Loading...
L.Brown Final - 105104891 HABITAT YELM - Peer SignedN Vicinity Map 46.9483, -122.6103 Owner / Developer Contact Info officeATTN: SOUTH PUGET SOUND HABITAT FOR HUMANITY 910 5TH AVE SE OLYMPIA, WA 98501 BEN FRANSUA 360-807-5890 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 514747586 105104891 N/A 101173178 N/A 108155306 N/A 105105514 N/A 593258097 N/A 583076795 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Relocation Removal St. Light Wire Transfer UG XFMR Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 10 5 1 0 4 8 9 1 N / A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 02.21.24 A. DUNN 206.437.9150 02.21.24 N/A .N/A C.DIAZ . 02.21.24 REDT # ( RW-133705 )YELM HABITAT YELM DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 22 S/F LOTS P#22719230700, 407 LONGMIRE ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105104891 N/A 1 OF 3 THURSTON N/A N/A QSTHLE 19NW-T17N-R02E N/A N/A 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 JESSICA.CALLAHAN@PSE.COM x x Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE ... ... ... x x BEN@SPSHABITAT.ORG VAULT DETAIL @ V02 NOT TO SCALE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRON T TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA CO M B U S T I B L E B U I L D I N G W A L L S & R O O F 10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN @ H1A, H1B & H2A SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 4,5 1,2 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 VAULT DETAIL @ V01 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 SITE 4.29.24 R O A D A 17 8 7 6 22 20 3 18 9 LO N G M I R E S T . N W C O A T E S A V E . N W CU L L E N S S T . N W T R U M P A V E . N W 16 15 5 21 4 11 19 10 2 1 14 13 12 T R U M P P L . N W FE E D YEL 25 '404' '108' OPEN SPACE TRACT 'C' STORM TRACT 'B' RELOCATE #2 A C S R B Ø '312' '310' '308' '307' #2 A C S R 46' R55' FUSE @ 65T SW#X91900 REPLACE 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 02.21.24 A. DUNN 206.437.9150 02.21.24 N/A .N/A C.DIAZ . 02.21.24 REDT # ( RW-133705 )YELM HABITAT YELM DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 22 S/F LOTS P#22719230700, 407 LONGMIRE ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105104891 1" = 50' 2 OF 3 THURSTON N/A N/A QSTHLE 19NW-T17N-R02E N/A N/A 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-25 11.06.23 394 363 312 N/A 18 N/A 394 381 312 ... ... ... SCHED.SQ. FT. MAX LRC = THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS V02 50kVA 0.5 2.34 26,700 AMPS 1.80 17,400 AMPS DEVELOPER TO PROVIDE TYPICAL 10' PSE FRONTAGE EASEMENT FOR OPERATION AND MAINTENANCE OF PSE EQUIPMENT. EASEMENT TO BE CLEAR OF ALL BUILDING OVERHANGS AND FOUNDATION FOOTINGS 10' CLEARANCE REQUIRED TO TRANSFORMERS OR NON-FLAMMABLE BUILDING MATERIALS REQUIRED CIRCUIT FEET ADDED: 370' 17 2,543 115 AMPS CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X1A LOT 1 LOT 22 2 DB120 1 75 ( )'WCL ST. LIGHT X01 LOT 1 LOT 22 3 DB120 1 65 ( )'WCL SECONDARY X02 LOT 3 LOT 21 3 DB120 2 65 ( )'WCL SECONDARY X03 LOT 5 LOT 19 3 DB120 2 65 ( )'WCL SECONDARY X04 LOT 7 LOT 17 3 DB120 1 65 ( )'WCL SECONDARY X05 LOT 8 LOT 16 3 DB120 1 65 ( )'WCL SECONDARY X06 LOT 10 LOT 15 3 DB120 1 65 ( )'WCL SECONDARY 2" DB120 GREY PVC = 75 FT 2" PVC PLUG /CAPS = 2 3" DB120 GREY PVC = 520 FT 3" PVC PLUG /CAPS = 16 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL P1A V01 2 1 75 1 1 - -39 94 1/0 AL JKT 110 -EJD779 -- V01 V02 2 1 300 - - 1 -107 86 1/0 AL JKT 315 -EJD880 -- 2" PVC (FT) & BENDS =375 1 1 1 0 1/0 AL JKT TOTAL (FT) =425 VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559593 147325 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 2 - MINU1LL 6045.1010 BØ V02 559613 147302 42"x48"x38" Unistrut HH Matid: 7663001 50KVA MP TRF 120/240 Matid: 6247100 1 1 MINU1SR 6045.1010 BØ SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in) Design (ft)90° 45°22° 11° (Percent) (Percent)Actual Amount Installed Cable Conduit V01 H1A 350 65 -3 65 1 - - - 2.6 1.2 V01 H1B 350 115 -3 115 1 - - - 3.1 1.5 V01 LOT 1 1/O 40 50 3 40 1 - - - 3.0 2.4 V01 LOT 2 1/O 15 50 3 15 1 - - - 2.7 2.0 V01 LOT 22 1/O 70 50 3 5 1 - - - 3.3 2.8 H1A LOT 3 1/O -50 3 -- - - - 3.2 2.1 H1A LOT 4 1/O -50 3 -- - - - 3.2 2.1 H1A LOT 19 4/O 105 50 3 40 2 - - - 3.9 3.1 H1A LOT 20 1/O 80 50 3 15 2 - - - 4.2 3.5 H1A LOT 21 1/O 75 50 3 10 2 - - - 4.2 3.5 H1B LOT 5 1/O -50 3 -- - - - 3.7 2.4 H1B LOT 6 1/O -50 3 -- - - - 3.7 2.4 H1B LOT 7 1/O 50 50 3 50 1 - - - 4.5 3.5 H1B LOT 17 4/O 100 50 3 35 2 - - - 4.4 3.5 H1B LOT 18 1/O 75 50 3 10 2 - - - 4.7 3.8 V02 H2A 350 110 -3 110 1 - - - 3.4 2.0 V02 LOT 11 1/O 60 50 3 60 1 -1 -3.7 3.2 V02 LOT 12 1/O 55 50 3 55 1 -1 -3.6 3.1 V02 LOT 13 1/O 10 50 3 10 1 - - - 3.0 2.3 V02 LOT 14 1/O 10 50 3 10 1 - - - 3.0 2.3 H2A LOT 8 4/O 55 50 3 55 1 - - - 4.4 3.4 H2A LOT 9 1/O -50 3 -- - - - 4.1 2.9 H2A LOT 10 1/O -50 3 -- - - - 4.1 2.9 H2A LOT 15 4/O 70 50 3 5 2 - - - 4.5 3.5 H2A LOT 16 4/O 90 50 3 25 2 - - - 4.7 3.7 1/O UG Triplex (ft) =540 3" PVC & BENDS (ft)=730 26 0 2 0 2.7 4/O UG Triplex (ft) =420 350 UG Triplex (ft) =290 TOTAL QTS OF GLUE 2.7 SITE SPECIFIC NOTES At P01 (559585-147325) 1976 CLASS 3 - 40' -TO BE RELOCATED OUT OF PROPOSED ROAD -REMOVE 25kVA XFMR APPROXIMATELY 7' WEST AND 10' NORTH TO PROPOSED PLANTER At P1A -INSTALL NEW 50' CL 3 POLE (PD503) 6010.1000 -INSTALL 1Ø PRI NEUT DE #2ACSR (DE2115A) 6031.3011 -APPROXIMATELY 7' WEST AND 10' NORTH TO PROPOSED PLANTER -INSTALL 1Ø TERM UG TO OH FEED W/ LOAD INTERRUPTER C/O (UTSU1L1) 6043.1001 - FUSE AT 65T (3412600) - ALUM "H" CONNECTOR (2167000) -INSTALL SW#X91900 -NEUTRAL TO BE ROLLED TO PRIMARY POSITION FOR ST. LIGHT CLEARANCE -INSTALL 10" SINGLE HELIX 1" ROD (ANDH1) 6012.1000 (L = 15'E) -INSTALL 7/16" PRI DG (GYD7SA) TO NEW ANCHOR 6013.0100 (E) -INSTALL GRID# 559593-147325 -REMOVE POLE AND ALL PSE EQUIPMENT PER PROJECT CONTACT BEN FRANSUA NO EV CHARGING TO BE INSTALLED ON HABITAT YELM DEVELOPMENT At P02 (559571-147314) 1978 CLASS 3 - 40' -EXISTING POLE TO BE RELACED TO MEET ST. LIGHT CLEARANCE -INSTALL 3" SECONDARY RISER (RIS3CSS) ON NEW STANDOFF BRACKETS 6042.1000 -APPROXIMATELY 4' SOUTH AND 2' WEST OF EX. POLE LOCATION -TRANSFER 50kVA TRANSFORMER TO NEW POLE -INSTALL NEW 45' CL 3 POLE (PD453) 6010.1000 -INSTALL 2" PRIMARY RISER (RIS2CSS) ON NEW STANDOFF BRACKETS 6042.1000 RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 559585-147325 40' 3 1976 COMCAST P02 559571-147314 40' 3 1978 YCOM / FAIRPOINT COMMUNICATIONS / COMCAST POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P1A 559585-147325 50 3 2024 PSE Equip # P02 559571-147314 45 3 2024 PSE Equip # DEDICATED FACILITIES SITE SPAN ADDITIONAL REMARKS LABOR UNITS # FROM TO FOOTAGE -V01 LOT 1 30 DED. CONDUIT & WIRE 2-36, 2-54A - H1B LOT 7 50 DED. CONDUIT & WIRE 2-36, 2-54A - H2A LOT 8 50 DED. CONDUIT & WIRE 2-36, 2-54A V02 LOT 12 45 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT= 175 -TRANSFER EXISTING SERVICES TO NEW POLE -EXISTING GRID# TO REMAIN -INSTALL NEW 37.5kVA OH XFMR (TRFPXF) 6025.1000 New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 559571-147315 50kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P1A 559593-147325 37.5kVA TRFPXF NEW @ 404: %V DROP: 3.2 % FLICKER: 7.3 EXISTING @ 404: % V. DROP: 3.7 % FLICKER: 7.5 NEW @ 108: %V DROP: 1.5 % FLICKER: 3.2 EXISTING @ 108: % V. DROP: 2.0 % FLICKER: 3.5 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 559585-147325 25kVA -TRANSFER EXISTING OH SERVICES TO P1A 4.29.24 R O A D A 17 8 7 6 22 20 3 18 9 16 15 5 21 4 11 19 10 2 1 14 13 12 OPEN SPACE TRACT 'C' FE E D YEL 25 B Ø #2 A C S R DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 02.21.24 A. DUNN 206.437.9150 02.21.24 N/A .N/A C.DIAZ . 02.21.24 REDT # ( RW-133705 )YELM HABITAT YELM DEVELOPMENT 1Ø PRIMARY U/G LINE EXTENSION - 22 S/F LOTS P#22719230700, 407 LONGMIRE ST NW, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105104891 AS SHOWN 3 OF 3 THURSTON N/A N/A QSTHLE 19NW-T17N-R02E N/A N/A 1702E074 1702E116 1702E074 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 1702E074 SCALE: 1" = 100' SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE NOT TO SCALE NEW CONDUIT DIAGRAM NEW 1/O AL EJD880-BØ NEW 1/O AL EJD779-BØ SL #6 CIC PRIMARY 2" SECONDARY 3" CONDUIT LEGEND SCALE: NONE STREET LIGHT TUBE DETAIL Plan View Detail of Street Light Tube Wire Entrance Slot Street Light Tube Field Side Road Side Wire Entrance Slot 45° 45° Position 3" x 6" wire entrance slot 45 degrees left or right from a line perpendicular to road- way through center of tube. Field Side 3" x 6" Wire Entrance Slot 45° 45° Street light tube set 2" below grade. Road Side 18" - 24" Minimum Depending on Pole Type 5'-0" 20" 26" 1. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". 2. ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. 3. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. 4. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. STREET LIGHT NOTES POTELCO: 1. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. 2. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 3. DEVELOPER TO PROVIDE ALL TRENCHING AND CONDUIT WITH PULL-STRINGS FOR STREET LIGHTING CIRCUITRY. 4. CONDUIT SHALL BE SCH 40 PVC, CONDUIT CROSSING ROADWAYS OR DRIVEWAYS SHALL BE SCH 80 PVC. DEVELOPER/CUSTOMER: STREET LIGHT CIRCUITRY TABLE - 105105514 SITE # FROM CABLE INFO AS-BUILT REMARKSTYPE LF TYPE LENGTH SL1 V01 #6 CIC 115 - BY INTOLIGHT SL2 V02 #6 CIC 105 - BY INTOLIGHT TOTAL FT =220 TOTAL FT = SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 6 - SEPL6 6050.1000 H1B PEDESTAL 6 - SEPL6 6050.1000 H2A PEDESTAL 6 - SEPL6 6050.1000 STREET LIGHT TABLE SITE # POLE LUMINAIRE TUBE POLE BASE TYPE (Direct Buried or Basemount) WO #BILLING SCH. SMART STREET LIGHT NODE TOTAL CONN LOADGRID # TAG #TYPE MTG HT. ARM WATTS STYLE TUBE LENGTH TUBE DIAMETER SL1 559609 147295 GRN CONCRETE 30' 8'71W LED CHFL 3K T3 5'18"DIRECT BURIED 105105515 51 120/240 SL2 559585 147325 GRN CONCRETE 30' 8'71W LED CHFL 3K T3 5'18"DIRECT BURIED 105105515 51 120/240 4.29.24