395 - HCM Lane V/C Ratio 0.09 - - 0.004 - HCM Control Delay (s) 9.5 - - 7.6 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.3 - - 0 - Lanes, Volumes, Timings 3: Canal Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 2 8 14 2 8 6 13 169 8 3 99 4 Future Volume (vph) 2 8 14 2 8 6 13 169 8 3 99 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 35 35 20 Link Distance (ft) 584 605 556 566 Travel Time (s) 15.9 11.8 10.8 19.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 0% 0% 7% 0% 0% 0% 0% 1% 13% 0% 1% 25% Shared Lane Traffic (%) Sign Control Stop Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th AWSC 3: Canal Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2023 Existing - PM Peak Hour Page 6 Intersection Intersection Delay, s/veh 8 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 8 14 2 8 6 13 169 8 3 99 4 Future Vol, veh/h 2 8 14 2 8 6 13 169 8 3 99 4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles, % 0 0 7 0 0 0 0 1 13 0 1 25 Mvmt Flow 2 8 15 2 8 6 14 178 8 3 104 4 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.4 7.5 8.3 7.8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 7% 8% 12% 3% Vol Thru, % 89% 33% 50% 93% Vol Right, % 4% 58% 38% 4% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 190 24 16 106 LT Vol 13 2 2 3 Through Vol 169 8 8 99 RT Vol 8 14 6 4 Lane Flow Rate 200 25 17 112 Geometry Grp 1 1 1 1 Degree of Util (X) 0.225 0.03 0.021 0.127 Departure Headway (Hd) 4.045 4.255 4.398 4.106 Convergence, Y/N Yes Yes Yes Yes Cap 882 846 819 864 Service Time 2.097 2.256 2.399 2.175 HCM Lane V/C Ratio 0.227 0.03 0.021 0.13 HCM Control Delay 8.3 7.4 7.5 7.8 HCM Lane LOS A A A A HCM 95th-tile Q 0.9 0.1 0.1 0.4 Traffic Impact Analysis Blue Fern Railway Road 2026 Baseline Lanes, Volumes, Timings 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 1 0 0 88 0 5 1 153 90 4 142 0 Future Volume (vph) 1 0 0 88 0 5 1 153 90 4 142 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 25 Link Distance (ft) 283 729 720 662 Travel Time (s) 7.7 19.9 19.6 18.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 0% 0% 11% 0% 0% 0% 4% 2% 0% 5% 0% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 2 Intersection Int Delay, s/veh 2.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 1 0 0 88 0 5 1 153 90 4 142 0 Future Vol, veh/h 1 0 0 88 0 5 1 153 90 4 142 0 Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 0 0 0 11 0 0 0 4 2 0 5 0 Mvmt Flow 1 0 0 95 0 5 1 165 97 4 153 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 379 425 155 379 377 214 153 0 0 262 0 0 Stage 1 161 161 - 216 216 - - - - - - - Stage 2 218 264 - 163 161 - - - - - - - Critical Hdwy 7.1 6.5 6.2 7.21 6.5 6.2 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.1 5.5 - 6.21 5.5 - - - - - - - Critical Hdwy Stg 2 6.1 5.5 - 6.21 5.5 - - - - - - - Follow-up Hdwy 3.5 4 3.3 3.599 4 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 582 524 896 563 558 831 1440 - - 1314 - - Stage 1 846 769 - 766 728 - - - - - - - Stage 2 789 694 - 818 769 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 577 522 894 560 556 831 1440 - - 1314 - - Mov Cap-2 Maneuver 577 522 - 560 556 - - - - - - - Stage 1 845 767 - 765 727 - - - - - - - Stage 2 783 693 - 814 767 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 11.3 12.7 0 0.2 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR Capacity (veh/h) 1440 - - 577 570 1314 - - HCM Lane V/C Ratio 0.001 - - 0.002 0.175 0.003 - - HCM Control Delay (s) 7.5 0 - 11.3 12.7 7.7 0 - HCM Lane LOS A A - B B A A - HCM 95th %tile Q(veh) 0 - - 0 0.6 0 - - Lanes, Volumes, Timings 2: Middle Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 3 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 22 66 5 22 71 4 Future Volume (vph) 22 66 5 22 71 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 Link Distance (ft) 430 457 547 Travel Time (s) 11.7 12.5 14.9 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 5% 2% 20% 5% 15% 25% Shared Lane Traffic (%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: Middle Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 4 Intersection Int Delay, s/veh 4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 22 66 5 22 71 4 Future Vol, veh/h 22 66 5 22 71 4 Conflicting Peds, #/hr 0 1 1 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 5 2 20 5 15 25 Mvmt Flow 24 73 6 24 79 4 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 98 0 98 62 Stage 1 - - - - 62 - Stage 2 - - - - 36 - Critical Hdwy - - 4.3 - 6.55 6.45 Critical Hdwy Stg 1 - - - - 5.55 - Critical Hdwy Stg 2 - - - - 5.55 - Follow-up Hdwy - - 2.38 - 3.635 3.525 Pot Cap-1 Maneuver - - 1390 - 870 942 Stage 1 - - - - 929 - Stage 2 - - - - 954 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1389 - 866 941 Mov Cap-2 Maneuver - - - - 866 - Stage 1 - - - - 928 - Stage 2 - - - - 950 - Approach EB WB NB HCM Control Delay, s 0 1.4 9.6 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 870 - - 1389 - HCM Lane V/C Ratio 0.096 - - 0.004 - HCM Control Delay (s) 9.6 - - 7.6 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.3 - - 0 - Lanes, Volumes, Timings 3: Canal Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 2 8 15 2 8 6 14 179 8 3 105 4 Future Volume (vph) 2 8 15 2 8 6 14 179 8 3 105 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 35 35 20 Link Distance (ft) 584 605 556 566 Travel Time (s) 15.9 11.8 10.8 19.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 0% 0% 7% 0% 0% 0% 0% 1% 13% 0% 1% 25% Shared Lane Traffic (%) Sign Control Stop Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th AWSC 3: Canal Rd SE & Railway Rd SE 02/15/2023 Blue Fern Railway Road Synchro 11 Report 2026 No Action - PM Peak Hour Page 6 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 8 15 2 8 6 14 179 8 3 105 4 Future Vol, veh/h 2 8 15 2 8 6 14 179 8 3 105 4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles, % 0 0 7 0 0 0 0 1 13 0 1 25 Mvmt Flow 2 8 16 2 8 6 15 188 8 3 111 4 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.4 7.5 8.4 7.8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 7% 8% 12% 3% Vol Thru, % 89% 32% 50% 94% Vol Right, % 4% 60% 38% 4% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 201 25 16 112 LT Vol 14 2 2 3 Through Vol 179 8 8 105 RT Vol 8 15 6 4 Lane Flow Rate 212 26 17 118 Geometry Grp 1 1 1 1 Degree of Util (X) 0.238 0.031 0.021 0.135 Departure Headway (Hd) 4.053 4.283 4.438 4.118 Convergence, Y/N Yes Yes Yes Yes Cap 880 841 811 861 Service Time 2.107 2.284 2.439 2.189 HCM Lane V/C Ratio 0.241 0.031 0.021 0.137 HCM Control Delay 8.4 7.4 7.5 7.8 HCM Lane LOS A A A A HCM 95th-tile Q 0.9 0.1 0.1 0.5 Traffic Impact Analysis Blue Fern Railway Road 2026 With Project Lanes, Volumes, Timings 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 1 0 0 97 0 5 1 153 109 4 142 0 Future Volume (vph) 1 0 0 97 0 5 1 153 109 4 142 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 25 Link Distance (ft) 283 729 720 662 Travel Time (s) 7.7 19.9 19.6 18.1 Confl. Peds. (#/hr) 2 2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 0% 0% 11% 0% 0% 0% 4% 2% 0% 5% 0% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: 1st St NE/Rhoton Rd NW & Driveway/Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 2 Intersection Int Delay, s/veh 2.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 1 0 0 97 0 5 1 153 109 4 142 0 Future Vol, veh/h 1 0 0 97 0 5 1 153 109 4 142 0 Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 0 0 0 11 0 0 0 4 2 0 5 0 Mvmt Flow 1 0 0 104 0 5 1 165 117 4 153 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 389 445 155 389 387 224 153 0 0 282 0 0 Stage 1 161 161 - 226 226 - - - - - - - Stage 2 228 284 - 163 161 - - - - - - - Critical Hdwy 7.1 6.5 6.2 7.21 6.5 6.2 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.1 5.5 - 6.21 5.5 - - - - - - - Critical Hdwy Stg 2 6.1 5.5 - 6.21 5.5 - - - - - - - Follow-up Hdwy 3.5 4 3.3 3.599 4 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 574 511 896 554 551 820 1440 - - 1292 - - Stage 1 846 769 - 757 721 - - - - - - - Stage 2 779 680 - 818 769 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 568 509 894 551 549 820 1440 - - 1292 - - Mov Cap-2 Maneuver 568 509 - 551 549 - - - - - - - Stage 1 845 767 - 756 720 - - - - - - - Stage 2 773 679 - 814 767 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 11.4 13 0 0.2 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR Capacity (veh/h) 1440 - - 568 560 1292 - - HCM Lane V/C Ratio 0.001 - - 0.002 0.196 0.003 - - HCM Control Delay (s) 7.5 0 - 11.4 13 7.8 0 - HCM Lane LOS A A - B B A A - HCM 95th %tile Q(veh) 0 - - 0 0.7 0 - - Lanes, Volumes, Timings 2: Middle Rd SE & Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 3 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 41 66 8 31 71 9 Future Volume (vph) 41 66 8 31 71 9 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 Link Distance (ft) 430 291 547 Travel Time (s) 11.7 7.9 14.9 Confl. Peds. (#/hr) 1 1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 5% 2% 20% 5% 15% 25% Shared Lane Traffic (%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: Middle Rd SE & Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 4 Intersection Int Delay, s/veh 3.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 41 66 8 31 71 9 Future Vol, veh/h 41 66 8 31 71 9 Conflicting Peds, #/hr 0 1 1 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 5 2 20 5 15 25 Mvmt Flow 46 73 9 34 79 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 120 0 136 84 Stage 1 - - - - 84 - Stage 2 - - - - 52 - Critical Hdwy - - 4.3 - 6.55 6.45 Critical Hdwy Stg 1 - - - - 5.55 - Critical Hdwy Stg 2 - - - - 5.55 - Follow-up Hdwy - - 2.38 - 3.635 3.525 Pot Cap-1 Maneuver - - 1363 - 828 915 Stage 1 - - - - 907 - Stage 2 - - - - 938 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1362 - 821 914 Mov Cap-2 Maneuver - - - - 821 - Stage 1 - - - - 906 - Stage 2 - - - - 931 - Approach EB WB NB HCM Control Delay, s 0 1.6 9.9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 831 - - 1362 - HCM Lane V/C Ratio 0.107 - - 0.007 - HCM Control Delay (s) 9.9 - - 7.7 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.4 - - 0 - Lanes, Volumes, Timings 3: Canal Rd SE & Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 15 8 22 2 8 6 23 179 8 3 105 26 Future Volume (vph) 15 8 22 2 8 6 23 179 8 3 105 26 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 35 35 20 Link Distance (ft) 1331 605 556 566 Travel Time (s) 36.3 11.8 10.8 19.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 0% 0% 7% 0% 0% 0% 0% 1% 13% 0% 1% 25% Shared Lane Traffic (%) Sign Control Stop Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th AWSC 3: Canal Rd SE & Railway Rd SE 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 6 Intersection Intersection Delay, s/veh 8.2 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 15 8 22 2 8 6 23 179 8 3 105 26 Future Vol, veh/h 15 8 22 2 8 6 23 179 8 3 105 26 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles, % 0 0 7 0 0 0 0 1 13 0 1 25 Mvmt Flow 16 8 23 2 8 6 24 188 8 3 111 27 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.8 7.6 8.6 7.9 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 11% 33% 12% 2% Vol Thru, % 85% 18% 50% 78% Vol Right, % 4% 49% 38% 19% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 210 45 16 134 LT Vol 23 15 2 3 Through Vol 179 8 8 105 RT Vol 8 22 6 26 Lane Flow Rate 221 47 17 141 Geometry Grp 1 1 1 1 Degree of Util (X) 0.253 0.059 0.021 0.159 Departure Headway (Hd) 4.118 4.472 4.538 4.067 Convergence, Y/N Yes Yes Yes Yes Cap 862 806 793 867 Service Time 2.193 2.473 2.54 2.163 HCM Lane V/C Ratio 0.256 0.058 0.021 0.163 HCM Control Delay 8.6 7.8 7.6 7.9 HCM Lane LOS A A A A HCM 95th-tile Q 1 0.2 0.1 0.6 Lanes, Volumes, Timings 4: Railway Rd SE & East Site Access 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 7 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 6 30 35 24 16 3 Future Volume (vph) 6 30 35 24 16 3 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 Link Distance (ft) 462 1331 481 Travel Time (s) 12.6 36.3 13.1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 4% 4% 0% 2% 2% Shared Lane Traffic (%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 4: Railway Rd SE & East Site Access 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 8 Intersection Int Delay, s/veh 1.9 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 6 30 35 24 16 3 Future Vol, veh/h 6 30 35 24 16 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 4 4 0 2 2 Mvmt Flow 7 33 38 26 17 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 64 0 - 0 98 51 Stage 1 - - - - 51 - Stage 2 - - - - 47 - Critical Hdwy 4.1 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.2 - - - 3.518 3.318 Pot Cap-1 Maneuver 1551 - - - 901 1017 Stage 1 - - - - 971 - Stage 2 - - - - 975 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1551 - - - 896 1017 Mov Cap-2 Maneuver - - - - 896 - Stage 1 - - - - 966 - Stage 2 - - - - 975 - Approach EB WB SB HCM Control Delay, s 1.2 0 9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1551 - - - 913 HCM Lane V/C Ratio 0.004 - - - 0.023 HCM Control Delay (s) 7.3 0 - - 9 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 Lanes, Volumes, Timings 5: Railway Rd SE & West Site Access 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 19 33 31 8 5 9 Future Volume (vph) 19 33 31 8 5 9 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 25 25 Link Distance (ft) 291 462 503 Travel Time (s) 7.9 12.6 13.7 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 8% 8% 0% 2% 2% Shared Lane Traffic (%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 5: Railway Rd SE & West Site Access 02/16/2023 Blue Fern Railway Road Synchro 11 Report 2026 With Project - PM Peak Hour Page 10 Intersection Int Delay, s/veh 2.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 19 33 31 8 5 9 Future Vol, veh/h 19 33 31 8 5 9 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 8 8 0 2 2 Mvmt Flow 21 36 34 9 5 10 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 43 0 - 0 117 39 Stage 1 - - - - 39 - Stage 2 - - - - 78 - Critical Hdwy 4.1 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.2 - - - 3.518 3.318 Pot Cap-1 Maneuver 1579 - - - 879 1033 Stage 1 - - - - 983 - Stage 2 - - - - 945 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1579 - - - 867 1033 Mov Cap-2 Maneuver - - - - 867 - Stage 1 - - - - 969 - Stage 2 - - - - 945 - Approach EB WB SB HCM Control Delay, s 2.7 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1579 - - - 967 HCM Lane V/C Ratio 0.013 - - - 0.016 HCM Control Delay (s) 7.3 0 - - 8.8 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0 Traffic Impact Analysis Blue Fern Railway Road Appendix C Trip Generation Calculations ITE Land Use Units 1 LUC 2 In Out In Out Total DAILY Proposed Use: Single Family Detached Housing 90 DU 210 Ln(T) = 0.92Ln(X)+2.68 50% 50% 458 458 916 Existing Use: Single Family Detached Housing 2 DU 210 Ln(T) = 0.92Ln(X)+2.68 50% 50% -14 -14 -28 Net New Daily Trips = 444 444 888 AM PEAK HOUR Proposed Use: Single Family Detached Housing 90 GFA 210 Ln(T) = 0.91Ln(X)+0.12 26% 74% 18 50 68 Existing Use: Single Family Detached Housing 2 DU 210 Ln(T) = 0.91Ln(X)+0.12 26% 74% -1 -1 -2 Net New AM Peak Hour Trips = 17 49 66 PM PEAK HOUR Proposed Use: Single Family Detached Housing 90 GFA 210 Ln(T) = 0.94Ln(X)+0.27 63% 37% 57 33 90 Existing Use: Single Family Detached Housing 2 DU 210 Ln(T) = 0.94Ln(X)+0.27 63% 37% -2 -1 -3 Net New PM Peak Hour Trips = 55 32 87 Notes: 1 DU = Dwelling Units. 2 Based on Institute of Transportation Engineers (I TE) Trip Generation Manual, 11th Edition, 2021. Blue Fern Railway Road Weekday Trip Generation Summary Directional Distribution Trips Generated Trip Rate or Equation 2 2/16/2023 Traffic Impact Analysis Blue Fern Railway Road Appendix D TRPC Model Distribution Ma de with Emme. Map t ile s ©MapTiler ©OpenSt ree t Map contribut ors 1016 T A Z 1 0 1 6 - 2 0 1 8 T r ip D istr ibution Committed Pr oject Networ k 2 0 2 2 -1 2 -1 6 Disclaimer: This map is f or gen eral plann ing purposes on ly. Thurston Regional Planning Cou ncil makes no rep resentation as to accu racy or fitness of the information for a p articular purpose. Dec 16 , 2022