Loading...
105105504-Yelm Loop-Canal Court Relocate16402 16408 CANAL C T S E C A N A L R D S E 559899-147710 Y2095 (ERROR-SET FUSE) 559892-147716 SLAP9893 559894-147714 SLAP9893 27'+/- INSTALL CIC COUPLER WHERE R1 WAS REMOVE & EXTEND CIC TO SL1. 1.ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". 2.ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. 3.BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. 4.IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. STREET LIGHT NOTES POTELCO: 1.THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. 2.DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 3.DEVELOPER TO PROVIDE ALL TRENCHING AND CONDUIT WITH PULL-STRINGS FOR STREET LIGHTING CIRCUITRY. 4.CONDUIT SHALL BE SCH 40 PVC, CONDUIT CROSSING ROADWAYS OR DRIVEWAYS SHALL BE SCH 80 PVC. DEVELOPER/CUSTOMER: ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CABLE TV PHONE GAS PROJECT PHASE St. Light Smart Node Job Order Distribution HP Main HP Svc/MS Removal New Install SuperiorPWR NOTIF#ORDER# N Vicinity Map 46.95652686, -122.59470849 Owner / Developer Contact Info officeATTN: WSDOT LUKE ERICKSON 360.701.7440 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" DESIGNED BY: PSE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION ACCOUNT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 NEW BUSINESS DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Andrew Allwardt 425-457-5901 Andrew Allwardt 425-457-59014 N/A N/A YELM LOOP-CANAL CT SE RELOCATE RELOCATE & UPGRADE EXISTING STREETLIGHT 16402 CANAL CT SE, YELM WA 98597 105105504 AS NOTED 1 of 1 THURSTON 3515 1702E072 1702E0721702E068 YEL-23 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CORRECTIVE / 10 DAY WAIVED THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) X JOB SITE Mike Hammons 425-765-1395-Cell Phone Lars Larson 425-456-2701 Project Manager Contact Information: 04/04/24 04/09/24 and that all quality requirements are met. I certify that the work performed meets PSE's standards and procedures Deviations noted on the As-built and their reason. Correct QA Checklist(s) reviewed. Company ID#'s RECORDED in correct location on As-built. Total PRIMARY Cable noted on As-built. Material VERIFIED and CHANGES noted on Paperwork. Print Name ___________________________________ Date ______________ Foreman's Signature _______________________________________________ Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Field Changes RED-LINED on As-built. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. FOREMAN (CHECK BOX WHEN COMPLETED) SCALE: 1"=40' SITE PLAN 514889829 141009226 105105504 101172143 10 5 1 0 5 5 0 4 108154310SCALE: 1"=20' CIRCUITRY PLAN 186067263 STREET LIGHT TABLE - REMOVE SITE # POLE LUMINAIRE WO #BILLING SCH. SMART STREET LIGHT NODE TOTAL CONN LOADGRID # TAG #TYPE MTG HT.ARM WATTS STYLE R1 559892 147716 SLAP9893 EXISTING CONCRETE 30'6'250W HPS CHFL 108154310 52 NA 120/240 STREET LIGHT TABLE - REINSTALL SITE # POLE LUMINAIRE WO #BILLING SCH. SMART STREET LIGHT NODE TOTAL CONN LOADGRID # TAG #TYPE MTG HT.ARM WATTS STYLE SL1 559894 147714 SLAP9893 EXISTING CONCRETE 30'6'149W LED CHFL 3K T3 101172143 51 120/240 SITE NOTES: -USE VACTRUCK TO TRENCH ~27FT FROM R1 TO SL1. USE VAC-TRUCK TO CREATE POLE HOLE AT SL1. -AT R1 REMOVE EXISTING 30FT MH CONC POLE, 6FT ARM, & 250W HPS CHFL. -AT SL1 RE-INSTALL EXISTING 30FT MH CONC POLE, 6FT ARM, & NEW 149W LED CHFL 3K T3. -AT R1 INSTALL CIC COUPLER & EXTEND CIC IN TRENCH TO SL1. -INSTALL SMART NODE. -FLAGGING REQUIRED. *FOREMANS WATCH REQUIRED FOR PRIMARY CLEARANCES* *NEW LOCATION STAKED IN FIELD BY CUSTOMER* NOTES TO M&R AND BILLING: NEW GRID AT SL1 559894-147714 Electric Service Cable in Conduit 2" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit - Soil that is free from debris, sharp rocks, and rocks larger than 10" in diameter. Backfill shall not damage the conduit. Backfill for Conduit (See Definition Above) STREET LIGHT CIRCUITRY TABLE SITE #FROM CABLE INFO AS-BUILT REMARKSTYPELFTYPELENGTH SL1 R1 #6 CIC 45 TOTAL FT =45 TOTAL FT =