Loading...
Yelm Proposed Project NarrativeNarrative Description of Project – Yelm, WA Ready Mix – NPDES Permit No. WAG501184 Yelm Ready Mix located at 705 NW Rhoton Rd. proposes to relocate the site’s existing infiltration pond from the northeastern to the northwestern area of the site. The relocation is being proposed to increase maneuvering area for the site’s loader operator. The site infiltration pond was sized according to the Drainage and Erosion Control Report in 2004 and has since function as designed. The required storage volumes and proposed changes are summarized in the tables below. All process water is detained, treated, and infiltrated or re-used onsite and there will be no changes to this as part of the proposed project. Infiltration is authorized under Sand and Gravel General Permit No. WAG501184 issued on February 17th, 2021, by the Washington Department of Ecology. Concrete process water is routed via curbs, grading, and pumps to the site’s four settling sumps (referenced as concrete re-use tanks/ponds in the attached drainage study). Water from the final settling sump is pumped to the onsite treatment tank before discharging to an L-shaped swale that bisects the property before turning east along the site’s northern boundary. Two catch basins in the aggregate storage area receive and route water to the onsite infiltration pond. Water from the front entrance/exit is captured by a drain and water along the internal access road is picked up by a catch basin routed to an oil/water separator. Berms and/or grading along the site boundaries direct stormwater inward, where it either infiltrates in situ or flows to the site’s various water infrastructure. As part of the proposed project, the northeastern area of the site will be regraded to direct water west and water from the aggregate storage area will be pumped to the swale. Please see the attached figures. Existing Storage Volumes Proposed Storage Volumes Pond 7,360 cf Pond 12,880 cf Concrete Re-Use Tanks/Ponds 6,012 cf Concrete Re-Use Tanks/Ponds 6,012 cf Holding Basin 1,152 cf Holding Basin 1,152 cf Setting Basin 4,257 cf Remove Settling Basin 0 cf Total 18,781 cf Total 20,044 cf Required Volume per HYDRA model 14,410 cf Existing Pond Dimensions Proposed Pond Dimensions 80’ x 46’ x 2’ = 7,360 cf and 3,680 sf bond bottom infiltration area 80’ x 46’ x 3.5’ = 12,880 cf and 3,680 sf pond bottom infiltration area