2021.0433.ST0047 ROW Permit Issue 8.27.2021ROW Permit Date Issued:
08/27/2021
Permit #:
2021.0433.ST0047
Applied Date:08/25/2021 Issue Date:08/27/2021 Expiration Date 02/23/2022
Proposed Use:Contractor to start on the southeast side of 1023 NW KINGS VIEW CT-
1011 NW Kings View Ct and go north 44' of 2" conduit and place Carson on 1023 NW Kings View Ct Property
line.
Physical Address:1023 KINGSVIEW CT NW Require Sprinklers:No
Parcel #:57630000300 Structures:Heating:
Subdivision:Stories:Roofing:
Zoning:Bedrooms:Bathrooms:
Load:Construction Type:
Use:Code Edition:
Occupancy:Service Location:02-0330.0
Applicant Contractor
COMCAST OF WASHINGTON,LOISELLE ANGELIQUE
410 VALLEY AVE NW 13701 24TH ST E
PUYALLUP, WA 98373-0 SUMNER, WA 98390
Contact:Contact:
Phone:( ) -Phone:(253) 259-6359
Fax:( ) -Fax:( ) -
Email:Bus Lic:
Cont Lic:
UBI:
Fees Qty Rate Amount Date Fully Paid Invoice #Amount
v Standard ROW Permit 1.00 250.00 250.00 08/27/2021 2709 250.00
250.00 250.00
Estimated Balance Due:
Inspections
FINAL
Initials ______Page 1
City of Yelm, Washington
106 2nd Street SE | Yelm, WA 98597
To Schedule Inspections Please Call:
(360) 458-8410 | www.yelmwa.gov
All work will comply with terms as described in Chapter 15.72 YMC "Conditions for Use of Right-of-Way" and
Chapter 18.28 YMC : Engineering Specifications and Standard Details"
= =
The Underground Utilities Coordinating Council (1-800-424-5555) must be contacted two (2) working days
before proceeding with any excavation associated with this permit.
=
Notify the City of Yelm Inspection Hotline @ (360) 458-8410 at least 24 hours before work commences and to
coordinate final inspection.
=
SOW DETAIL VIEW
Contractor to start on the southeast side of 1011 NW Kings View Ct and go north 44' of 2"
conduit and place Carson on 1023 NW Kings View Ct Property line.
884533 CONTACTS:
Area Manager
GARY PACKARD
1023 NW KINGS VIEW CT ESS COMCAST
SOW OVERVIEW DETAIL 2
YELM Rhonda Resnik
ANGELIQUE LOISELLE
COVER PAGE 1 (206)641-9903
(253)864-4246
SECTIONS:SITE CONTACT
New Lock Box
3
LEGEND
Tie in Point
Path34
4
REVISION DESCRIPTIONS
DATE:BY:REASON:
8/24/2021 ANGELIQUE LOISELLE DROP BURY
New Building Interior =
TOTAL FOOTAGE
44
COVER SHEET
ENGINEERED FOR:
New Flush Mount
Carson
Cut To Expose Utilities
Building Attachment
Drop Path
New Pedestal
POE44
SOW DETAIL VIEW
Bore/Drill New UG =
Trench New UG =
New OH =
Overlash =
New Building Exterior =
Existing UG =
Riser =
NEW FLUSH
TIE IN POINT
PATH FOR 44'
CONDUIT. ALL
SUBSTRUCTRE TO
HAVE 36" COVER.
NEW FLUSH
MOUNT CARSON
TIE IN POINT
PATH FOR 44' CONDUIT. ALL
SUBSTRUCTRE TO HAVE 36"
COVER.