PSE FINAL 105103590 CRYSTAL SPRINGS - MKS 08.22.2023.LWsignedN
Vicinity Map
46.9490 -122.6059
Owner / Developer Contact Info
officeATTN:
COPPER RIDGE, LLC
PO BOX 73790
PUYALLUP, WA 98373
EVAN MANN 253-820-7835
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
514242703 105103590
N/A 105103770
N/A N/A
N/A N/A
N/A N/A
N/A N/A
514242704 107063055
N/A 106393566
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Street Light
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105103590 107063055
Phone
INTOLIGHT Contact Information:
LARS LARSON
425.456.2701
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
M. SAO 206.231.9766 08.22.23
M. SAO 206.231.9766 08.22.23
M. WU . 08.01.23
REDT # ( RW-131034 )YELM
CRYSTAL SPRINGS
1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS
714 CRYSTAL SPRINGS ST NW, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107063055 105103590
N/A 1 OF 4
THURSTON 344 CIONC QSTHLE
19NW-T17N-R02E 280.044 282.044
1702E074 1702E116 1702E074 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
jessica.callahan@pse.com
x
x
...
...
...
EVAN@SOUNDBUILTHOMES.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
4'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A, H1B, H2A, H2B, H3A & H3B
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
NOT TO SCALE
VAULT DETAIL @ V02
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
SITE
CRYSTAL SPRINGS ST NWS
T
E
V
E
N
S
A
V
E
NWCULLENS ST NWxx
Excavation - 11-1/4 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
4'-0"
6'-0"
6"6'-7"
3'-6"
4'-0"
7'
10'
TOP VIEW
VAULT DETAIL @ V01 & V03
NOT TO SCALE
08.25.23
ss
s ss
s
s
sssssssssssssssssssss
s
s
26
1817
12 16141113
6
1
2
3
4
7
8
9
15
20 19
5
2930
28
23
22
21
TRACT A
25
24
10
27
TRACT B
CRYSTAL SPRINGS ST NWWO
ODLAND CT SE
WOODLAND CT SE
CHIEF LESCHI ST SERIVAS AVE SE
95TH
C
T
S
E
908
904
900
YEL
25FEED
FUT: 1-2"
FUT: 1-2"
FUT: 1-2"
ABC
TYPICAL PSE
EASEMENT
56'56'5
0
'40'36'R50'
R50'
ABC #2ACSR#2ACSR#2ACSRFUSE @ 65T
SW#X90375
'A''C'
'B'
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
M. SAO 206.231.9766 08.22.23
M. SAO 206.231.9766 08.22.23
M. WU . 08.01.23
REDT # ( RW-131034 )YELM
CRYSTAL SPRINGS
1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS
714 CRYSTAL SPRINGS ST NW, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107063055 105103590
1" = 50' 2 OF 4
THURSTON 344 CIONC QSTHLE
19NW-T17N-R02E 280.044 282.044
1702E074 1702E116 1702E074 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 610'
17 3500
115 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
05.18.23
377 320 320
-9 34 N/A
368 354 320
J-BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X
MIN.
%Z
FAULT
CURRENT
MIN.
%Z FAULT CURRENT
V01 - V03 75kVA 0.5 2.30
36,200 AMPS 1.80 23,100 AMPS
H2A - - -
11,196 AMPS -13,053 AMPS
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
10' CLEARANCE REQUIRED TO
TRANSFORMER OR NON-FLAMMABLE
BUILDING MATERIALS REQUIRED
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
DEVELOPER TO PROVIDE TYPICAL 10' PSE
FRONTAGE EASEMENT FOR OPERATION
AND MAINTENANCE OF PSE EQUIPMENT.
EASEMENT TO BE CLEAR OF ALL BUILDING
OVERHANGS AND FOUNDATION FOOTINGS
DEDICATED FACILITIES (105103590) for Dedicated Stub Location
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
# FROM TO FOOTAGE
-V01 LOT 14 30 DED. CONDUIT & WIRE
2-36, 2-54A
-V01 LOT 15 30 DED. CONDUIT & WIRE
2-36, 2-54A
-V02 LOT 8 30 DED. CONDUIT & WIRE
2-36, 2-54A
-V03 LOT 4 30 DED. CONDUIT & WIRE
2-36, 2-54A
-V03 LOT 5 30 DED. CONDUIT & WIRE
2-36, 2-54A
-H3A LOT 26 40 DED. CONDUIT & WIRE
2-36, 2-54A
TOTAL FT=190
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 LOT 13 LOT 10 4 40 1 E 2 DB120 1 75 ( )' WCL GAS MAIN, PRIMARY
X02 LOT 16 LOT 21 - - - - 2 DB120 1 75 ( )' ECL STREETLIGHT
X03 LOT 18 LOT 19 2 40 1 W 3 DB120 2 105 ( )' ECL GAS SVC, SECONDARY
X04 LOT 10 LOT 21 2 40 1 S 3 DB120 1 65 ( )' SCL GAS SVC, SECONDARY
X05 LOT 8 LOT 23 2 40 1 N 3 DB120 2 65 ( )' SCL GAS SVC, SECONDARY
X06 LOT 6 LOT 25 2 40 1 N 3 DB120 1 65 ( )' NCL GAS SVC, SECONDARY
X07 LOT 4 TR. A 4 40 1 N
2 DB120 1 65 ( )' SCL GAS MAIN, PRIMARY
3 DB120 1 65 ( )' SCL SECONDARY
X08 LOT 4 TR. A - - - - 2 DB120 1 60 ( )' SCL STREETLIGHT
X09 LOT 28 LOT 27 2 40 1 W 3 DB120 1 45 ( )' ECL GAS SVC, SECONDARY
X10 LOT 1 TR. A 4 40 1 N 2 DB120 1 95 ( )' NCL GAS MAIN, PRIMARY
X11 LOT 1 'A' - - - - 2 DB120 1 50 ( )' WCL SECONDARY
X12 'A' 'B' - - - - 2 DB120 1 445 ( )' SCL FRONTAGE LIGHT
X13 'A' 'C' - - - - 2 DB120 1 40 ( )' SCL FRONTAGE LIGHT
2" PVC PLUG /CAPS = 10 2" YELLOW SCH 40 PVC = 345 FT 2" DB120 GREY PVC = 905 FT 2" PVC PLUG /CAPS = 16
4" PVC PLUG /CAPS = 6 4" YELLOW SCH 40 PVC = 235 FT 3" DB120 GREY PVC = 580 FT 3" PVC PLUG /CAPS = 16
SITE NOTES
P01: 559667-147441
-EX 45' CL 3, 1994 POLE TO REMAIN
-REMOVE EXISTING 1Ø LINK BREAK CUTOUT & 40T FUSE (SW# Y1249)
-INSTALL 1Ø LOAD INTERRUPTOR CUTOUT (DLS115F) 6022.1000
-FUSE @ 65T (3412600); TAP BØ
-SW#X90375
08.25.23
EIJ095-AØ
YEL
25
FEE
D
AØ25480
AØ25479
AØ25477
AØ25475 - 1/0 AL
AØUNK
EIJ097-AØ
EIJ096-AØ
EIJ098-AØ
EIJ099-AØAØ25478
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
M. SAO 206.231.9766 08.22.23
M. SAO 206.231.9766 08.22.23
M. WU . 08.01.23
REDT # ( RW-131034 )YELM
CRYSTAL SPRINGS
1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS
714 CRYSTAL SPRINGS ST NW, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107063055 105103590
AS SHOWN 3 OF 4
THURSTON 344 CIONC QSTHLE
19NW-T17N-R02E 280.044 282.044
1702E074 1702E116 1702E074 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 1702E074
NOT TO SCALE
VAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559678
147494
4'x6'x3'6"
Combo Vault
Matid: 7664000
Cover: 7665800
75KVA MP TRF
120/240
Matid: 6247150
4 2
CMBO15LS 6045.1050 AØ
ELB10J 6041.1000
CAP (7630600)
V02 559661
147486
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 6247150
2 -
MINU1LL 6045.1010 AØ
V03 559645
147487
4'x6'x3'6"
Combo Vault
Matid: 7664000
Cover: 7665800
75KVA MP TRF
120/240
Matid: 6247150
4 2
CMBO15LS 6045.1050 AØ
ELB10J 6041.1000
CAP (7630600)
Existing
V04
559676
147470
4'x6'x3'6"
Combo Vault
Matid: Existing
37.5KVA MP TRF
120/240
Matid: Existing
1 -
ELB10J 6041.1000 AØ
SITE
SITE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO
SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
V04 V01 2 1 220 - -2 -111 121 1/0 AL JKT 230 EIJ095
--0.9
V01 JMPR CABLE ONLY - -1/0 AL JKT 15 EIJ096
--0.1
V01 V02 2 1 160 1 - - -191 156 1/0 AL JKT 250 EIJ097
--1.0
V02 V03 2 1 155 2 - - -90 119 1/0 AL JKT 165 EIJ098
--0.7
V03 JMPR CABLE ONLY - -1/0 AL JKT 15 EIJ099
--0.1
V01 E01 2 1 160 - - - -CONDUIT ONLY ---
V03 E02 2 1 175 1 - - -CONDUIT ONLY ---
V03 E03 2 1 185 1 - - -CONDUIT ONLY ---
2" PVC (FT) & BENDS =1055 5 0 2 0 1/0 AL JKT TOTAL (FT) =675 TTL(Gal.)2.8
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
08.25.23
FUT: 1-2"
FUT: 1-2"
FUT: 1-2"
26
18171216141113
6
1
2
3
4
7
8
9
15
20 19
5
2930 28
23
22
21
25
24
10
27
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
M. SAO 206.231.9766 08.22.23
M. SAO 206.231.9766 08.22.23
M. WU . 08.01.23
REDT # ( RW-131034 )YELM
CRYSTAL SPRINGS
1Ø PRIMARY U/G LINE EXTENSION - 30 S/F LOTS
714 CRYSTAL SPRINGS ST NW, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107063055 105103590
N/A 4 OF 4
THURSTON 344 CIONC QSTHLE
19NW-T17N-R02E 280.044 282.044
1702E074 1702E116 1702E074 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
NOT TO SCALE
NEW CONDUIT DIAGRAM
NOT TO SCALE
STREET LIGHT TUBE DETAIL
Plan View Detail
of Street Light Tube
Wire Entrance
Slot
Street Light
Tube
Field
Side
Road
Side
Wire
Entrance Slot
45°
45°
Position 3" x 6" wire entrance slot 45 degrees
left or right from a line perpendicular to road-
way through center of tube.
Field Side
3" x 6" Wire
Entrance Slot
45°
45°
Street light tube
set 2" below grade.
Road Side
18" - 24" Minimum
Depending on
Pole Type
5'-0"
20"
26"
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 4 - SEPS4 6050.1000
H1B PEDESTAL 5 - SEPL6 6050.1000
H2A PEDESTAL 4 - SEPS4 6050.1000
H2B PEDESTAL 3 - SEPS3 6050.1000
H3A PEDESTAL 6 - SEPL6 6050.1000
H3B PEDESTAL 4 - SEPS4 6050.1000
H3C HANDHOLE 3 - HHSL3 6050.2000
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER
Foreman - Complete
FROM TO
(1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in) Design (ft)90° 45°22° 11°
(Percent) (Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 130 3 130 2 2.5 1.6
V01 H1B 350 130 3 130 2 2.9 1.6
V01 LOT 13 1/O 50 50 3 50 1 3.0 2.6
V01 LOT 14 1/O 45 50 3 45 1 2.9 2.5
V01 LOT 15 1/O 40 50 3 40 1 2.9 2.4
V01 LOT 16 1/O 45 50 3 45 1 2.9 2.5
H1A LOT 11 1/O 50 3 3.2 2.5
H1A LOT 12 1/O 50 3 3.2 2.5
H1B LOT 17 1/O 50 3 3.5 2.5
H1B LOT 18 1/O 50 3 3.5 2.5
H1B LOT 19 4/O 130 50 3 25 1 4.4 3.7
H1B LOT 20 4/O 135 50 3 30 2 4.4 3.8
V02 H2A 350 55 3 55 2 1.9 1.2
V02 H2B 350 170 3 105 4 2.6 1.9
V02 LOT 7 1/O 45 50 3 45 1 2.8 2.5
V02 LOT 8 1/O 40 50 3 40 1 2.7 2.4
V02 LOT 22 1/O 90 50 3 25 3 3.4 3.3
V02 LOT 23 1/O 85 50 3 20 2 3.4 3.2
H2A LOT 9 1/O 50 3 2.6 2.0
H2A LOT 10 1/O 50 3 2.6 2.0
H2A LOT 21 1/O 85 50 3 20 2 3.8 3.6
H2B LOT 24 1/O 50 3 3.3 2.8
H2B LOT 25 1/O 50 3 3.3 2.8
V03 H3A 350 180 3 115 3 3.7 1.9
V03 H3B 350 130 3 130 2 2.6 1.6
V03 LOT 3 1/O 50 50 3 50 1 3.1 2.6
V03 LOT 4 1/O 45 50 3 45 1 3.0 2.5
V03 LOT 5 1/O 40 50 3 40 1 3.0 2.4
V03 LOT 6 1/O 45 50 3 45 1 3.0 2.5
H3A LOT 26 4/O 105 50 3 60 3 4.8 3.4 LABEL YELLOW TAG " MUST BE 4/O TO METER"
H3A LOT 27 4/O 100 50 3 55 2 4.8 3.4 LABEL YELLOW TAG " MUST BE 4/O TO METER"
H3A LOT 28 4/O 50 50 3 50 1 4.8 3.3
H3A LOT 29 1/O 50 3 4.4 2.8
H3A LOT 30 1/O 50 3 4.4 2.8
H3B LOT 1 1/O 50 3 3.3 2.5
H3B LOT 2 1/O 50 3 3.3 2.5
H3B H3C 1/O 100 50 3 50 2.6 3.4
1/O UG Triplex (ft) =805 3" PVC & BENDS (ft)=1445 41 4.4
4/O UG Triplex (ft) =520
350 UG Triplex (ft) =790 TOTAL QTS OF GLUE 4.4
STREET LIGHT CIRCUITRY TABLE - 105103770
SITE
# FROM
CABLE INFO AS-BUILT
REMARKSTYPE LF TYPE LENGTH
FL1 H3C #6 CIC 445 - BY INTOLIGHT
FL2 H3C #6 CIC 35 - BY INTOLIGHT
SL1 V03 #6 CIC 75 - BY INTOLIGHT
SL2 V01 #6 CIC 120 - BY INTOLIGHT
SL3 V01 #6 CIC 50 - BY INTOLIGHT
SL4 H1A #6 CIC 75 - BY INTOLIGHT
TOTAL FT =800 TOTAL FT =
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PRIMARY 2"
CONDUIT LEGEND
SECONDARY 3"
1. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER
STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES
MANUAL".
2. ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET
PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE
POLE.
3. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT
IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT
ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS
CRUSHED ROCK WILL BE REQUIRED.
4. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE
LUMINAIRE MUST BE LEVELED.
STREET LIGHT NOTES
POTELCO:
1. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC
(NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO
AID IN THE INSTALLATION OF THE STREET LIGHTING POLES.
2. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET
LIGHT TUBE.
3. DEVELOPER TO PROVIDE ALL TRENCHING AND CONDUIT WITH
PULL-STRINGS FOR STREET LIGHTING CIRCUITRY.
4. CONDUIT SHALL BE SCH 40 PVC, CONDUIT CROSSING ROADWAYS
OR DRIVEWAYS SHALL BE SCH 80 PVC.
DEVELOPER/CUSTOMER:
STREET LIGHT TABLE (BY INTOLIGHT)
SITE
#
STATION
OFFSET
POLE LUMINAIRE TUBE
WO #
(INTOLIGHT)
BILLING
SCH.GRID #INTOLIGHT
TAG #TYPE ARM MTG HT. WATTS STYLE
TUBE
LENGTH
TUBE
DIAMETER
FL1 559625
147442
GREEN
CONCRETE OCT 6' 30' 47W LED CHFL 3K T3 5'18" 105103769 51
FL2 559624
147490
GREEN
CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51
SL1 559643
147492
GREEN
CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51
SL2 559671
147500
GREEN
CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51
SL3 559676
147489
GREEN
CONCRETE OCT 6' 30'47W LED CHFL 3K T3 5'18" 105103769 51
SL4 559676
147476
GREEN
CONCRETE OCT 6' 30' 47W LED CHFL 3K T3 5'18" 105103769 51
#6 CIC
08.25.23