17-050 - JB0000690701 - AMERICAS CREDIT UNION - APPRevised 03/09/2011
City of Yelm
PUBLIC WORKS
901 Rhoton Rd NW
Yelm, WA 98597
Phone: 360-458-8406
FAX: 360-458-8417
Permit No. _____ ________
Application to Perform Work on
Public Right of Way and/or Connect
to Utilities
APPLICATION
The undersigned hereby makes application to:
Location of work:
I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter ___________, the special
conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions
applicable to permits contained on this form.
The Public Works Department (360-458-8406) must be contacted for inspection 24 hours before work
commences or this permit will be void.
The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days
before proceeding with any excavation associated with this permit.
Name:
Address: Phone:
Proposed starting date of installation: Duration:
Date: Signature:
PERMIT REQUIREMENTS
For Official Use Only
Fee $ Issued
Fee Received $ Application Approval
Signature: Receipt Number
To Be Completed By City
Permission is hereby granted to perform the above described work subject to the general provisions contained
on this form, and the following special conditions:
A bond in the amount of ______________________ is required to insure compliance with the above
conditions, refundable upon satisfactory completion of work.
No work shall be done under this permit until the party or parties to whom it is granted shall have
communicated with and received instructions from: ___________________________________
Remarks:
First Inspection
Date:
Inspector Final Project
Completion Approval: Date:
Revised 03/09/2011
GENERAL PROVISIONS APPLICABLE TO ALL PERMITS
In accepting this permit, the petitioner, his successor and assigns, agree to protect the CITY OF YELM,
WASHINGTON, and save it harmless from all claims, actions or damages of every kind and description which
may accrue to or be suffered by any person, or persons, corporation or property by reason of the performance of
any such work, character of materials used or manner of installation, maintenance and operation or by the
improper occupancy or rights of way or public structure and in case of any suit or action is brought against said
City for damages arising out of or by reason of any commencement of such action, defend the same at his or
their sole cost and expense and will satisfy any judgment after the said suit or action shall have finally been
determined if adverse to the said City.
If the work done under this permit interferes in any way with the drainage of the area, the grantee shall wholly
and at his own expense make such provisions as the City may direct to correct said drainage problems.
Upon completion of said work herein contemplated, all rubbish and debris shall be immediately removed and
from the roadway and roadside shall be left in a neat and presentable condition that is satisfactory to the City.
The party or parties to whom this permit is issued shall maintain at his or their sole expense the structure or
object for which this permit is granted in a condition satisfactory to the CITY OF YELM.
The CITY OF YELM may revoke, annul, change, amend, amplify, or terminate this permit or any of the
conditions herein enumerated if grantee fails to comply with any or all of its provisions, requirements or
regulations as herein set forth or thru willful or unreasonable neglect, fails to heed or comply with notices given
or if the utility herein granted is not installed, operated, and maintained in conformity herewith or at all or for
any cause or reason whatsoever.
All work areas shall be adequately barricaded according to MUTCD Standards. Barriers shall be properly
lighted at night.
All trenches shall be backfilled with selected backfill materials unless otherwise directed by the Engineer.
PAVEMENT REPLACEMENT: Asphalt pavement shall be replaced to a minimum depth of four (4) inches
thick or match to the existing pavement whichever depth is greater and to the dimensions specified by the
Engineer. In gravel alleys the permittee shall replace base and surface rock.
All work shall be conducted using current WISHA/OSHA regulations. Particular attention shall be paid to the
requirements as they pertain to work in trenches, electrical work, work in high places and to safety apparel such
as, hard hats and safety vests.
All work shall be completed to City Standards as set forth in the City of Yelm Development Guidelines, and
policies.
The PUBLIC WORKS DEPARTMENT office (360-458-8406) must be contacted for inspections 24 hours
before work commences.