Loading...
2021.0361.ST0044 ROW Permit Issue 8.06.2021ROW Permit Date Issued: 08/03/2021 Permit #: 2021.0361.ST0044 Applied Date:07/14/2021 Issue Date:08/03/2021 Expiration Date 01/30/2022 Proposed Use:AERIAL SCOPE OF WORK : - TIE IN @ CASE: T109S.11A.1D (SP.WAFT.0063 - OVERLASH (1) 96 CT FIBER - LEAVE 200' TAIL - INSTALL NEW 4" RISER & PULL (1) 96 CT FIBER THROUGH - LEAVE 50' STORAGE UNDERGROUND WORK: -PULL (1) NEW 96CT FIBER THROUGH RISER. - OPEN TRENCH ON SOFT SURFACE. INSTALL (1) NEW 4" CONDUIT. PULL (1) NEW 96CTFIBER THROUGH. SEE DETAIL 1 ON SHEET 4.- DIRECTIONAL DRILL. INSTALL Physical Address:415 YELM AVE E Require Sprinklers:No Parcel #:22719342800 Structures:Heating: Subdivision:Stories:Roofing: Zoning:Bedrooms:Bathrooms: Load:Construction Type: Use:Code Edition: Occupancy:Service Location:20-0086.0 Applicant Contractor CANNON CONSTRUCTION, INC, HEATOIN SHANN CANNON CONSTRUCTION, INC, HEATOIN SHANN 406 PORTER WAY 406 PORTER WAY MILTON, WA 98354-0 MILTON, WA 98354-0 Contact:Contact: Phone:(253) 922-2787 Phone:(253) 922-2787 Fax:( ) -Fax:( ) - Email:sheaton@cannonconstructioninc.com Bus Lic: Cont Lic: UBI: Fees Qty Rate Amount Date Fully Paid Invoice #Amount v Standard ROW Permit 1.00 250.00 250.00 08/03/2021 2532 250.00 250.00 250.00 Estimated Balance Due: Inspections FINAL Initials ______Page 1 City of Yelm, Washington 106 2nd Street SE | Yelm, WA 98597 To Schedule Inspections Please Call: (360) 458-8410 | www.yelmwa.gov All work will comply with terms as described in Chapter 15.72 YMC "Conditions for Use of Right-of-Way" and Chapter 18.28 YMC : Engineering Specifications and Standard Details" = = The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. = Notify the City of Yelm Inspection Hotline @ (360) 458-8410 at least 24 hours before work commences and to coordinate final inspection. =