Loading...
186064578 - Site Design1ST ST N '110' J E F F E R S O N A V E N E V A N T R U M P A V E N E1ST ST N Y E L M A V E E '102' '206' '202'1ST ST SW A S H I N G T O N A V E S E S E M C K E N Z I E A V E ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. 513868487 186064578 N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Sub Order SITE SPECIFIC NOTES P01 (559330-147371) -ZIPTIE SEC TO NEUT APPROX 118' TO P02 -CREW TO MAINTAIN MIN 30" MIDSPAN CLEARANCES P03 (559382-147440) -ZIPTIE SEC TO NEUT APPROX 130' TO P04 -INST NEW RC (6015.1000 INDNRC) -INST S/L GRND WIRE MOLDING (8920300) -CLEAN DRIP LOOPS -CREW TO MAINTAIN MIN 30" MIDSPAN SAFETY SPACE CLEARANCES P05 (559388-147447) -ZIPTIE SEC TO NEUT APPROX 88' TO P06 -CREW TO MAINTAIN MIN 30" MIDSPAN CLEARANCES P06 (559393-147451) -RAISE EXIST S/L 12-18”(____') -CREW TO MAINTAIN SAFETY SPACE CLEARANCES P07 (559398-147458) -RE-TENSION SECONDARY APPROX 100' TO P02 -CREW TO MAINTAIN 30” MIDSPAN CLEARANCES N/A N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186064578VICINITY MAP FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OH CIRCUIT MAP: D1702E116 SCALE 6" = 1 MILE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP W. BLOOD 253-259-7076 03/03/23 J. COSME 253-259-7076 03/03/23 N/A N/A N/A A. FARAH N/A 03/03/23 N/A YELM ENGR1 COMCAST TK#5437834 ZIP TIE (3) SEC, RAISE (1) S/L, ATTACH RC & RE-TENSION SEC 206 2ND ST SE YELM, WA 98597 POTELCO N/A N/A N/A 186064578 AS NOTED 1/1 THURSTON N/A N/A QSTHLE T17, RO02E, S19 N/A N/A A1702E075 D1702E116 R1702E075 YEL-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AJOB SITETHIS PAGE PERTAINS TO DISTRIBUTION UNDERBUILD SEE ADDITIONAL PRINT FOR TRANSMISSION NOTES SCALE: 1:100 SITE PLAN: P03-P07 SITE PLAN: P01-P02 SCALE: 1:100 JOB SITE