Loading...
PSE FINAL 107063055 CRYSTAL SPRINGS - MKS 08.22.2023.LWsignedss s ss s s sssssssssssssssssssss s s 1573815734 26 1817 12 16141113 6 1 2 3 4 7 8 9 15 20 19 5 2930 28 23 22 21 TRACT A 25 24 10 27 TRACT B CRYSTAL SPRINGS ST NWWO ODLAND CT SE WOODLAND CT SE CHIEF LESCHI ST SERIVAS AVE SE2" PE IP 26'W 9315951 JT95TH C T S E 2" PE I P 2 8 ' N 93159 5 1 J T 2" P E I P 5 2' R 931 5 9 5 1 J T 2" STW IP 12'W72-7831 1/4" PE IP 27'E9315951 JT5/8" MPE 1995 5/8" MPE 1995 1 1 / 4 " P E I 1 1 6 ' N TYPICAL PSE EASEMENT2" STW IP 12'W72-78333'N 8 6 ' N 25'W 220'N226'N56'56'5 0 '40'36'R50' R50' Owner / Developer Contact Info officeATTN: COPPER RIDGE, LLC PO BOX 73790 PUYALLUP, WA 98373 EVAN MANN 253-820-7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH):105103590 107063055 Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 2" MPE-___ GAS MAIN EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY 107063055 105103590 1" = 50' 1 OF 2 THURSTON 344 CIONC 19NW-T17N-R02E 280.044 282.044 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 514242704 107063055 N/A 106393566 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2" MPE-___ 50 FT JOINT 2" MPE-___ 1154 FT .. .. .. .. .. .. .. .. Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:JESSICA CALLAHAN 206.503.1520 jessica.callahan@pse.com 60 IP 344-60 .. xx INSTALL 2" = 50 FT JOINT 2" = 1154 FT ... ... ... JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 EVAN@SOUNDBUILTHOMES.COM 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE CFH / HOME = 90 SITE PLAN 1" = 50' N Vicinity Map 46.9490 -122.6059 SITE CRYSTAL SPRINGS ST NWCULLENS ST NWS T E V E N S A V E NW 2" FUSED TIE-IN 52'R & 226'N C/L ______'R _____'N C/L INSTALL 2" MPE-___ 50' @ 52'R TO 33'N C/L (______)' @ _____'R TO _____'N C/L JOINT 2" MPE-___ 89' @ 33'N C/L (______)' @ _____'N C/L 2" INLINE TEE 33'N C/L & 28'W C/L ______'N C/L & _____'W C/L 2" CAP EOM/WIREBOX 33'N C/L & 210'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 335' @ 28'W C/L (______)' @ _____'W C/L JOINT 2" MPE-___ 238' @ 33'N C/L (______)' @ _____'N C/L JOINT 2" MPE-___ 162' @ 28'W C/L (______)' @ _____'W C/L 2" INLINE TEE 20'S C/L & 28'W C/L ______'S C/L & _____'W C/L 2" 90° ELBOW 25'N C/L & 28'W C/L ______'N C/L & _____'W C/L 2" CAP EOM/WIREBOX 20'S C/L & 199'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 227' @ 20'S C/L (______)' @ _____'S C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 33'N C/L & 117'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 103' @ 25'NC/L (______)' @ _____'NC/L 2" CAP EOM/WIREBOX 25'N C/L & 75'E C/L ______'N C/L & _____'E C/L STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 IP-344-60 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 13 LOT 10 4 40 1 E 2 DB120 1 75 ( )' WCL GAS MAIN, PRIMARY X02 LOT 16 LOT 21 - - - - 2 DB120 1 75 ( )' ECL STREETLIGHT X03 LOT 18 LOT 19 2 40 1 W 3 DB120 2 105 ( )' ECL GAS SVC, SECONDARY X04 LOT 10 LOT 21 2 40 1 S 3 DB120 1 65 ( )' SCL GAS SVC, SECONDARY X05 LOT 8 LOT 23 2 40 1 N 3 DB120 2 65 ( )' SCL GAS SVC, SECONDARY X06 LOT 6 LOT 25 2 40 1 N 3 DB120 1 65 ( )' NCL GAS SVC, SECONDARY X07 LOT 4 TR. A 4 40 1 N 2 DB120 1 65 ( )' SCL GAS MAIN, PRIMARY 3 DB120 1 65 ( )' SCL SECONDARY X08 LOT 4 TR. A - - - - 2 DB120 1 60 ( )' SCL STREETLIGHT X09 LOT 28 LOT 27 2 40 1 W 3 DB120 1 45 ( )' ECL GAS SVC, SECONDARY X10 LOT 1 TR. A 4 40 1 N 2 DB120 1 95 ( )' NCL GAS MAIN, PRIMARY X11 LOT 1 'A' - - - - 2 DB120 1 50 ( )' WCL SECONDARY X12 'A' 'B' - - - - 2 DB120 1 445 ( )' SCL FRONTAGE LIGHT X13 'A' 'C' - - - - 2 DB120 1 40 ( )' SCL FRONTAGE LIGHT 2" PVC PLUG /CAPS = 10 2" YELLOW SCH 40 PVC = 345 FT 2" DB120 GREY PVC = 905 FT 2" PVC PLUG /CAPS = 16 4" PVC PLUG /CAPS = 6 4" YELLOW SCH 40 PVC = 235 FT 3" DB120 GREY PVC = 580 FT 3" PVC PLUG /CAPS = 16 08.25.23 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL J. CALLAHAN 206.503.1520 . M. SAO 206.231.9766 08.22.23 M. WU . 08.01.23 REDT # ( RW-131034 )YELM CRYSTAL SPRINGS 2" MPE-___ GAS MAIN EXTENSION - 30 S/F LOTS 714 CRYSTAL SPRINGS ST NW, YELM, WA 98597 PUGET SOUND ENERGY 107063055 105103590 N/A 2 OF 2 THURSTON 344 CIONC 19NW-T17N-R02E 280.044 282.044 COMCAST TED AXTELL 253.878.2794 TELEPHONE . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... ... ... GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 2" MAIN 1 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 2 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 3 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 4 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 5 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 6 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( )' NCL 2600 SS SINGLE 2" MAIN 9 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 10 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 11 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 13 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 14 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 15 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 16 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 17 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 18 1 1/8 MPE-___10 ( )' ECL 2600 LS TWIN 2" MAIN 19 & 20 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 21 1 1/8 MPE-___65 ( )' SCL 2600 LS TWIN 2" MAIN 22 & 23 1 1/8 MPE-___65 ( )' SCL 2600 LS TWIN 2" MAIN 24 & 25 1 1/8 MPE-___65 ( )' NCL 2600 LS TWIN 2" MAIN 26 & 27 1 1/8 MPE-___45 ( )' ECL 2600 SS SINGLE 2" MAIN 28 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 29 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 30 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLES = 21 515 FT 1 1/8" PE PIPE LS SINGLES = 1 LS TWIN = 4 EX PLAT MAP 282.044 NOT TO SCALE SITE Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) NOT TO SCALE CROSS SECTION - CHIEF LESCHI ST SE LOOKING NORTH PROP. 2" MPE IP - 28'WCL G NOT TO SCALE CROSS SECTION - WOODLAND CT SE LOOKING WEST N 56' ROW PROP. 2" MPE IP - 52'R TO 33'NCL EX 2" MPE IP 52'R 9315951 JT S G G NOT TO SCALE CROSS SECTION - TR. B LOOKING WESTNOT TO SCALE CROSS SECTION - RIVAS AVE SE LOOKING WEST PROP. 2" MPE IP - 22'NCL G E 56' ROW W N 40' ROW S S N PROP. 2" MPE IP - 20'SCL G 08.25.23