Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TIA Country Meadow Estates II
COUNTRY MEADOW ESTATES II Yelm, WA/Thurston County TRAFFIC IMPACT ASSESSMENT (TIA) August 2, 2023 HeathTraffic.com Country Meadow Estates II TIA 2 COUNTRY MEADOW ESTATES II TRAFFIC IMPACT ANALYSIS Prepared for: Evan Mann SoundBuilt Homes PO Box 73790 Puyallup, WA 98373 Prepared by: Heath & Associates PO Box 397 Puyallup, WA 98371 (253) 770 1401 Heathtraffic.com License: HeathTraffic.com Country Meadow Estates II TIA 3 COUNTRY MEADOW ESTATES II TRAFFIC IMPACT ANALYSIS CONTENTS 1. Introduction ........................................................................................................... 4 2. Project Description ............................................................................................... 4 3. Existing Conditions .............................................................................................. 6 4.Forecast Traffic Demand and Analysis ............................................................ 11 5.Conclusions & Mitigation .................................................................................. 24 TABLES 1. Roadway Network ................................................................................................ 6 2.Transportation Improvement Projects ............................................................... 8 3.Existing PM Peak Hour Level of Service ............................................................. 9 4.Project Trip Generation ..................................................................................... 11 5.Forecast 2026 Weekday Peak Hour Level of Service..................................... 19 6.Forecast 2026 Weekday Peak Hour Level of Service With Project .............. 20 FIGURES 1.Vicinity Map & Roadway System ......................................................................... 4 2.Conceptual Site Plan ............................................................................................ 5 3.Existing PM Peak Hour Volumes ......................................................................... 7 4.New East-West Connection ............................................................................. 12 5.Traffic Reroute Area ........................................................................................... 12 6.PM Peak Hour Trip Distribution & Assignment ............................................... 14 7.Traffic Reroute Volumes .................................................................................... 15 8.PM Peak Hour Pipeline Volumes ...................................................................... 16 9.Forecast 2026 PM Peak hour Volumes Without Project ............................... 17 10.Forecast 2026 PM Peak hour Volumes With Project ...................................... 18 11.Bald Hill Roadway Width .................................................................................. 20 12.Conceptual TWLTL Cross Section Design ....................................................... 21 13.Northern Sight Distance ................................................................................... 22 14.Combined Site Plan .......................................................................................... 23 HeathTraffic.com Country Meadow Estates II TIA 4 COUNTRY MEADOW ESTATES II TRAFFIC IMPACT ANALYSIS 1.INTRODUCTION The main goals of this study focus on the assessment of existing roadway conditions and forecasts of newly generated project traffic. The first task includes the review of general roadway information on the adjacent street system and baseline vehicular volumes. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. As a final step, appropriate conclusions and mitigation measures are defined if needed. 2.PROJECT DESCRIPTION Country Meadow Estates II is a proposed residential development comprised of 29 single family homes located within the Yelm Urban Growth Area (UGA) of Thurston County. The subject site is bordered to the east by Morris Road SE situated on tax parcel #: 22730410000 comprised of 5.0-acres. Access to and from the site is proposed via one new roadway extending west from Morris Road SE with westerly connection to Country Meadows I and northerly connection to Vancil Court SE. A vicinity map is provided below which highlights the nearby roadway network with the subject site highlighted in red. Figure 2 on the following page displays the conceptual site plan. Figure 1: Vicinity Map N Subject Site SR 507 FIGURE 2SITE PLANCOUNTRY MEADOW ESTATES IIN5 HeathTraffic.com Country Meadow Estates II TIA 6 3. EXISTING CONDITIONS 3.1 Existing Street System Characteristics of the major roadways and arterials serving the subject site are provided in Table 1 below. Table 1: Roadway Network Functional Classification Roadway Speed Limit (MPH) Lanes Sidewalk/ Walking Path Street Parking Bike Lane Major Arterial SR 507 25-45 2-3 In city area Some Some Urban Arterial Bald Hill Rd 40 2 Some Some No Commercial Collector Creek St SE 25 2-3 Yes No No Morris Rd SE 35 2 No No No *No observed speed limit so city standard 25 mph applies. 3.2 Transit Service A review of the Intercity Transit regional bus schedule indicates that transit is available within walking distance (under one mile) from the subject site. The closest stop in relation to the subject site is located at the intersection of SR 507 & Bald Hill Road SE (~1,200 feet north). The bus route served at the intersection is Route 94 – Boulevard Road/Yelm. Route 94 provides service from the Olympia Transit Center to the Yelm Walmart. Weekday service is provided from 6:04 AM – 9:58 PM with approximately 60-minute headways during peak travel times. Weekend service is provided from 6:39 AM – 9:58 PM with approximately 60-minute headways. Refer to the Intercity Transit website for more detailed information. 3.3 Existing Peak Hour Volumes and Travel Patterns Field data for this study was collected in June 2023 at two outlying study intersections and the access along Morris Road SE (school still in session). Each intersection is listed below. • SR 507 & Bald Hill Road SE/Creek Street SE (6/14/2023) • Bald hill Road SE & Marris Road SE (6/14/2023) • Morris Road SE at proposed point of access (6/14/2023) Data were obtained during the PM peak period from 4:00-6:00 PM. The single hour representing peak volumes for the PM time periods are then determined and used for capacity analysis. Figure 3 highlights existing PM peak hour volumes. Count sheets have been included in the appendix for reference. FIGURE 3 EXISTING PM PEAK HOUR VOLUMES COUNTRY MEADOW ESTATES II N NE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 3 9 13 16 13 13 171 394 297 136 37 20 511 103 64245 263 313 74 244 139 14 113 45 193 161 S T O P STOPVANCIL RD SEFUTURE CONNECTIONS COUNTRY MEADOW ESTATES I 7 HeathTraffic.com Country Meadow Estates II TIA 8 3.4 Roadway Improvements The city of Yelm’s most recent (2022-2027) Transportation Improvement Plan, the Thurston County Transportation Plan (2023-2028), and the Washington State STIP (Statewide Transportation Improvement program) (2023-2026) were all reviewed. The city of Yelm’s TIP and the WSDOT STIP both indicated planned improvements in the vicinity of the proposed project, each project is listed and described below. Table 2: Transportation Improvement Projects Name Location Improvement Cost City of Yelm 2nd Ave SE ID #: WA12343 Mosman Ave to 575’ south Construct 5-foot-wide multi-use concrete sidewalk along the west side of 2nd Street SE from Cochrane Park to the existing sidewalk at Mosman Ave. $250,000 Mosman Ave SE ID #: WA- 12344 2nd St SE to 3rd St SE Construct sidewalks on both sides of Mosman Ave, install intersection treatment at 2nd St and Mosman Ave. Construct bike lanes from 2nd St to 3rd St. $310,000 Yelm Ave Improvements ID #: WA- 12346 1st St to 4th St Construction and repair of sidewalks, installation of new parallel parking, intersection treatment, and access control along both sides of Yelm Ave. $2,321,800 Mosman Ave II ID #: Yelm 13 01 Longmire to Railroad Construct a new road connecting Longmire St with the new Mosman Ave intersection. Bike lanes, sidewalk, street lighting, and storm water improvements are included. Improvements include construction of new road from Longmire to Solberg, and reconstruction of Mosman between Solberg and Railroad. $11,482,200 Bald Hill Rd ID #: Yelm 13 14 City Limits to 5 Corners This project is a feasibility study to identify a project that resolves seasonal flooding issues. $70,000 Statewide Transportation Improvement Plan SR 510/Yelm Loop SR 510 Traffic throughout the city is extremely congested at this time. This project will construct the second stage of a new alignment for SR 510 through the city of Yelm. When complete, this project will relieve congestion and improve motorist safety. $58,697,552 Several planned improvements would further increase non-motorist mobility in the area. Moreover, the anticipated new SR 510 loop would relieve congestion along SR 507 (E Yelm Avenue). 3.5 Non-Motorist Activity and Infrastructure Pedestrian and bicycle activity were monitored at each intersection studied for this project during routine PM peak hour field counts. The intersection of SR 507 & Bald HeathTraffic.com Country Meadow Estates II TIA 9 Hill Road SE/Creek Street SE received two pedestrians, one crossing the north leg and one crossing the east leg. The intersection of Bald Hill Road SE & Morris Road SE received one bicyclist crossing the Morris Road SE intersection leg. Non motorist infrastructure in the area is consisted of continuous sidewalk along Bald Hill Road SE which provides connection to SR 507 where many amenities and transit opportunities are present. 3.6 Existing Level of Service Peak hour delays were determined through the use of the Highway Capacity Manual 7th Edition. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. The range1 for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Detailed descriptions of intersection LOS are given in the Highway Capacity Manual. Level of service calculations were made through the use of the Synchro 12 analysis program. For signalized intersections, LOS is determined by the overall average delay. For side-street stop-controlled intersections, LOS is determined by the approach with the highest delay. Table 3 below summarizes existing LOS and delays for the key intersections of study. Table 3: Existing PM Peak Hour Level of Service Delays given in seconds per vehicle Intersection Control Movement LOS Delay SR 507 & Bald Hill Rd SE/Creek St SE Signal Overall C 25.8 Bald Hill Rd SE & Morris Rd SE Two-Way Stop NEB F 56.6 *NEB-Northeast Bound City Level of Service Standards2: Yelm has an adopted a Level of Service Standard D. 1 Signalized Intersections - Level of Service Stop Controlled Intersections – Level of Service Control Delay per Control Delay per Level of Service Vehicle (sec) Level of Service Vehicle (sec) A 10 A 10 B 10 and 20 B 10 and 15 C 20 and 35 C 15 and 25 D 35 and 55 D 25 and 35 E 55 and 80 E 35 and 50 F 80 F 50 Highway Capacity Manual, 7th Edition 2 Yelm Comprehensive Plan. HeathTraffic.com Country Meadow Estates II TIA 10 State Level of Service Standards3: SR 507 also has an adopted a Level of Service Standard D. SR 507 & Bald Hill Road SE/Creek Street SE: Is shown to operate with acceptable LOS C conditions in the PM peak hour. Bald Hill Road SE & Morris Road SE: Is shown to operate with LOS F conditions for the northbound approach (i.e., drivers from Morris Road waiting to enter Bald Hill Road). This is due to the observed 136 vehicles attempting to make a left-turn (compared to 13 right-turning vehicles) in the peak hour. According to the City’s Transportation System Plan4 Project Y9 intends to reconstruct Bald Hill Road to comprise three-lanes (presently two-lanes) from Yelm Avenue to the Western Chehalis Rail. A three-lane cross-section would accommodate a center two- way left-turn lane across Morris Road SE whereby motorists could perform two- staged entry to the roadway. Additional analysis on the improvement and its affect on operations will be examined in Section 4. Several other projects in the city are also anticipated to reduce overall congestion such as the SR 507/510 Loop extensions. 3 WSDOT – Level of Service Standard - ArcGIS 4 City of Yelm Transportation System Plan - 2022 HeathTraffic.com Country Meadow Estates II TIA 11 4. FORECAST TRAFFIC DEMAND & ANALYSIS 4.1 Project Trip Generation Trip generation is defined as the number of vehicle movements that enter or exit the respective project site during a designated time period, such as a specific peak hour (AM or PM) or an entire day. The magnitude of the anticipated vehicle trip generation for the proposed project was derived from the Institute of Transportation Engineers (ITE) publication, Trip Generation, 11th Edition. Based on the proposed development, the designated land use is defined as LUC – 210 Single-Family Detached Housing. Dwelling units were used as the input variable and ITE’s equations were used to determine trip ends. ITE trip generation sheets have been included in the appendix for reference. See Table 4 below. Table 4: Project Trip Generation Land Use Units AWDT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total LUC 210 Single Family 29 323 6 18 24 20 11 31 Based on the data presented in Table 4, the project is estimated to generate 323 average weekday daily trips with 24 trips (6 inbound / 18 outbound) occurring in the AM peak hour and 31 trips (20 inbound / 11 outbound) occurring in the PM peak hour. 4.2 Distribution & Assignment Trip distribution describes the process by which project generated trips are dispersed on the roadway network surrounding the site. Trip distribution for this project utilized the TAZ 726—consistent with County Meadows I. Trip distribution herein assumes completion of Country Meadows I whereupon an east-west connection between Morris Road SE & Vancil Road SE will be provided. Therefore, project traffic heading to/from the west may utilize this connection through Country Meadow Estates I. The PM peak hour trip distribution & assignment is shown in Figure 6. HeathTraffic.com Country Meadow Estates II TIA 12 Country Meadow Estates I All traffic was assigned to/from Vancil Road per the initial traffic study. Adjustments, therefore, occurred to travel assignments to/from the east such as Morris Road, Bald Hill, and half of traffic to SR 507 due to a more direct route through Estates II. This resulted in a redistribution of 8 entering and 5 exiting movements from Estates I. Local Neighborhood Rerouting Also taken into consideration, as part of Country Meadow Estates II development and the east/west connectivity, redistribution of local traffic is anticipated. In review of the existing area and in context to the site layout, Figure 5 below shows the anticipated capture area. The new roadway connection would mainly attract drivers going to/from Bald Hill Road SE and/or Morris Road SE. N Figure 5: Reroute Area Figure 4: New East-West Connection HeathTraffic.com Country Meadow Estates II TIA 13 As shown, approximately 35 single-family residences could utilize the new east/west connection. Applying ITE data suggests a total of 37 PM peak hour trips (23 in / 14 out). Applying the same travel assignments to the anticipated routes (e.g., Bald Hill and Morris—no appreciable change to SR 507 is anticipated), results in 2 entering and 1 exiting rerouted motorists. When Country Meadow Estates II is completed, a new east-west roadway connection would be available for nearby residents. The new roadway would provide a through connection from Vancil Road SE to Morris Road SE. The new roadway connection would mainly attract drivers going to/from Bald Hill Road SE and/or Morris Road SE. Rerouted traffic from both the nearby existing residents and The Country Meadow Estates II project are shown in Figure 7, which are included in forecast analysis. 4.4 Future Peak Hour Volumes A 3-year horizon of 2026 was used for future traffic delay analysis. Forecast 2026 background traffic volumes were derived by applying a one percent compound annual growth rate to the existing volumes shown in Figure 3. This growth rate was developed from WSDOT volumes along SR 507 just northwest of Bald Hill Road SE which are shown to be consistent from 2016 (ADT – 19,000) to 2019 (ADT – 19,000) (pre-COVID conditions) (2021 ADT – 18,000). Moreover, also taken into consideration are in-process developments within the city which includes: The Hutch5, Durant Street Plat, Alpine Estates, Tahoma Boulevard Apartments, El Rey Burro, The Summit at Thompson Creek, Samantha Ridge, Habitat for Humanity, Liberty Grove, 407 E Yelm Coffee, and Country Meadow Estates I6. PM peak hour pipeline volumes are shown in Figure 8. Forecast 2026 PM peak hour volumes without the project (background growth plus pipeline) are shown in Figure 9 while Figure 10 illustrates forecast 2026 volumes with the addition of project-generated traffic. 5 Based on site visit (6/14/23), approximately 40/118 homes were constructed and occupied. Therefore, 70% of the trips have been applied as pipeline trips. 6 Trips adjusted to account for east-west connectivity. FIGURE 6 PM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENT COUNTRY MEADOW ESTATES II N VANCIL RD SENE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 0 0 0 1 1 0 12 0 0 7 0 0 0 5 34 7 0 0 0 0 0 0 0 S T O P STOP1 0 13 0 0 8 STOPPM PEAK HOUR TRIPS INBOUND: 20 VPH OUTBOUND: 11 VPH 60% 5.5% 23% 0 0 0 0 6 3 STOPFUTURE CONNECTIONS 2.5% 5% 4% LOCAL COUNTRY MEADOW ESTATES I 14 FIGURE 7 TRAFFIC REROUTE COUNTRY MEADOW ESTATES II N VANCIL RD SENE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 0 0 0 3 2 0 5 0 0 3 0 0 0 5 30 0 0 0 0 0 0 0 0 S T O P STOP2 1 8 0 0 5 STOPEXISTING TRAFFIC REROUTE INBOUND: 2 VPH OUTBOUND: 1 VPH FUTURE CONNECTIONS COUNTRY MEADOW ESTATES I TRAFFIC REROUTE INBOUND: 8 VPH OUTBOUND: 5 VPH COUNTRY MEADOW ESTATES I 15 FIGURE 8 PM PEAK HOUR PIPELINE VOLUMES COUNTRY MEADOW ESTATES II N NE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 0 0 0 0 0 0 0 10 13 0 0 0 81 0 013 10 47 3 0 0 1 0 0 0 0 S T O P STOPVANCIL RD SEFUTURE CONNECTIONS COUNTRY MEADOW ESTATES I 16 FIGURE 9 FORECAST 2026 PM PEAK HOUR VOLUMES WITHOUT PROJECT COUNTRY MEADOW ESTATES II N NE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 3 9 13 16 13 13 176 416 319 140 38 21 607 106 66265 281 369 79 251 143 15 116 46 199 166 S T O P STOPVANCIL RD SEFUTURE CONNECTIONS COUNTRY MEADOW ESTATES I 17 FIGURE 10 FORECAST 2026 PM PEAK HOUR VOLUMES WITH PROJECT COUNTRY MEADOW ESTATES II N VANCIL RD SENE PLAZA DRCREEK ST SEMORRIS RD SESITE B A L D H I L L R D S E 507 507 3 9 13 20 16 13 193 416 319 150 38 21 607 116 72269 288 369 79 251 143 15 116 46 S T O P STOP3 1 21 199 166 13 STOPFUTURE CONNECTIONS COUNTRY MEADOW ESTATES I 18 HeathTraffic.com Country Meadow Estates II TIA 19 4.4 Future Level of Service Level of service analyses were made of the future PM peak hour volumes without (background) and with project related trips added to the key roadways and intersections. This analysis once again involved the use of the Synchro 12 analysis program. Delays for the study/access intersections under future conditions are shown below in Table 5. Table 5: Forecast 2026 Weekday Peak Hour Level of Service Delays Given in Seconds per Vehicle Without Project With Project Intersection Control LOS Std. Critical Mvmt. LOS Delay LOS Delay SR 507 & Bald Hill Rd SE/Creek St SE Signal D Overall C 30.6 C 31.1 Bald Hill Rd SE & Morris Rd SE Stop D NEB F 74.9 F 94.4 Morris Rd SE & Project Access Stop D -- -- B 11.1 SR 507 & Bald Hill Road SE/Creek Street SE: Is shown to continue operating with LOS C conditions in the PM peak hour. Bald Hill Road SE & Morris Road SE: Is shown to continue operating with LOS F conditions with or without the Country Meadow Estates II. A scenario with the converting Bald Hill Road from two- to three-lanes is described in the following section. Morris Road SE & Access: Is projected to operate with acceptable LOS B conditions. 4.5 Intersection Evaluation Bald Hill Road & Morris Road presently operates at LOS F and is anticipated to continue operating at LOS F in the future. Per the City’s Transportation System Plan, improvements along Bald Hill Road are planned by way of converting the two-lane roadway to three-lanes. An evaluation was therefore conducted to examine operational improvements with a center two-way left-turn lane along Bald Hill Road and across Morris Road. HeathTraffic.com Country Meadow Estates II TIA 20 Table 6: Forecast 2026 Weekday Peak Hour Level of Service With Project Delays Given in Seconds per Vehicle Intersection Control Scenario Movement LOS Delay Bald Hill Rd SE & Morris Rd SE Two-Way Stop Existing Lane Configuration NEB F 94.4 TWLTL Restriping NEB D 29.9 As shown above, a three-lane section at the intersection would bring LOS within City standards. The existing cross-section at Bald Hill Road & Morris Road, based on initial review, appears to be around 34-feet from fog line to fog line. Restriping could be achieved without roadway widening. A conceptual restriping plan is shown on Figure 12. Lane widths are shown at 11-feet but could be modified as needed. Figure 11: Bald Hill Roadway Width NFIGURE 12CONCEPTUAL CROSS SECTION DESIGNCOUNTRY MEADOW ESTATES II50'OPENING11'11'12'13'14'12'12'18'14'14'12'11'12'11'11'11'11'11'11'11'11'11'10.5'10.5'11'11'11'11'11'11'21 HeathTraffic.com Country Meadow Estates II TIA 22 4.6 Left Turn Lane Warrant Left turn lanes are a means of providing necessary storage space for left turning vehicles at intersections. Procedures prescribed by WSDOT Design Manual Exhibit 1310-7a were used to ascertain storage requirements at the proposed access intersection via Morris Road SE. Based on forecast 2026 PM peak hour volumes with project and rerouted traffic – a left turn lane would not be warranted. Refer to the appendix for the left turn warrant nomograph. 4.7 Access & Sight Distance Access to and from the site is proposed via a roadway extending west from Morris Road SE. Moreover, a westerly connection to Country Meadows Estates I, will be provided. See Figure 14 on the following page which displays the combined Country Meadows I and II site plan. In accordance with established AASHTO Standards7 and the 35-mph posted speed limit along Morris Road SE, sight lines would need to meet or exceed 390 feet. Based on preliminary measurements, sight lines to the north are shown to be clear in excess of 390- feet. Sight lines to the south are shown to exceed 500-feet. Refer to the figure to the right which shows the sight distance triangle to the north along Morris Road SE. No deficiencies are identified with the proposed access location. 7 AASHTO Green Book Figure 13: Northern Sight Distance FIGURE 14COMBINED SITE PLANCOUNTRY MEADOW ESTATES IINCOUNTRY MEADOW ESTATES I COUNTRY MEADOW ESTATES II 23 HeathTraffic.com Country Meadow Estates II TIA 24 5. CONCLUSIONS & MITIGATION Country Meadow Estates II proposes for the construction of a residential development comprised of 29 single-family homes located within the Yelm Urban Growth Area (UGA) of Thurston County. The subject site is bordered to the east by Morris Road SE within a single tax parcel comprised of 5.0-acres. Access is proposed via one new roadway extending west from Morris Road SE. As part of site development, a new east-west roadway connection from Vancil Road SE to Morris Road SE through Country Meadow Estates I will be provided. Existing LOS is shown to meet city and state LOS standards except for the intersection of Bald Hill Road SE & Morris Road SE which is shown to operate with LOS F conditions. According to the City of Yelm’s Transportation System Plan 2022, Bald Hill Road SE is planned for improvements via upgrading the two-lane section to three- lanes between the Chehalis Railroad to SR 507 (Yelm Avenue). This improvement would ultimately lower delays at the deficient intersection. Based on ITE data, the 29-unit plat is estimated to generate 323 average weekday daily trips with 24 AM peak hour trips and 31 PM peak hour trips. A three-year horizon of 2026 was used to assess future conditions with and without project generated traffic. Forecast 2026 peak hour analysis included a 1.0% background growth rate to the existing volumes shown in Figure 3. Several pipeline projects have been included in forecast 2026 analysis. Forecast 2026 PM peak hour level of service was shown to continue meeting City standards with the exception of Bald Hill Road SE & Morris Road SE operating at LOS F. The existing Bald Hill Road near Morris Road appears to have sufficient width to accommodate restriping to comprise three-lanes. Upon a three-lane cross-section, the intersection operations would improve from LOS F to LOS D—meeting City standards. Based on the analysis above, recommended mitigation is as follows: 1.Bald Hill Road SE & Morris Road SE is shown to comprise existing deficiencies in the LOS F range. The City has planned improvements along Bald Hill Road that would improve operations and service levels. However, the timing of the planned improvements is unknown. Should mitigation be required on behalf of County Meadow Estates II, a restriping plan as illustrated in Figure 12 would bring the intersection within City LOS standards. Should the City complete the project prior to Country Meadow Estates II development, the intersection would meet standards and no additional mitigation is identified. HeathTraffic.com Country Meadow Estates II TIA 25 2. The subject development would be subject for Transportation Facilities Charge per city of Yelm requirements. The city imposes a fee of $1,497.00 per PM peak hour primary trip. Initial fees are estimated as follows: 31 PM Peak Hour Trips x $1,497.00 = $46,407.00. Depending on mitigation outcome, credit may be received for any improvements along Bald Hill Road as the roadway is outlined within the City’s Transportation System Plan. Please feel free to contact me should you have any questions. Aaron Van Aken, P.E., PTOE HeathTraffic.com Country Meadow Estates II TIA 26 COUNTRY MEADOW ESTATES II TRAFFIC IMPACT ANALYSIS APPENDIX File Name : 5165a Site Code : 00005165 Start Date : 6/14/2023 Page No : 1 Groups Printed- Passenger + - Heavy NE Creek Rd SE Southbound Yelm Ave SE Westbound Bald Hill Rd SE Northbound Yelm Ave SE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 24 55 31 110 6 118 17 141 11 33 69 113 49 73 1 123 487 04:15 PM 21 38 18 77 14 131 23 168 21 25 62 108 55 94 4 153 506 04:30 PM 13 67 24 104 13 126 31 170 14 20 56 90 62 70 2 134 498 04:45 PM 18 55 26 99 11 123 25 159 21 54 68 143 65 78 6 149 550 Total 76 215 99 390 44 498 96 638 67 132 255 454 231 315 13 559 2041 05:00 PM 19 64 43 126 9 139 34 182 15 34 60 109 63 69 0 132 549 05:15 PM 24 58 20 102 12 123 13 148 14 31 61 106 73 96 6 175 531 05:30 PM 17 53 20 90 5 118 16 139 15 18 44 77 70 95 12 177 483 05:45 PM 18 47 27 92 8 127 21 156 6 20 63 89 63 102 6 171 508 Total 78 222 110 410 34 507 84 625 50 103 228 381 269 362 24 655 2071 Grand Total 154 437 209 800 78 1005 180 1263 117 235 483 835 500 677 37 1214 4112 Apprch %19.2 54.6 26.1 6.2 79.6 14.3 14 28.1 57.8 41.2 55.8 3 Total %3.7 10.6 5.1 19.5 1.9 24.4 4.4 30.7 2.8 5.7 11.7 20.3 12.2 16.5 0.9 29.5 Passenger +147 436 205 788 78 973 179 1230 115 229 468 812 493 644 36 1173 4003 % Passenger +95.5 99.8 98.1 98.5 100 96.8 99.4 97.4 98.3 97.4 96.9 97.2 98.6 95.1 97.3 96.6 97.3 Heavy 7 1 4 12 0 32 1 33 2 6 15 23 7 33 1 41 109 % Heavy 4.5 0.2 1.9 1.5 0 3.2 0.6 2.6 1.7 2.6 3.1 2.8 1.4 4.9 2.7 3.4 2.7 Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 27 File Name : 5165a Site Code : 00005165 Start Date : 6/14/2023 Page No : 2 NE Creek Rd SE Southbound Yelm Ave SE Westbound Bald Hill Rd SE Northbound Yelm Ave SE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 13 67 24 104 13 126 31 170 14 20 56 90 62 70 2 134 498 04:45 PM 18 55 26 99 11 123 25 159 21 54 68 143 65 78 6 149 550 05:00 PM 19 64 43 126 9 139 34 182 15 34 60 109 63 69 0 132 549 05:15 PM 24 58 20 102 12 123 13 148 14 31 61 106 73 96 6 175 531 Total Volume 74 244 113 431 45 511 103 659 64 139 245 448 263 313 14 590 2128 % App. Total 17.2 56.6 26.2 6.8 77.5 15.6 14.3 31 54.7 44.6 53.1 2.4 PHF .771 .910 .657 .855 .865 .919 .757 .905 .762 .644 .901 .783 .901 .815 .583 .843 .967 Passenger +71 243 109 423 45 495 102 642 63 136 241 440 259 299 14 572 2077 % Passenger +95.9 99.6 96.5 98.1 100 96.9 99.0 97.4 98.4 97.8 98.4 98.2 98.5 95.5 100 96.9 97.6 Heavy 3 1 4 8 0 16 1 17 1 3 4 8 4 14 0 18 51 % Heavy 4.1 0.4 3.5 1.9 0 3.1 1.0 2.6 1.6 2.2 1.6 1.8 1.5 4.5 0 3.1 2.4 NE Creek Rd SE Yelm Ave SE Yelm Ave SE Bald Hill Rd SE Right 71 3 74 Thru 243 1 244 Left 109 4 113 InOut Total 195 423 618 3 8 11 198 629 431 Right45 0 45 Thru495 16 511 Left102 1 103 OutTotalIn471 642 1113 19 17 36 490 1149 659 Left 241 4 245 Thru 136 3 139 Right 63 1 64 Out TotalIn 604 440 1044 6 8 14 610 1058 448 Left14 0 14 Thru299 14 313 Right259 4 263 TotalOutIn807 572 1379 23 18 41 830 1420 590 Peak Hour Begins at 04:30 PM Passenger + Heavy Peak Hour Data North Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 28 File Name : 5165b Site Code : 00005165 Start Date : 6/14/2023 Page No : 1 Groups Printed- Passenger + - Heavy North Access Southbound Bald Hill Rd SE Westbound Morris Rd SE Northbound Bald Hill Rd SE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 7 0 1 8 4 82 2 88 6 3 22 31 37 91 11 139 266 04:15 PM 3 1 2 6 3 77 3 83 3 5 30 38 37 77 4 118 245 04:30 PM 2 0 4 6 4 63 4 71 5 4 32 41 32 110 14 156 274 04:45 PM 2 1 0 3 1 93 2 96 3 1 46 50 44 86 10 140 289 Total 14 2 7 23 12 315 11 338 17 13 130 160 150 364 39 553 1074 05:00 PM 11 2 3 16 3 70 6 79 1 5 33 39 56 99 8 163 297 05:15 PM 5 0 2 7 5 71 4 80 4 3 25 32 39 99 5 143 262 05:30 PM 4 0 1 5 2 63 4 69 4 2 23 29 31 105 6 142 245 05:45 PM 4 1 2 7 4 58 5 67 1 1 20 22 29 93 5 127 223 Total 24 3 8 35 14 262 19 295 10 11 101 122 155 396 24 575 1027 Grand Total 38 5 15 58 26 577 30 633 27 24 231 282 305 760 63 1128 2101 Apprch %65.5 8.6 25.9 4.1 91.2 4.7 9.6 8.5 81.9 27 67.4 5.6 Total %1.8 0.2 0.7 2.8 1.2 27.5 1.4 30.1 1.3 1.1 11 13.4 14.5 36.2 3 53.7 Passenger +38 5 15 58 26 564 29 619 27 18 231 276 303 755 63 1121 2074 % Passenger +100 100 100 100 100 97.7 96.7 97.8 100 75 100 97.9 99.3 99.3 100 99.4 98.7 Heavy 0 0 0 0 0 13 1 14 0 6 0 6 2 5 0 7 27 % Heavy 0 0 0 0 0 2.3 3.3 2.2 0 25 0 2.1 0.7 0.7 0 0.6 1.3 Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 29 File Name : 5165b Site Code : 00005165 Start Date : 6/14/2023 Page No : 2 North Access Southbound Bald Hill Rd SE Westbound Morris Rd SE Northbound Bald Hill Rd SE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 2 0 4 6 4 63 4 71 5 4 32 41 32 110 14 156 274 04:45 PM 2 1 0 3 1 93 2 96 3 1 46 50 44 86 10 140 289 05:00 PM 11 2 3 16 3 70 6 79 1 5 33 39 56 99 8 163 297 05:15 PM 5 0 2 7 5 71 4 80 4 3 25 32 39 99 5 143 262 Total Volume 20 3 9 32 13 297 16 326 13 13 136 162 171 394 37 602 1122 % App. Total 62.5 9.4 28.1 4 91.1 4.9 8 8 84 28.4 65.4 6.1 PHF .455 .375 .563 .500 .650 .798 .667 .849 .650 .650 .739 .810 .763 .895 .661 .923 .944 Passenger +20 3 9 32 13 294 15 322 13 10 136 159 169 392 37 598 1111 % Passenger +100 100 100 100 100 99.0 93.8 98.8 100 76.9 100 98.1 98.8 99.5 100 99.3 99.0 Heavy 0 0 0 0 0 3 1 4 0 3 0 3 2 2 0 4 11 % Heavy 0 0 0 0 0 1.0 6.3 1.2 0 23.1 0 1.9 1.2 0.5 0 0.7 1.0 North Access Bald Hill Rd SE Bald Hill Rd SE Morris Rd SE Right 20 0 20 Thru 3 0 3 Left 9 0 9 InOut Total 60 32 92 3 0 3 63 95 32 Right13 0 13 Thru294 3 297 Left15 1 16 OutTotalIn414 322 736 2 4 6 416 742 326 Left 136 0 136 Thru 10 3 13 Right 13 0 13 Out TotalIn 187 159 346 3 3 6 190 352 162 Left37 0 37 Thru392 2 394 Right169 2 171 TotalOutIn450 598 1048 3 4 7 453 1055 602 Peak Hour Begins at 04:30 PM Passenger + Heavy Peak Hour Data North Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 30 File Name : 5165c Site Code : 00005165 Start Date : 6/14/2023 Page No : 1 Groups Printed- Passenger + - Heavy Morris Rd SE Southbound Morris Rd SE Northbound Start Time Thru App. Total Thru App. Total Int. Total 04:00 PM 41 41 31 31 72 04:15 PM 44 44 36 36 80 04:30 PM 38 38 41 41 79 04:45 PM 46 46 44 44 90 Total 169 169 152 152 321 05:00 PM 62 62 41 41 103 05:15 PM 47 47 35 35 82 05:30 PM 39 39 23 23 62 05:45 PM 35 35 20 20 55 Total 183 183 119 119 302 Grand Total 352 352 271 271 623 Apprch %100 100 Total %56.5 56.5 43.5 43.5 Passenger +348 348 265 265 613 % Passenger +98.9 98.9 97.8 97.8 98.4 Heavy 4 4 6 6 10 % Heavy 1.1 1.1 2.2 2.2 1.6 Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 31 File Name : 5165c Site Code : 00005165 Start Date : 6/14/2023 Page No : 2 Morris Rd SE Southbound Morris Rd SE Northbound Start Time Thru App. Total Thru App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 38 38 41 41 79 04:45 PM 46 46 44 44 90 05:00 PM 62 62 41 41 103 05:15 PM 47 47 35 35 82 Total Volume 193 193 161 161 354 % App. Total 100 100 PHF .778 .778 .915 .915 .859 Passenger +189 189 158 158 347 % Passenger +97.9 97.9 98.1 98.1 98.0 Heavy 4 4 3 3 7 % Heavy 2.1 2.1 1.9 1.9 2.0 Morris Rd SE Morris Rd SE Thru 189 4 193 InOut Total 158 189 347 3 4 7 161 354 193 Thru 158 3 161 Out TotalIn 189 158 347 4 3 7 193 354 161 Peak Hour Begins at 04:30 PM Passenger + Heavy Peak Hour Data North Heath & Associates PO Box 397 Puyallup, WA 98371 Country Meadow Estates II TIA 32 10/4/21, 2:23 PM https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=AWDVTE&x=&edition=639&locationCode=Gener… https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=AWDVTE&x=&edition=639&locationCode=General Urban/Suburban&…1/1 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:174 Avg. Num. of Dwelling Units:246 Directional Distribution:50% entering, 50% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 9.43 4.45 - 22.61 2.13 Data Plot and Equation T = Trip EndsX = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.92 Ln(X) + 2.68 R²= 0.95 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 5,000 10,000 15,000 20,000 Country Meadow Estates II TIA 33 10/4/21, 2:23 PM https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=TASIDE&x=&edition=639&locationCode=General… https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=TASIDE&x=&edition=639&locationCode=General Urban/Suburban&c…1/1 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:192 Avg. Num. of Dwelling Units:226 Directional Distribution:26% entering, 74% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.70 0.27 - 2.27 0.24 Data Plot and Equation T = Trip EndsX = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.91 Ln(X) + 0.12 R²= 0.90 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 500 1,000 1,500 2,000 Country Meadow Estates II TIA 34 10/4/21, 2:24 PM https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=TPSIDE&x=&edition=639&locationCode=General… https://itetripgen.org/PrintGraph.htm?code=210&ivlabel=UNITS210&timeperiod=TPSIDE&x=&edition=639&locationCode=General Urban/Suburban&c…1/1 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:208 Avg. Num. of Dwelling Units:248 Directional Distribution:63% entering, 37% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.94 0.35 - 2.98 0.31 Data Plot and Equation T = Trip EndsX = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.94 Ln(X) + 0.27 R²= 0.92 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 500 1,000 1,500 2,000 2,500 Country Meadow Estates II TIA 35 Made with Emme. Map tiles ©MapTiler ©OpenStreetMap contributors 726 TAZ 726 Trip Distribution Committed Project Network 2023-06-07 Disclaimer: This map is for general planning purposes only. Thurston Regional Planning Council makes no representation as to accuracy or fitness of the information for a particular purpose. Jun 07, 2023 Country Meadow Estates II TIA 36 Heath & Associates, Inc. Pipeline Volumes - Country Meadow Estates II - TIA 7-11-2023 SR 507 & Bald Hill Rd SE PM Peak Hour Pipeline Volume Summations 1. The Hutch 3 10 5 3 4 1 2. Durant St Plat 6 1 1 3 3. Alpine Estates 9 2 2 5 4. Tahoma Blvd Apartments 9 1 1 6 5. El Rey Burro 4 1 1 4 6. The Summit At Thompson Creek 30 3 2 17 7. Samantha Ridge 5 2 8. Habitat for Humanity 4 3 9. Liberty Grove 10. 407 E Yelm Coffee 1 11. Country Meadow Estates I 4 2 Totals 3 0 0 0 81 0 0 0 13 10 47 1 Bald Hill Rd SE & Morris Rd SE PM Peak Hour Pipeline Volume Summations 1. The Hutch 5 3 2. Durant St Plat 1 1 3. Alpine Estates 2 2 4. Tahoma Blvd Apartments 1 1 5. El Rey Burro 1 1 6. The Summit At Thompson Creek 3 2 7. Samantha Ridge 8. Habitat for Humanity 9. Liberty Grove 10. 407 E Yelm Coffee Country Meadow Estates II TIA 37 Heath & Associates, Inc County Meadow Estates II TIA 7-20-2023 Annual Growth Rate: 1 % # of Years to Horizon: 3 1. SR 507 & Bald Hill Rd SE / Creek St SE SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL Existing 74 244 113 45 511 103 64 139 245 263 313 14 Project Trips 0 0 0 0 0 5 3 0 4 7 0 0 Pipeline 3 0 0 0 81 0 0 0 13 10 47 1 Traffic Reroute 0 0 0 0 0 5 3 0 0 0 0 0 Without 79 251 116 46 607 106 66 143 265 281 369 15 With 79 251 116 46 607 116 72 143 269 288 369 15 2. Bald Hill Rd SE & Marris Rd SE SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL Existing 20 3 9 13 297 16 13 13 136 171 394 37 Project Trips 0 0 0 0 0 1 1 0 7 12 0 0 Pipeline 0 0 0 0 13 0 0 0 0 0 10 0 Traffic Reroute 0 0 0 0 0 3 2 0 3 5 0 0 Without 21 3 9 13 319 16 13 13 140 176 416 38 With 21 3 9 13 319 20 16 13 150 193 416 38 3. Morris Rd SE & Access SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL Existing 0 193 0 0 0 0 0 161 0 0 0 0 Project Trips 13 0 0 0 0 0 0 0 1 0 0 8 Pipeline 0 0 0 0 0 0 0 0 0 0 0 0 Traffic Reroute 8 0 0 0 0 0 0 0 2 1 0 5 Without 0 199 0 0 0 0 0 166 0 0 0 0 With 21 199 0 0 0 0 0 166 3 1 0 13 2026 PM Peak Hour Forecast Intersection Volumes Country Meadow Estates II TIA 38 HCM 7th Signalized Intersection Summary Existing PM Peak Hour 1: Bald Hill Rd SE/Creek St SE & SR 507 07/11/2023 Synchro 12 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 14 313 263 103 511 45 245 139 64 113 244 74 Future Volume (veh/h) 14 313 263 103 511 45 245 139 64 113 244 74 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1826 1870 1885 1856 1885 1870 1870 1870 1841 1885 1841 Adj Flow Rate, veh/h 14 323 271 106 527 46 253 143 66 116 252 76 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 152131222414 Cap, veh/h 31 512 444 140 633 544 343 232 107 327 352 290 Arrive On Green 0.02 0.28 0.28 0.08 0.34 0.34 0.19 0.19 0.19 0.19 0.19 0.19 Sat Flow, veh/h 1795 1826 1582 1795 1856 1593 1781 1205 556 1753 1885 1552 Grp Volume(v), veh/h 14 323 271 106 527 46 253 0 209 116 252 76 Grp Sat Flow(s),veh/h/ln 1795 1826 1582 1795 1856 1593 1781 0 1761 1753 1885 1552 Q Serve(g_s), s 0.5 10.6 10.2 4.0 17.9 1.3 9.2 0.0 7.5 4.0 8.6 2.9 Cycle Q Clear(g_c), s 0.5 10.6 10.2 4.0 17.9 1.3 9.2 0.0 7.5 4.0 8.6 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.32 1.00 1.00 Lane Grp Cap(c), veh/h 31 512 444 140 633 544 343 0 339 327 352 290 V/C Ratio(X)0.46 0.63 0.61 0.76 0.83 0.08 0.74 0.00 0.62 0.35 0.72 0.26 Avail Cap(c_a), veh/h 497 1064 922 497 1081 928 1064 0 1052 817 879 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.4 21.6 21.4 31.0 20.8 15.3 26.1 0.0 25.4 24.3 26.2 23.9 Incr Delay (d2), s/veh 10.2 1.3 1.4 8.2 2.9 0.1 3.1 0.0 1.8 0.7 2.7 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 4.3 3.6 1.9 7.5 0.5 3.9 0.0 3.0 1.7 4.0 1.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 43.7 22.9 22.8 39.2 23.7 15.4 29.2 0.0 27.2 25.0 28.9 24.3 LnGrp LOS DCCDCBC CCCC Approach Vol, veh/h 608 679 462 444 Approach Delay, s/veh 23.3 25.6 28.3 27.1 Approach LOS CCCC Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 9.8 23.8 17.3 5.7 27.9 17.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.0 40.0 32.0 19.0 40.0 41.0 Max Q Clear Time (g_c+I1), s 6.0 12.6 10.6 2.5 19.9 11.2 Green Ext Time (p_c), s 0.2 2.9 2.1 0.0 3.4 1.9 Intersection Summary HCM 7th Control Delay, s/veh 25.8 HCM 7th LOS C Country Meadow Estates II TIA 39 HCM 7th TWSC Existing PM Peak Hour 2: Bald Hill Rd SE & Morris Rd SE/Driveway Synchro 12 Light Report Page 1 Intersection Int Delay, s/veh 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 136 13 13 9 3 20 16 297 13 37 394 171 Future Vol, veh/h 136 13 13 9 3 20 16 297 13 37 394 171 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized --None --None --None --None Storage Length ------------ Veh in Median Storage, #-0 --0 --0 --0 - Grade, %-0 --0 --0 --0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, %1 23 1 1 1 1 6 1 1 1 1 1 Mvmt Flow 145 14 14 10 3 21 17 316 14 39 419 182 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 940 953 510 862 1037 323 601 0 0 330 0 0 Stage 1 589 589 -357 357 ------- Stage 2 352 364 -505 680 ------- Critical Hdwy 7.11 6.73 6.21 7.11 6.51 6.21 4.16 --4.11 -- Critical Hdwy Stg 1 6.11 5.73 -6.11 5.51 ------- Critical Hdwy Stg 2 6.11 5.73 -6.11 5.51 ------- Follow-up Hdwy 3.509 4.207 3.309 3.509 4.009 3.309 2.254 --2.209 -- Pot Cap-1 Maneuver 245 239 565 277 232 720 957 --1235 -- Stage 1 496 464 -663 630 ------- Stage 2 667 589 -551 452 ------- Platoon blocked, %---- Mov Cap-1 Maneuver 218 222 565 236 216 720 957 --1235 -- Mov Cap-2 Maneuver 218 222 -236 216 ------- Stage 1 486 441 -648 616 ------- Stage 2 630 576 -495 430 ------- Approach EB WB NB SB HCM Control Delay, s/v56.59 14.8 0.43 0.49 HCM LOS F B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h)957 --229 401 1235 -- HCM Lane V/C Ratio 0.018 --0.751 0.085 0.032 -- HCM Control Delay (s/veh)8.8 0 -56.6 14.8 8 0 - HCM Lane LOS A A -F B A A - HCM 95th %tile Q(veh)0.1 --5.2 0.3 0.1 -- Country Meadow Estates II TIA 40 HCM 7th Signalized Intersection Summary Forecast 2026 PM Peak Hour 1: Bald Hill Rd SE/Creek St SE & SR 507 Without Project Synchro 12 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h)15 369 281 106 607 46 265 143 66 116 251 79 Future Volume (veh/h)15 369 281 106 607 46 265 143 66 116 251 79 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1826 1870 1885 1856 1885 1870 1870 1870 1841 1885 1841 Adj Flow Rate, veh/h 15 380 290 109 626 47 273 147 68 120 259 81 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, %1 5 2 1 3 1 2 2 2 4 1 4 Cap, veh/h 32 585 507 142 708 608 350 236 109 319 343 283 Arrive On Green 0.02 0.32 0.32 0.08 0.38 0.38 0.20 0.20 0.20 0.18 0.18 0.18 Sat Flow, veh/h 1795 1826 1583 1795 1856 1593 1781 1204 557 1753 1885 1551 Grp Volume(v), veh/h 15 380 290 109 626 47 273 0 215 120 259 81 Grp Sat Flow(s),veh/h/ln 1795 1826 1583 1795 1856 1593 1781 0 1761 1753 1885 1551 Q Serve(g_s), s 0.7 14.5 12.4 4.8 25.5 1.5 11.8 0.0 9.1 4.9 10.6 3.7 Cycle Q Clear(g_c), s 0.7 14.5 12.4 4.8 25.5 1.5 11.8 0.0 9.1 4.9 10.6 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.32 1.00 1.00 Lane Grp Cap(c), veh/h 32 585 507 142 708 608 350 0 346 319 343 283 V/C Ratio(X)0.47 0.65 0.57 0.77 0.88 0.08 0.78 0.00 0.62 0.38 0.75 0.29 Avail Cap(c_a), veh/h 421 901 781 421 916 786 901 0 891 692 744 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.4 23.6 22.9 36.6 23.4 16.0 30.9 0.0 29.8 29.1 31.4 28.6 Incr Delay (d2), s/veh 10.5 1.2 1.0 8.4 8.4 0.1 3.8 0.0 1.8 0.7 3.4 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 6.0 4.5 2.4 11.9 0.5 5.1 0.0 3.8 2.1 5.1 1.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 50.0 24.9 23.9 45.0 31.8 16.0 34.7 0.0 31.6 29.8 34.8 29.2 LnGrp LOS D C C D C B C C C C C Approach Vol, veh/h 685 782 488 460 Approach Delay, s/veh 25.0 32.7 33.4 32.5 Approach LOS C C C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 10.9 30.5 19.3 5.9 35.4 20.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.0 40.0 32.0 19.0 40.0 41.0 Max Q Clear Time (g_c+I1), s 6.8 16.5 12.6 2.7 27.5 13.8 Green Ext Time (p_c), s 0.2 3.3 2.1 0.0 3.4 2.0 Intersection Summary HCM 7th Control Delay, s/veh 30.6 HCM 7th LOS C Country Meadow Estates II TIA 41 HCM 7th TWSC Forecast 2026 PM Peak Hour 2: Bald Hill Rd SE & Morris Rd SE/Driveway Without Project Synchro 12 Light Report Page 1 Intersection Int Delay, s/veh 11.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 140 13 13 9 3 21 16 319 13 38 416 179 Future Vol, veh/h 140 13 13 9 3 21 16 319 13 38 416 179 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized --None --None --None --None Storage Length ------------ Veh in Median Storage, #-0 --0 --0 --0 - Grade, %-0 --0 --0 --0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, %1 23 1 1 1 1 6 1 1 1 1 1 Mvmt Flow 149 14 14 10 3 22 17 339 14 40 443 190 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 994 1006 538 911 1094 346 633 0 0 353 0 0 Stage 1 619 619 -380 380 ------- Stage 2 375 387 -530 714 ------- Critical Hdwy 7.11 6.73 6.21 7.11 6.51 6.21 4.16 --4.11 -- Critical Hdwy Stg 1 6.11 5.73 -6.11 5.51 ------- Critical Hdwy Stg 2 6.11 5.73 -6.11 5.51 ------- Follow-up Hdwy 3.509 4.207 3.309 3.509 4.009 3.309 2.254 --2.209 -- Pot Cap-1 Maneuver 225 222 545 256 215 699 931 --1211 -- Stage 1 478 449 -644 615 ------- Stage 2 648 574 -534 437 ------- Platoon blocked, %---- Mov Cap-1 Maneuver 199 205 545 217 199 699 931 --1211 -- Mov Cap-2 Maneuver 199 205 -217 199 ------- Stage 1 467 425 -629 601 ------- Stage 2 610 561 -477 413 ------- Approach EB WB NB SB HCM Control Delay, s/v74.92 15.42 0.41 0.48 HCM LOS F C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h)931 --210 381 1211 -- HCM Lane V/C Ratio 0.018 --0.843 0.092 0.033 -- HCM Control Delay (s/veh)8.9 0 -74.9 15.4 8.1 0 - HCM Lane LOS A A -F C A A - HCM 95th %tile Q(veh)0.1 --6.3 0.3 0.1 -- Country Meadow Estates II TIA 42 HCM 7th Signalized Intersection Summary Forecast 2026 PM Peak Hour 1: Bald Hill Rd SE/Creek St SE & SR 507 With Project Synchro 12 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h)15 369 288 116 607 46 269 143 72 116 251 79 Future Volume (veh/h)15 369 288 116 607 46 269 143 72 116 251 79 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1826 1870 1885 1856 1885 1870 1870 1870 1841 1885 1841 Adj Flow Rate, veh/h 15 380 297 120 626 47 277 147 74 120 259 81 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, %1 5 2 1 3 1 2 2 2 4 1 4 Cap, veh/h 32 571 495 155 707 607 354 232 117 319 343 282 Arrive On Green 0.02 0.31 0.31 0.09 0.38 0.38 0.20 0.20 0.20 0.18 0.18 0.18 Sat Flow, veh/h 1795 1826 1583 1795 1856 1593 1781 1168 588 1753 1885 1551 Grp Volume(v), veh/h 15 380 297 120 626 47 277 0 221 120 259 81 Grp Sat Flow(s),veh/h/ln 1795 1826 1583 1795 1856 1593 1781 0 1755 1753 1885 1551 Q Serve(g_s), s 0.7 14.7 13.0 5.3 25.7 1.5 12.0 0.0 9.4 4.9 10.6 3.7 Cycle Q Clear(g_c), s 0.7 14.7 13.0 5.3 25.7 1.5 12.0 0.0 9.4 4.9 10.6 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.33 1.00 1.00 Lane Grp Cap(c), veh/h 32 571 495 155 707 607 354 0 349 319 343 282 V/C Ratio(X)0.47 0.67 0.60 0.77 0.89 0.08 0.78 0.00 0.63 0.38 0.76 0.29 Avail Cap(c_a), veh/h 418 895 776 418 909 781 895 0 882 687 739 608 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.7 24.4 23.7 36.5 23.6 16.1 31.0 0.0 30.0 29.3 31.7 28.8 Incr Delay (d2), s/veh 10.5 1.3 1.2 8.0 8.6 0.1 3.8 0.0 1.9 0.7 3.4 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 6.2 4.7 2.6 12.0 0.5 5.2 0.0 3.9 2.1 5.1 1.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 50.2 25.7 24.9 44.5 32.2 16.2 34.8 0.0 31.9 30.1 35.1 29.4 LnGrp LOS D C C D C B C C C D C Approach Vol, veh/h 692 793 498 460 Approach Delay, s/veh 25.9 33.1 33.5 32.8 Approach LOS C C C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 11.5 30.0 19.3 5.9 35.6 20.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 19.0 40.0 32.0 19.0 40.0 41.0 Max Q Clear Time (g_c+I1), s 7.3 16.7 12.6 2.7 27.7 14.0 Green Ext Time (p_c), s 0.2 3.3 2.1 0.0 3.4 2.1 Intersection Summary HCM 7th Control Delay, s/veh 31.1 HCM 7th LOS C Country Meadow Estates II TIA 43 HCM 7th TWSC Forecast 2026 PM Peak Hour 2: Bald Hill Rd SE & Morris Rd SE/Driveway With Project - No Mitigation Synchro 12 Light Report Page 1 Intersection Int Delay, s/veh 14.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 150 13 16 9 3 21 20 319 13 38 416 193 Future Vol, veh/h 150 13 16 9 3 21 20 319 13 38 416 193 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized --None --None --None --None Storage Length ------------ Veh in Median Storage, #-0 --0 --0 --0 - Grade, %-0 --0 --0 --0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, %1 23 1 1 1 1 6 1 1 1 1 1 Mvmt Flow 160 14 17 10 3 22 21 339 14 40 443 205 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1010 1022 545 919 1118 346 648 0 0 353 0 0 Stage 1 626 626 -389 389 ------- Stage 2 384 396 -530 729 ------- Critical Hdwy 7.11 6.73 6.21 7.11 6.51 6.21 4.16 --4.11 -- Critical Hdwy Stg 1 6.11 5.73 -6.11 5.51 ------- Critical Hdwy Stg 2 6.11 5.73 -6.11 5.51 ------- Follow-up Hdwy 3.509 4.207 3.309 3.509 4.009 3.309 2.254 --2.209 -- Pot Cap-1 Maneuver 220 217 540 253 208 699 919 --1211 -- Stage 1 474 445 -637 610 ------- Stage 2 641 569 -534 430 ------- Platoon blocked, %---- Mov Cap-1 Maneuver 192 199 540 211 191 699 919 --1211 -- Mov Cap-2 Maneuver 192 199 -211 191 ------- Stage 1 460 421 -619 593 ------- Stage 2 600 553 -473 407 ------- Approach EB WB NB SB HCM Control Delay, s/v94.36 15.65 0.51 0.47 HCM LOS F C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h)919 --205 373 1211 -- HCM Lane V/C Ratio 0.023 --0.931 0.094 0.033 -- HCM Control Delay (s/veh)9 0 -94.4 15.7 8.1 0 - HCM Lane LOS A A -F C A A - HCM 95th %tile Q(veh)0.1 --7.6 0.3 0.1 -- Country Meadow Estates II TIA 44 HCM 7th TWSC Forecast 2026 PM Peak Hour 4: Bald Hill Rd SE & Morris Rd SE/Driveway With Project - With Mitigation Synchro 12 Light Report Page 1 Intersection Int Delay, s/veh 5.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 150 13 16 9 3 21 20 319 13 38 416 193 Future Vol, veh/h 150 13 16 9 3 21 20 319 13 38 416 193 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized --None --None --None --None Storage Length ------------ Veh in Median Storage, #-1 --0 --0 --0 - Grade, %-0 --0 --0 --0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, %1 23 1 1 1 1 6 1 1 1 1 1 Mvmt Flow 160 14 17 10 3 22 21 339 14 40 443 205 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1010 1022 545 919 1118 346 648 0 0 353 0 0 Stage 1 626 626 -389 389 ------- Stage 2 384 396 -530 729 ------- Critical Hdwy 7.11 6.73 6.21 7.11 6.51 6.21 4.16 --4.11 -- Critical Hdwy Stg 1 6.11 5.73 -6.11 5.51 ------- Critical Hdwy Stg 2 6.11 5.73 -6.11 5.51 ------- Follow-up Hdwy 3.509 4.207 3.309 3.509 4.009 3.309 2.254 --2.209 -- Pot Cap-1 Maneuver 220 217 540 253 208 699 919 --1211 -- Stage 1 474 445 -637 610 ------- Stage 2 641 569 -534 430 ------- Platoon blocked, %---- Mov Cap-1 Maneuver 193 201 540 217 192 699 919 --1211 -- Mov Cap-2 Maneuver 319 302 -217 192 ------- Stage 1 463 421 -622 596 ------- Stage 2 603 556 -473 407 ------- Approach EB WB NB SB HCM Control Delay, s/v29.88 15.48 0.51 0.47 HCM LOS D C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h)919 --329 378 1211 -- HCM Lane V/C Ratio 0.023 --0.578 0.093 0.033 -- HCM Control Delay (s/veh)9 --29.9 15.5 8.1 0 - HCM Lane LOS A --D C A A - HCM 95th %tile Q(veh)0.1 --3.4 0.3 0.1 -- Country Meadow Estates II TIA 45 HCM 7th TWSC Forecast 2026 PM Peak Hour 3: Morris Rd SE/Bald Hill Rd SE & Project Access With Project Synchro 12 Light Report Page 1 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 13 1 3 166 199 21 Future Vol, veh/h 13 1 3 166 199 21 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized -None -None -None Storage Length ------ Veh in Median Storage, #0 --0 0 - Grade, %0 --0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 14 1 3 180 216 23 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 415 228 239 0 -0 Stage 1 228 ----- Stage 2 187 ----- Critical Hdwy 6.42 6.22 4.12 --- Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 --- Pot Cap-1 Maneuver 594 812 1328 --- Stage 1 810 ----- Stage 2 845 ----- Platoon blocked, %--- Mov Cap-1 Maneuver 592 812 1328 --- Mov Cap-2 Maneuver 592 ----- Stage 1 808 ----- Stage 2 845 ----- Approach EB NB SB HCM Control Delay, s/v11.11 0.14 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h)1328 -604 -- HCM Lane V/C Ratio 0.002 -0.025 -- HCM Control Delay (s/veh)7.7 0 11.1 -- HCM Lane LOS A A B -- HCM 95th %tile Q(veh)0 -0.1 -- Country Meadow Estates II TIA 46 Intersections Chapter 1310 Page 1310-14 WSDOT Design Manual M 22-01.19 May 2021 Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds Country Meadow Estates II TIA 47 56.00' ROW VANCIL CT SE MORRIS RD SECOUNTRY MEADOWS ESTATES PHASE 1 PRELIMINARY PLAT (NOT APPROVED) 6524 S.F. 17 30.00' SHARED DRIVEWAY EASEMENT 30.00' SHARED DRIVEWAY EASEMENT ROAD C 4990 S.F. TRACT B OPEN SPACE 12876 S.F. TRACT A PARK AND STORM 75.12'11.31' 5 4 .0 6 '81.47'65.00' 3 5 .6 0 '12.23' 2 6 .2 2 '105.31'70.00' 5063 S.F. 18 4409 S.F. 19 4408 S.F. 20 4407 S.F. 21 4407 S.F. 22 4406 S.F. 23 4405 S.F. 24 4404 S.F. 25 4403 S.F. 26 4402 S.F. 27 4401 S.F. 28 5418 S.F. 29 6576 S.F. 88 5978 S.F. 89 5319 S.F. 12 4200 S.F. 11 4200 S.F. 10 4200 S.F. 9 5250 S.F. 8 5250 S.F. 5 4200 S.F. 4 4200 S.F. 3 4200 S.F. 2 4200 S.F. 1 9202 S.F. 69184 S.F. 79261 S.F. 13 9485 S.F. 16 4 1.4 2 ' 5.51'110.24'46.53' 40.00'110.22'40.00' 40.00'110.20'40.00' 40.00'110.18'40.00' 40.00'110.15'40.00' 40.00'110.13'40.00' 40.00'110.11'40.00' 40.00'110.08'40.00' 40.00'110.06'40.00' 40.00'110.04'40.00' 40.00'110.02'40.00' 30.05'31.43'89.98'50.00' 50.01'127.85'3 9 .3 8 ' 11.21'132.34'50.00'110.00'1 2 .6 6 '12.23' 2 8 .2 6 '50.00'105.00'4.45' 4 5 .8 6 '109.60'40.00'105.00'40.00' 20.00'20.00'105.00'40.00'105.00'40.00' 40.00'105.00'50.00' 50.00'105.00'50.00'105.00'50.00'40.00'105.00'40.00' 20.00'20.00'105.00'40.00' 40.00'105.00'40.00' 40.00'105.00'40.00'165.94'125.00'61.09'15.00'60.80'125.00' 15.00'173.85'125.00' 1 5 .4 3 '68.41'114.89' 1 5 .7 2 '501+00502+00503+00504+00505+00506+00507+00507+24EP: 507+24.05 105+ 0 0 106+00107+00108+00109+00110+00110+11PC: 104+73.80PT: 105+49.11 EP: 110+10.77 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 22+32 S88° 28' 38"E 445.55' N68° 5 9' 2 9 " E 8.98' S88° 30' 31"E 516.29' L =7 8 .6 5 'R =2 0 0 .0 4 'Δ =2 2 °3 1 '3 6 " L =7 8 .5 4 'R =2 0 0 .0 0 'Δ =2 2 °3 0 '0 0 " 1 2 3 4 TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX ? MW/SK JULY 2023 PRELIMINARY PLAT 2230299.10 P.O.BOX 73790 PUYALLUP, WA 98373 KURT WILSON / EVAN MANN COPPER RIDGE LLC COUNTRY MEADOWS ESTATES PHASE 2 PRELIMINARY PLAT A PORTION OF THE NE 1/4 OF THE SE 1/4 OF SEC. 30, TWN. 17 N., RGE. 02 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON. COUNTRY MEADOWS ESTATES PHASE 2 PRELIMINARY PLAT DATE: July 21, 2023 FILENAME: Q:\2023\2230299\10_CIV\CAD\_Preliminary Plat\2230299-SH-PLAT MAP.dwg C1.1 3 PLAT MAP GRAPHIC SCALE 0 40 80 1" = 40 FEET 20 N STATISTICS SITE AREA 209,638 SF (4.81 ACRES) ZONING R-6 DENSITY 29 (28.86) DU/AC PROPOSED LOTS 29 (5) - 60'± WIDE LOTS (3) - 50'± WIDE LOTS (22) - 40'± WIDE LOTS OPEN SPACE REQUIRED 10,476.18 SF (0.24 AC) OPEN SPACE SHOWN (TRACT A AND B)17,321 SF (0.39 AC) Country Meadow Estates II TIA 48