Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2022.0125 - Truss Layout (approved)
Truss Connector Total List Manuf Product Qty MiTek JUS24 12 TTC 2X4 Vented Blocks* 43 TTC 2X4 Solid Blocks* 42 FOLLOW ALL BRACING REQUIREMENTS AS SPECIFIIED IN THE TRUSS ENGINEERING SEALS PACKET GARAGE 2018 UBC HVAC PLATFORM TOTAL BLOCK COUNT =85 FOR BIDDING ONLY LAYOUT FOR VERIFICATION & PRICING A01 R01R0 1 J64J64AJ21 J22 J21 J22A A06 B01 JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS24JUS246/12 6/12 4/12 6/12 J66(3) J67(6)A02(8) A03(9) A03(3)A05(2)A04(4)2-00-0053-00-002-00-00 61-00-0037-06-00 19-06-0057-00-0024-00-00 10-00-00 14-00-00 24-00-00 4-00-0014-00-0010-00-00 14-00-0010-00-006-00-0011-06-006-00-001-00-001-00-001-00-001-00-001-00-001-00-001-00-001-00-00 Sales Rep: Estimate By: Kelly Finelli Customer: Ryan Kittelson Sheet Number:1of1Drawing Type: Roof Trusses Soundbuilt NW, LLC Plan: 997B Job Name: Date: 7/14/2022 Tahoma Terra - Garage Alley J1122624 Job Number: Loading TC/LL = 25.0 lb TC/DL= 8.0 lb BC/DL= 7.0 lb WIND = 110 mph 'B' Finalized By: Kelly Finelli ** IMPORTANT ** = INDICATES LEFT ENDAddress:,Yelm,WA 98597 Received by City of Yelm 11/29/2022 8:39:51 AM