Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Roof Truss Layout
Truss Connector Total List ManufProductQty MUS2614 MONO TRUSSES SIT ON FLOOR DECKING GARAGE COVERED PATIO UNDER UPPER FLOOR DECK TOTAL BLOCK COUNT =41 B1 B2 C1 D2 D1 EJ2EJ3A01A2A01MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26MUS26EJ2(5)EJ3(4) A2(10)A3(3)A4(5) 40-00-00 36-00-002-00-0034-00-0028-02-00 11-10-00 12-00-008-00-0010-00-0010-00-00 20-00-00 2-00-003-00-003-00-002-00-0034-00-00Sales Rep: Estimate By: Kelly Finelli Customer: Ryan Kittelson Sheet Number:1of1Drawing Type: Roof Trusses Soundbuilt NW, LLC Plan: 2394/A/Gar LT Job Name: Date: 8/2/2023 West Hill M-2062-04 Job Number: Loading TC/LL = 25.0 lb TC/DL= 8.0 lb BC/DL= 7.0 lb WIND = 110 mph 'B' Finalized By: Kelly Finelli ** IMPORTANT ** = INDICATES LEFT ENDAddress:,Auburn,WA 98092