Loading...
PSE FINAL WRECKOUT 108147838 CRYSTAL SPRINGS - MKS 07.25.23.signed_LW APPROVEDsssssssssssssssssssss 15737 15728 15738 15734 15730 15726 15732 15736 15740 1573715737 15728 12 141113 6 1 2 3 4 7 8 9 15 5 23 22 21 TRACT A 25 24 10 TRACT B CRYSTAL SPRINGS STREET NWCRYSTAL SPRINGS ST NWWOODLAND CT SE WOODLAND CT SE CHIEF LESCHI ST SERIVAS AVE SE 95TH C T S E YEL 25 FEED REMOVE REMOVE 5 0 ' 56'56'FUTURE CRYSTAL SPRINGS PLATS N Vicinity Map 46.9490, -122.6059 Owner / Developer Contact Info officeATTN: COPPER RIDGE, LLC PO BOX 73790 PUYALLUP WA 98373 EVAN MANN 253-820-7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 514249984 108147838 N/A 584049965 N/A 594155618 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior UG XFMR UG MISC OH MISC Temporary Job Order Distribution Service Stubs HP Svc/MSA 108147838 N/A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 07.25.23 ... M. WU 858.282.8818 7.18.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS REMOVE (1) POLE & (1) PM XFMR 714 CRYSTAL SPRINGS ST NW YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 108147838 AS SHOWN 1 OF 1 THURSTON N/A N/A QSTHLE 19NW-T17N-R02E N/A N/A 1702E074 1702E116 1702E074 YEL-25 . . . . . . RIGHT OF WAY SUMMER WALKER 253.302.1899 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 jessica.callahan@pse.com x ... ... ... x EVAN@SOUNDBUILTHOMES.COM SITE CRYSTAL SPRINGS ST NWS T E V E N S A V E NWCULLENS ST NWx RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID # HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 559640 147480 40' 3 1976 SITE SPECIFIC NOTES AT P01 (559640-147480) EXISTING 40', 1976 CLASS 3 POLE TO BE REMOVED -REMOVE POLE & ALL PSE FACILITIES AT V01 (559640-147479) -REMOVE EXISTING 25kVA TRANSFORMER & VAULT AT V02 (559679-147470) -INSTALL CAP (7630600) LABOR UNITS - - CABLE/WIRE REMOVAL TABLE SPAN ACTUAL LENGTH REMARKS FROM TO CABLE TAG LENGTH CONDUIT WIRE V02 V01 AØ25482 440'- NOT TO SCALE EX. UNDERGROUND CIRCUIT MAP 1702E074 SCALE: 6" = 1 MILE EX. OVERHEAD CIRCUIT MAP 1702E116 - Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 559640-147479 25kVA SITE SITE 1" = 50' SITE PLAN PSE GENERAL SPECIFICATIONS GENERAL -ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST. -WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS; EQUIPMENT AND PACKING SHALL BE REMOVED DAILY. -RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE, STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS. -RETURN ALL STREETLIGHTS, AREA LIGHTS AND FLOODLIGHTS TO SUMNER YARD. PRE-CONSTRUCTION -NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT. -ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS (425-882-4652) A MINIMUM OF 48 HOURS IN ADVANCE. -NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE. WORK DRAWINGS & DOCUMENTS -PSE PROJECT MANAGER OR ENGINEER SHALL APPROVE FIELD DESIGN CHANGES. -MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE INFORMATION IN RED ON FOREMAN'S COPY OF WORK SKETCH. -RETURN ONE FOREMAN'S COPY OF WORK SKETCH TO PROJECT MANGER AT COMPLETION OF JOB. -WHEN PERMITS ARE REQUIRED, A COPY OF THE PERMITS SHALL BE AVAILABLE ON WORK SITE AT ALL TIMES. SAFETY -EFER TO PSE STANDARDS 6275.3000 FOR REQUIREMENTS ON SYSTEM GROUNDING -REFER TO PSE STANDARDS 6275.9210, 6275.9230 AND 6275.9250 FOR PERSONAL PROTECTIVE GROUNDING REQUIREMENTS. -REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS. -PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF EACH WORKDAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR. -PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT REGULATIONS. -UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE WITH LOCAL TRAFFIC REGULATIONS. -MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY. JOINT FACILITIES -COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS. CIRCUIT FEET REMOVED: 400' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. x WIRE REMOVAL TABLE Location Pri Sec Wire Size & Type Quantity Length (ft per conductor)RemarksFrom To V01 P01 X 4/O UG TPX SEC 1 40' Total Feet (4/O UG TPX SEC) Removed 40' SPAN NOTES V01 - P01 -REMOVE 4/O UG TPX SEC (SEE WIRE REMOVAL TABLE) V02-V01 -REMOVE 1/O AL UG PRI (SEE CABLE REMOVAL TABLE) - - - - - - - - 7.25.23