1011 E Main Ave Suite 453 | Puyallup, WA | 98372 (253) 770-1401| heathtraffic.com TRAFFIC IMPACT ANALYSIS The Reserve at Palisades Yelm, WA August 30, 2024 HeathTraffic.com The Reserve at Palisades TIA 2 THE RESERVE AT PALISADES TRAFFIC IMPACT ANALYSIS Prepared for: Jessica Estrada Garrette Custom Homes/Pacific Lifestyle Homes Prepared by: Heath & Associates PO Box 397 Puyallup, WA 98371 (253) 770 1401 Heathtraffic.com License: 08/30/2024 HeathTraffic.com The Reserve at Palisades TIA 3 THE RESERVE AT PALISADES TRAFFIC IMPACT ANALYSIS CONTENTS 1. Introduction ........................................................................................................... 4 2. Project Description ............................................................................................... 4 3. Existing Conditions .............................................................................................. 6 4. Forecast Traffic Demand and Analysis ............................................................ 12 5. Conclusions & Mitigation .................................................................................. 20 TABLES 1. Transportation Improvement Projects ............................................................... 9 2. Existing PM Peak Hour Level of Service ........................................................... 10 3. Collision History .................................................................................................. 11 4. Project Trip Generation ..................................................................................... 12 5. Forecast 2027 Weekday Peak Hour Level of Service .................................... 18 FIGURES 1. Vicinity Map & Roadway System ......................................................................... 4 2. Conceptual Site Plan ............................................................................................ 5 3. Existing PM Peak Hour Volumes ......................................................................... 8 4. PM Peak Hour Trip Distribution & Assignment............................................... 14 5. PM Peak Hour Pipeline Volumes ...................................................................... 15 6. Forecast 2027 PM Peak Hour Volumes Without Project ............................... 16 7. Forecast 2027 PM Peak Hour Volumes With Project ..................................... 17 HeathTraffic.com The Reserve at Palisades TIA 4 THE RESERVE AT PALISADES TRAFFIC IMPACT ANALYSIS 1. INTRODUCTION Heath & Associates has been engaged to prepare a Traffic Impact Analysis (TIA) to assess the impacts of a proposed residential development located within Yelm city limits. This report will review existing traffic conditions in the general vicinity of the project site and compare them against future buildout conditions with and without the proposed development. As a final step, conclusions and mitigation measures, if needed, are identified. A project description is summarized in the following section. 2. PROJECT DESCRIPTION The Reserve at Palisades is a proposed residential development comprised of 39 single-family homes located within Yelm city limits. The subject site is partially bordered to the northwest via SR 507 and located west of Palisades Street SE. The project is situated on 9.71-acres within undeveloped tax parcel number 21725130200. Site ingress/egress is proposed via two new access connections to Palisades Street SE, one to the north end of the property and one on the south end of the property. A vicinity map is provided below which highlights the nearby roadway network with the subject site highlighted in red. Figure 2 on the following page displays the conceptual site plan. Figure 1: Vicinity Map N Subject Site FIGURE 2 SITE PLAN THE PRESERVE AT PALISADES N 5 HeathTraffic.com The Reserve at Palisades TIA 6 3. EXISTING CONDITIONS 3.1 Existing Street System Characteristics of the major roadways and arterials serving the subject site are described below. SR 5071: is a north-south two-lane, minor arterial bordering the subject site to the north. The roadway’s cross section near the subject site is comprised of one travel lane in each direction and a southbound right-turn onto 105th Avenue SE. Non- motorist infrastructure is generally not available in the site vicinity; however, bikes lanes are provided along the southeastern side of the roadway, north of the subject site. The Yelm-Tenino Trail is provided along the northside of the roadway. The posted speed limit is 40 mph. Per WSDOT data, the AADT (average annual daily traffic) is ~9,500 as of 2023. Palisades Street SE: is a north-south two-lane, local roadway which the project proposes to access from. The local roadway currently serves approximately 24 single- family homes. Sidewalk is available along the western side of the roadway. There is no posted speed limit so the city standard of 25 mph is assumed. 3.2 Transit Service A review of the Intercity Transit regional bus schedule indicates that transit is available under one mile from the subject site. The closest stop in relation to the subject site is served via Route 94 with stops located at the intersection of Yelm Avenue (SR 507) & 3rd Street SE (~5,100 feet northeast). Route 94 provides service from the Olympia Transit Center to the Yelm Walmart. Weekday service is provided from 6:04 AM – 9:58 PM with approximately 60-minute headways during peak travel times. Weekend service is provided from 7:15 AM – 9:58 PM with approximately 60-minute headways. Refer to the Intercity Transit website for more detailed information. 1 Managed Access Class 2 HeathTraffic.com The Reserve at Palisades TIA 7 3.3 Existing Peak Hour Volumes and Travel Patterns Field data for this study was collected in August of 2024 at the study intersection of SR 507 & Palisades Street SE. Data were obtained during the PM peak period from 4:00-6:00 PM. The single hour representing peak volumes for the PM time period is then determined and used for capacity analysis. The PM peak hour was found to occur from 4:15-5:15 PM with 960 total entering vehicles (TEV). Figure 3 highlights existing PM peak hour volumes. Count sheets have been included in the appendix for reference. 3.4 Non-Motorist Activity and Infrastructure Pedestrian and bicycle activity were monitored at the study intersection during routine PM peak hour field counts. Given the surrounding area, no non-motorist activity was recorded during the peak hour. Non-motorist infrastructure in the site vicinity is comprised of continuous sidewalk along the western/northern side of Palisades Street SE. Moreover, the Yelm-Tenino Trail is located along the northside side of SR 507 which leads into the city area. A marked pedestrian crosswalk is available to the north at the intersection of SR 507 & Carter Street SE/Brighton Road SE. FIGURE 3 EXISTING PM PEAK HOUR VOLUMES THE PRESERVE AT PALISADES N SITE507 507 497 6 8 03419 STOP STOP 2 1 4 11 9 0 P A L I S A D E S S T S E 8 HeathTraffic.com The Reserve at Palisades TIA 9 3.5 Roadway Improvements The city of Yelm’s most recent (2022-2027) Transportation Improvement Plan, Thurston County’s Transportation Plan (2024-2029), and the Washington State STIP (Statewide Transportation Improvement Program) (2024-2027) were all reviewed. The city of Yelm’s TIP and the WSDOT STIP both indicated planned improvements in the vicinity of the proposed project, each project is listed and described below. Table 1: Transportation Improvement Projects Name Location Improvement Cost City of Yelm Yelm Ave Improvements ID #: WA-12346 1st St to 4th St Construction and repair of sidewalks, installation of new parallel parking, intersection treatment, and access control along both sides of Yelm Ave. $2,321,800 Mosman Ave II ID #: Yelm 13 01 Longmire to Railroad Construct a new road connecting Longmire St with the new Mosman Ave intersection. Bike lanes, sidewalk, street lighting, and storm water improvements are included. Improvements include construction of new road from Longmire to Solberg, and reconstruction of Mosman between Solberg and Railroad. Project has been constructed. $11,482,200 2nd St SE – Sidewalk Improvements ID #: WA-12343 Mosman Ave to 575’ S/O Mosman Ave Construct new 5-foot-wide multi-use concrete sidewalk along the west side of 2nd Street SE from Cochrane Park to the existing sidewalk along Mosman Ave. Project has been constructed. $250,000 Statewide Transportation Improvement Plan SR 510/Yelm Loop SR 510 Traffic throughout the city is extremely congested at this time. This project will construct the second stage of a new alignment for SR 510 through the city of Yelm. When complete, this project will relieve congestion and improve motorist safety. $58,697,552 Several planned improvements would further increase non-motorist mobility in the city. Moreover, the anticipated new SR 510 loop would relieve congestion along SR 507 (E Yelm Avenue). It is important to note that some of the Yelm projects may be completed or under construction given the date of the City’s TIP. HeathTraffic.com The Reserve at Palisades TIA 10 3.6 Existing Level of Service Peak hour delays were determined through the use of the Highway Capacity Manual 7th Edition. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. The range2 for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Detailed descriptions of intersection LOS are given in the Highway Capacity Manual. Level of service calculations were made through the use of the Synchro 12 analysis program. For side-street stop-controlled intersections, LOS is determined by the approach with the highest delay. Table 2 below summarizes existing LOS and delays for the intersection of study. Table 2: Existing PM Peak Hour Level of Service Delays given in seconds per vehicle Intersection Control Movement LOS Delay SR 507 & Palisades St SE Two-Way Stop SEB C 20.9 *SEB – Southeast Bound (105th Ave SE) WSDOT & City Level of Service Standards3: LOS D or better. Existing level of service is shown to meet city standards operating with LOS C conditions. 2 Signalized Intersections - Level of Service Stop Controlled Intersections – Level of Service Control Delay per Control Delay per Level of Service Vehicle (sec) Level of Service Vehicle (sec) A ≤10 A ≤10 B >10 and ≤20 B >10 and ≤15 C >20 and ≤35 C >15 and ≤25 D >35 and ≤55 D >25 and ≤35 E >55 and ≤80 E >35 and ≤50 F >80 F >50 Highway Capacity Manual, 7th Edition 3WSDOT Level of Service Standards – ArcGIS/Yelm Comprehensive Plan HeathTraffic.com The Reserve at Palisades TIA 11 3.7 Collision History Collision history at the study intersection was requested from WSDOT for the prior five full years between 2019-2023. Refer to Table 3 below. Table 3: Collision History Intersection 2019 2020 2021 2022 2023 Avg/Yr SR 507 & Palisades St SE 1 0 0 0 0 0.2 The study area experienced a single collision which occurred at milepost 27.41, just north of the Palisades intersection in June of 2019. The collision occurred at 9:50 PM when a left turning vehicle (from SR 507 onto Palisade) was listed as “striking a linear curb”. Weather conditions were listed as clear/partly cloudy with a dry roadway surface. The contributing driver circumstance is listed as exceeding stated speed limit. The collision resulted in no apparent injury. HeathTraffic.com The Reserve at Palisades TIA 12 4. FORECAST TRAFFIC DEMAND & ANALYSIS 4.1 Project Trip Generation Trip generation is defined as the number of vehicle movements that enter or exit the respective project site during a designated time period, such as a specific peak hour (AM or PM) or an entire day. Trip generation estimates were derived from the Institute of Transportation Engineers (ITE) publication, Trip Generation, 11th Edition. In review of ITE’s Land Use Codes (LUC), LUC 210 – Single-Family Detached Housing was selected. Dwelling units were used as the input variable with ITE’s equations to determine trip ends. Table 4 below highlights the estimated number of trips to/from the proposed development. Refer to the appendix for ITE trip generation sheets. Table 4: Project Trip Generation Land Use Units AWDT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Single-Family 39 424 8 24 32 26 15 41 According to ITE data, the project is estimated to generate 424 weekday daily trips with 32 AM peak hour trips (8 inbound/24 outbound) and 41 PM peak hour trips (26 inbound/15 outbound). 4.2 Distribution & Assignment Trip distribution describes the process by which project generated trips are dispersed on the roadway network surrounding the site. Trip distribution for this project follows TAZ Map 1075 which was provided by TRPC. The TAZ Map displays a 75%/25% northeast/southwest split along SR 507 at Palisades Street SE. Refer to the appendix for the provided TAZ Map. Figure 4 displays the PM peak hour trip distribution & assignment. HeathTraffic.com The Reserve at Palisades TIA 13 4.4 Future Peak Hour Volumes A 3-year horizon of 2027 was used for future traffic delay analysis. Forecast 2027 background traffic volumes were derived by applying a one percent compound annual growth rate to the existing volumes shown in Figure 3. This growth rate is generally used in other projects within the city. Moreover, historic WSDOT ADT volumes along SR 507 just south of Palisades Street show less than a one percent growth rate per year4. The one percent growth rate is considered conservative. Also taken into consideration are in-process developments within the city which include: C & E Commercial, Yelm Circle K, Country Meadow Estates I, Country Meadow Estates II, Armor Storage, Habitat for Humanity, Liberty Grove, Blue Fern Railway Road, The Hutch, Willow Glenn IV, 407 E Yelm Coffee, Middle Road Plat, Tahoma Ranch, Deutscher Commercial, and the Summit at Thompson Creek. PM peak hour pipeline volumes are shown in Figure 5. Forecast 2027 PM peak hour volumes without the project (background growth plus pipeline) are shown in Figure 6 while Figure 7 illustrates forecast 2027 volumes with the addition of project-generated traffic. 4 2023 ADT = 9,500 / 2018 ADT = 9,300 FIGURE 4 PM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENT THE PRESERVE AT PALISADES N SITE507 507 PM PEAK HOUR TRIPS INBOUND: 26 VPH OUTBOUND: 15 VPH 75% 25% 0 20 11 46 0 STOP STOP 0 0 0 0 0 0 P A L I S A D E S S T S E 14 FIGURE 5 PM PEAK HOUR PIPELINE VOLUMES THE PRESERVE AT PALISADES N SITE507 507 55 0 0 0064 STOP STOP 0 0 0 0 0 0 P A L I S A D E S S T S E 15 FIGURE 6 FORECAST 2027 PM PEAK HOUR VOLUMES WITHOUT PROJECT THE PRESERVE AT PALISADES N SITE507 507 567 6 8 03496 STOP STOP 2 1 4 11 9 0 P A L I S A D E S S T S E 16 FIGURE 7 FORECAST 2027 PM PEAK HOUR VOLUMES WITH PROJECT THE PRESERVE AT PALISADES N SITE507 507 567 26 19 49496 STOP STOP 2 1 4 11 9 0 P A L I S A D E S S T S E 17 HeathTraffic.com The Reserve at Palisades TIA 18 4.4 Future Level of Service Level of service analyses were made of the future PM peak hour volumes without (background) and with project related trips added to the key roadways and intersections. This analysis once again involved the use of the Synchro 12 analysis program. Delays for the study/access intersection under future conditions are shown below in Table 5. Per WSDOT’s Synchro policy, the future peak hour factor (PHF) has been set to 1.0. Table 5: Forecast 2027 Weekday PM Peak Hour Level of Service Delays Given in Seconds per Vehicle Without Project With Project Intersection Control LOS Std. Critical Mvmt. LOS Delay LOS Delay SR 507 & Palisades St SE Two-Way Stop D SEB C 23.3 D 25.4 Forecast 2027 PM peak hour level of service is shown to meet city standards operating with LOS C conditions without project traffic and LOS D conditions with project traffic. 4.5 Left Turn Lane Warrant Left turn lanes are a means of providing necessary storage space for left turning vehicles at intersections. Procedures prescribed by WSDOT Design Manual Exhibit 1310-9 were used to ascertain storage requirements at the proposed access intersection of SR 507 & Palisade Street SE. Based on forecast 2027 PM peak hour volumes with project traffic – a left turn lane would be warranted. Refer to the appendix for the left turn warrant nomograph. As a southbound left-turn lane would benefit the existing ~24 dwelling units on Palisade Street SE, along with causing less disruption to through traffic on SR 507, it is recommended that the City either allow Traffic Impact Fee credit or that the applicant pay a proportional share of the construction costs. Infrastructure improvements along a state route places a significant burden on a project of this size and could render the plat infeasible. Further coordination with the City is recommended regarding the left- turn lane needs. HeathTraffic.com The Reserve at Palisades TIA 19 4.6 Access & Sight Distance Access to and from the site is proposed via Palisades Street SE, an existing intersection along SR 507. With 24 existing single-family homes and 39 additional proposed homes, (63 total) the estimated ADT is around 660 which fall within WSDOT’s Driveway Sight Distance Standards5. Based on the posted speed limit of 40 mph, sight lines need to meet or exceed 305 feet. Preliminary measurements at SR 507 & Palisades Street SE, sight lines are shown to exceed the 305-foot requirement to the north and south along SR 507. Moreover, the development is proposed to access Palisades via two new connections, each connection shall follow City/AASHTO design standards. 5 WSDOT Design Manual – Chapter 1340.03(3) Sight Distance. (less than 1,500 AD). HeathTraffic.com The Reserve at Palisades TIA 20 5. CONCLUSIONS & MITIGATION The Reserve at Palisades is a proposed residential development comprised of 39 single-family homes located within Yelm city limits. The subject site is situated on 9.71-acres within a single undeveloped tax parcel. Site ingress/egress is proposed via Palisades Street SE and subsequently two connections to Palisades Street SE. PM peak hour counts were conducted at the study intersection of SR 507 & Palisades Street SE/105th Avenue SE. Existing level of service was shown to meet WSDOT LOS D standards operating with LOS C conditions. Based on ITE data, the project is anticipated to generate 424 average weekday daily trips with 32 AM peak hour trips and 41 PM peak hour trips. A three-year horizon of 2027 was evaluated to assess future conditions with and without project generated traffic. Forecast 2027 peak hour analysis included a one percent background growth rate and several pipeline projects to establish future peak hour volumes. Forecast 2027 PM peak hour level of service was shown to continue meeting standards operating with LOS D conditions with project traffic. A left turn lane was analyzed at the access via SR 507 & Palisades Street SE; based on forecast 2027 volumes with project traffic, a left turn lane was found warranted. Based on the analysis above, recommended mitigation is as follows: 1. A southbound left-turn lane on SR 507 onto Palisade Street SE was found warranted with the project buildout based on existing traffic volumes. Other existing homes on Palisade contribute to the need of the turn lane. A turn lane would also improve conditions along SR 507 by removing stored left-turning vehicles into a separate lane. Given the benefit to other homeowners and road users, and based on the size of this project, discussion with the City is recommended on whether a proportional share contribution toward construction costs would be appropriate or if Traffic Impact Fee credit could be received. 2. The proposed development is subject for Transportation Facilities Charge. The city imposes a fee of $1,497.00 per PM peak hour trip. Initial fees are estimated as follows: 41 PM Peak Hour Trips x $1,497.00 = $61,377.00. Finals fees will be assessed by the City at the time of building permit issuance. HeathTraffic.com The Reserve at Palisades TIA 21 THE RESERVE AT PALISADES TRAFFIC IMPACT ANALYSIS APPENDIX Date Collected: Day of the Week: Time Period: Peak Hour: SR 507 & Palisades Street SE N 14 13 2 1 11 0 0 9 4 6 3 0 0 0 0 8 10 8 UT LT T RT UT LT T RT UT LT T RT UT LT T RT 0 1 83 1 0 2 105 1 0 0 0 1 0 1 0 1 196 0 0 109 1 0 1 120 2 0 0 0 2 0 3 0 0 238 0 2 109 0 0 1 123 3 0 0 0 2 0 3 0 1 244 0 0 97 0 0 1 119 1 0 0 0 4 0 2 0 0 224 902 0 2 104 2 0 3 135 3 0 0 0 0 0 3 1 1 254 960 0 0 94 0 0 3 114 1 0 0 0 1 0 2 0 0 215 937 0 0 121 1 0 1 110 2 0 0 0 1 0 3 0 1 240 933 0 3 98 1 0 1 87 3 0 0 0 2 0 0 0 2 197 906 0 8 815 6 0 13 913 16 0 0 0 13 0 17 1 6 1808 -- 0 4 419 3 0 6 497 9 0 0 0 8 0 11 1 2 960 -- 0.94 -- 0 0 9 1 0 0 22 0 0 0 0 0 0 0 0 0 32 -- 0.0% 0.0% 2.1% 33.3% 0.0% 0.0% 4.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.3%-- EB WB NB SB Total E W N S Total E W N S Total 2 7 0 0 9 0 0 0 0 0 0 0 0 0 0 2 6 0 0 8 0 0 0 0 0 0 0 0 0 0 2 4 0 0 6 0 0 0 0 0 0 0 0 0 0 4 4 0 0 8 0 0 0 0 0 0 0 0 0 0 2 8 0 0 10 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4 0 0 2 1 3 0 0 0 1 1 3 4 1 1 9 0 0 0 0 0 0 0 0 0 0 15 40 1 1 57 0 0 2 1 3 0 0 0 1 1 10 22 0 0 32 0 0 0 0 0 0 0 0 0 0 2.3% 4.3% 0.0% 0.0% 3.3%Peak Hour HV% SR 507 105th Ave SE Palisades St SE 426 499 512 438 497 419 SR 507 Heavy Vehicles HV % Interval Start Time 4:00 PM 4:15 PM Count Total 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM SR 507 105th Ave SE Westbound Heavy Vehicles Pedestrians (Leg) Palisades St SE Northbound 5:45 PM Count Total Peak Hour Total Bicycles (Leg) 8/26/2024 Monday Hourly Totals 0.96 0.91 0.50 0.70 4:00 PM 6:00 PM 5:15 PM4:15 PM 15 Minute Totals 5:30 PM Interval Start Time 4:00 PM 4:15 PM 4:30 PM 0 0 0 Peak Hour Total 0 0 0 0 0 Southbound PHF SR 507 Eastbound 4:45 PM 5:00 PM 5:15 PM to to The Reserve at Palisades TIA 22 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:174 Avg. Num. of Dwelling Units:246 Directional Distribution:50% entering, 50% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 9.43 4.45 - 22.61 2.13 Data Plot and Equation T = T r i p E n d s X = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.92 Ln(X) + 2.68 R²= 0.95 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 5,000 10,000 15,000 20,000 8/20/24, 5:31 PM itetripgen.org/query/PrintGraph2?code=210&ivlabel=UNITS210&timeperiod=AWDVTE&x=&edition=685&locationCode=General Ur… https://www.itetripgen.org/printGraph 1/1 The Reserve at Palisades TIA 23 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:192 Avg. Num. of Dwelling Units:226 Directional Distribution:25% entering, 75% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.70 0.27 - 2.27 0.24 Data Plot and Equation T = T r i p E n d s X = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.91 Ln(X) + 0.12 R²= 0.90 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 500 1,000 1,500 2,000 8/20/24, 5:31 PM itetripgen.org/query/PrintGraph2?code=210&ivlabel=UNITS210&timeperiod=TASIDE&x=&edition=685&locationCode=General Urb… https://www.itetripgen.org/printGraph 1/1 The Reserve at Palisades TIA 24 Single-Family Detached Housing (210) Vehicle Trip Ends vs:Dwelling Units On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:208 Avg. Num. of Dwelling Units:248 Directional Distribution:63% entering, 37% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.94 0.35 - 2.98 0.31 Data Plot and Equation T = T r i p E n d s X = Number of Dwelling Units Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.94 Ln(X) + 0.27 R²= 0.92 Trip Gen Manual,11th Edition Institute of Transportation Engineers 0 500 1,000 1,500 2,000 2,500 3,0000 500 1,000 1,500 2,000 2,500 8/20/24, 5:32 PM itetripgen.org/query/PrintGraph2?code=210&ivlabel=UNITS210&timeperiod=TPSIDE&x=&edition=685&locationCode=General Urb… https://www.itetripgen.org/printGraph 1/1 The Reserve at Palisades TIA 25 Heath & Associates, Inc. Pipeline Volumes - The Reserve at Palisades TIA 8/26/2024 1. SR 507 & Palisades Street SE Pipeline Projects PM Peak Hour 1. C & E Commercial Pipeline Volume Summations 2. Yelm Circle K 3. Country Meadow Estates I 4. Country Meadow Estates II 1. C & E Commercial 3 1 5. Armor Storage 2. Yelm Circle K 19 18 6. Habitat For Humanity - Yelm 3. Country Meadow Estates I 3 4 7. Liberty Grove 4. Country Meadow Estates II 1 2 8. Blue Fern Railway Road 5. Armor Storage 9. The Hutch (~50% built & occupied) 6. Habitat For Humanity - Yelm 1 1 10. Willow Glenn IV 7. Liberty Grove 1 1 11. 407 E Yelm Coffee 8. Blue Fern Railway Road 3 6 12. Middle Road Plat 9. The Hutch 4 6 13. Tahoma Ranch 10. Willow Glenn IV 1 3 14. Deutscher Commercial 11. 407 E Yelm Coffee 1 15. The Summit at Thompson Creek 12. Middle Road Plat 1 2 13. Tahoma Ranch 9 9 14. Deutscher Commercial 4 4 15. The Summit at Thompson Creek 4 7 Totals 0 0 0 0 55 0 0 0 0 0 64 0 The Reserve at Palisades TIA 26 Made with EMME. Map tiles ©MapTiler ©OpenStreetMap contributors 1075 TAZ 1075 - 2018 Trip Distribution Committed Project Network 2024-07-17 Disclaimer: This map is for general planning purposes only. Thurston Regional Planning Council makes no representation as to accuracy or fitness of the information for a particular purpose. Jul 17, 2024 The Reserve at Palisades TIA 27 Heath & Associates, Inc The Reserve at Palisades TIA 8-26-2024 Annual Growth Rate: 1 % # of Years to Horizon:3 1. SE Sedgwick Rd (SR 160) & Bethel Rd SE SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL Existing 2 1 11 9 497 6 8 0 0 3 419 4 Project Trips 0 0 0 0 0 20 11 0 4 6 0 0 Pipeline 0 0 0 0 55 0 0 0 0 0 64 0 Without 2 1 11 9 567 6 8 0 0 3 496 4 With 2 1 11 9 567 26 19 0 4 9 496 4 2027 PM Peak Hour Forecast Intersection Volumes The Reserve at Palisades TIA 28 HCM 7th TWSC Existing pM Peak Hour 1: SR 507 & Palisades St SE/105th Ave SE Synchro 12 Report Page 1 Intersection Int Delay, s/veh 0.5 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h 11 1 2 0 0 8 4 419 3 6 497 9 Future Vol, veh/h 11 1 2 0 0 8 4 419 3 6 497 9 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 50 - - - - - 50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 1 1 1 1 1 1 1 2 33 1 4 1 Mvmt Flow 12 1 2 0 0 9 4 446 3 6 529 10 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 996 999 529 998 1007 447 538 0 0 449 0 0 Stage 1 541 541 - 456 456 - - - - - - - Stage 2 454 457 - 542 551 - - - - - - - Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.11 5.51 - 6.11 5.51 - - - - - - - Critical Hdwy Stg 2 6.11 5.51 - 6.11 5.51 - - - - - - - Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 224 244 552 224 242 613 1035 - - 1117 - - Stage 1 527 522 - 586 570 - - - - - - - Stage 2 587 569 - 526 517 - - - - - - - Platoon blocked, %- -- - Mov Cap-1 Maneuver 218 241 552 219 239 613 1035 - - 1117 - - Mov Cap-2 Maneuver 218 241 - 219 239 - - - - - - - Stage 1 522 518 - 583 567 - - - - - - - Stage 2 576 566 - 519 513 - - - - - - - Approach SE NW NE SW HCM Control Delay, s/v20.95 10.95 0.08 0.1 HCM LOS C B Minor Lane/Major Mvmt NEL NET NERNWLn1NWLn2 SELn1 SWL SWT SWR Capacity (veh/h)17 - - - 613 241 21 - - HCM Lane V/C Ratio 0.004 - - - 0.014 0.062 0.006 - - HCM Control Delay (s/veh) 8.5 0 - 0 11 20.9 8.2 0 - HCM Lane LOS A A - A B C A A - HCM 95th %tile Q(veh) 0 - - - 0 0.2 0 - - The Reserve at Palisades TIA 29 HCM 7th TWSC Forecast 2027 PM Peak Hour 1: SR 507 & Palisades St SE/105th Ave SE Without Project Synchro 12 Report Page 1 Intersection Int Delay, s/veh 0.5 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h 11 1 2 0 0 8 4 496 3 6 567 9 Future Vol, veh/h 11 1 2 0 0 8 4 496 3 6 567 9 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 50 - - - - - 50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 100 100 100 100 100 100 100 100 100 100 100 100 Heavy Vehicles, % 1 1 1 1 1 1 1 2 33 1 4 1 Mvmt Flow 11 1 2 0 0 8 4 496 3 6 567 9 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1083 1086 567 1085 1094 498 576 0 0 499 0 0 Stage 1 579 579 - 506 506 - - - - - - - Stage 2 504 507 - 580 588 - - - - - - - Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.11 5.51 - 6.11 5.51 - - - - - - - Critical Hdwy Stg 2 6.11 5.51 - 6.11 5.51 - - - - - - - Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 196 217 525 195 215 575 1002 - - 1070 - - Stage 1 503 502 - 551 542 - - - - - - - Stage 2 552 541 - 502 498 - - - - - - - Platoon blocked, %- -- - Mov Cap-1 Maneuver 190 214 525 191 212 575 1002 - - 1070 - - Mov Cap-2 Maneuver 190 214 - 191 212 - - - - - - - Stage 1 498 498 - 548 539 - - - - - - - Stage 2 541 538 - 495 493 - - - - - - - Approach SE NW NE SW HCM Control Delay, s/v23.25 11.35 0.07 0.09 HCM LOS C B Minor Lane/Major Mvmt NEL NET NERNWLn1NWLn2 SELn1 SWL SWT SWR Capacity (veh/h)14 - - - 575 211 19 - - HCM Lane V/C Ratio 0.004 - - - 0.014 0.066 0.006 - - HCM Control Delay (s/veh) 8.6 0 - 0 11.4 23.3 8.4 0 - HCM Lane LOS A A - A B C A A - HCM 95th %tile Q(veh) 0 - - - 0 0.2 0 - - The Reserve at Palisades TIA 30 HCM 7th TWSC Forecast 2027 PM Peak Hour 1: SR 507 & Palisades St SE/105th Ave SE With Project Synchro 12 Report Page 1 Intersection Int Delay, s/veh 0.8 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h 11 1 2 4 0 19 4 496 9 26 567 9 Future Vol, veh/h 11 1 2 4 0 19 4 496 9 26 567 9 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - 50 - - - - - 50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 100 100 100 100 100 100 100 100 100 100 100 100 Heavy Vehicles, % 1 1 1 1 1 1 1 2 33 1 4 1 Mvmt Flow 11 1 2 4 0 19 4 496 9 26 567 9 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1123 1132 567 1128 1137 501 576 0 0 505 0 0 Stage 1 619 619 - 509 509 - - - - - - - Stage 2 504 513 - 620 628 - - - - - - - Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.11 5.51 - 6.11 5.51 - - - - - - - Critical Hdwy Stg 2 6.11 5.51 - 6.11 5.51 - - - - - - - Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 184 204 525 182 203 572 1002 - - 1065 - - Stage 1 478 482 - 549 540 - - - - - - - Stage 2 552 538 - 478 477 - - - - - - - Platoon blocked, %- -- - Mov Cap-1 Maneuver 170 196 525 173 194 572 1002 - - 1065 - - Mov Cap-2 Maneuver 170 196 - 173 194 - - - - - - - Stage 1 461 465 - 546 537 - - - - - - - Stage 2 531 535 - 458 460 - - - - - - - Approach SE NW NE SW HCM Control Delay, s/v 25.4 14.07 0.07 0.37 HCM LOS D B Minor Lane/Major Mvmt NEL NET NERNWLn1NWLn2 SELn1 SWL SWT SWR Capacity (veh/h)14 - - 173 572 190 79 - - HCM Lane V/C Ratio 0.004 - - 0.023 0.033 0.074 0.024 - - HCM Control Delay (s/veh) 8.6 0 - 26.3 11.5 25.4 8.5 0 - HCM Lane LOS A A - D B D A A - HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0.2 0.1 - - The Reserve at Palisades TIA 31 Chapter 1310 Intersections WSDOT Design Manua M 22-01.22 Page 1310-17 October 2023 Exhibit 1310-9 Left-Turn Storage Guidelines: Two-Lane, Unsignalized The Reserve at Palisades TIA 32 S R 5 0 7 PALIS A D E S S T S E PA L I S A D E S S T S E PALIS A D E S W E S T N1° 24' 07"E S8 8 ° 2 1 ' 1 9 " E 22 9 . 6 0 ' L=69.13' R=200.00' Δ=19°48'20" L=69.13' R =2 00.00' Δ =19°48'20" S88° 21' 19"E 34.18' N1° 24' 07"E 753.20' L=78.5 4 ' R = 5 0 . 0 0 ' Δ=9 0 °0 0 ' 0 0 " S8 8 ° 3 5 ' 5 3 " E 21 1 . 2 1 ' 90.0°' 90.2°' 56.00' ROW 60 . 0 0 ' 105.21' 48.66' 13.17' 91.53' 60 . 0 0 ' 105.28' 49 . 2 1 ' 10.8 0 ' 60 . 0 0 ' 105.02' 60 . 0 0 ' 60 . 0 0 ' 104.76' 60 . 0 0 ' 104.49' 60 . 4 4 ' 60 . 0 0 ' 65.00' 11 0 . 0 0 ' 44.92' 3 1 . 5 0' 89 . 9 2 ' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 65.00' 11 0 . 0 0 ' 65.00' 147.59' 122.00' 68 . 2 2 ' 50 . 0 0 ' 50 . 0 0 ' 130.59' 108.59'34 .5 6 ' 65.00' 10 5 . 0 0 ' 34.00' 10 5 . 0 0 ' 65.00' 26.10' 20 . 0 0 ' 94.00' 121.00' 33.88' 100.00' 60.00' 63 . 3 0 ' 60.00' 10 8 . 2 8 ' 65 . 0 0 ' 10 5 . 0 0 ' 34.00' 10 5 . 0 0 ' 50.00' 10 5 . 0 0 ' 60.00' 60.00' 10 5 . 0 0 ' 50.00' 25 . 0 0 ' 127.00' 92 . 7 9 ' 20.0 0 ' 100.00' 20 . 0 0 ' 127.00' 54 . 4 1 ' 8. 9 4 ' 60.00' 25 . 0 0 ' 46 . 0 0 ' 19 . 0 0 ' 50.00' 10 5 . 0 0 ' 34.00' 10 5 . 0 0 ' 40 . 0 0 ' 65 . 0 0 ' 50.00'84.81' 105.00' 0. 6 7 ' 43 . 9 7 ' 31.3 3 ' 59.70' 113.20' 18.44' 127.87' 38.48' 129.37' 34 . 0 5 ' 2 0.9 8' 56.00' 10.08' 1 2 2 . 5 2 ' 21 1 . 2 1 ' 56.00' 65.00' 60.00' 56.00' 34 . 3 0 ' 65.65' 99 . 4 1 ' 82.58' 2 7 1 . 6 2 ' 1 8 .2 5 ' 77.7 4 ' 6 9 . 4 8 ' 8 0 . 6 9 ' 85.60' 24.31' 14.33'77.06' 1 9 8 . 8 3 ' 60.00' 130.59' 83 . 2 1 ' 2 6 . 9 0 ' 20.0 0 ' 20 . 0 0 ' 32 . 1 0 ' 34 . 5 0 ' 10 5 . 0 0 ' 65 . 0 0 ' 63 . 2 7 ' 39.00' 60.00' 4 1 . 2 3 ' 41 . 2 3 ' 43 . 0 0 ' 65 . 0 0 ' 50 . 0 0 ' 24 . 5 0 ' 20 . 0 0 ' 7063 S.F. 6 6301 S.F. 5 79533 S.F. ROW 7150 S.F. 15 7150 S.F. 16 23133 S.F. TRACT F EXISTING STORM EASEMENT 24666 S.F. TRACT E STORM AND RECREATION 6950 S.F. 33 6293 S.F. 4 6309 S.F. 3 6323 S.F. 2 5993 S.F. 1 6708 S.F. 36 7150 S.F. 9 7150 S.F. 10 7150 S.F. 11 7150 S.F. 12 7150 S.F. 13 7150 S.F. 147150 S.F. 7 7150 S.F. 8 8374 S.F. TRACT A RECREATION 5250 S.F. 28 6300 S.F. 29 7061 S.F. 39 5250 S.F. 35 6300 S.F. 34 4599 S.F. TRACT B PRIVATE ROAD 6419 S.F. 19 4922 S.F. TRACT D 6359 S.F. 37 6673 S.F. 38 8831 S.F. 31 6300 S.F. 27 7697 S.F. 26 8385 S.F. 17 6530 S.F. 18 6950 S.F. 30 6825 S.F. 23 6607 S.F. 22 4242 S.F. TRACT C 6830 S.F. 24 7019 S.F. 25 8834 S.F. 32 8236 S.F. 21 10525 S.F. 20 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422 TEL 253.383.2572 FAX JOB NO. DATE: THE RESERVE AT PALISADES PRELIMINARY LOT LAYOUT A 2220348.10 1/16/2024 N GRAPHIC SCALE 0 50 100 1" = 50 FEET 25 SITE DATA ZONING: R4 (LOW DENSITY RESIDENTIAL DISTRICT) PARCEL NUMBER: 21725130200 ACREAGE: 9.71 AC. DENSITY: 9.71 X 4 DU/AC = 38.84, ROUND UP TO 39 MINIMUM LOT SIZE: NO MINIMUM MINIMUM LOT WIDTH: NONE CLIENT'S PREFERRED LOT WIDTH: 60' SETBACKS: FRONT:15' LOCAL ROAD, 25' COLLECTOR MINIMUM DRIVEWAY APPROACH: 20' SIDE:5' FLANKING:15' REAR:25' RECREATION REQUIRED: 0.485 AC (5% OF GROSS ACREAGE) RECREATION PROVIDED: 0.758 AC (7.8% OF GROSS ACREAGE) The Reserve at Palisades TIA 33