101158552 YEL-23 REPL 1 POLE-signedCØEIG691CNC25T8947#2ACSRCNC9037NVicinity MapN.T.S.Owner / Developer Contact InfoofficeATTN:PSE--KELLY ULICNY425-429-0949THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PHONECABLE TV11813402 101158552N/A 593250182N/A 594153860N/A N/AN/A N/AN/A 108144697PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 4/4/23S. REEVES 253-331-3897 4/4/23...J. WATT 509-714-3143 4/4/23N/A YELMYEL-23 REPL 1 POLEDISTRIBUTION POLE REPLACEMENT8947 CANAL RD SE, YELM, WA 98597ASPLUNDH CONSTRUCTIONN/A N/AN/A 101158552AS NOTED 1 OF 1THURSTON N/A N/A QSTHLESE18-T17N-R02E N/A N/A1702E072 1702E068 1702E072 YEL-23COMCAST...........E-Mail:Cell Phone:Project Manager Contact Information:Manager:KELLY ULICNY425-429-0949KELLY.ULICNY@PSE.COM.........101158552
YEL-23 REPL 1 POLEDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILEP01: 559881-147726(Avg. Span = 321', Angle = 0°)TREE TRIMMING REQ'D-EX 40' CL 1, 1961 POLE TO BE REPLACED-INST 45' CL 1 (PD451) 6010.1000 -DEEP SET +1' DUE TO CROSSWIND-INST 1Ø PTP #2ACSR (TAN112) 6031.1010 -ROLL NEUT TO COMMON POSITION-SLEEVE THROUGH WIRES-TRANSFER 1Ø #2ACSR PRI & NEUT (NW/SE)-RM EX 1Ø TERM & C/O-RM EX RISER-INST 2" RISER (RIS2CSS) 6042.1000-INST 1Ø TERM & L/B C/O (TSU1C1) 6043.1000 (SW#Y645) -FUSE @ 25T (3412400)-TRANSFER 1Ø 1/0AL UG PRI (SW); EXTEND AS REQ'D -ACTUAL 1Ø 1/0AL UG PRI ADDED L=_________ BATCH YEAR_________ -ACTUAL TRENCH L=_________-RM EX DG & ANC-CUT ANC 6" BELOW GRADE-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERREDSITE PLAN1" = 50' POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 559881-147726 40 1 1961POLE TABLE (NEW)Site#Pole DataGrid #HeightClass Year Remarks / Location Ref.P01 559881-147726 45 1LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONCANAL RD SECANAL CT SETHEA ROSE DR SESITE
Standoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLC
Direction of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNOT TO SCALEGeneral- Return removed materials to the local storeroom or PSE storeroom.OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurementsare from the roadside face of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers.UNDERGROUND CONSTRUCTIONExcavation-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover forprimary conductors and 24” of cover for secondary conductors.-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimumof 36” of cover for all conductors or as required by the permitting Agency.-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.-No rocks larger than 6” shall be included in backfill.-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as requiredby the permitting Agency.-Restore all excavated areas to original condition.UTILITY POLE EROSION CONTROL DETAILTOP VIEWFLOWING DITCH or BODY OF WATERSLOPESecure bottom of fencewith gravel bagsPlace straw mulchon disturbed areaExcavated orAugered HolePoleSLOPENot to scaleAdjacent to flowing ditches or bodies of waterInstall silt fence aroundpole excavationJ. WATT4/10/232-812-572-45XX2-54 x ______'2-129