Loading...
PSE FINAL 105103590 CRYSTAL SPRINGS - MKS 08.22.2023.LWsignedN Vicinity Map 46.9490 -122.6059 Owner / Developer Contact Info officeATTN: COPPER RIDGE, LLC PO BOX 73790 PUYALLUP, WA 98373 EVAN MANN 253-820-7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 514242703 105103590 N/A 105103770 N/A N/A N/A N/A N/A N/A N/A N/A 514242704 107063055 N/A 106393566 N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Street Light Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 105103590 107063055 Phone INTOLIGHT Contact Information: LARS LARSON 425.456.2701 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A IP 344-60 107063055 105103590 N/A 1 OF 4 THURSTON 344 CIONC QSTHLE 19NW-T17N-R02E 280.044 282.044 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 jessica.callahan@pse.com x x ... ... ... EVAN@SOUNDBUILTHOMES.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV 12" Min 12" Sand Cover when gas line is in trench Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" Gas 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN @ H1A, H1B, H2A, H2B, H3A & H3B SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE NOT TO SCALE VAULT DETAIL @ V02 EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 SITE CRYSTAL SPRINGS ST NWS T E V E N S A V E NWCULLENS ST NWxx Excavation - 11-1/4 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 4'-0" 6'-0" 6"6'-7" 3'-6" 4'-0" 7' 10' TOP VIEW VAULT DETAIL @ V01 & V03 NOT TO SCALE 08.25.23 ss s ss s s sssssssssssssssssssss s s 26 1817 12 16141113 6 1 2 3 4 7 8 9 15 20 19 5 2930 28 23 22 21 TRACT A 25 24 10 27 TRACT B CRYSTAL SPRINGS ST NWWO ODLAND CT SE WOODLAND CT SE CHIEF LESCHI ST SERIVAS AVE SE 95TH C T S E 908 904 900 YEL 25FEED FUT: 1-2" FUT: 1-2" FUT: 1-2" ABC TYPICAL PSE EASEMENT 56'56'5 0 '40'36'R50' R50' ABC #2ACSR#2ACSR#2ACSRFUSE @ 65T SW#X90375 'A''C' 'B' 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A IP 344-60 107063055 105103590 1" = 50' 2 OF 4 THURSTON 344 CIONC QSTHLE 19NW-T17N-R02E 280.044 282.044 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 610' 17 3500 115 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-25 05.18.23 377 320 320 -9 34 N/A 368 354 320 J-BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 - V03 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS H2A - - - 11,196 AMPS -13,053 AMPS Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN 10' CLEARANCE REQUIRED TO TRANSFORMER OR NON-FLAMMABLE BUILDING MATERIALS REQUIRED DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES DEVELOPER TO PROVIDE TYPICAL 10' PSE FRONTAGE EASEMENT FOR OPERATION AND MAINTENANCE OF PSE EQUIPMENT. EASEMENT TO BE CLEAR OF ALL BUILDING OVERHANGS AND FOUNDATION FOOTINGS DEDICATED FACILITIES (105103590) for Dedicated Stub Location SITE SPAN ADDITIONAL REMARKS LABOR UNITS # FROM TO FOOTAGE -V01 LOT 14 30 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 15 30 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 8 30 DED. CONDUIT & WIRE 2-36, 2-54A -V03 LOT 4 30 DED. CONDUIT & WIRE 2-36, 2-54A -V03 LOT 5 30 DED. CONDUIT & WIRE 2-36, 2-54A -H3A LOT 26 40 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT=190 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 13 LOT 10 4 40 1 E 2 DB120 1 75 ( )' WCL GAS MAIN, PRIMARY X02 LOT 16 LOT 21 - - - - 2 DB120 1 75 ( )' ECL STREETLIGHT X03 LOT 18 LOT 19 2 40 1 W 3 DB120 2 105 ( )' ECL GAS SVC, SECONDARY X04 LOT 10 LOT 21 2 40 1 S 3 DB120 1 65 ( )' SCL GAS SVC, SECONDARY X05 LOT 8 LOT 23 2 40 1 N 3 DB120 2 65 ( )' SCL GAS SVC, SECONDARY X06 LOT 6 LOT 25 2 40 1 N 3 DB120 1 65 ( )' NCL GAS SVC, SECONDARY X07 LOT 4 TR. A 4 40 1 N 2 DB120 1 65 ( )' SCL GAS MAIN, PRIMARY 3 DB120 1 65 ( )' SCL SECONDARY X08 LOT 4 TR. A - - - - 2 DB120 1 60 ( )' SCL STREETLIGHT X09 LOT 28 LOT 27 2 40 1 W 3 DB120 1 45 ( )' ECL GAS SVC, SECONDARY X10 LOT 1 TR. A 4 40 1 N 2 DB120 1 95 ( )' NCL GAS MAIN, PRIMARY X11 LOT 1 'A' - - - - 2 DB120 1 50 ( )' WCL SECONDARY X12 'A' 'B' - - - - 2 DB120 1 445 ( )' SCL FRONTAGE LIGHT X13 'A' 'C' - - - - 2 DB120 1 40 ( )' SCL FRONTAGE LIGHT 2" PVC PLUG /CAPS = 10 2" YELLOW SCH 40 PVC = 345 FT 2" DB120 GREY PVC = 905 FT 2" PVC PLUG /CAPS = 16 4" PVC PLUG /CAPS = 6 4" YELLOW SCH 40 PVC = 235 FT 3" DB120 GREY PVC = 580 FT 3" PVC PLUG /CAPS = 16 SITE NOTES P01: 559667-147441 -EX 45' CL 3, 1994 POLE TO REMAIN -REMOVE EXISTING 1Ø LINK BREAK CUTOUT & 40T FUSE (SW# Y1249) -INSTALL 1Ø LOAD INTERRUPTOR CUTOUT (DLS115F) 6022.1000 -FUSE @ 65T (3412600); TAP BØ -SW#X90375 08.25.23 EIJ095-AØ YEL 25 FEE D AØ25480 AØ25479 AØ25477 AØ25475 - 1/0 AL AØUNK EIJ097-AØ EIJ096-AØ EIJ098-AØ EIJ099-AØAØ25478 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A IP 344-60 107063055 105103590 AS SHOWN 3 OF 4 THURSTON 344 CIONC QSTHLE 19NW-T17N-R02E 280.044 282.044 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE EX UNDERGROUND CIRCUIT MAP 1702E074 NOT TO SCALE VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559678 147494 4'x6'x3'6" Combo Vault Matid: 7664000 Cover: 7665800 75KVA MP TRF 120/240 Matid: 6247150 4 2 CMBO15LS 6045.1050 AØ ELB10J 6041.1000 CAP (7630600) V02 559661 147486 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 2 - MINU1LL 6045.1010 AØ V03 559645 147487 4'x6'x3'6" Combo Vault Matid: 7664000 Cover: 7665800 75KVA MP TRF 120/240 Matid: 6247150 4 2 CMBO15LS 6045.1050 AØ ELB10J 6041.1000 CAP (7630600) Existing V04 559676 147470 4'x6'x3'6" Combo Vault Matid: Existing 37.5KVA MP TRF 120/240 Matid: Existing 1 - ELB10J 6041.1000 AØ SITE SITE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL V04 V01 2 1 220 - -2 -111 121 1/0 AL JKT 230 EIJ095 --0.9 V01 JMPR CABLE ONLY - -1/0 AL JKT 15 EIJ096 --0.1 V01 V02 2 1 160 1 - - -191 156 1/0 AL JKT 250 EIJ097 --1.0 V02 V03 2 1 155 2 - - -90 119 1/0 AL JKT 165 EIJ098 --0.7 V03 JMPR CABLE ONLY - -1/0 AL JKT 15 EIJ099 --0.1 V01 E01 2 1 160 - - - -CONDUIT ONLY --- V03 E02 2 1 175 1 - - -CONDUIT ONLY --- V03 E03 2 1 185 1 - - -CONDUIT ONLY --- 2" PVC (FT) & BENDS =1055 5 0 2 0 1/0 AL JKT TOTAL (FT) =675 TTL(Gal.)2.8 NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE 08.25.23 FUT: 1-2" FUT: 1-2" FUT: 1-2" 26 18171216141113 6 1 2 3 4 7 8 9 15 20 19 5 2930 28 23 22 21 25 24 10 27 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A IP 344-60 107063055 105103590 N/A 4 OF 4 THURSTON 344 CIONC QSTHLE 19NW-T17N-R02E 280.044 282.044 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... NOT TO SCALE NEW CONDUIT DIAGRAM NOT TO SCALE STREET LIGHT TUBE DETAIL Plan View Detail of Street Light Tube Wire Entrance Slot Street Light Tube Field Side Road Side Wire Entrance Slot 45° 45° Position 3" x 6" wire entrance slot 45 degrees left or right from a line perpendicular to road- way through center of tube. Field Side 3" x 6" Wire Entrance Slot 45° 45° Street light tube set 2" below grade. Road Side 18" - 24" Minimum Depending on Pole Type 5'-0" 20" 26" SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 4 - SEPS4 6050.1000 H1B PEDESTAL 5 - SEPL6 6050.1000 H2A PEDESTAL 4 - SEPS4 6050.1000 H2B PEDESTAL 3 - SEPS3 6050.1000 H3A PEDESTAL 6 - SEPL6 6050.1000 H3B PEDESTAL 4 - SEPS4 6050.1000 H3C HANDHOLE 3 - HHSL3 6050.2000 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in) Design (ft)90° 45°22° 11° (Percent) (Percent)Actual Amount Installed Cable Conduit V01 H1A 350 130 3 130 2 2.5 1.6 V01 H1B 350 130 3 130 2 2.9 1.6 V01 LOT 13 1/O 50 50 3 50 1 3.0 2.6 V01 LOT 14 1/O 45 50 3 45 1 2.9 2.5 V01 LOT 15 1/O 40 50 3 40 1 2.9 2.4 V01 LOT 16 1/O 45 50 3 45 1 2.9 2.5 H1A LOT 11 1/O 50 3 3.2 2.5 H1A LOT 12 1/O 50 3 3.2 2.5 H1B LOT 17 1/O 50 3 3.5 2.5 H1B LOT 18 1/O 50 3 3.5 2.5 H1B LOT 19 4/O 130 50 3 25 1 4.4 3.7 H1B LOT 20 4/O 135 50 3 30 2 4.4 3.8 V02 H2A 350 55 3 55 2 1.9 1.2 V02 H2B 350 170 3 105 4 2.6 1.9 V02 LOT 7 1/O 45 50 3 45 1 2.8 2.5 V02 LOT 8 1/O 40 50 3 40 1 2.7 2.4 V02 LOT 22 1/O 90 50 3 25 3 3.4 3.3 V02 LOT 23 1/O 85 50 3 20 2 3.4 3.2 H2A LOT 9 1/O 50 3 2.6 2.0 H2A LOT 10 1/O 50 3 2.6 2.0 H2A LOT 21 1/O 85 50 3 20 2 3.8 3.6 H2B LOT 24 1/O 50 3 3.3 2.8 H2B LOT 25 1/O 50 3 3.3 2.8 V03 H3A 350 180 3 115 3 3.7 1.9 V03 H3B 350 130 3 130 2 2.6 1.6 V03 LOT 3 1/O 50 50 3 50 1 3.1 2.6 V03 LOT 4 1/O 45 50 3 45 1 3.0 2.5 V03 LOT 5 1/O 40 50 3 40 1 3.0 2.4 V03 LOT 6 1/O 45 50 3 45 1 3.0 2.5 H3A LOT 26 4/O 105 50 3 60 3 4.8 3.4 LABEL YELLOW TAG " MUST BE 4/O TO METER" H3A LOT 27 4/O 100 50 3 55 2 4.8 3.4 LABEL YELLOW TAG " MUST BE 4/O TO METER" H3A LOT 28 4/O 50 50 3 50 1 4.8 3.3 H3A LOT 29 1/O 50 3 4.4 2.8 H3A LOT 30 1/O 50 3 4.4 2.8 H3B LOT 1 1/O 50 3 3.3 2.5 H3B LOT 2 1/O 50 3 3.3 2.5 H3B H3C 1/O 100 50 3 50 2.6 3.4 1/O UG Triplex (ft) =805 3" PVC & BENDS (ft)=1445 41 4.4 4/O UG Triplex (ft) =520 350 UG Triplex (ft) =790 TOTAL QTS OF GLUE 4.4 STREET LIGHT CIRCUITRY TABLE - 105103770 SITE # FROM CABLE INFO AS-BUILT REMARKSTYPE LF TYPE LENGTH FL1 H3C #6 CIC 445 - BY INTOLIGHT FL2 H3C #6 CIC 35 - BY INTOLIGHT SL1 V03 #6 CIC 75 - BY INTOLIGHT SL2 V01 #6 CIC 120 - BY INTOLIGHT SL3 V01 #6 CIC 50 - BY INTOLIGHT SL4 H1A #6 CIC 75 - BY INTOLIGHT TOTAL FT =800 TOTAL FT = THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PRIMARY 2" CONDUIT LEGEND SECONDARY 3" 1. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". 2. ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. 3. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. 4. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. STREET LIGHT NOTES POTELCO: 1. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. 2. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 3. DEVELOPER TO PROVIDE ALL TRENCHING AND CONDUIT WITH PULL-STRINGS FOR STREET LIGHTING CIRCUITRY. 4. CONDUIT SHALL BE SCH 40 PVC, CONDUIT CROSSING ROADWAYS OR DRIVEWAYS SHALL BE SCH 80 PVC. DEVELOPER/CUSTOMER: STREET LIGHT TABLE (BY INTOLIGHT) SITE # STATION OFFSET POLE LUMINAIRE TUBE WO # (INTOLIGHT) BILLING SCH.GRID #INTOLIGHT TAG #TYPE ARM MTG HT. WATTS STYLE TUBE LENGTH TUBE DIAMETER FL1 559625 147442 GREEN CONCRETE OCT 6' 30' 47W LED CHFL 3K T3 5'18" 105103769 51 FL2 559624 147490 GREEN CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51 SL1 559643 147492 GREEN CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51 SL2 559671 147500 GREEN CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51 SL3 559676 147489 GREEN CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51 SL4 559676 147476 GREEN CONCRETE OCT 6' 30' 47W LED CHFL 3K T3 5'18" 105103769 51 #6 CIC 08.25.23