ASP PRELIM 105105500 SHELM MEADOWSN
Vicinity Map
46.9459, -122.5943
Owner / Developer Contact Info
officeATTN:
LGI HOMES-WASHINGTON, LLC
12951 BEL-RED ROAD, STE 150
BELLEVUE, WA 98005
VANESSA LEWIS 425.330.2453
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
514958428 105105500
N/A 105xx
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Street Lights
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
10
5
1
0
5
5
0
0
N/
A
Phone
INTOLIGHT Contact Information:
LARS LARSON
425.456.2701
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J.CALLAHAN 206.503.1520 .
C.DIAZ .06.26.24
N/A .N/A
C.DIAZ .06.26.24
REDT # ( RW-TBD )YELM
SHELM MEADOWS
3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS
16330 & 16314 RAILWAY RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105105500
N/A 1 OF 3
THURSTON N/A N/A QSTHLE
19NE-T17N-R02E N/A N/A
1702E073 1702E116 1702E073 YEL-27
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
JESSICA.CALLAHAN@PSE.COM
x
x
x
...
...
...
x
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
VANESSA.LEWIS@LGIHOMES.COM
VAULT DETAIL @ V04-V09
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRON
T
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for
Single Stubout Location
4'
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
CO
M
B
U
S
T
I
B
L
E
B
U
I
L
D
I
N
G
W
A
L
L
S
&
R
O
O
F
10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A, H1B, H2A, H2B, H3A, H3B, H3C,
H5A, H6A, H7A, H7B, H8A, H8B & H10A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
4,5
1,2
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
VAULT DETAIL @ V01-V03,V10
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
SITE
RAI
L
W
A
Y
R
D
S
E
M
I
D
D
L
E
R
D
S
E
ROW
NOR
T
H
E
R
N
P
A
C
I
F
I
C
R
D
S
E
(
P
U
B
L
I
C
R
-
O
-
W
)
ROA
D
D
ROA
D
E
R
O
A
D
A
R
O
A
D
B
R
O
A
D
C
RAIL
W
A
Y
R
O
A
D
S
E
LOT 23
LOT 17
LOT 29
LOT 69
LOT 8
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
LOT 12
LOT 9
LOT 10
LOT 11
LOT 14
LOT 13
LOT 15
LOT 85
LOT 84
LOT 90
LOT 89
LOT 88
LOT 87
LOT 86
LOT 74
LOT 73
LOT 81
LOT 72
LOT 79
LOT 77
LOT 76
LOT 75
LOT 67
LOT 68
LOT 70
LOT 63
LOT 71
LOT 64
LOT 65
LOT 66
LOT 83
LOT 50
LOT 46
LOT 36
LOT 35
LOT 42
LOT 34
LOT 41
LOT 33
LOT 40
LOT 32
LOT 39
LOT 31
LOT 38
LOT 30
LOT 37
TRACT A
LOT 55
LOT 52
LOT 56
LOT 51
LOT 48
LOT 57
LOT 49
LOT 58
LOT 47
LOT 59
LOT 60
LOT 61
LOT 62
TRACT C
LOT 53
LOT 54
LOT 28
T
R
A
C
T
E
LOT 27
LOT 26
LOT 25
LOT 24
LOT 20
LOT 22
LOT 21
LOT 18
LOT 19
T
R
A
C
T
D
LOT 16
LOT 45
LOT 78
LOT 82
LOT 80
TRACT B
16333
16325
C
B
A
336
A
C
S
R
115
k
V
FUT: 1-4"
FUT: 1-2"
IRR.
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
HH TO METER LOCATION
(TYPICAL)
TRACT A
R
O
A
D
C
R
O
A
D
B
R
O
A
D
A
LOT 5
LOT 80
LOT 81
LOT 82
FUT: 1-4"
336
A
C
S
R
115
k
V
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J.CALLAHAN 206.503.1520 .
C.DIAZ .06.26.24
N/A .N/A
C.DIAZ .06.26.24
REDT # ( RW-TBD )YELM
SHELM MEADOWS
3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS
16330 & 16314 RAILWAY RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105105500
1" = 50'2 OF 3
THURSTON N/A N/A QSTHLE
19NE-T17N-R02E N/A N/A
1702E073 1702E116 1702E073 YEL-27
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-27
11.06.23
290 273 224
17 23 24
307 296 248
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: TBD
17 2500
80 AMPS
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
→SEE PSE HANDBOOKS←
SEE 1218 (SF),1220 (MF), 6080,
FOR TRENCH SEE 3061, 2809
MATC
H
L
I
N
E
A
-
A
(
S
E
E
P
A
G
E
3
)
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL
LC
Direction of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 H3C 1 TBD IRRIGATION
-1 H8A 1 TBD STREET LIGHTS
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01-V03,
V10 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
J-BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
VAULT DETAIL @ J01 & J02
NOT TO SCALE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #IRRIGATION
N/A
N/A
TBD
ELEC
1KW
65A
1.4 @ H3C
1.8 @ H3C
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #STREET LIGHTS
N/A
N/A
200A
ELEC
1KW
65A
1.8 @ H8A
2.5 @ H8A
10' CLEARANCE REQUIRED TO
TRANSFORMER OR NON-FLAMMABLE
BUILDING MATERIALS REQUIRED
ROW
M
I
D
D
L
E
R
O
A
D
S
E
RAILWAY ROAD SE
FLUME LANE (NOT OPEN)
ROA
D
E
R
O
A
D
B
R
O
A
D
C
RAIL
W
A
Y
R
O
A
D
S
E
LOT 69
LOT 8
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
LOT 12
LOT 9
LOT 10
LOT 11
LOT 85
LOT 84
LOT 90
LOT 89
LOT 88
LOT 87
LOT 86
LOT 74
LOT 73
LOT 81
LOT 72
LOT 79
LOT 77
LOT 76
LOT 75
LOT 67
LOT 68
LOT 70
LOT 63
LOT 71
LOT 64
LOT 65
LOT 66
LOT 83
LOT 46
LOT 43
LOT 42
LOT 41
LOT 40
LOT 39
LOT 38
LOT 44
TRACT A
LOT 58
LOT 47
LOT 59
LOT 60
LOT 61
LOT 62
TRACT C
LOT 45
LOT 78
LOT 82
LOT 80
TRACT B
16333
16325
16311
16309
336
A
C
S
R
C
B
A
336
A
C
S
R
C
B
A
115
k
V
115
k
V
FEE
D
YEL
27
FUSE @ 65T
SW#T__________
IRR.
ST. LTS
(TYPICAL)
TRACT A
R
O
A
D
C
R
O
A
D
B
R
O
A
D
A
LOT 5
LOT 80
LOT 81
LOT 82
336
A
C
S
R
115
k
V
336
A
C
S
R
115
k
V
16345
16411
16408
NEW
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J.CALLAHAN 206.503.1520 .
C.DIAZ .06.26.24
N/A .N/A
C.DIAZ .06.26.24
REDT # ( RW-TBD )YELM
SHELM MEADOWS
3Ø PRIMARY U/G LINE EXTENSION - 90 S/F LOTS
16330 & 16314 RAILWAY RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105105500
AS SHOWN 3 OF 3
THURSTON N/A N/A QSTHLE
19NE-T17N-R02E N/A N/A
1702E073 1702E116 1702E073 YEL-27
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
...
...
...
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
1" = 50'
SITE PLAN
MATC
H
L
I
N
E
A
-
A
(
S
E
E
P
A
G
E
2
)