Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
El_Rey_Burro_2018_WSEC_Project_Mechanical_Compliance_Form
Administered by: ©2024 NEEA, All rights reserved Date: Mar 14, 2024 MECHANICAL COMPLIANCE SUMMARY 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Project & Applicant Information Project Title El Rey Burro - 2018 WSEC For Building Department Use: Project Address 604 W Yelm Ave Yelm, WA 98597 Applicant Name Office HBHU Applicant Phone 253-383-3257 Applicant Email wanrec@hultzbhu.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Dining, Fast Food Building Cond. Floor Area 1,445 General Project Types New Building New Building or Addition Mechanical Scope Single Zone Systems & Equipment Alteration Mechanical Scope Project Cond. Floor Area 1,445 Floors Above Grade 1 Compliance Method Compliance Method 1 - General Mechanical Project Description VRF with DOAS for heating /cooling/ventilation. Type 1 kitchen hood with exhaust fan and gas-fired make-up air unit. Mechanical Compliance Scope and Method Project Type Mechanical Scope Economizer Exception(s) Applied? DOAS Ventilation Provided? Higher Equipment Efficiency Option Applied? Equipment Efficiency Compliance Verification New Building Single Zone Systems & Equipment No Yes NA COMPLIES Additional Efficiency Credits Included (AEC) Dedicated outside air systems (DOAS) Does building include occupancy classifications requiring DOAS? No Does project include DOAS equipment?Yes Based on project scope do TSPR requirements apply? No Do all systems comply with Appendix D standard reference design or qualify for an exception to TSPR?No Scope & Space Conditioning NEW BUILDING - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES Single Zone Air Systems Category - Dedicated outside air system (DOAS) Air Systems Summary Information System/Equip ID Paired with other Systems/Equip Ventilation Airflow Control Ventilation Standard Ventilation CFM Ventilation energy recovery Energy Recovery Efficiency (%) DOAS-1 Constant volume IMC Ventilation 1,300 Provided but not required 60 Air Systems & Equipment - Heating System /Equip ID Heating System/Equip Type Specific Type Heat Pump Heating Capacity (Btu/h)Cooling Capacity (Btu/h)AEC Efficiency Multiplier Proposed Heat Pump Heating Efficiency HPH Units Proposed Low OSA Temp Efficiency LTH Units Efficiency Compliance Verification DOAS-1 DOAS Supplemental heat only 1 COMPLIES Air Systems & Equipment Details System/Equip ID Area(s) Served Location In Project Documents - Plan/Detail # DOAS-1 See plans and equipment schedules M0.3, M4.0 DOAS paired with heating & cooling systems/equip: Paired w/ one single zone system or equipment Single Zone Air Systems Category - Fan coil unit, hydronic & VRF Air Systems Summary Information System/Equip ID Quantity of Items Supply Airflow Control Ventilation Standard Ventilation CFM (Total if Multiple Items) Ventilation Air Source Paired with DOAS HP-100 Constant volume IMC Ventilation 1,300 Separate DOAS DOAS-1 Air Systems & Equipment - Cooling System/ Equip ID Cooling System/Equip Type Specific Type Cooling Capacity per item (Btu/h) AEC Efficiency Multiplier Econo Exception Multiplier (FL & PL) Combined Efficiency Multiplier (AEC & Econo) Proposed Cooling Efficiency CE Units Proposed Part Load Efficiency PL Units Efficiency Compliance Verification HP-100 Fan coils, hydronic & VRF, cooling VRF 120,000 1 0 COMPLIES Air Systems & Equipment Details System/Equip ID Area(s) Served Location In Project Documents - Plan/Detail # HP-100 See plans and equipment schedules M0.3, M4.0 System/Equip ID for a single or multiple items?: Single item Cooling Capacity Source: HP-100