Loading...
PSE FINAL 107063209 TAHOMA TERRA 7&8 PH 3509 518 519 510 511 512 513 514 515 516 517 'C' ROAD 'B' ROAD 'A' ROAD 'D ' R O A D 'E ' R O A D 558 559 560 561 562 563 564 565566567568569 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620621622623624625 626 627 628 629 630 631 632 570 TRACT U TRACT T TRACT S 4" M P E - 9 I P 3 7 - 2 8 ' W 10 7 0 5 9 7 7 7 - 2 0 2 1 J T 66'S 67'S 5 6 ' 90 ' 56' 56 ' R57' 56 ' 56' SEE DETAIL (PAGE 2) SEE DETAIL (PAGE 2) 'A' JA C K S O N S T JENSEN DRIVE SE 4" MPE-9 IP 29'S 107059777 - 2021 JT 28'S 99 ' W 1 1 / 8 " M P E - 9 - E 2 0 2 1 356 2" M P E I - 9 70 - 7 1 ' W 2 " M P E - 9 I P 2 9 ' W 1 0 7 0 5 9 7 7 7 - 2 0 2 1 J T 4 " M P E I - 9 5 1 - 3 7 ' W 152'N, 37'W EOC 150'N, 37'W 24'S,70'W 30'N 71 ' W 56 ' SITE Owner / Developer Contact Info officeATTN: TAHOMA TERRA HOLDINGS, LLC. P.O. BOX 73790 PUYALLUP, WA 98373 EVAN MANN 253.820.7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50' 10 5 1 0 4 5 6 0 10 7 0 6 3 2 0 9 Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . A. DUNN .06.05.24 D. WALKER .05.30.24 REDT # ( RW-134833 )YELM TAHOMA TERRA 7&8 PH 3 2" MPE-___ GAS MAIN EXTENSION - 75 S/F LOTS P#78640000018, TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY 107063209 105104560 1" = 50'1 OF 3 THURSTON 344 CIONC 23SE-T17N-R01E 280.038 283.041 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 514593101 107063209 N/A 106395927 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 JOINT 8"MPE-___353 FT JOINT 6"MPE-___3 FT JOINT 4"MPE-___582 FT JOINT 2"MPE-___1,996 FT .... .... Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:LEE BROWN 425.417.8620 Lee.Brown@pse.com 60 IP 344-60 N/A N/A SITE PLAN xx JOINT 8" = 353 FT JOINT 6" = 3 FT ... ... ... EVAN@SOUNDBUILTHOMES.COM IP 344-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CFH / HOME = 90 MATCHLINE A-A (SEE BELOW LEFT) MATCHLINE A-A (SEE ABOVE RIGHT) JOINT 8" MPE-___ 105' @ 30'E C/L (______)' @ _____'E C/L 8" CAP EOM/WIREBOX 30'N C/L & 118'E C/L ______'N C/L & _____'E C/L JOINT 8" MPE-___ 88' @ 30'N C/L (______)' @ _____'N C/L JOINT 4" MPE-___ 247' @ 30'E C/L (______)' @ _____'E C/L JOINT 4" MPE-___ 209' @ 30'E C/L (______)' @ _____'E C/L 4" INLINE TEE 30'S C/L & 30'E C/L ______'S C/L & _____'E C/L JOINT 4" MPE-___ 1' @ 30'S C/L (______)' @ _____'S C/L 4" x 2" REDUCER 30'S C/L & 29'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 422' @ 30'S C/L (______)' @ _____'S C/L 2" INLINE TEE 30'S C/L & 30'W C/L ______'S C/L & _____'W C/L JOINT 2" MPE-___ 761' @ 30'N C/L TO 59'R TO 30'W C/L (______)' @ _____'W C/L TO _____'R TO _____'W C/L JOINT 2" MPE-___ 312' @ 30'W C/L (______)' @ _____'W C/L 2" CAP EOM/WIREBOX 342'S C/L & 30'W C/L ______'S C/L & _____'W C/L 2" CAP EOM/WIREBOX 30'S C/L & 430'W C/L ______'S C/L & _____'W C/L JOINT 4" MPE-___ 1' @ 30'S C/L (______)' @ _____'S C/L 4" x 2" REDUCER 30'S C/L & 29'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 460' @ 30'S C/L (______)' @ _____'S C/L JOINT 4" MPE-___ 120' @ 30'S C/L (______)' @ _____'S C/L 4" CAP EOM/WIREBOX 30'S C/L & 150'E C/L ______'S C/L & _____'E C/L 4" INLINE TEE 30'S C/L & 30'E C/L ______'S C/L & _____'E C/L JOINT 4" = 582 FT JOINT 2" = 1,996 FT N Vicinity Map 46.9407, -122.6361 2" POLYVALVE/OPEN W/ BOX & SUPPORT 30'S C/L & 27'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 10' @ 30'S C/L ______'S C/L JOINT 2" MPE-___ 1' @ 30'S C/L (______)' @ ______'S C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 30'S C/L & 27'E C/L ______'S C/L & _____'E C/L CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 596 LOT 595 10 40 1 S 4 DB120 2 85 ( )' SCL GAS MAIN, PRIMARY X02 LOT 596 LOT 595 6 40 1 S 2 DB120 1 100 ( )' NCL GAS MAIN, PRIMARY X03 LOT 596 LOT 598 6 40 1 W 4 DB120 1 85 ( )' ECL GAS MAIN, PRIMARY ----2 DB120 1 85 ( )' ECL PRIMARY ----3 DB120 1 85 ( )' ECL SECONDARY X04 LOT 594 LOT 631 2 40 1 E 3 DB120 2 65 ( )' WCL GAS SVC, SECONDARY ----2 DB120 1 65 ( )' WCL ST. LIGHT X05 LOT 592 LOT 629 2 40 1 E 3 DB120 2 65 ( )' WCL GAS SVC, SECONDARY X06 LOT 590 LOT 628 2 40 1 W 3 DB120 2 65 ( )' ECL GAS SVC, SECONDARY X07 LOT 589 LOT 626 2 40 1 W 3 DB120 1 65 ( )' ECL GAS SVC, SECONDARY ----2 DB120 1 65 ( )' ECL ST. LIGHT X08 LOT 604 LOT 619 4 40 1 N 2 DB120 1 75 ( )' SCL GAS MAIN, PRIMARY ----3 DB120 1 75 ( )' SCL SECONDARY X09 LOT 618 LOT 621 2 40 1 E 3 DB120 2 65 ( )' WCL GAS SVC, SECONDARY X10 LOT 617 LOT 622 2 40 1 W 3 DB120 2 65 ( )' WCL GAS SVC, SECONDARY X11 LOT 615 LOT 624 2 40 1 W 3 DB120 2 65 ( )' ECL GAS SVC, SECONDARY X12 LOT 614 LOT 577 4 40 1 N GAS ONLY 75 ( )' SCL GAS MAIN X13 LOT 574 LOT 613 2 40 1 S 3 DB120 2 65 ( )' NCL GAS SVC, SECONDARY X14 LOT 572 LOT 611 2 40 1 S 3 DB120 2 65 ( )' NCL GAS SVC, SECONDARY X15 'A'LOT 560 6 40 1 W 4 DB120 1 75 ( )' ECL GAS MAIN, PRIMARY X16 LOT 561 LOT 607 2 40 1 E 3 DB120 1 65 ( )' WCL GAS SVC, SECONDARY X17 LOT 563 LOT 608 2 40 1 E 3 DB120 1 65 ( )' WCL GAS SVC, SECONDARY X18 LOT 564 LOT 608 2 40 1 W 3 DB120 1 65 ( )' WCL GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 24 2" YELLOW SCH 40 PVC = 780 FT 2" DB120 GREY PVC = 390 FT 2" PVC PLUG /CAPS = 10 4" PVC PLUG /CAPS = 4 4" YELLOW SCH 40 PVC = 150 FT 3" DB120 GREY PVC = 1460 FT 3" PVC PLUG /CAPS = 44 6" PVC PLUG /CAPS = 6 6" YELLOW SCH 40 PVC = 260 FT 4" DB120 GREY PVC = 330 FT 4" PVC PLUG /CAPS = 8 10" PVC PLUG /CAPS = 2 10" YELLOW SCH 40 PVC = 85 FT JOINT 8" MPE-___ 58' @ 91'S C/L (______)' @ _____'S C/L 8" ELBOW 30'E C/L & 91'S C/L ______'E C/L & _____'S C/L THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . A. DUNN .06.05.24 D. WALKER .05.30.24 REDT # ( RW-134833 )YELM TAHOMA TERRA 7&8 PH 3 2" MPE-___ GAS MAIN EXTENSION - 75 S/F LOTS P#78640000018, TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY 107063209 105104560 N/A 2 OF 3 THURSTON 344 CIONC 23SE-T17N-R01E 280.038 283.041 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . N/A N/A N/A ... ... ... ... GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 4" MAIN 558 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 4" MAIN 559 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 4" MAIN 560 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 561 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 562 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 563 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 564 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 565 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 566 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 567 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 568 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 569 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 570 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 571 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 572 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 573 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 574 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 575 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 576 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 577 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 578 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 579 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 580 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 581 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 2" MAIN 582 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 583 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 584 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 585 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 2" MAIN 586 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 587 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 588 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 589 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 590 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 591 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 592 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 593 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 594 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 595 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 8" MAIN 596 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 8" MAIN 597 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 4" MAIN 598 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 599 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 600 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 601 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 4" MAIN 602 1 1/8 MPE-___10 ( )' NCL 2,600 SS SINGLE 4" MAIN 603 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 604 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 605 1 1/8 MPE-___10 ( )' SCL 2,600 SS SINGLE 4" MAIN 606 1 1/8 MPE-___10 ( )' SCL 2,600 LS SINGLE 2" MAIN 607 1 1/8 MPE-___65 ( )' WCL 2,600 LS SINGLE 2" MAIN 608 1 1/8 MPE-___65 ( )' WCL 2,600 LS SINGLE 2" MAIN 609 1 1/8 MPE-___65 ( )' ECL 2,600 LS TWIN 2" MAIN 610 & 611 1 1/8 MPE-___65 ( )' NCL 2,600 LS TWIN 2" MAIN 612 & 613 1 1/8 MPE-___65 ( )' SCL 2,600 SS SINGLE 2" MAIN 614 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 615 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 616 1 1/8 MPE-___10 ( )' ECL 2,600 SS SINGLE 2" MAIN 617 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 618 1 1/8 MPE-___10 ( )' WCL 2,600 SS SINGLE 2" MAIN 619 1 1/8 MPE-___10 ( )' WCL 2,600 LS TWIN 2" MAIN 620 & 621 1 1/8 MPE-___65 ( )' WCL 2,600 LS TWIN 2" MAIN 622 & 623 1 1/8 MPE-___65 ( )' WCL 2,600 LS TWIN 2" MAIN 624 & 625 1 1/8 MPE-___65 ( )' ECL 2,600 LS SINGLE 2" MAIN 626 1 1/8 MPE-___65 ( )' ECL 2,600 LS TWIN 2" MAIN 627 & 628 1 1/8 MPE-___65 ( )' ECL 2,600 LS TWIN 2" MAIN 629 & 630 1 1/8 MPE-___65 ( )' WCL 2,600 LS TWIN 2" MAIN 631 & 632 1 1/8 MPE-___65 ( )' WCL 2,600 SS SINGLES =55 1330 FT 1 1/8" PE PIPE LS SINGLES =4 LS TWIN =8 T01 CONSTRUCTION DETAIL N.T.S. T02 CONSTRUCTION DETAIL N.T.S. 4" FUSED TIE-IN 67'S C/L & 28'W C/L ______'S C/L & _____'W C/L PROP. 8" EX. 4" JOINT 4" MPE-___ 1' @ 28'W C/L (______)' @ _____'W C/L PROP. 8"PROP. 2" PROP. 8" PROP. 4" 6" x 4" REDUCER 68'S C/L & 28'W C/L ______'S C/L & _____'W C/L JOINT 6" MPE-___ 1' @ 28'W C/L (______)' @ _____'W C/L 8" x 6" REDUCER 69'S C/L & 28'W C/L ______'S C/L & _____'W C/L JOINT 8" MPE-___ 21' @ 28'W C/L (______)' @ _____'W C/L 8" POLYVALVE/OPEN W/ BOX & SUPPORT 70'S C/L & 28'W C/L ______'S C/L & _____'W C/L JOINT 8" MPE-___ 1' @ 28'W C/L (______)' @ _____'W C/L JOINT 8" MPE-___ 20' @ 91'S C/L (______)' @ _____'S C/L 8" INLINE TEE 91'S C/L & 28'W C/L ______'S C/L & _____'W C/L 8" POLYVALVE/OPEN W/ BOX & SUPPORT 91'S C/L & 45'W C/L ______'S C/L & _____'W C/L 8" CAP EOM/WIREBOX 91'S C/L & 46'W C/L ______'S C/L & _____'W C/L 66'S 67'S 8" INLINE TEE 30'N C/L & 30'E C/L ______'N C/L & _____'E C/L 8" INLINE TEE 30'N C/L & 30'E C/L ______'N C/L & _____'E C/L 8" x 6" REDUCER 29'N C/L & 30'E C/L ______'N C/L & _____'E C/L 6" x 4" REDUCER 28'N C/L & 30'E C/L ______'N C/L & _____'E C/L 8" x 6" REDUCER 30'N C/L & 29'E C/L ______'N C/L & _____'E C/L 6" x 4" REDUCER 30'N C/L & 28'E C/L ______'N C/L & _____'E C/L 4" x 2" REDUCER 30'N C/L & 27'E C/L ______'N C/L & _____'E C/L JOINT 8" MPE-___ 1' @ 30'N C/L (______)' @ _____'N C/L JOINT 8" MPE-___ 1' @ 30'E C/L (______)' @ _____'E C/L JOINT 6" MPE-___ 1' @ 30'N C/L (______)' @ _____'N C/L JOINT 4" MPE-___ 1' @ 30'N C/L (______)' @ _____'N C/L JOINT 6" MPE-___ 1' @ 30'E C/L (______)' @ _____'E C/L JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 4" POLYVALVE/OPEN W/ BOX & SUPPORT 27'N C/L & 30'E C/L ______'N C/L & _____'E C/L JOINT 4" MPE-___ 1' @ 30'E C/L (______)' @ _____'E C/L JOINT 4" MPE-___ 1' @ 30'N C/L (______)' @ _____'N C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 30'N C/L & 26'E C/L ______'N C/L & _____'E C/L THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . A. DUNN .06.05.24 D. WALKER .05.30.24 REDT # ( RW-134833 )YELM TAHOMA TERRA 7&8 PH 3 2" MPE-___ GAS MAIN EXTENSION - 75 S/F LOTS P#78640000018, TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY 107063209 105104560 N/A 2 OF 3 THURSTON 344 CIONC 23SE-T17N-R01E 280.038 283.041 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY LINDA OLSON 425.462.3787 . . . N/A N/A N/A ... ... ... ... EX PLAT MAP 283.041 NOT TO SCALE SITE NOT TO SCALE CROSS SECTION - 'D' ROAD & 'E' ROAD LOOKING NORTH 56' ROW PROP. 8" MPE IP - 30'ECL W G G E 4" MPE-9 IP 37-28'W 107059777 - 2021 JT PROP. 4" MPE IP - 30'ECL G NOT TO SCALE CROSS SECTION - 'A' ROAD, 'B' ROAD & 'C' ROAD LOOKING WEST 56' ROW S N PROP. 2" MPE IP - 59'R TO 30'WCLG'D' ROAD 'E' ROAD 'E' ROAD 'E' ROAD PROP. 2" MPE IP - 30'SCL G'B' ROAD PROP. 8" MPE IP - 30'NCL G 'A' ROAD PROP. 2" MPE IP - 30'NCL TO 59'R G 'A' ROADPROP. 4" MPE IP - 30'SCL G'C' ROAD PROP. 2" MPE IP - 30'SCL G'C' ROAD NOT TO SCALE CROSS SECTION - TAHOMA BLVD SE LOOKING WEST 90' ROW S PROP. 8" MPE IP - 91'SCL N G 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE