Loading...
101157885 Approved DesignREPLACE EXIST XF W/ 37.5kVA 120/240V P01 EXST 559511 147734 25kVA 120/240V '16333' '16325' '16330' '16311' '16314' '16309' RAIL W A Y R D S E RAIL W A Y R D S E RAILWAY RD SE MI D D L E R D S E SITE PLAN P01 SCALE: 1:50 EXISTING OH MAP: 1702E116 SCALE: 6'' = 1 MILE 101157885THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11918425 101157885 N/A 583072773 N/A N/A N/A VICINITY MAP For contacts below dial 1-888-CALL PSE (225-5773) Contact Information FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. N/A N/A N/A POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. SITE SPECIFIC NOTES P01 (559511-147734) -REMOVE EXISTING 25kVA 120/240V TRANSFORMER. - INST NEW 37.5kVA 120/240V TRANSFORMER ON EXISTING POLE. (6025.1000 TRFPXF) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 559511-147734 25kVA 120/240V 6. TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE. GENERAL OVERHEAD NOTES: 1. POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE 2. POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. 3. ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH 4. INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. 5. INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH. STANDARDS & SPECIFICATIONS. OR BETTER. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information P01 559511-147734 JOB SITE JOB SITE 37.5 kVA 120/240V 62113002-24X UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP G. A. KENT 253-569-7345 03/20/23 A. CRAWFORD 425-559-5712 03/20/23 N/A N/A N/A K. STOKES 360-271-2282 03/20/23 N/A YELM YEL-27 TRANSFORMER REPLACEMENT UPGRADE (1) OH TRANSFORMER 16333 Railway Rd SE, Yelm, WA 98597 N/A N/A 101157885 AS NOTED 1 OF 1 THURSTON N/A N/A QSTHLE T17N-R02E-S19 N/A N/A 1702E073 1702E116 N/A YEL-27 N/A N/A N/A N/A N/A N/A N/A N/A N/A S. KVAMME 253-553-6200 05/04/23 Potelco, Inc.DESIGNED BY XFMR SELECTION Existing XFMR Design Criteria Proposed XFMR Location Nameplate Rating (kVA) Residential Peak Demand Peak Demand Percent of Nameplate (%) Residence Heating Type Max. Allowable Peak Demand Percent of Nameplate (%) (Sec. 6315.0032) kW kVA All Resistance/Gas Any Air Conditioning / Heat Pump Nameplate Rating (kVA) Peak Demand Percent of Nameplate (%) P01 25 40.8 42.9 171.8 N Y 130 37.5 114.5 425.559.5712 7/31/2023