101156412 YEL-23 REPL 2 POLES-signedACCESS FROMCANAL RD SECAN
AL
R
D
S
E
UNKUNK#4ACSRNVicinity MapN.T.S.Owner / Developer Contact InfoofficeATTN:PSE--KELLY ULICNY425-429-0949THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PHONECABLE TV11813407 101156412N/A 593248912N/A 594153901N/A 583072224N/A N/AN/A 108143129PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 7/19/23S. REEVES 253-331-3897 7/19/23...J. WATT 509-714-3143 7/19/23N/A SEE LISTYEL-23 REPL 2 POLESDISTRIBUTION POLE REPLACEMENT9222 CANAL RD NW, YELM, WA 98597ASPLUNDH CONSTRUCTIONN/A N/AN/A 101156412AS NOTED 1 OF 2THURSTON N/A N/A QSTHLESEE LIST N/A N/ASEE LIST SEE LIST SEE LIST YEL-23COMCAST...........E-Mail:Cell Phone:Project Manager Contact Information:Manager:KELLY ULICNY425-429-0949KELLY.ULICNY@PSE.COM.........101156412
YEL-23 REPL 2 POLESDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILELEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONP01: 559780-147738-EX 45' CL 4, 1980 POLE TO BE REMOVED-RM IDLE 2x10kVA 120/240V XFMR BANK & C/O'S-RM ALL PSE ELECTRIC FACILITIES-PULL POLE BUTT & DISPOSESITE PLAN 11" = 50'WILKENSEN RD SEORDWAY DR SECANAL RD SESITE 2SITE 1SITE 31/4 SECTIONSSE18-T17N-R02ENE18-T17N-R02ENW20-T17N-R02EOH CKT MAPS1702E0681702E116UG CKT MAPS1702E0721702E0691702E078U-MAPS1702E0721702E080General- Return removed materials to the local storeroom or PSE storeroom.OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurementsare from the roadside face of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers.UNDERGROUND CONSTRUCTIONExcavation-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover forprimary conductors and 24” of cover for secondary conductors.-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimumof 36” of cover for all conductors or as required by the permitting Agency.-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.-No rocks larger than 6” shall be included in backfill.-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as requiredby the permitting Agency.-Restore all excavated areas to original condition.UTILITY POLE EROSION CONTROL DETAILTOP VIEWDRY DRAINAGE DITCH or DRY VEGETATED SITESLOPEPlace gravel bags forSediment TrapPlace straw mulchon disturbed areaExcavated orAugered HolePoleSLOPENot to scaleDrainage ditches or Dry vegetated sitesStandoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLC
Direction of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNOT TO SCALEP02: 559785-147769-EX 45' CL 2, 1990 POLE TO BE REMOVED-RM IDLE 5kVA 120/240V XFMR C/O-RM ALL PSE ELECTRIC FACILITIES-PULL POLE BUTT & DISPOSEWIRE REMOVAL TABLELocationPriSecWire Size & Type QuantityLength(ft perconductor)RemarksFrom ToP01 P02 X #4ACSR PRI & NEUT 3 322P02P2A X #4ACSR PRI & NEUT3305Total Feet (#4ACSR & NEUT) Removed1254Total Feet (#4ACSR NEUT) Removed627PERMITSP2AYELMP03-P04THURSTON POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 559780-147738 45 4 1980P02 559785-147769 45 2 1990Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP01559780-14773810kVARemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP02559785-1477695kVARemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP01559780-14773810kVAP2A: 559790-147799-EX 40' CL 3, 1961 POLE TO REMAIN-RM EX DE ARM (W)-RM EX DG & ANC-CUT ANC 6" BELOW GRADEJ.WATT7/26/237/26/232-262-262-21
16628CANAL RD
S
E16620
1664316630559625-147860Y460AØADH454BØADH455CØADH456WILKENSEN RD SEDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 7/19/23S. REEVES 253-331-3897 7/19/23...J. WATT 509-714-3143 7/19/23N/A SEE LISTYEL-23 REPL 2 POLESDISTRIBUTION POLE REPLACEMENT9222 CANAL RD NW, YELM, WA 98597ASPLUNDH CONSTRUCTIONN/A N/AN/A 101156412AS NOTED 2 OF 2THURSTON N/A N/A QSTHLESEE LIST N/A N/ASEE LIST SEE LIST SEE LIST YEL-23COMCAST....................THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)101156412
SITE PLAN 31" = 50'P04: 559657-147852(Avg. Span = 341', Angle = 0°)-EX 40' CL 2, 1970 POLE TO BE REPLACED-INST 45' CL H4 (PD45H4) 6010.1000 -DEEP SET +1.5' DUE TO CROSSWIND -INST POLE FIRE PROTECTION SPRAY COATING (9998881) 1275.1910-INST 3Ø TAN PTP 336ACSR (TAN313) 6033.1012-TRANSFER 3Ø 336ACSR PRI & NEUT (NW/SE)-TRANSFER EX 25kVA 120/240v XFMR-RM EX GH C/O-INST L/B C/O (DLS115L) 6022.1000; TAP CØ-FUSE @ 10T (3412200)-TRANSFER OH TPX SEC-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERRED POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP03 560022-147829 45 3 1972P04 559657-147852 40 2 1970POLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P03 560022-147829 35 3P04 559657-147852 45H4MAPS AND RECORDS NOTE (P04):16628 CANAL RD SE IS BEING FED FROM ANUNDERGROUND SERVICE AT SECONDARY POLE559666-147855 AND NOT FROM P04.SITE PLAN 21" = 50'P03: 560022-147829-EX 45' CL 3, 1972 POLE TO BE REPLACED-INST 35' CL 3 (PS353) 6010.1100 -DEEP SET +2' DUE TO SLOPE-TRANSFER OH QPX SEC-RM (2) EX RISER'S-INST (2) 3" RISER'S (RIS3CSS) 6042.1000-TRANSFER (2) #350 UG QPX SVC'S (NW); EXTEND AS REQ'D -ACTUAL #350 UG QPX ADDED L=_________ BATCH YEAR_________ -ACTUAL TRENCH L=_________-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERREDNew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageP04559657-14785225kVAJ.WATT7/26/237/26/232-1292-24XX x 22-812-1292-81