Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Sternoff Yelm - Yelm Scope - 8-2-24
1011 E Main Ave Suite 453 | Puyallup, WA | 98372 (253) 770-1401| heathtraffic.com . SCOPING MEMO Sternoff Yelm Yelm, WA August 2, 2024 HeathTraffic.com Sternoff Yelm - Scoping Memo 2 August 2, 2024 City of Yelm Traffic Impact Analysis Scoping Memo The intent of this assessment is to provide Yelm with a trip generation summary and site characteristics for the proposed project herein referred to as Sternoff Yelm. A project description is provided below. PROJECT DESCRIPTION · Proposal o Sternoff Yelm is a proposed residential development comprised of up to 71 mobile homes that will be aged-restricted to 55 and over. · Location o The project site is bordered to the east via Canal Road SE and to the south by Northern Pacific Road NW o The site is located on undeveloped tax parcel #: 64300900100 comprised of 10-acres. · Site Access o Site ingress/egress is proposed via: o Northern Pacific Road SE approximately 440-ft south of Canal Road SE right-of-way o Canal Road SE approximately 120-ft north of Northern Pacific Road SE right-of-way A vicinity map of the surrounding roadway network is provided on the following page in Figure 1 with the subject site highlighted in blue. A conceptual site plan is presented in Figure 2. HeathTraffic.com Sternoff Yelm - Scoping Memo 3 N Figure 1: Vicinity Map Subject Site SITE PLAN FIGURE 2 STERNOFF YELM N 4 HeathTraffic.com Sternoff Yelm - Scoping Memo 5 PROJECT TRIP GENERATION Trip generation estimates were derived from the Institute of Transportation Engineers (ITE) publication, Trip Generation, 11th Edition. In review of ITE’s Land Use Codes (LUC), LUC 240 – Mobile Home Park was selected. Dwelling units were used as the input variable with ITE’s equations to determine trip ends. Table 1 below highlights the estimated number of trips to/from the proposed development. Refer to the appendix for ITE trip generation sheets. Table 1: Project Trip Generation Land Use Units AWDT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Mobile Home Park – LUC 240 71 548 8 28 36 25 16 41 The project is estimated to generate 548 total average weekday daily trips with 36 AM peak hour trips (8 inbound/28 outbound) and 41 PM peak hour trips (25 inbound / 16 outbound). TRIP DISTRIBUTION & ASSIGNMENT Traffic has been assigned via TAZ Map 1018 with some minor adjustments as the distribution model assumes completion of the SR 510 bypass loop. Since the bypass is not anticipated to be completed at the time of project buildout, most traffic would be routed to and from the south and east directions. Refer to Figure 3 for the PM peak hour trip distribution & assignments. PM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENT FIGURE 3 STERNOFF YELM N SITE PM PEAK HOUR TRIPS INBOUND: 25 VPH OUTBOUND: 16 VPH 5% 44% 51% 9 6 1 0 1 0 S T O P 3 2 1 8 1 5 S T O P 1 1 7 12 2 3 STOP HeathTraffic.com Sternoff Yelm - Scoping Memo 7 TIA PARAMETERS If a full TIA is required, the following parameters are proposed. Time Period to Evaluate: Weekday: 4:00-6:00 PM Horizon Year: 2027 (Three-Year) Background Growth: 1.0%1 Pipeline Projects: C & E Commercial Yelm Circle K Country Meadow Estates I & II Armor Storage Habitat for Humanity Liberty Grove Blue Fern Railway Road The Hutch (Partially Built Out) Willow Glenn IV 407 E Yelm Coffee Middle Road SE Plat Left Turn Warrant: Canal Road SE & Access Future Peak Hour Factor: 0.92 Uncongested / 0.98 Congested Intersections to Study: 1. Canal Road SE & Access 2. Northern Pacific Road SE & Access 3. Canal Road SE & Northern Pacific Road SE 1 Used in previous projects in the general area (Middle Road SE Plat). HeathTraffic.com Sternoff Yelm - Scoping Memo 8 STERNOFF YELM SCOPING MEMO APPENDIX Sternoff Yelm - Scoping Memo 9 Sternoff Yelm - Scoping Memo 10 Sternoff Yelm - Scoping Memo 11 Made with EMME. Map tiles ©MapTiler ©OpenStreetMap contributors 1018 TAZ 1018 - 2018 Trip Distribution Committed Project Network 2024-07-17 Disclaimer: This map is for general planning purposes only. Thurston Regional Planning Council makes no representation as to accuracy or fitness of the information for a particular purpose. Jul 17, 2024 Sternoff Yelm - Scoping Memo 12 Sternoff Yelm - Scoping Memo 13