Loading...
WSEC Envelope Compliance Summary COFFEE SHOPAdministered by: ©2023 NEEA, All rights reserved Date: Sep 07, 2023 ENVELOPE COMPLIANCE SUMMARY 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Project & Applicant Information Project Title TAHOMA TERRA HOLDINGS LLC COFFEE HOUSE - 2018 WSEC For Building Department Use: Project Address TAHOMA BOULEVARD YELM, WA 98597 Applicant Name Raul Garcia Applicant Phone 253-939-3232 Applicant Email raultkaarchitects@gmail.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type(s)Dining, Restaurant/Bar Building Cond. Floor Area 848 Project Scope New Building Space Conditioning Categories Fully Conditioned Project Cond. Floor Area 848 Floors Above Grade 1 Compliance Method Compliance Method 1 - General Envelope Project Description NEW CONSTRUCTION, COFFEE SHOP WITH DRIVE THRU AND SOME DINING SPACE. Envelope Compliance Scope and Method Scope Space Conditioning Category Compliance Method WWR/SRR per Category UA Calculation Adjustment Fenestration Alternates Compliance Verification New Building Fully Conditioned Component performance 10.47% / %None selected No alternates selected COMPLIES Air Barrier Testing Air barrier testing included in project scope Air Barrier Comments Project Title TAHOMA TERRA HOLDINGS LLC COFFEE HOUSE - 2018 WSEC Date Sep 07, 2023 Scope & Space Conditioning NEW BUILDING - FULLY CONDITIONED Compliance Verification COMPLIES Window-to-wall Ratio 10.47%Skylight-to-roof-ratio %Vertical Fenestration Alternate No alternates selected Opaque Envelope Assemblies Insulation R-Values Roof/Ceiling Location in Documents Assembly ID Assembly Location Cavity Continuous (% penetration) 2nd Layer (MB Roof)U-Factor Net Area (SF) Insulation entirely above deck A-4.1 ROOF Exterior R-38 (< 0.04%)U-0.027 1,353 U-Factor Source: WSEC Appendix A U-Factor Source Description: Is this assembly exterior or interior?: Exterior Walls Location in Documents Assembly ID Assembly Location Cavity Continuous (% penetration) Insulated Wall Furring U-Factor Net Area (SF) Wood-framed and other - Commercial A-4.1 WALLS Exterior R-21 R-0 (< 0.04%)U-0.054 1,602 Which insulation code target does wall comply with?: R-21 Cavity + Intermediate Framing U-Factor Source: WSEC Appendix A U-Factor Source Description:Wall Framing Type (Standard, Inter., Advanced): Standard Framing Depth: 2x6 Framing Spacing: 16" ON CENTER Is this assembly exterior or interior?: Exterior Slab-on-grade Floors Location in Documents Assembly ID Assembly Location Slab Edge Under Slab F-Factor Perimeter Length (SF) Heated slab A-4.1 FLOOR At grade level R-10 R-10 F-0.55 125 Slab Insulation Method: Fully insulated slab (slab edge and underneath)F-Factor Source: WSEC Appendix A F-Factor Source Description: Fenestration & Opaque Door Assemblies Insulation R-Values Vertical Fenestration Location in Documents Assembly ID Assembly Location Orientation Shading (PF)Fenestration SHGC Fenestration U-Factor Rough Opening (SF) Operable - Class AW or site built A-4.1 WINDOW OPENINGS Exterior South/East/West Facing PF < 0.2 SHGC-0.38 U-0.40 187 U-Factor & SHGC Source: WSEC Appendix A U-Factor Source Description: Is this assembly exterior or interior?: Exterior Project Title TAHOMA TERRA HOLDINGS LLC COFFEE HOUSE - 2018 WSEC Date Sep 07, 2023 U x A Calculation NEW BUILDING - FULLY CONDITIONED COMPLIES Opaque Envelope Assemblies PROPOSED TARGET Roof/Ceiling Assembly ID Roof/Ceiling Assembly U- Factor Net Area (SF)U x A Roof/Ceiling Assembly U- Factor Net Area (SF)U x A Insulation entirely above deck ROOF 0.027 1,352.5 36.5 0.027 1,352.5 (1)36.5 Walls Assembly ID Wall Assembly U- factor Net Area (SF)U x A Wall Assembly U- factor Net Area (SF)U x A Wood-framed and other - Commercial WALLS 0.054 1,602.4 86.5 0.054 1,602.4 (1)86.5 Slab on Grade Floors PROPOSED TARGET Slab-on-grade Floors Assembly ID F-Factor Perimeter Length (LF)U x A F-Factor Perimeter Length (LF)U x A Heated slab FLOOR 0.55 125.3 68.9 0.55 125.3 (1)68.9 Fenestration and Opaque Door Assemblies PROPOSED TARGET Vertical Fenestration Assembly ID Fenestration Assembly U- Factor Rough Opening (SF)U x A Fenestration Assembly U- Factor Rough Opening (SF)U x A Operable - Class AW or site built WINDOW OPENINGS 0.40 187.4 75.0 0.40 187.4 (1)75.0 Proposed Area Proposed UxA Target Area Target UxA Project Totals 3,268 267 3,268 267 Project Title TAHOMA TERRA HOLDINGS LLC COFFEE HOUSE - 2018 WSEC Date Sep 07, 2023 SHGC x A Calculation NEW BUILDING - FULLY CONDITIONED COMPLIES Fenestration and Opaque Door Assemblies PROPOSED TARGET Vertical Fenestration - South/East/West Facing Assembly ID PF Fenestration SHGC Rough Opening (SF)SHGC x A Fenestration SHGC Rough Opening (SF)SHGC x A Operable - Class AW or site built WINDOW OPENINGS PF < 0.2 0.38 187.4 71.2 0.38 187.4 (1)71.2 Proposed Area Proposed SHGC x A Target Area Target SHGC x A Project Totals 187 71 187 71