Loading...
ASP PRELIM 105105500 SHELM MEADOWSN Vicinity Map 46.9459, -122.5943 Owner / Developer Contact Info officeATTN: LGI HOMES-WASHINGTON, LLC 12951 BEL-RED ROAD, STE 150 BELLEVUE, WA 98005 VANESSA LEWIS 425.330.2453 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 514958428 105105500 N/A 105xx N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Street Lights Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 10 5 1 0 5 5 0 0 N/ A Phone INTOLIGHT Contact Information: LARS LARSON 425.456.2701 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 . C.DIAZ .06.26.24 N/A .N/A C.DIAZ .06.26.24 REDT # ( RW-TBD )YELM SHELM MEADOWS 3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS 16330 & 16314 RAILWAY RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105105500 N/A 1 OF 3 THURSTON N/A N/A QSTHLE 19NE-T17N-R02E N/A N/A 1702E073 1702E116 1702E073 YEL-27 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY ROW TBD ROW TEL TBD . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 JESSICA.CALLAHAN@PSE.COM x x x ... ... ... x CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date VANESSA.LEWIS@LGIHOMES.COM VAULT DETAIL @ V04-V09 NOT TO SCALE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRON T TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA CO M B U S T I B L E B U I L D I N G W A L L S & R O O F 10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN @ H1A, H1B, H2A, H2B, H3A, H3B, H3C, H5A, H6A, H7A, H7B, H8A, H8B & H10A SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 4,5 1,2 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 VAULT DETAIL @ V01-V03,V10 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 SITE RAI L W A Y R D S E M I D D L E R D S E ROW NOR T H E R N P A C I F I C R D S E ( P U B L I C R - O - W ) ROA D D ROA D E R O A D A R O A D B R O A D C RAIL W A Y R O A D S E LOT 23 LOT 17 LOT 29 LOT 69 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 12 LOT 9 LOT 10 LOT 11 LOT 14 LOT 13 LOT 15 LOT 85 LOT 84 LOT 90 LOT 89 LOT 88 LOT 87 LOT 86 LOT 74 LOT 73 LOT 81 LOT 72 LOT 79 LOT 77 LOT 76 LOT 75 LOT 67 LOT 68 LOT 70 LOT 63 LOT 71 LOT 64 LOT 65 LOT 66 LOT 83 LOT 50 LOT 46 LOT 36 LOT 35 LOT 42 LOT 34 LOT 41 LOT 33 LOT 40 LOT 32 LOT 39 LOT 31 LOT 38 LOT 30 LOT 37 TRACT A LOT 55 LOT 52 LOT 56 LOT 51 LOT 48 LOT 57 LOT 49 LOT 58 LOT 47 LOT 59 LOT 60 LOT 61 LOT 62 TRACT C LOT 53 LOT 54 LOT 28 T R A C T E LOT 27 LOT 26 LOT 25 LOT 24 LOT 20 LOT 22 LOT 21 LOT 18 LOT 19 T R A C T D LOT 16 LOT 45 LOT 78 LOT 82 LOT 80 TRACT B 16333 16325 C B A 336 A C S R 115 k V FUT: 1-4" FUT: 1-2" IRR. DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM HH TO METER LOCATION (TYPICAL) TRACT A R O A D C R O A D B R O A D A LOT 5 LOT 80 LOT 81 LOT 82 FUT: 1-4" 336 A C S R 115 k V 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 . C.DIAZ .06.26.24 N/A .N/A C.DIAZ .06.26.24 REDT # ( RW-TBD )YELM SHELM MEADOWS 3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS 16330 & 16314 RAILWAY RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105105500 1" = 50'2 OF 3 THURSTON N/A N/A QSTHLE 19NE-T17N-R02E N/A N/A 1702E073 1702E116 1702E073 YEL-27 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY ROW TBD ROW TEL TBD . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-27 11.06.23 290 273 224 17 23 24 307 296 248 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: TBD 17 2500 80 AMPS CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) →SEE PSE HANDBOOKS← SEE 1218 (SF),1220 (MF), 6080, FOR TRENCH SEE 3061, 2809 MATC H L I N E A - A ( S E E P A G E 3 ) Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS -1 H3C 1 TBD IRRIGATION -1 H8A 1 TBD STREET LIGHTS ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01-V03, V10 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS J-BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" VAULT DETAIL @ J01 & J02 NOT TO SCALE LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #IRRIGATION N/A N/A TBD ELEC 1KW 65A 1.4 @ H3C 1.8 @ H3C LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #STREET LIGHTS N/A N/A 200A ELEC 1KW 65A 1.8 @ H8A 2.5 @ H8A 10' CLEARANCE REQUIRED TO TRANSFORMER OR NON-FLAMMABLE BUILDING MATERIALS REQUIRED ROW M I D D L E R O A D S E RAILWAY ROAD SE FLUME LANE (NOT OPEN) ROA D E R O A D B R O A D C RAIL W A Y R O A D S E LOT 69 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 12 LOT 9 LOT 10 LOT 11 LOT 85 LOT 84 LOT 90 LOT 89 LOT 88 LOT 87 LOT 86 LOT 74 LOT 73 LOT 81 LOT 72 LOT 79 LOT 77 LOT 76 LOT 75 LOT 67 LOT 68 LOT 70 LOT 63 LOT 71 LOT 64 LOT 65 LOT 66 LOT 83 LOT 46 LOT 43 LOT 42 LOT 41 LOT 40 LOT 39 LOT 38 LOT 44 TRACT A LOT 58 LOT 47 LOT 59 LOT 60 LOT 61 LOT 62 TRACT C LOT 45 LOT 78 LOT 82 LOT 80 TRACT B 16333 16325 16311 16309 336 A C S R C B A 336 A C S R C B A 115 k V 115 k V FEE D YEL 27 FUSE @ 65T SW#T__________ IRR. ST. LTS (TYPICAL) TRACT A R O A D C R O A D B R O A D A LOT 5 LOT 80 LOT 81 LOT 82 336 A C S R 115 k V 336 A C S R 115 k V 16345 16411 16408 NEW DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 . C.DIAZ .06.26.24 N/A .N/A C.DIAZ .06.26.24 REDT # ( RW-TBD )YELM SHELM MEADOWS 3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS 16330 & 16314 RAILWAY RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105105500 AS SHOWN 3 OF 3 THURSTON N/A N/A QSTHLE 19NE-T17N-R02E N/A N/A 1702E073 1702E116 1702E073 YEL-27 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY ROW TBD ROW TEL TBD . . . ... ... ... CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 1" = 50' SITE PLAN MATC H L I N E A - A ( S E E P A G E 2 )