Loading...
Tahoma Terra-II - Building B - Structural SetStructural NotesNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 IBC 2018 TABLE 1705.6 REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS VERIFICATION AND INSPECTION TASK CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION 1 VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY. - X 2 VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL. - X 3 PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS. - X 4 VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACITON OF COMPACTED FILL. X - 5 PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY. - X IBC 2018 TABLE 1705.3 REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION PERIODIC REFERENCED STANDARD IBC REFERENCE 1. INSPECTION OF REINFORCING STEEL, INCLUDING PRESTRESSING TENDONS AND PLACEMENT. - X ACI 318: 20, 25.2, 25.3, 26.6.1-26.6.3 1908.4 2. INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCE WITH TABLE 1705.2.2, ITEM 5b. - - AWS D1.4, ACI 318: 26.6.4 - 3. INSPECTION OF ANCHORS CAST IN CONCRETE. - X ACI 318: 17.8.2 - 4. INSPECTION OF ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS. - X - a. ADHESIVE ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS X - ACI 318: 17.8.2.4 - b. MECHANICAL AND ADHESIVE ANCHORS NOT DEFINED IN 4a. - X ACI 318: 17.8.2 - 5. VERIFYING USE OF REQUIRED DESIGN MIX. - X ACI 318: CH 19, 26.4.3, 26.4.4 1904.1, 1904.2, 1908.2, 1908.3 6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF CONCRETE. X - ASTM C 172, ASTM C 31, ACI 318: 26.4, 26.12 1908.10 7. INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. X - ACI 318: 26.5 1908.6, 1908.7, 1908.8 8. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. - X ACI 318: 26.5.3 - 26.5.5 1908.9 9. INSPECTION OF PRESTRESSED CONCRETE: a. APPLICATION OF PRESTRESSING FORCES. X - ACI 318: 26.10 - b. GROUTING OF BONDED PRESTRESSING TENDONS IN THE SEISMIC-FORCE-RESISTING SYSTEM. X - ACI 318: 26.10 - 10. ERECTION OF PRECAST CONCRETTE MEMBERS. - X ACI 318: CH 26.8 - 11. VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENSONS IN POST TENSIONED CONCRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS. - X ACI 318: 26.11.2 - 12. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. - X ACI 318: 26.11.1.2(b) - IBC 2018 SECTION 1705.5 INSPECTIONS FOR WOOD CONSTRUCTION INSPECTIONS REQUIRED 1705.5 SPECIAL INSPECTIONS OF PREFABRICATED WOOD STRUCTURAL ELEMENTS AND ASSEMBLIES SHALL BE IN ACCORDANCE WITH IBC 1704.2.5 1705.5.1 HIGH-LOAD DIAPHRAGMS (ALL DESIGNATED DIAPHRAGMS PER IBC 2306.2) SHALL BE INSTALLED ACCORDING TO THE PROVISIONS OF IBC 1704.2. THE FOLLOWING SHALL BE INSPECTED: a. WOOD STRUCTURAL PANEL SHEATHING - CONFIRM GRADE AND THICKNESS PER APPROVED CONSTRUCTION DOCUMENTS b. VERIFY SIZE OF FRAMING MEMBERS AT ADJOINING PANEL DEGES c. VERIFY NAIL OR STAPLE DIAMETER AND LENGTH d. VERIFY NUMBER OF FASTENER LINES AND THE SPACING BETWEEN EACH FASTENER LINE AND AT EDGE MARGINS 1705.5.2 FOR METAL-PLATE-CONNECTED WOOD TRUSSES SPANNING 60FT OR MORE, THE SPECIAL INSPECTOR SHALL VERIFY THAT THE TEMPORARY RESTRAINT/BRACING AND PERMANENT INDIVIDUAL TRUSS MEMBER RESTRAINT/BRACING ARE INSTALLED ACCORDING TO THE APPROVED TRUSS SUBMITTAL PACKAGE 1705.12.2 SEISMIC RESISTING ELEMENTS: PERIODIC SPECIAL INSPECTION IS REQUIRED FOR NAILING, BOLTING, ANCHORING AND OTHER FASTENING OF ELEMENTS OF THE SEISMIC FORCE-RESISTING SYSTEM - INCLUDING WOOD SHEAR WALLS, WOOD DIAPHRAGMS, DRAG-STRUTS, BRACES AND HOLDOWNS - EXCEPT THAT SUCH IS NOT REQUIRED WHERE THE FASTENER SPACING IS MORE THAN 4"OC.Strtucutral NotesNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 Shearwall Schedule and NotesNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 Holdown Schedule and notesNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 b.1 b.1 b.3 b.3 b.4 b.4 b.5 b.5 b.6 b.6 b.8 b.8 b.2 b.2 b.7 b.7 b.Ab.A b.Bb.B b.Cb.C b.Db.D b.Eb.E Foundation PlanNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 b.1 b.1 b.3 b.3 b.4 b.4 b.5 b.5 b.6 b.6 b.8 b.8 b.2 b.2 b.7 b.7 b.Ab.A b.Bb.B b.Cb.C b.Db.D b.Eb.E Second Floor Framing PlanNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 b.1 b.1 b.3 b.3 b.4 b.4 b.5 b.5 b.6 b.6 b.8 b.8 b.2 b.2 b.7 b.7 b.Ab.A b.Bb.B b.Cb.C b.Db.D b.Eb.E Third Floor Framing PlanNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 b.1 b.1 b.3 b.3 b.4 b.4 b.5 b.5 b.6 b.6 b.8 b.8 b.2 b.2 b.7 b.7 b.Ab.A b.Bb.B b.Cb.C b.Db.D b.Eb.E Roof Framing PlanNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 Concrete DetailsNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 Concrete DetailsNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 CONFORMS TO DESIGN CONCEPT CONFORMS TO DESIGN CONCEPT WITH REVISIONS AS SHOWN NON-CONFORMING – REVISE AND RESUBMIT THIS SHOP DRAWING HAS BEEN REVIEWED FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE FABRICATOR/VENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH THE DESIGN DRAWINGS AND SPECIFICATIONS ALL OF WHICH HAVE PRIORITY OVER THIS SHOP DRAWING. By: Date: . CT ENGINEERING,INC. MWM 04/20/202207/28/2023 Wood DetailsNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597 Wood DetailsNO. REVISION DATE CAD:ENG'R:FILE:DATE:JOB #:Tahoma Terra Apartments BLDG B9955 TAHOMA BLVD. SEYELM, WA 98597