101157885 Approved DesignREPLACE EXIST XF
W/ 37.5kVA 120/240V
P01
EXST
559511
147734 25kVA 120/240V
'16333'
'16325'
'16330'
'16311'
'16314'
'16309'
RAIL
W
A
Y
R
D
S
E
RAIL
W
A
Y
R
D
S
E
RAILWAY RD SE
MI
D
D
L
E
R
D
S
E
SITE PLAN P01
SCALE: 1:50
EXISTING OH MAP: 1702E116
SCALE: 6'' = 1 MILE 101157885THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11918425 101157885
N/A
583072773
N/A
N/A
N/A
VICINITY MAP
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
N/A
N/A
N/A
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any
deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and
NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project
Manager at least three (3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as
applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
SITE SPECIFIC NOTES
P01 (559511-147734)
-REMOVE EXISTING 25kVA 120/240V TRANSFORMER.
- INST NEW 37.5kVA 120/240V TRANSFORMER ON EXISTING POLE. (6025.1000 TRFPXF)
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
559511-147734
25kVA 120/240V
6. TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
GENERAL OVERHEAD NOTES:
1. POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE
2. POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED.
3. ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH
4. INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.
5. INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
STANDARDS & SPECIFICATIONS.
OR BETTER.
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
P01
559511-147734
JOB SITE
JOB SITE
37.5 kVA 120/240V
62113002-24X
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
G. A. KENT 253-569-7345 03/20/23
A. CRAWFORD 425-559-5712 03/20/23
N/A N/A N/A
K. STOKES 360-271-2282 03/20/23
N/A YELM
YEL-27 TRANSFORMER REPLACEMENT
UPGRADE (1) OH TRANSFORMER
16333 Railway Rd SE, Yelm, WA 98597
N/A
N/A 101157885
AS NOTED 1 OF 1
THURSTON N/A N/A QSTHLE
T17N-R02E-S19 N/A N/A
1702E073 1702E116 N/A YEL-27
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
S. KVAMME
253-553-6200 05/04/23
Potelco, Inc.DESIGNED BY
XFMR SELECTION
Existing XFMR Design Criteria
Proposed XFMR
Location
Nameplate
Rating
(kVA)
Residential
Peak Demand Peak Demand
Percent of
Nameplate (%)
Residence Heating Type Max. Allowable Peak Demand
Percent of Nameplate (%)
(Sec. 6315.0032)
kW kVA
All
Resistance/Gas
Any Air
Conditioning /
Heat Pump
Nameplate
Rating (kVA)
Peak Demand
Percent of Nameplate (%)
P01 25 40.8 42.9 171.8 N Y 130 37.5 114.5