NOTICE OF DECISION-Eagle Plaza
1/6 | P a g e
NOTICE OF DECISION
DATE: February 12, 2024
PROJECT NAME: Eagle Plaza Retail
PROJECT LOCATION: 937 Yelm Avenue
PARCEL NUMBER: 45170000400
CASE NUMBER: MU 2023.0195
NOTICE IS HEREBY GIVEN that the Public Services Department issued an Administrative Site Plan
Review approval to Melena Stewart of Helix Design Group for the above referenced project.
The complete decision may be viewed on the City’s website at www.yelmwa.gov and choosing ‘I
Want To’ then ‘View’ then ‘Public Notices’ from the menu system. A copy of the decision may
also be obtained at the Public Services Department in City Hall at 901 Rhoton Rd. NW, Yelm, WA
98597 during normal business hours for a fee of 15 cents per page. For additional information,
please contact the Public Services Department at 360-400-5001.
2/6 | P a g e
ADMINISTRATIVE SITE PLAN REVIEW
FINDINGS OF FACT
1. Melena Stewart of Helix Design Group proposes to construct a 6,300 square foot building
with two businesses, one of which is a coffee shop with a drive thru. The site is located at
937 Yelm Avenue.
2. The property is zoned C-1 Commercial which is codified at Chapter 18.36 YMC and allows
retail and service oriented establishments.
3. Melena Stewart applied for an Administrative Review on December 7, 2023 and the
application was determined to be complete on December 18, 2023. The application
included a Trip Generation Report, Preliminary Site Plan, Preliminary Utility Plans, and
Landscaping Plans.
4. As required by Section 18.10.050 YMC, the Yelm Planning & Building Department mailed a
Notice of Application to local and state agencies and surrounding property owners on
12/18/2023. In addition, the notice was published in the Nisqually Valley News on
12/21/2023. No comments were received.
5. The project is a part of the 2008 Binding Site Plan to construct a 36,000 square feet medical
office building, and three commercial buildings equaling approximately 32,786 square feet
retail with associated parking.
6. The City of Yelm SEPA responsible official issued a Mitigated Determination of Non-
Significance on October 14, 2008. Consistent with the MDNS, this project will be subject to
the standard Traffic Facilities Charge per PM peak hour trip and additional traffic mitigation
measures as follows:
A. $137.20 per PM peak hour trip for the Longmire Street/Yelm Avenue traffic signal.
B. $322.68 per PM peak hour trip for the realignment of 93rd Avenue/Burnett Road.
C. $63.06 per PM peak hour trip for the construction of the Coates Road extension.
7. A trip generation report completed by SCJ Alliance concludes that Starbucks will generate
19 PM peak hour trips and the general commercial, identified as “Strip Retail Plaza” will
generate 16 PM peak hour trips. A credit of 16 PM peak trips will be allocated to the general
retail site. Traffic Impact Fees are due and payable at the time of building permit issuance.
A. If the tenant of the general commercial building exceeds 16 PM peak trips the tenant
will be responsible for the difference.
8. Chapter 13.04 YMC and Chapter 6 of the Development Guidelines establish
requirements for connection to the City’s water system.
The site will need to connect to City water service.
One water connection is equal to 875 cubic feet of water per month. The civil engineer
shall provide estimated water calculations at the time of civil plan review to determine
the number of connections needed to serve this project.
The City has implemented a cross-connection and backflow control program pursuant to
Title 43 RCW and Chapter 248-54 WAC [Section 13.04.220 YMC]. A backflow prevention
3/6 | P a g e
assembly is required to protect Yelm’s water system from cross-connections from all new
development [Section 13.04.220 (D) YMC]. A reduced pressure backflow assembly is
required on the commercial meter.
9. Chapter 13.08 YMC and Chapter 7 of the Development Guidelines establish requirements
for connection to the City’s sewer system.
A. The site is will need to be connected to City sewer service. Sewer connections are based
on water usage. Proposed water calculations will be used to determine the number of
sewer connections that will be required. Any commercial use that potentially generates
Fats, Oils, or Greases (FOG) are required to remove FOG from the wastewater before it
enters the STEP tank through grease traps and grease interceptors. Proof of compliance
with FOG regulations is required at civil plan submission.
10. Chapter 18.16 YMC requires a determination that the infrastructure facilities necessary to
serve a proposed development are in place or planned for and properly funded with a
reasonable expectation that the facilities will be in place at the time needed to preserve
adopted levels of service.
A. Concurrency with sewer infrastructure means the project is within an area approved for
sewer pursuant to the adopted sewer comprehensive plan for the City and
improvements necessary to provide facilities and services are present to meet the
needs of the proposed development.
B. Concurrency with water infrastructure means the project is within an area approved for
municipal water service pursuant to the adopted water comprehensive plan for the City
and improvements necessary to provide services are present.
C. Concurrency with transportation infrastructure means that the project completes
frontage improvements in accordance with requirements of pedestrian oriented
streets, and pays the traffic facilities charges listed above. The pedestrian oriented
requirement will be met with a screen wall/ trellis with additional plantings at the
corner of the shopping center, and a pathway that connects to the outdoor seating area.
i. A 42” railing must be installed surrounding the outdoor seating area in
addition to the landscaping buffer for the outdoor seating areas.
D. Concurrency with fire protection means the developer pays a fire impact fee at the time
of construction. Payment of the Fire Impact Fee at the time of building permit issuance
satisfies concurrency requirements
11. Chapter 18.16 YMC requires a determination that the infrastructure facilities necessary to
serve a proposed development are in place or planned for and properly funded with a
reasonable expectation that the facilities will be in place at the time needed to preserve
adopted levels of service.
12. The Yelm Critical Areas and Resource Lands, Chapter 18.21 YMC provides protection for
critical aquifer recharge areas, frequently flooded areas, wetlands, geologically hazardous
areas, and fish and wildlife habitat conservation areas.
4/6 | P a g e
A. All of Yelm is identified as a critical aquifer recharge area. Compliance with Federal,
State, and County water source protection regulations and with the City’s adopted
stormwater regulations is required to protect the aquifer [Section 18.21.070(C) YMC].
B. The Mazama Pocket Gopher has been listed as a threatened species by the Washington
Department of Fish and Wildlife since at least 2008. Yelm has protected this species
through the implementation of the Critical Areas Code. When a development occurs on
property suspected to be occupied by the Mazama Pocket Gopher, the Community
Development Department has required the applicant prepare a critical areas report
which would include mitigation measures if it was determined that pocket gophers
would be impacted by the proposed development. The Washington Department of Fish
and Wildlife is provided with notice of all threshold determinations issued pursuant to
the State Environmental Policy Act and the City consults with the Department when a
critical areas report is required.
In April, 2014, the U.S. Fish and Wildlife Service listed the Yelm subspecies of the
Mazama Pocket Gopher as threatened under the Endangered Species Act. While the
City of Yelm is not responsible for implementation or enforcement of the Endangered
Species Act, it consults with the Service and provides notice to applicants that the
pocket gopher is a federally protected species and a permit from the U.S. Fish and
Wildlife Service may be required.
As this site is already disturbed, and completely surro unded by impervious surfaces, a
gopher study is not required. Compliance with Yelm’s requirements under the Critical
Areas Code does not ensure compliance with the provisions of the Endangered Species
Act. The applicant should contact the US Fish and Wildl ife Service with any questions
about compliance with Federal standards for threatened species.
CONCLUSIONS OF LAW & CONDITIONS OF APPROVAL
A. Section 18.12.060 (B) YMC allows the Site Plan Review Committee to approve preliminary
administrative site plans when the site conforms to the standards, provisions, and policies
of the city as expressed in its various adopted plans and ordinances.
B. Melena Stewart / Helix Design Group has established that the proposed site can satisfy
all criteria set forth in Section 18.12.060(C) YMC, meet all requirements of the C-1
Commercial Zoning classification, and meet all other requirements of the Yelm Municipal
Code. Therefore, the site should be approved subject to the following conditions:
1. Install 42” railing surrounding the outdoor seating area.
2. Pay Traffic Facilities Charge per PM peak hour trip and additional traffic mitigation
measures as listed in the 2008 MDNS.
i. $137.20 per PM peak hour trip for the Longmire Street/Yelm Avenue traffic
signal.
ii. $322.68 per PM peak hour trip for the realignment of 93rd Avenue/Burnett
Road.
5/6 | P a g e
iii. $63.06 per PM peak hour trip for the construction of the Coates Road
extension.
3. If the tenant of the general commercial building exceeds 16 PM peak trips the
tenant will be responsible for the difference.
C. The site plan is valid for eighteen (18) months from the date of this approval. The
applicant may request a six-month extension on the approval, if the request is made in
writing prior to the expiration date of this approval.
D. All conditions of this approval must be met b efore a certificate of occupancy will be
issued.
6/6 | P a g e
DECISION
The request for Preliminary Site Plan approval is hereby granted to Melena Stewart / Helix
Design Group, subject to the conditions contained in the conclusions above.
Dated this 12th day of February, 2024
_______________________________ ____________________________
Gary Cooper Cody Colt
Planning and Building Manager Public Services Director
Prepared this 8th day of January, 2024
_________________________
Andrew Kollar
Assistant Planner
APPEAL
The Site Plan Review Committee’s decision in this matter may be appealed pursuant to Chapter
18.10 YMC, to the City of Yelm Hearing Examiner no later than 21 days from the date of this
decision. An appeal must be in writing, contain specific factual objections, and include the appeal