SEPA Environmental Checklist 2023SEPA Environmental checklist September 2023 Page 1
(WAC 197-11-960)
SEPA1 Environmental Checklist
Purpose of checklist
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization, or
compensatory mitigation measures will address the probable significant impacts or if an environmental impact
statement will be prepared to further analyze the proposal.
Instructions for applicants
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully, to the best of your knowledge. You may need to consult with an
agency specialist or private consultant for some questions. You may use “not applicable” or “does not apply”
only when you can explain why it does not apply and not when the answer is unknown. You may also attach
or incorporate by reference additional studies reports. Complete and accurate answers to these questions
often avoid delays with the SEPA process as well as later in the decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time
or on different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for lead agencies
Please adjust the format of this template as needed. Additional information may be necessary to evaluate the
existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist
is considered the first but not necessarily the only source of information needed to make an adequate
threshold determination. Once a threshold determination is made, the lead agency is responsible for the
completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts
of sections A and B, plus the Supplemental Sheet for Nonproject Actions (Part D). Please completely answer all
questions that apply and note that the words "project," "applicant," and "property or site" should be read as
"proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non-
projects) questions in “Part B: Environmental Elements” that do not contribute meaningfully to the analysis of
the proposal.
1 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/Checklist-guidance
SEPA Environmental checklist September 2023 Page 2
(WAC 197-11-960)
A. Background
Find help answering background questions2
1. Name of proposed project, if applicable:
Tahoma Ranch
2. Name of applicant:
RJ Development
3. Address and phone number of applicant and contact person:
Frank Durocher
401 Central Street SE
Olympia, WA 98501
Phone Number: 360.810.8359
a. Project Representative:
LDC, Inc
Ross Jarvis, PE
321 Cleveland Ave SE, Suite 209
Tumwater, WA 98501
Phone Number: 360.634.2065
4. Date checklist prepared:
February 9, 2024
5. Agency requesting checklist:
City of Yelm
6. Proposed timing of schedule (including phasing, if applicable):
Construction is anticipated to commence April 2025 and will take approximately 18 months
to complete.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
At this time, the intent is to construct the apartments and townhome-style apartments.
The commercial lots will be constructed in the future.
2 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-A-Background
SEPA Environmental checklist September 2023 Page 3
(WAC 197-11-960)
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
No environmental information has been prepared that we know about. Environmental
information is not intended to be prepared for this project.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
None known.
10. List any government approvals or permits that will be needed for your proposal, if known.
Site Plan Review, site permits, building permits.
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site. There are several questions later in this checklist that ask you
to describe certain aspects of your proposal. You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional specific information
on project description.)
The proposal is for a mixed-use development that will include townhomes, apartment
buildings, recreation buildings, and retail buildings. The project site is approximately 14
acres located in Yelm, WA and comprises 2 parcels (21724131000 and 21724130302).
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by
the agency, you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
Site Address: 15010 Berry Valley Rd SE, Yelm, WA 98597.
The project parcel fronts Tahoma Boulevard SE in between Tornando Aly and 510 SR.
Abbreviated Legal Description for 21724131000:
Section 24 Township 17 Range 1E Quarter SW NE THAT PTN OF THE FOLLOWING DESC
PARCEL LYING NLY OF ROW 3899169 DAF BAP 20F N & 20F E OF THE SW COR OF SD NE
QUARTER THENCE NLY PARALLEL W LN
Abbreviated Legal Description for 21724130302:
24-17-1E 2.00A SW-NE COM NW COR N 89-11-05-E 280F S 01-04-2 0-E 250
SEPA Environmental checklist September 2023 Page 4
(WAC 197-11-960)
B. Environmental Elements
1. Earth
Find help answering earth questions3
a. General description of the site:
Circle or highlight one: Flat, rolling, hilly, steep slopes, mountainous, other:
b. What is the steepest slope on the site (approximate percent slope)?
Steepest slope on site is approximately 12.5%
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them, and note any
agricultural land of long-term commercial significance and whether the proposal
results in removing any of these soils.
According to the Web Soil Survey, the majority of the project site consist of Spanaway
gravelly sandy loam. The rest of the project site consists of Nisqually loamy fine sand
and Spanaway stony sand loam.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If
so, describe.
There is no surface indications or history of unstable soils in the immediate vicinity.
e. Describe the purpose, type, total area, and approximate quantities and total affected
area of any filling, excavation, and grading proposed. Indicate source of fill.
13.5 acres of the parcel will be graded for the proposed development. A net of
approximately 7,000 cubic yards of fill are estimated for grading purposes. Imported
material will be provided by an approved source.
f. Could erosion occur because of clearing, construction, or use? If so, generally describe.
During construction, the potential for increased erosion would be present. However,
erosion control BMP's will be implemented. Following construction, erosion potential
would decrease when drainage is controlled and cleared areas are re-vegetated.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
The impervious surfacing onsite will be approximately 53%.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any.
3 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-earth
SEPA Environmental checklist September 2023 Page 5
(WAC 197-11-960)
The project will meet or exceed the Engineering Design and Development Standards for
erosion control and shall apply BMP's throughout the construction of the project.
2. Air
Find help answering air questions4
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe
and give approximate quantities if known.
Typical air emissions of [project land use] site are possible. During construction, there would be
increased exhaust and dust particle emissions. Objectionable odors could be caused by the
roofing of homes or the paving of roads and driveways. After construction, the principal source
of air pollution would be vehicular traffic exhaust. All emissions must comply with current
Puget Sound Clear Air Agency regulations.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If
so, generally describe.
There are no off-site sources of emissions or odor that may impact this proposal.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Should construction activities be taken during the dry season, periodic watering, if
deemed necessary, could be used to control dust. Automobile emissions should be
negligible because of the standards regulated by the State of Washington Department
of Licensing.
3. Water
Find help answering water questions5
a. Surface:
Find help answering surface water questions6
1. Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If
yes, describe type and provide names. If appropriate, state what stream or river it
flows into.
4 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-Air
5 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water
6 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Surface-water
SEPA Environmental checklist September 2023 Page 6
(WAC 197-11-960)
There are no surface water bodies on or near the project site.
2. Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
The project will not require an work over, in or adjacent to any surface water bodies.
3. Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
There will be no fill or dredge material placed in or removed from surface water or
wetlands on the site.
4. Will the proposal require surface water withdrawals or diversions? Give a general
description, purpose, and approximate quantities if known.
No surface water withdrawals are proposed.
5. Does the proposal lie within a 100-year floodplain? If so, note location on the site
plan.
The project site is not located within a 100-year floodplain.
6. Does the proposal involve any discharges of waste materials to surface waters? If
so, describe the type of waste and anticipated volume of discharge.
No, the proposal does not involve any discharges of waste material into surface
waters.
b. Ground:
Find help answering ground water questions7
1. Will groundwater be withdrawn from a well for drinking water or other purposes?
If so, give a general description of the well, proposed uses and approximate
quantities withdrawn from the well. Will water be discharged to groundwater?
Give a general description, purpose, and approximate quantities if known.
No groundwater will be withdrawn from a well for drinking water or other purposes.
Water is to be provided by the City of Yelm.
2. Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (domestic sewage; industrial, containing the following
chemicals…; agricultural; etc.). Describe the general size of the system, the number
of such systems, the number of houses to be served (if applicable), or the number
of animals or humans the system(s) are expected to serve.
There will be no waste material discharged into the ground from septic tanks or
other sources.
7 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Groundwater
SEPA Environmental checklist September 2023 Page 7
(WAC 197-11-960)
c. Water Runoff (including stormwater):
1. Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow? Will
this water flow into other waters? If so, describe.
Through the construction of buildings and roadways, the existing runoff pattern
would be locally modified. Additional runoff from the proposal would be generated
by building roofs, parking lots, sidewalks and roadways. This water would be
collected by the storm drainage systems and directed to storm infiltration galleries.
2. Could waste materials enter ground or surface waters? If so, generally describe.
It is unlikely that waste material will enter ground or surface waters as a result of
this project.
3. Does the proposal alter or otherwise affect drainage patterns in the vicinity of the
site? If so, describe.
The proposal will not alter or otherwise affect the drainage patterns in the vicinity of the
project site.
d. Proposed measures to reduce or control surface, ground, and runoff water, and
drainage pattern impacts, if any:
All adopted development and engineering requirements imposed by the City of Yelm to
control hydrologic impacts on adjacent properties will be incorporated into final
construction plans and implemented by the proponent. Storm drainage facilities will be
designed in accordance with the DOE Storm Water Manual, and City of Yelm
engineering standards.
4. Plants
Find help answering plants questions
a. Check the types of vegetation found on the site:
☒ deciduous tree: alder, maple, aspen, other
☒ evergreen tree: fir, cedar, pine, other
☒ shrubs
☒ grass
☐ pasture
☐ crop or grain
☐ orchards, vineyards, or other permanent crops.
☐ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
☐ water plants: water lily, eelgrass, milfoil, other
☐ other types of vegetation
SEPA Environmental checklist September 2023 Page 8
(WAC 197-11-960)
b. What kind and amount of vegetation will be removed or altered?
All vegetation within the grading limits will be removed as part of this project.
c. List threatened and endangered species known to be on or near the site.
There are no known threatened or endangered plant species known to be on or near
the site per the State Department of Natural Resources Natural Heritage database.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any.
All landscaping will be consistent with the City of Yelm landscape standards. Please see
Landscape Plan for more information.
e. List all noxious weeds and invasive species known to be on or near the site.
There are no noxious weeds or invasive species know to be on or near the site.
5. Animals
Find help answering animal questions8
a. List any birds and other animals that have been observed on or near the site or are
known to be on or near the site.
Examples include:
• Birds: hawk, heron, eagle, songbirds, other:
• Mammals: deer, bear, elk, beaver, other:
• Fish: bass, salmon, trout, herring, shellfish, other:
b. List any threatened and endangered species known to be on or near the site.
According to the WDFW PHS online, no species listed as threatened or endangered
occur on or in the immediate vicinity of this site.
c. Is the site part of a migration route? If so, explain.
The project site, like all Western Washington, lies within the Pacific Flyway Migratory
Route.
d. Proposed measures to preserve or enhance wildlife, if any.
There are no measures to preserve or enhance wildlife.
e. List any invasive animal species known to be on or near the site.
There are no invasive animals in or near the site to our knowledge.
8 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-5-Animals
SEPA Environmental checklist September 2023 Page 9
(WAC 197-11-960)
6. Energy and natural resources
Find help answering energy and natural resource questions9
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
Electricity and natural gas will be the primary source of energy for the proposal and
would be used for heating, lighting, and other miscellaneous household purposes.
Project will meet current energy codes.
b. Would your project affect the potential use of solar energy by adjacent properties? If
so, generally describe.
It is not anticipated that the project will impact any surrounding solar uses.
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any.
Measures required by the Washington State residential and commercial energy code
would be employed. Additional energy conservation features would be at the choice of
property owner.
7. Environmental health
Health Find help with answering environmental health questions10
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur because of this
proposal? If so, describe.
There are no increased environmental health hazards or risks associated with the
proposal.
1. Describe any known or possible contamination at the site from present or past
uses.
None known or possible contamination at the site from present or past uses.
2. Describe existing hazardous chemicals/conditions that might affect project
development and design. This includes underground hazardous liquid and gas
transmission pipelines located within the project area and in the vicinity.
There are no known existing hazardous conditions that will affect this project.
According to the Utilities and Transportation Commission ArcGIS website, there are
no underground pipelines located within the project neighborhood.
9 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-6-Energy-natural-resou
10 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-7-Environmental-health
SEPA Environmental checklist September 2023 Page 10
(WAC 197-11-960)
3. Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
No toxic or hazardous chemicals are expected to be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
4. Describe special emergency services that might be required.
No need for special emergency services are anticipated.
5. Proposed measures to reduce or control environmental health hazards, if any.
All potentially hazardous materials used during construction would be handled and
stored in accordance with state and federal hazardous materials handling
requirements. If contaminated soil or groundwater are encountered during
construction, a formal plan would be developed consistent with state and federal
regulations for their removal and treatment or disposal. Also, if contaminants are
encountered, measures would be implemented to minimize exposure to people in
accordance with applicable regulations.
b. Noise
1. What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
Typical noise expected from a residential neighborhood and commercial
developments. Vehicular noise from established and planned single-family
communities in the vicinity of the site will be heard from the project site.
2. What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, construction, operation,
other)? Indicate what hours noise would come from the site)?
Noise levels would be intermittently high during construction but would be limited
to code allowed and normal waking hours. Post-development traffic noise created
by vehicular trips would increase ambient noise levels to the vicinity.
3. Proposed measures to reduce or control noise impacts, if any:
Construction will be limited to normal waking hours as prescribed by the City of
Yelm’s Ordinance so nearby residences should not experience long-lasting adverse
noise impacts.
8. Land and shoreline use
Find help answering land and shoreline use questions11
a. What is the current use of the site and adjacent properties? Will the proposal affect
current land uses on nearby or adjacent properties? If so, describe.
11 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-8-Land-shoreline-use
SEPA Environmental checklist September 2023 Page 11
(WAC 197-11-960)
The site is currently vacant and undeveloped land. Properties surrounding the project
site are currently used for commercial and residential uses. The proposal impact the
uses on nearby properties.
b. Has the project site been used as working farmlands or working forest lands? If so,
describe. How much agricultural or forest land of long-term commercial significance
will be converted to other uses because of the proposal, if any? If resource lands have
not been designated, how many acres in farmland or forest land tax status will be
converted to nonfarm or nonforest use?
The site has not been used as working farmland or forest land.
1. Will the proposal affect or be affected by surrounding working farm or forest
land normal business operations, such as oversize equipment access, the
application of pesticides, tilling, and harvesting? If so, how?
The proposal will not be affected by surrounding working farm or forest land.
c. Describe any structures on the site.
There are no structures currently on the site.
d. Will any structures be demolished? If so, what?
Not applicable as there are no structures currently on the site.
e. What is the current zoning classification of the site?
The site is currently zoned C-1 (Commercial District).
f. What is the current comprehensive plan designation of the site?
The current comprehensive plan designates this site as Commercial.
g. If applicable, what is the current shoreline master program designation of the site?
The site is not within a shoreline.
h. Has any part of the site been classified as a critical area by the city or county? If so,
specify.
To our knowledge, the site has not been classified as a critical area by the city or county.
i. Approximately how many people would reside or work in the completed project?
The project will provide a mix 192 townhome and apartment dwelling units. Using the
average size of households for the US (2.55 people) and the number of dwelling units
proposed, we estimate approximately 489.6 people will reside in residential portion of
the site.
This development would also include retail space. At this time, it is difficult to estimate
the amount of people would work in the proposed retail portion of the site.
j. Approximately how many people would the completed project displace?
This project will not displace any residents as the site is currently undeveloped.
k. Proposed measures to avoid or reduce displacement impacts, if any.
SEPA Environmental checklist September 2023 Page 12
(WAC 197-11-960)
The project will not displace any residents, measures to avoid or reduce displacement
impacts are not applicable to this project.
l. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any.
Compliance with existing regulatory codes and standards ensures compatibility with
existing and project land uses.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of
long-term commercial significance, if any:
This proposal is within an existing, developed area within the City of Yelm city limits,
there will be no impact to agricultural or forest lands.
9. Housing
Find help answering housing questions12
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
The project will provide approximately 192 dwelling units. These units would be
Medium income apartment and townhome units.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
This project will not eliminate any units as the site is currently undeveloped.
c. Proposed measures to reduce or control housing impacts, if any:
There are no measures in place to reduce or control housing impacts as the site is
currently vacant and undeveloped.
10. Aesthetics
Find help answering aesthetics questions13
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
The tallest building will not exceed the maximum building height allowed in the C-1
(Commercial District) zone which is 60 feet.
b. What views in the immediate vicinity would be altered or obstructed?
No views in the immediate vicinity would be altered or obstructed.
c. Proposed measures to reduce or control aesthetic impacts, if any:
12 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-9-Housing
13 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-10-Aesthetics
SEPA Environmental checklist September 2023 Page 13
(WAC 197-11-960)
The observance of building setbacks and provision on native landscaping would reduce
the aesthetic impact of the project. The project will comply with the City of Yelm’s
design review.
11. Light and glare
Find help answering light and glare questions14
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
This proposal would produce light from automobile headlights and streetlights primarily
at night.
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
No light or glare from the finished project is anticipated to be a safety hazard or
interfere with views.
c. What existing off-site sources of light or glare may affect your proposal?
Light from nearby residences and roadway lights may be present.
d. Proposed measures to reduce or control light and glare impacts, if any:
None proposed. Lighting from exterior of building will adhere to County code.
12. Recreation
Find help answering recreation questions
a. What designated and informal recreational opportunities are in the immediate
vicinity?
Nearby recreation opportunities can be found at Yelm City Park and Splash Pad and
Cochrane Memorial Park. The Yelm City Park and Splash Pad is located 1.0 miles southeast
of the project site, a 3 minute drive or 20 minute walk from the project site which provides
a playground, splash pad, basketball court on site as well as access to the Yelm Community
Center. The Cochrane Memorial Park which provides cooking facilities, walking trails and
lake is located 1.0miles southeast of the project site, a 3 minute drive or 22 minute walk
from the project site.
b. Would the proposed project displace any existing recreational uses? If so, describe.
The proposal will not displace any existing recreation use.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
There are no proposed measures to reduce or control impacts on recreation. Impact fees
required by the City of Yelm will be paid.
14 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-11-Light-glare
SEPA Environmental checklist September 2023 Page 14
(WAC 197-11-960)
13. Historic and cultural preservation
Find help answering historic and cultural preservation questions15
a. Are there any buildings, structures, or sites, located on or near the site that are over
45 years old listed in or eligible for listing in national, state, or local preservation
registers? If so, specifically describe.
There are no buildings, structures, or sites, located on or near the site that are over 45
years old listed in or eligible for listing in national, state, or local preservation registers.
b. Are there any landmarks, features, or other evidence of Indian or historic use or
occupation? This may include human burials or old cemeteries. Are there any material
evidence, artifacts, or areas of cultural importance on or near the site? Please list any
professional studies conducted at the site to identify such resources.
There are no landmarks, features, or other evidence of Indigenous or historic use or
occupation.
c. Describe the methods used to assess the potential impacts to cultural and historic
resources on or near the project site. Examples include consultation with tribes and
the department of archeology and historic preservation, archaeological surveys,
historic maps, GIS data, etc.
The methods used to assess the potential impacts to cultural and historic resources on
or near the project site include site walks and reviewing the site and surrounding area
on Washington State’s Department of Archeology and Historic Preservation WISAARD
website.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and
disturbance to resources. Please include plans for the above and any permits that may
be required.
If any human remains or evidence of historic recourses of any type (e.g., old bottles,
charcoal, bones, shell, stone, horn or antler tools or weapons ) are uncovered during the
clearing and grading activities, all work in the immediate vicinity should stop, the area
should be secured, and any equipment moved to a safe distance away from the
location. The on-site superintendent should then follow the steps specified in the UDP.
15 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-13-Historic-cultural-p
SEPA Environmental checklist September 2023 Page 15
(WAC 197-11-960)
14. Transportation
Find help with answering transportation questions16
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
The project site is served by Tahoma Boulevard Southeast.
b. Is the site or affected geographic area currently served by public transit? If so,
generally describe. If not, what is the approximate distance to the nearest transit
stop?
The site is served by public transit. The closest transit stop to the project site is located
at the intersection of W Yelm Ave and Tahoma Boulevard Southeast bus stop located 0.3
mile northeast of the project site.
c. Will the proposal require any new or improvements to existing roads, streets,
pedestrian, bicycle, or state transportation facilities, not including driveways? If so,
generally describe (indicate whether public or private).
The project anticipates frontage improvements will be required as a condition of project
approval.
d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe.
The proposal will not use water, rail, or air transportation.
e. How many vehicular trips per day would be generated by the completed project or
proposal? If known, indicate when peak volumes would occur and what percentage of
the volume would be trucks (such as commercial and nonpassenger vehicles). What
data or transportation models were used to make these estimates?
Heath & Associates is currently preparing a trip generation scoping report. Additional
information can be found in the scoping report and future traffic impact analysis.
f. Will the proposal interfere with, affect, or be affected by the movement of agricultural
and forest products on roads or streets in the area? If so, generally describe.
The proposal will not interfere with the movement of agricultural and forest products
on roads or streets in the area.
g. Proposed measures to reduce or control transportation impacts, if any:
Payment of any traffic impact fees that are required by the City of Yelm.
16 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-14-Transportation
SEPA Environmental checklist September 2023 Page 16
(WAC 197-11-960)
15. Public services
Find help answering public service questions17
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, public transit, health care, schools, other)? If so,
generally describe.
The proposal would result in an increase need for fire protection, police protection,
public transit, health care, and schools.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Payment of any impact or mitigation fees that are required by the City of Yelm.
16. Utilities
Find help answering utilities questions18
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse
service, telephone, sanitary sewer, septic system, other:
The site is currently vacant and does not currently have access to the utilities listed
above.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate vicinity
which might be needed.
Existing services in the vicinity of the project site will be extended for service. This
extension will involve trenching and backfill efforts for each of the utilities.
C. Signature
Find help about who should sign19
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
X
Type name of signee: Ross Jarvis, PE
17 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-15-public-services
18 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-16-utilities
19 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-C-Signature
SEPA Environmental checklist September 2023 Page 17
(WAC 197-11-960)
Position and agency/organization:
Date submitted:
D. Supplemental sheet for nonproject actions
Find help for the nonproject actions worksheet20
Do not use this section for project actions.
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of activities
likely to result from the proposal, would affect the item at a greater intensity or at a faster rate
than if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances; or production of
noise?
• Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
• Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
• Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection, such as
parks, wilderness, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetlands, floodplains, or prime farmlands?
• Proposed measures to protect such resources or to avoid or reduce impacts are:
20 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-d-non-project-actions
SEPA Environmental checklist September 2023 Page 18
(WAC 197-11-960)
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
• Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
• Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws
or requirements for the protection of the environment.