721123 AF_Yelm WA_IFP Set 07.10.23D
CUBBIES
CUBBIES
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
CODE DATA - BUILDING DESIGN INFORMATION:ABBREVIATIONS:
PROJECT DIRECTORY:
DRAWING LEGEND:
COVER SHEET
CS1
JURSDICTION:
PROJECT SCOPE:
USE:
FLOOR AREA: (NO INCREASE IN BUILDING HEIGHT OR AREA)
OCCUPANT LOAD:
OCCUPANCY SEPARATION:
CONSTRUCTION TYPE:
FIRE PROTECTION SYSTEMS:
EXITS AND EXIT ACCESS DOORWAYS:
ENERGY COMPLIANCE METHOD:
TM
AF #1009 SCHEME: REAL AF
SHEET INDEX:
E
Y
E
L
M
A
V
E
N
U
E CREEK STREET SECREEK
STREET
PLAZA
VENDOR SCHEDULE:
DEFERRED SUBMITTALS:
CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
GENERAL NOTES
G0.1
GENERAL NOTES:ARCHITECTURAL GENERAL NOTES:
DEMOLITION NOTES:
FLOOR PLAN NOTES:
PARTITION NOTES:
TOILET ROOM NOTES:
TILE DETAIL NOTES:
FINISH FLOORING NOTES:
CEILING NOTES:
PAINTING NOTES:
ELECTRICAL NOTES:
FIRE PROTECTION NOTES:
CONTRACTOR NOTES:
DEMOLITION NOTES:
RESTROOMRESTROOMROOM IDEXITCONSULTANTARCHITECTSEALREVISIONSDATE:DRAWN BY:CHECKED BY:PROJECT NUMBER:04.10.23721123CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597JCBTMG ACCESSIBLE DETAILS:A0.1ACCESSIBILITYREQUIREMENTS
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
DEMOLITION PLAN
A1.1
DEMOLITION KEYED NOTES:DEMOLITION LEGEND:
D
CUBBIES
CUBBIES
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
ARCHITECTURAL
LEGEND:
ARCHITECTURAL
FLOOR PLAN
A2.1
KEYED NOTES:
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
ENLARGED TOILET
ROOM PLAN &
DETAILS
A2.2
KEYED NOTES:RESTROOM & SHOWER ACCESSORY SCHEDULE
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597RESTROOM
TILE DETAILS
A2.4
SEB
SEB
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
FINISH PLAN
A3.1
KEYED NOTES:KEYED NOTES:
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
HARDWARE GROUPS:
SCHEDULES
A3.2
ROOM FINISH SCHEDULE
DOOR & HARDWARE SCHEDULE
DECOR SCHEDULE COLOR SCHEME: REAL AF
PAINT
FLOORING / WALL COVERING
WALL COVERING
CEILING
MISCELLANEOUS
DOOR TYPES:FRAME TYPES:
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
KEYED NOTES:REFLECTED CEILING LEGEND:
REFLECTED
CEILING PLAN
A4.1
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
PARTITION TYPES
A5.1
DCUBBIESCUBBIESOFFICEA6.1CONSULTANTARCHITECTSEALREVISIONSDATE:DRAWN BY:CHECKED BY:PROJECT NUMBER:04.10.23721123CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597JCBTMGDETAILS
CUBBIESCUBBIESDETAILSA6.2CONSULTANTARCHITECTSEALREVISIONSDATE:DRAWN BY:CHECKED BY:PROJECT NUMBER:04.10.23721123CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597JCBTMG
······CONSULTANTARCHITECTSEALREVISIONSDATE:DRAWN BY:CHECKED BY:PROJECT NUMBER:04.10.23721123CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597JCBTMGDETAILSA6.3
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
SPECIFICATIONS
A7.1
SECTION 09300 - TILE
SECTION 08800 - GLAZING
SECTION 092216 - NON-STRUCTURAL METAL FRAMING
PART 2.2 FRAMING SYSTEMS
SECTION 09260 - GYPSUM BOARD SYSTEMS
SECTION 01010 - SUMMARY OF WORK
SECTION 01045 - CUTTING AND PATCHING
SECTION 01500 - CONSTRUCTION FACILITIES
SECTION 01600 - MATERIALS AND EQUIPMENT
SECTION 01710 - FINAL CLEANING
SECTION 01732 - MINOR DEMO FOR REMODELING
SECTION 03300 - CAST-IN-PLACE CONCRETE
SECTION 05500 - METAL FABRICATION
SECTION 06100 - MISCELLANEOUS CARPENTRY
SECTION 07840 - FIRE STOPPING
SECTION 08110 - HOLLOW METAL DOORS AND FRAMES
SECTION 08211 - FLUSH WOOD DOORS
SECTION 08311 - ACCESS DOORS AND FRAMES
SECTION 08710 - DOOR HARDWARE
CONSULTANTARCHITECTSEALREVISIONSDATE:DRAWN BY:CHECKED BY:PROJECT NUMBER:04.10.23721123CREEK STREET PLAZA
1304 E YELM AVENUE, SUITE A108
YELM, WA 98597JCBTMG SECTION 09512 - ACOUSTICAL TILE CEILINGSSECTION 09645 - ACTIVITY FLOORSECTION 09651 - RESILIENT FLOOR & ACCESSORIESSECTION 09681 - CARPET TILESECTION 09720 - WALL COVERINGS/ GRAPHIC WALLSECTION 09772 - FIBERGLASS REINFORCED WALL PANELSSECTION 09900 - PAINTINGSECTION 09900 - FIRE EXTINGUISHERSSECTION 10801 - TOILET AND BATH ACCESSORIESSPECIFICATIONSA7.2111111111
CUBBIES
CUBBIES
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
ELECTRICAL LEGEND:
ELECTRICAL
PLAN
E1
KEYED NOTES:
–
ELECTRICAL LIGHTING FIXTURE SCHEDULE (OR EQUAL)
OCCUPANCY SENSOR SCHEDULE
ONE-LINE RISER NOTES:
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
MECHANICAL LEGEND:
MECHANICAL
PLAN
M1
KEYED NOTES:
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
PLUMBING
PLAN
P1
KEYED NOTES:
PLUMBING FIXTURE SCHEDULE
“
ADDITIONAL FIRE PROTECTION NOTES:
YELM, WA. NOTE
CONSULTANT
ARCHITECT
SEAL
REVISIONS
DATE:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
04.10.23
721123CREEK STREET PLAZA1304 E YELM AVENUE, SUITE A108YELM, WA 98597JCB
TMG
MEP1
DESIGN BUILD CRITERIA:
ELECTRICAL DESIGN-BUILD CRITERIA:MECHANICAL DESIGN-BUILD CRITERIA:
PLUMBING DESIGN-BUILD CRITERIA:
FIRE PROTECTION DESIGN-BUILD CRITERIA:ELECTRICAL DESIGN-BUILD CRITERIA, CONTINUED:
DESIGN BUILD
CRITERIA /
SPECIFICATIONS