Loading...
Plans Berry Valley Preliminary929394 84 696168606766 58 65 TRACT 'E' 6463 7062 2 TRACT 'G' 42 41 46 47 TR A C T ' D ' 71 TR A C T ' C ' 83 72 80 TRACT 'B' 82 81 TRACT 'J' TRACT 'A' 79 76 77 78 74 75 73 24 1 21 22 108 106 105 53 54 56 57 28 31 25 TRACT 'I' 5150 49 59 91 89 88 87 85 97 18 23 8690 38 TRACT 'L' 104107 109 43 48 55 45 TRACT 'H' 44 TRACT 'K' 52 3 102 100 99 9596 103 98 101 36 37 35 14 6 13 5 12 4 11 10 9 16 8 15 7 17 31 36 37 39 40 35 34 33 32 30 14 20 13 19 12 11 10 9 8 15 7 29 27 26 13 12 11 10 9 8 7 17 31 27 26 28 31 21 18 38 36 37 39 40 35 34 33 32 30 14 6 20 13 5 19 12 4 11 10 9 16 8 15 7 17 29 27 26 17 6 9 18 38 11 JA C K S O N S T S E DATE: April 18, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-COVER.dwg C0.1 1 COVER SHEET N GRAPHIC SCALE 0 120 240 1" = 120 FEET 60 AHBL ENGINEERS, PLANNERS, & SURVEYORS 2215 NORTH 30TH STREET, SUITE 300 TACOMA, WA 98403 PH. (253) 383-2422 FAX (253) 383-2572 CONTACT: MATT WEBER, P.E. COPPER RIDGE, LLC P.O. BOX 73790 PUYALLUP, WA 98373-0790 CONTACT: MR. KURT WILSON AHBL ENGINEERS, PLANNERS, & SURVEYORS 2215 NORTH 30TH STREET, SUITE 300 TACOMA, WA 98403 PH. (253) 383-2422 FAX (253) 383-2572 CONTACT: DAVE FOLLANSBEE, PLS. TOPOGRAPHIC SURVEY WAS PREPARED BY AHBL, INC. FIELD DATA WAS COLLECTED IN APRIL 2023. NAVD 1988 VERTICAL DATUM ON ORTHOMETRICALLY CORRECTED GPS OBSERVATIONS USING WSRN AND GEOID 2012A. NAD 1983/11 WASHINGTON STATE PLANE SOUTH PROJECTION, BASED ON GPS OBSERVATION USING WSRN AND GEOID 2012A. UNITS OF MEASUREMENT ARE US SURVEY FEET. SEE SHEET C0.2 - EXISTING CONDITIONS FOR LEGAL DESCRIPTION PARCEL NUMBERS:21724230100, 21723140000, 21723140102 ADDRESS:14444 BERRY VALLEY RD SE YELM WA, 98597 SITE AREA:1,505,994 SF (34.57 ACRES) (AFTER PROPOSED BLA) EXISTING ZONING:R-4, RESIDENTIAL N EXISTING DESCRIPTION PROPOSED LEGEND SITE DATA LEGAL DESCRIPTION BASIS OF BEARING VERTICAL DATUM DEVELOPER CIVIL ENGINEER SURVEYOR VICINITY MAP NOT TO SCALE SITE AREA 1,505,994 SF (34.57 AC) (AFTER PROPOSED BLA) MAX. DENSITY (4 DU) = 138.28 UNITS (USE 138 UNITS) PROPOSED DENSITY = 109 UNITS GROSS DEVELOPABLE ACREAGE X ALLOWED DENSITY IN DWELLING UNITS = ALLOWABLE NUMBER OF DWELLING UNITS CUT = 90,750 CU. YDS FILL = 81,000 CU. YDS NET = 9,750 CU. YDS EXPORT NOTE: THE ABOVE QUANTITIES ARE ESTIMATES ONLY INTENDED FOR THE PERMITTING PROCESS. DO NOT USE FOR BID PURPOSES. THE QUANTITIES DO NOT HAVE STRIPPING, COMPACTION, OR CUT OR FILL ADJUSTMENT FACTORS APPLIED TO THEM, NOR DO THEY ACCOUNT FOR ROADWAY SECTION. THE WETLAND DELINEATION AND STREAM ASSESSMENT REPORT PREPARED BY LAND SERVICES NORTHWEST IDENTIFIES THREE WETLANDS AND A TYPE F STREAM ON THE PROJECT SITE. THE DELINEATED WETLANDS AND STREAM WITH ASSOCIATED BUFFERS ARE SHOWN IN THIS PLAN SET. PROJECT LIMITS PROJECT SITE SCALE 1"=120' WETLAND DELINEATION EARTHWORK QUANTITIES DENSITY CALCULATIONS 21723140102 EVANS, JEFFREY B CEMENT CONC. PAVEMENT NATURAL GAS LINE CONIFER TREE DECIDUOUS TREE ASPHALT CONC. PAVEMENT STANDARD DUTY PAVING SANITARY SEWER LINE STORM DRAIN LINE POWER/TELE. POLE CHAIN LINK FENCE FIRE SERVICE WATER LINE CONTOURS WIRE FENCE WOOD FENCE WATER METER WATER VALVE SIGN HYDRANT STORM DRAIN MH SANITARY SEWER MH CATCH BASIN TELEPHONE MH TELEPHONE RISER GUY WIRE LIGHT W D ELEV D W SS F ELEV G LAND SERVICES NORTHWEST 120 STATE AVENUE, NE PMB 190 OLYMPIA, WA 98501 PH. (360) 481-4208 CONTACT: ALEX CALLENDER, MS PWS WETLAND BIOLOGIST BOUNDARY LINE AFTER PROPOSED BLA EXISTING WELL SETBACK RO A D 3 21723110300 MOSS, WILLIAM R & DEBRA A 21724220200 VALENZUELA, MICHAEL LAWRENCE 21724210500 SCHOOL DISTRICT #2 21 7 2 4 2 3 0 1 0 1 JE N K I N S , T A M M Y M 21724230105 KIMBROUGH, WILBERT L 21724230200 HOBART, DELYNN B 21724230900 SOETEBER, MARK W 21724230400 GERRISH FAMILY REVOCABLE LIVING TRUST DA I N S T . S E 78640100019 TAHOMA TERRA HOLDINGS LLC 21723420000 DDD WASHINGTON LLC 21723130000 DDD WASHINGTON LLC 21723120400 HUDDLESTON, JOE D 21724230100 PURVIS, DAVID A 21723140000 PURVIS, DAVID A EXISTING INGRESS/EGRESS & UTILITY EASEMENT (TO BE VACATED) EXISTING UTILITY EASEMENT (TO BE VACATED)EXISTING WELL TO BE ABANDONED 21723140101 (FOR TAX PURPOSES) BERRY VALL E Y R O A D S E ROAD 1 JAC K S O N S T . S E ROAD 2 BERRY VALLEY ROAD SE 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX PROJECT LIMITS Sheet List Table Sheet Number Sheet Title C0.1 COVER SHEET C0.2 EXISTING CONDITIONS C1.1 TESC AND DEMOLITION PLAN C1.2 TESC NOTES AND DETAILS C1.3 TESC NOTES AND DETAILS C2.1 BERRY VALLEY ROAD PLAN & PROFILE C2.2 BERRY VALLEY ROAD PLAN & PROFILE C2.3 ROAD SECTIONS C3.1 BERRY VALLEY ROAD WATER PLAN & PROFILE C3.2 BERRY VALLEY ROAD WATER PLAN & PROFILE C3.3 WATER NOTES AND DETAILS C3.4 WATER NOTES AND DETAILS C4.1 BERRY VALLEY ROAD STEP PLAN & PROFILE C4.2 BERRY VALLEY ROAD STEP PLAN & PROFILE C4.3 SEWER NOTES AND DETAILS C4.4 SEWER NOTES AND DETAILS Preliminary 10/09/2024 8:56:01 AM THIS PLAN HAS BEEN PREPARED FOR PRELIMINARY CITY REVIEW AND FEEDBACK. TRYING TO WORK WITH ADJACENT DEVELOPMENT (PARCEL 21724230400) FOR OFFSITE ROAD IMPROVEMENTS ALONG BERRY VALLEY ROAD. BERRY VALLEY RD SE BERRY VALLEY RD SE BERRY VALLEY RD SE PARCEL A: LOT A OF BOUNDARY LINE ADJUSTMENT NO. BLA-99-8233-YL, AS RECORDED ON JULY 13, 2000 UNDER RECORDING NOS. 3302940 AND 3302942; PARCEL B: THAT PART OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 24, TOWNSHIP 17 NORTH, RANGE 1 EAST LYING NORTHERLY OF A LINE RUNNING FROM A POINT ON THE WEST LINE OF SAID SUBDIVISION THAT IS 406 FEET SOUTH OF ITS NORTHWEST CORNER TO A POINT ON THE EAST LINE OF SAID SUBDIVISION THAT IS 312 FEET SOUTH OF ITS NORTHEAST CORNER; EXCEPT THE EAST 400 FEET THEREOF; AND EXCEPT THAT PORTION, IF ANY, CONVEYED TO THURSTON COUNTY FOR ROAD PURPOSES DESCRIBED IN DEEDS RECORDED NOVEMBER 19, 1969 AND FEBRUARY 2, 1992 UNDER AUDITOR'S FILE NOS. 812829, 9202070138, AND 9202070139; AND BEGINNING AT A POINT ON THE EAST LINE OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 24, TOWNSHIP 17 NORTH, RANGE 1 EAST, W.M., SOUTH 01°02'46" WEST 266.97 FEET FROM THE NORTHEAST CORNER THEREOF; THENCE SOUTH 80°25'13" WEST TO INTERSECT THE SOUTH LINE OF THAT CERTAIN PARCEL CONVEYED TO JOSEPH H. CLARAMBEAU AND RECORDED UNDER AUDITOR'S FILE NO. 215228, AND THE TRUE POINT OF BEGINNING OF THIS DESCRIPTION; THENCE CONTINUING SOUTH 80°25'13" WEST TO THOMPSON CREEK, THENCE NORHWESTERLY ALONG THOMPSON CREEK TO SAID SOUTH LINE OF SAID 20 FOOT WIDE STRIP RESERVED BY DEED RECORDED UNDER AUDITOR'S FILE NO. 215228; THENCE EASTERLY ALONG SAID SOUTH LINE TO THE TRUE POINT OF BEGINNING; EXCEPT THAT PORTION, IF ANY, CONVEYED TO THURSTON COUNTY FOR ROAD PURPOSES DESCRIBED IN DEEDS RECORDED NOVEMBER 19, 1969 AND FEBRUARY 2, 1992 UNDER AUDITOR'S FILE NOS. 812829, 9202070138, AND 9202070139; PARCEL C: LOT B OF BOUNDARY LINE ADJUSTMENT NO. BLA-99-8233-YL, AS RECORDED ON JULY 13, 2000 UNDER RECORDING NOS. 3302940 AND 3302942; EXCEPT ANY MOBILE HOMES LOCATED THEREON; IN THURSTON COUNTY, WASHINGTON LEGAL DESCRIPTION 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-EXST-COND.dwg C0.2 2 EXISTING CONDITIONS N GRAPHIC SCALE 0 20 40 FEET 1" = 20 FEET 10 M A T C H L I N E A A N GRAPHIC SCALE 0 40 80 FEET 1" = 40 FEET 20 MA T C H L I N E B B SE E O N S I T E I M P R O V E M E N T S P E R M I T # MAT C H L I N E A A MA T C H L I N E B B N GRAPHIC SCALE 0 40 80 FEET 1" = 40 FEET 20 Preliminary 10/09/2024 8:56:11 AM TESC AND DEMO LEGEND INLET PROTECTION CLEARING LIMITS FILTER FABRIC FENCE INTERCEPTOR DITCH RIP-RAP PROTECTION 4"x6" SPALLS REMOVE EXISTING FENCE EXISTING GRADE CONTOUR ROCK CHECK DAM EXISTING TREE TO BE REMOVED SF CL IP CE CD ID 1 C1.2 1 C1.3 2 C1.3 6 C1.2 2 C1.2 BERRY VALLEY RD SE BERRY VALLEY RD SE BERRY VALLEY RD SE N GRAPHIC SCALE 0 20 40 FEET 1" = 20 FEET 10 M A T C H L I N E A A N GRAPHIC SCALE 0 40 80 FEET 1" = 40 FEET 20 MA T C H L I N E B B SE E O N S I T E I M P R O V E M E N T S P E R M I T # MAT C H L I N E A A MA T C H L I N E B B N GRAPHIC SCALE 0 40 80 FEET 1" = 40 FEET 20 DATE: April 25, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-TESC-DEMO.dwg C1.1 3 TESC AND DEMOLITION PLAN 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX Preliminary 10/09/2024 8:56:11 AM CHECK DAM 20 5 10 10 6 15 5 20 4 25 2 50 100 % 1 SPACING (FT.) DITCH SLOPE CHECK DAM SPACING A AND B ARE OF EQUAL ELEVATION L = THE DISTANCE SUCH THAT POINTS 2:1 SLOPES 3: 1 L A TOP OF DITCH B 3:1 2"-4" ROCK 24" MIN. BOTTOM AND SIDES OF THE DITCH ROCK MUST COMPLETELY COVER THE 6" MIN. 4"-8" QUARRY SPALLS GEOTEXTILE 12" MIN. THICKNESS EXIST I N G R O A D R = 25' MIN. INGRESS/EGRESS AREA PROVIDE FULL WIDTH OF 20' M I N . RUNOFF DRAINS OFF THE PAD ENTRANCE BE CROWNED SO THAT IT IS RECOMMENDED THAT THE 1 0 0 ' 1.QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 2.IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON-SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, THE CONSTRUCTION OF A SMALL SUMP SHALL BE CONSIDERED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP. 4.ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 5.IF VEHICLES ARE ENTERING OR EXITING THE SITE AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. MAINTENANCE STANDARDS PROVIDE DIP CULVERT FOR TEMPORARY CONTROL OF DRAINAGE. NOTES: 1.FILTERS SHALL BE i NSPECTED AFTER EACH STORM EVENT AND CLEANED OR REPLACED WHEN 1/3 FULL. 2.INSTALL INLET PROTECTION IN ALL NEW STORM STRUCTURES THAT WILL COLLECT STORMWATER AS THEY ARE INSTALLED. ADAPTOR SKIRT RETRIEVAL STRAP OVERFLOW (TO BYPASS PEAK STORM VOLUMES) EXISTING CATCH BASIN SEDIMENT ACCUMULATION GEOTEXTILE FABRIC 24 " 36"48" 1' M I N . INLET/OUTFALL PIPE OUTFALL P I P E SECTION VIEW PLAN VIEW EXISTING AND/OR PROPOSED GROUND 12" MIN. DEPTH (12"Ø PIPE) 18" MIN. DEPTH (15"-18"Ø PIPE) 24" MIN. ( 24"-36"Ø PIPE) 4" MIN. FACE QUARRY ROCK DIA. +4" 3 1 1 6' MIN. 2 0.5' SPILLWAY DEPTH 1' FREEBOARD MIN. 2' SETTLING DEPTH MAX. 4' SETTLING DEPTH EMERGENCY OVERFLOW SPILLWAY CREST, OUTLET BERM FILTER FABRIC FENCE ENERGY DISSIPATING ROCK SEDIMENT STORAGE 1' DEPTH (3' MAX) 6'-0" 2 1 5/8" MINUS WASHED ROCK ELEV: 326.53 ELEV: 333.00 ELEV: 336.00 ELEV: 337.00 ELEV: 337.50 OVERFLOW SPILLWAY 6' MINIMUM WIDTH 0.5' FREEBOARD 1' OF 3 4" -3" WASHED ROCK 1' OF QUARRY SPALLS SPILLWAY ELEV 337.00 TOP OF BERM: 337.50 0.57' 6.5' SEPARATION FROM PERMANENT INFILTRATION FACILITY SUBGRADE DATE: April 25, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-TESC-DEMO.dwg C1.2 4 TESC NOTES AND DETAILS 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX 1 NOT TO SCALE INLET PROTECTION 2 NOT TO SCALE GRAVEL CHECK DAM 3 NOT TO SCALE EMERGENCY OVERFLOW SPILLWAY 4 NOT TO SCALE INFILTRATION SEDIMENT TRAP 5 NOT TO SCALE CONSTRUCTION ENTRANCE 6 NOT TO SCALE ROCK OUTFALL Preliminary 10/09/2024 8:56:11 AM CONSTRUCTION NOTES 5. 4. 3. 2.UTILITIES INSPECTOR PRIOR TO CONSTRUCTION. SHALL SECURE THE NECESSARY PERMITS FROM THE YELM CONSTRUCTED IN THE YELM RIGHT-OF-WAY, THE APPLICANT IF WATER OR OTHER UTILITIES ARE REQUIRED TO BE BE IN ATTENDANCE. THE DEVELOPER AND HIS/HER CONTRACTOR(S) MUST YELM'S DEVELOPMENT AND UTILITIES INSPECTOR. PRECONSTRUCTION CONFERENCE SHALL BE SCHEDULED WITH OR IMPROVEMENTS TO EXISTING ROADWAY FACILITIES, A PRIOR TO ANY ON SITE IMPROVEMENTS, ROADWAY CONSTRUCTION, CONSTRUCTED FACILITIES OR ADJACENT PROPERTIES. UNDERTAKEN DURING CONSTRUCTION TO AVOID DAMAGE TO TEMPORARY EROSION AND SEDIMENTATION CONTROL SHALL BE IS RESPONSIBLE FOR SCHEDULING THIS WORK. QUALIFIED LICENSED SURVEYOR. THE DEVELOPER OR CONTRACTOR CONSTRUCTION STAKING SHALL BE BY THE DESIGN ENGINEER OR A CONSTRUCTION USE BY THE ENGINEER. RESPECTS, INCLUDING SAND EQUIVALENT, WILL BE APPROVED FOR NATIVE MATERIALS MEETING THE SPECIFICATIONS IN ALL ASSOCIATION, AND CITY OF YELM PUBLIC WORKS STANDARDS. AND WASHINGTON STATE CHAPTER, AMERICAN PUBLIC WORKS JOINTLY BY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, PUBLISHED MOST CURRENT STANDARD SPECIFICATIONS FOR ROAD SPECIFICATIONS WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE1. A SILT SOCK SHALL BE INSTALLED AT EACH CATCH BASIN LOCATION.6. SEDIMENTS OR BUILD A NEW FENCE PARALLEL TO THE OLD ONE. WHEN SEDIMENT BUILDUP BECOMES EXCESSIVE, REMOVE THE AND DAILY DURING PROLONGED RAIN AND REPAIR THEM AS NECESSARY. POSSIBLE. INSPECT FILTER FABRIC FENCES AFTER EACH RUNOFF EVENT STORM WATER DISCHARGED OFF SITE IS AS FREE OF SEDIMENT AS 9. FILTER FABRIC FENCES SHALL BE MAINTAINED IN ORDER THAT DURING CONSTRUCTION AND SHALL WATER DOWN AREAS AS NECESSARY 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE AND IN CONFORMANCE WITH THE PERTINENT CITY OF YELM ORDINANCES. STABILIZED BY SEEDING AND MULCHING. UNWORKED REGULARLY OR FOR AN EXTENDED TIME SHALL BE DISTURBED AREAS GREATER THAN 5,000 S.F. THAT ARE LEFT 5. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH APRIL 30, ALL 6. STOCKPILED DIRT MATERIAL SHALL BE COVERED. BY THE CITY. THROUGHOUT DURATION OF PROJECT CONSTRUCTION AS DIRECTED 4. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES ROCK ACCESS DRIVEWAY SHALL BE IN PLACE, AS SHOWN ON PLAN. 3. PRIOR TO ANY OTHER WORK ON SITE, EROSION CONTROL FENCING AND CITY OF YELM OR OTHER GOVERNING AUTHORITY OR AGENCY. 2. COMPLY WITH ALL OTHER PERMITS AND OTHER REQUIREMENTS BY FOLLOWING COMPLETION OF CONSTRUCTION. SHALL BE CLEANED OF ALL SILTS, SAND AND OTHER MATERIALS WATER POLLUTION/FLOOD ACTIVITIES AND CONVEYANCE SYSTEMS USED AS PART OF THE TEMPORARY EROSION CONTROL AND B. ALL PERMANENT STORAGE AND DETENTION AREAS MANUAL. REQUIREMENTS OF TABLE 9.1 OF THE THURSTON REGION DRAINAGE 8. ALL DISTURBED AREAS SHALL BE SEEDED PER THE STABILIZATION PRECLUDE ANY CONSTRUCTION ACTIVITY ON THE SITE. SUBMITTAL AND APPROVAL OF THESE PLANS SHALL SHALL BE SUBMITTED TO AND APPROVED BY THE COUNTY. A. SOIL EROSION AND WATER POLLUTION/FLOOD CONTROL PLANS SPECIFICATIONS AND AS FOLLOWS: REQUIRED IN ACCORDANCE WITH SECTION 1-07.15 OF THE STANDARD 1. TEMPORARY EROSION/WATER POLLUTION MEASURES SHALL BE DRAINAGE, GRADING AND OTHER TREATMENT. CONTRACTOR, BUT MUST BE AUGMENTED WITH MULCH, NETTING, OR HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE APPLICANT/ APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY PROCEED, SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR 16. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE AND/OR STORM DRAINAGE SYSTEMS. ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES SHALL INSTALL ADDITIONAL FACILITIES AS NECESSARY TO PROTECT CONTROL EROSION AND SEDIMENTATION, THE APPLICANT/CONTRACTOR MEASURES AS SHOWN ON THIS DRAWING NOT PROVE ADEQUATE TO 15. SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL SATISFIED. CONTINUE UNTIL SUCH TIME AS THE AFFECTED PROPERTY OWNER IS COMMENCE RESTORATION METHODS. RESTORATION ACTIVITY WILL MUST CEASE, AND THE OWNER/CONTRACTOR WILL IMMEDIATELY DEVELOPMENT THAT WILL AGGRAVATE THE SITUATION IN THE FUTURE PROPERTY OWNERS, ALL CONSTRUCTION WORK WITHIN THE 14. IN CASE EROSION OR SEDIMENTATION OCCURS TO ADJACENT IN A FIELD BY A SOILS ENGINEER OR ENGINEERING GEOLOGIST. NATIVE SOILS. HEIGHT AND WIDTH OF THE BENCH WILL BE DETERMINED (HORIZONTAL TO VERTICAL) SHALL BE BENCHED AS DIRECTED INTO 13. PLACEMENT OF FILL SECTIONS ON SLOPES GREATER THAN 4:1 BACKFILL SHALL BE COMPACTED AS SPECIFIED ABOVE. DENSITY BEFORE PLACING THE NEXT LIFT. ALL UTILITY TRENCH MOISTURE CONTENT, AND COMPACTED TO THE SPECIFIED MINIMUM EIGHT INCHES LOOSE THICKNESS, CONDITIONED TO THE OPTIMUM 12. ALL FILL SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS OF SIX TO CONSULTANT FOR USE. SUBSTITUTED WITH PRIOR APPROVAL BY A GEOTECHNICAL ANSI/ASTM D-1140 TEST PROCEDURE. OTHER MATERIAL MAY BE MORE THAN 7% BY WEIGHT SHALL PASS THE #200 SCREEN AS TESTED BY DETERMINED BY ANSI/ASTM TEST METHOD D-2487) SHALL BE USED. NO GRADED GRAVEL OR GRAVELY SAND (CLASSIFYING AS GW OR SW AS 11. FOR IMPORTED STRUCTURAL FILL A CLEAN, SIX-INCH MINUS, WELL CONTROL FACILITIES ONLY WHEN THE ENTIRE SITE IS STABILIZED. 17. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENTATION TEMPORARY EROSION CONTROL NOTES IN AREAS UNDER STRUCTURES, PAVING SECTIONS, SIDEWALKS, AND OTHER AREAS TO BE GRADED, STRIP ALL TOPSOIL AND ORGANIC MATERIAL. STOCKPILE AND COVER WITH PLASTIC ALL STOCKPILED TOPSOIL. ALL TOPSOIL AND SOD NOT TO BE REUSED SHALL BE REMOVED FROM SITE AND DISPOSED OF PROPERLY AT THE CONTRACTORS EXPENSE. FOR STRUCTURAL FILL IN AREAS UNDER FOOTINGS AND SLABS ON GRADE, ALL SOILS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 90% OF ASTM D-1557 OR 95% OF UBC 70-1. THIS INCLUDES PROOF-ROLLING NATIVE SOILS EXPOSED IN THE BOTTOM OF THE EXCAVATION PRIOR TO PLACEMENT OF FILL. MATERIALS UNDER THE PAVING SECTION SHALL ALSO BE COMPACTED TO THE MINIMUM DENSITY BY PROOF-ROLLING PRIOR TO PLACEMENT OF THE PAVING SECTION; THIS INCLUDES PROOF-ROLLING IN-PLACE SOILS, SOILS THAT HAVE BEEN DISTURBED DURING CONSTRUCTION AND ALL STRUCTURAL FILL MATERIALS. 1.STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31. 2.IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. 3.TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. 4.PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE APPROVED PLAN. 1.MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE APPLIED AT THE RATE OF 2 TONS/ACRE. (MIN. 2" THICK) 2.MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1. 3.MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. 4.ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1. 1.CONTRACTOR SHALL DESIGNATE A WASHINGTON STATE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD WHO SHALL HAVE THE RESPONSIBILITY TO MONITOR AND IMPLEMENT EROSION CONTROL MEASURES. 2.CONTRACTOR SHALL PROVIDE AN EROSION AND SEDIMENT CONTROL LEAD (ESCL) WHO WILL BE ON-SITE OR ON CALL AT ALL TIMES. THE EROSION CONTROL LEAD SHALL HAVE THE AUTHORITY TO IMPLEMENT THE STORMWATER POLLUTION PREVENTION PLAN BASED ON SITE CONDITIONS WITHIN THEIR SCOPE. IF THE METHODS INDICATED FOR EROSION AND SEDIMENT CONTROL ARE NOT ADEQUATE, THE ESCL SHALL IMPLEMENT ADDITIONAL METHODS AS REQUIRED. 3.CONTRACTOR SHALL PREPARE A CONSTRUCTION SWPPP FOR THIS PROJECT. REFER TO THE PROJECT MANUAL FOR A SAMPLE SWPPP FOR THIS PROJECT. RETAIN A COPY OF THE SWPPP ON-SITE AT ALL TIMES AND AVAILABLE TO THE JURISDICTIONS HAVING AUTHORITY. 4.CONTRACTOR TO COORDINATE AREAS FOR LAY DOWN, STOCK PILE, TRAILERS & PARKING WITH WMD CONSTRUCTION PROJECT MANAGER BRAD OLSON. 5.CONTRACTOR TO REMOVE CONSTRUCTION DEBRIS, MUD, ROCKS, DIRT, ETC FROM EXISTING ROAD AND PARKING LOT DAILY. MULCHING NOTES TESC/SWPPP NOTES SOIL STOCKPILE NOTES 1.THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST WITH A MINIMUM SIX-INCH OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST. 2.THE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS (WHERE FEASIBLE). THE FENCE POSTS SHALL BE SPACED A MAXIMUM OF SIX FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30") 3.A TRENCH SHALL BE EXCAVATED, ROUGHLY EIGHT INCHES WIDE AND TWELVE INCHES DEEP, UPSLOPE AND ADJACENT TO THE WOOD POST TO ALLOW THE FILTER FABRIC TO BE BURIED. 4.WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE STAPLES AT LEAST ONE INCH LONG, TIE WIRES, OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF FOUR INCHES AND SHALL NOT EXTEND MORE THAN THIRTY SIX INCHES ABOVE THE ORIGINAL GROUND SURFACE. 5.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND TWENTY INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN THIRTY SIX INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 6.WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF STANDARD NOTE (S) APPLYING. 7.THE TRENCH SHALL BE BACKFILL WITH 3/4 INCH MINIMUM DIAMETER WASHED GRAVEL. 8.FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 9.FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 10.CONTRIBUTING LENGTH TO FENCE SHALL NOT BE MORE THAN 100 FEET. 11.DO NOT INSTALL BELOW AN OUTLET PIPE OR WEIR. 12.DO NOT DRIVE OVER OR FILL OVER FILTER FABRIC FENCE. SIDE VIEW NOTES: FRONT VIEW CHAINLINK FENCE 8" 2.0' MIN. 5. 0 ' 1. 0 ' 2. 0 ' 0. 5 ' 6' MAX. 5.0' 2.0' 2.5' 2" X 4" WOOD POSTS, STANDARD OR BETTER, OR STEEL FENCE POST BURY BOTTOM OF FILTER MATERIAL IN 8"X12" TRENCH 2" X 4" BY 14 GA. WIRE FABRIC OR EQUIVALENT EXISTING GRADE ORANGE FILTER FABRIC MATERIAL 60" WIDE ROLLS - USE RINGS TO ATTACH ATTACH TO WIRE FABRIC 2" X 4" WOOD POST OR STEEL FENCE POST PROVIDE 3/4" - 1 1/2" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OF FILTER FENCE FABRIC ON THE SURFACE 2" X 2" BY 14 GA. WIRE FABRIC OR EQUIVALENT, AFFIX TO POST FILTER FABRIC MATERIAL MIRAFI 100 NS OR EQUIVALENT 2' MIN 1' MIN. 2 1 SPACING (FEET) 2 1 1' MIN SLOPE 1.SEED AND MULCH SHALL BE APPLIED WITHIN 5 DAYS OF DIKE CONSTRUCTION. (SEE HYDROSEEDING NOTES) 2.THE UPSLOPE SIDE OF THE DIKE SHALL PROVIDE POSITIVE DRAINAGE TO THE DIKE OUTLET. 3.NO EROSION SHALL OCCUR AT THE DIKE OUTLET. PROVIDE ENERGY DISSIPATION MEASURES AS NECESSARY. 4.SEDIMENT LADEN RUNOFF MUST BE RELEASED THROUGH A SEDIMENT TRAPPING FACILITY SUCH AS A POND, TRAP, OR SILT FENCE AS APPROPRIATE TO DRAINAGE AREA SIZE. TEMPORARY DIKE AND SWALE NOTES GRASS OR ROCK LEVEL BOTTOM SPACING=100', 200' OR 300' DEPENDING ON SLOPE (SEE TABLE) 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 25, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-TESC-DEMO.dwg C1.3 5 TESC NOTES AND DETAILS 1 NOT TO SCALE FILTER FABRIC FENCE 2 NOT TO SCALE INTERCEPTOR SWALE Preliminary 10/09/2024 8:56:12 AM TRACT 'K' CB#40 CB#39 CB#41CB#40 CB#39 CB#41 1 3 + 0 0 14+00 15+00 16+00 17+00 18+00 19+00 20+00 PC : 1 2 + 5 4 . 8 3 PT: 1 2 + 9 9 . 0 4 PC : 1 3 + 0 3 . 8 2 PT : 1 4 + 0 6 . 1 3 330 33 0328328329329 1.10 ROW DEDICATION0.42' ROW DEDICATION EXISTING ROW S80° 39' 28"W PROPOSED ROW S80° 33' 09"W 26.00 5.00 10.00 16.00 32.00 5.50 5.50 1.50' BACK OF SW TO ROW 3.50' BACK OF SW TO ROW 7.00 26.00 5.00 ROW DEDICATION 16.00 16.00 10.00 CB#42 10.00 13.09 INSTALL NEW CULVERTS INSTALL NEW CULVERT 14.56 CENTERLINE PROPOSED ROAD N80° 33' 09"E A C2.3 A C2.3 320 325 330 335 340 345 320 325 330 335 340 345 13+50 33 0 . 2 5 33 0 . 0 6 14+00 32 9 . 8 8 32 9 . 6 9 14+50 32 9 . 5 1 32 9 . 3 2 15+00 32 9 . 1 3 32 8 . 9 5 15+50 32 8 . 7 6 32 8 . 5 8 16+00 32 8 . 3 9 32 8 . 2 1 16+50 32 8 . 0 5 32 7 . 9 6 17+00 32 7 . 9 4 32 7 . 9 7 17+50 32 8 . 0 7 32 8 . 2 3 18+00 32 8 . 4 2 32 8 . 6 1 18+50 32 8 . 8 0 32 8 . 9 9 19+00 32 9 . 1 8 32 9 . 3 7 19+50 32 9 . 5 9 32 9 . 8 4 20+00 33 0 . 1 2 33 0 . 3 9 20+50 33 0 . 6 6 0.74%0.76% 1.10% PVI: 327.66 PVI STA: 16+99.04 K: 99.83 150' VC BV C S : 1 6 + 2 4 . 0 4 BV C E : 3 2 8 . 2 1 EV C S : 1 7 + 7 4 . 0 4 EV C E : 3 2 8 . 2 3 LO W P T : 1 6 + 9 8 . 2 0 EL E V : 3 2 7 . 9 4 PVI: 329.55 PVI STA: 19+48.86 K: 147.86 50' VC BV C S : 1 9 + 2 3 . 8 6 BV C E : 3 2 9 . 3 6 EV C S : 1 9 + 7 3 . 8 6 EV C E : 3 2 9 . 8 3 N GRAPHIC SCALE 0 50 100 FEET 1" = 50 FEET 25 BERRY VALLEY ROAD SE PROFILE (STA. 13+50 - STA. 20+50) HORIZ. 1"=50', VERT. 1"=5' BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 13+50 - STA. 21+00) 1"=50' BERRY VALLEY ROAD SE EXISTING ELEVATION @ CL OF ROAD PROPOSED ELEVATION @ CL OF ROAD EXISTING GRADE @ CL OF ROAD PROPOSED GRADE @ CL OF ROAD SE E C2 . 2 EXISTING 24" CULVERTS PROPOSED HEADWALL PROPOSED HEADWALL WETLAND BUFFER EDGE OF WETLAND (THOMPSON CREEK) EXISTING 24" CULVERTS ROW DEDICATION WIDTH VARIES MATCH CL BEARING 7 5 WETLAND BUFFER PER TAHOMA TERRA SURVEY SE E O N S I T E I M P R O V E M E N T S PE R M I T # 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-ROAD&PROF.dwg C2.1 6 BERRY VALLEY ROAD PLAN & PROFILE Preliminary 10/09/2024 8:56:12 AM 31+63 2 0 + 0 0 21+00 22+00 23+0024+0025+0026+0027+0028+0029+0030+0031+00 PC: 21+05.1 5 PT : 2 2 + 1 0 . 6 4 EP : 3 1 + 6 3 . 4 1 16.00' 10.00' 20.00 EXISTING ROW WIDTH 18.00 ROW DEDICATION 2 6 . 0 0 5 . 0 0 1 0 . 0 0 1 6 . 0 0 7 . 0 0 0. 5 8 % 0. 1 3 % 3. 2 2 % 0. 1 8 % RELOCATE TELECOMM TO UTILITY EASEMENT 5.00' R60.00 3. 1 4 % 26.00 R44.00 11.00 16.00 7.00' 5 . 0 0 R O W D E D I C A T I O N R72.00 CB#44 CB#43 1 4 . 5 6 AC 2 . 3 A C2.3 B C2.3 B C2.3 C C2.3 320 325 330 335 340 345 320 325 330 335 340 345 20+50 33 0 . 6 6 33 0 . 9 4 21+00 33 1 . 1 6 33 1 . 2 6 21+50 33 1 . 2 6 33 1 . 1 5 22+00 33 0 . 9 3 33 0 . 6 0 22+50 33 0 . 2 2 32 9 . 8 4 23+00 32 9 . 4 6 32 9 . 1 0 23+50 32 8 . 7 9 32 8 . 5 4 24+00 32 8 . 3 4 32 8 . 2 1 24+50 32 8 . 1 4 32 8 . 1 2 25+00 32 8 . 1 6 32 8 . 2 7 25+50 32 8 . 4 3 32 8 . 6 5 26+00 32 8 . 9 3 32 9 . 2 5 26+50 32 9 . 5 8 32 9 . 9 2 27+00 33 0 . 3 4 33 0 . 8 1 27+50 33 1 . 2 8 33 1 . 7 5 28+00 33 2 . 2 2 33 2 . 6 9 28+50 33 3 . 1 2 33 3 . 4 5 29+00 33 3 . 6 8 33 3 . 8 4 29+50 33 3 . 9 9 33 4 . 1 5 30+00 33 4 . 3 1 33 4 . 4 7 30+50 33 4 . 6 5 33 4 . 9 2 31+00 33 5 . 2 7 33 5 . 6 4 31+50 33 5 . 9 7 1.10% 1.49% 0.63% 1.88% 1.52% 1.31% GRADE BREAK STA: 31+59.55 ELEV: 336.07 PVI: 331.76 PVI STA: 21+49.38 K: 57.25 150' VC BV C S : 2 0 + 7 4 . 3 8 BV C E : 3 3 0 . 9 3 EV C S : 2 2 + 2 4 . 3 8 EV C E : 3 3 0 . 6 1 HI P T : 2 1 + 3 7 . 2 3 EL E V : 3 3 1 . 2 8 PVI: 333.47 PVI STA: 28+66.14 K: 63.87 80' VC BV C S : 2 8 + 2 6 . 1 4 BV C E : 3 3 2 . 7 1 EV C S : 2 9 + 0 6 . 1 4 EV C E : 3 3 3 . 7 2 PVI: 335.83 PVI STA: 31+37.58 K: 103.53 40' VC BV C S : 3 1 + 1 7 . 5 8 BV C E : 3 3 5 . 5 3 EV C S : 3 1 + 5 7 . 5 8 EV C E : 3 3 6 . 0 5 PVI: 334.70 PVI STA: 30+61.56 K: 69.83 60' VC BV C S : 3 0 + 3 1 . 5 6 BV C E : 3 3 4 . 5 1 EV C S : 3 0 + 9 1 . 5 6 EV C E : 3 3 5 . 1 5 PVI: 327.07 PVI STA: 24+57.47 K: 106.09 300' VC BV C S : 2 3 + 0 7 . 4 7 BV C E : 3 2 9 . 3 5 EV C S : 2 6 + 0 7 . 4 7 EV C E : 3 2 9 . 0 2 LO W P T : 2 4 + 6 8 . 9 7 EL E V : 3 2 8 . 1 2 PVI: 329.99 PVI STA: 26+81.66 K: 69.26 40' VC BV C S : 2 6 + 6 1 . 6 6 BV C E : 3 2 9 . 7 3 EV C S : 2 7 + 0 1 . 6 6 EV C E : 3 3 0 . 3 7 N GRAPHIC SCALE 0 50 100 FEET 1" = 50 FEET 25 BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 21+00 - STA. 31+60) 1"=50' BERRY VALLEY ROAD SE SEE C2.1 EXISTING ELEVATION @ CL OF ROAD PROPOSED ELEVATION @ CL OF ROAD EXISTING GRADE @ CL OF ROAD PROPOSED GRADE @ CL OF ROAD BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 21+00 - STA. 31+60) 1"=50' UNSTANDARD CROSS-SLOPE TO AVOID GRADING INTO NEIGHBORS PROPERTY DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-ROAD&PROF.dwg C2.2 7 BERRY VALLEY ROAD PLAN & PROFILE 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX Preliminary 10/09/2024 8:56:12 AM 0.25' HMA CI. 1/2" PG 64-22 0.17' CSTC 0.67' GRAVEL BASE COMPACTED SUBGRADE 2% CO N S T R U C T I O N C L 10' CL PROFILE GRADE 2%2% 16' FL O W L I N E 7' LANDSCAPE 5' SIDEWALK PROPOSED 8" WATER 42 " M I N , T Y P 10' 18 " M I N 0.25' HMA CI. 1/2" PG 64-22 0.17' CSTC 0.67' GRAVEL BASE COMPACTED SUBGRADE 2% CO N S T R U C T I O N C L 3' CL PROFILE GRADE 16' 2:1 MAX TO MATCH EXISTING GRADE STORM SYSTEM AS REQUIRED STORM SYSTEM AS REQUIRED PROPOSED 8" WATER 42 " M I N , T Y P 10' 18 " M I N 2%2% FL O W L I N E 7' LANDSCAPE 5' SIDEWALK 2:1 MAX TO MATCH EXISTING GRADE EX I S T I N G R O W 10' EX I S T I N G R O W EXISTING ROAD PAVEMENT VARIES 7.2-7.6' EXISTING ROAD PAVEMENT VARIES 9'-12' VARIES ~2.8' EX R O A D CR O W N 10'16' ROW DEDICATION PR O P O S E D R O W EX I S T I N G R O W 10' EX I S T I N G R O W EXISTING ROAD PAVEMENT VARIES 7.6-8.4' EXISTING ROAD PAVEMENT VARIES 11'-10' VARIES 0.9'-1.5' EX R O A D CR O W N 10'16' ROW DEDICATION PR O P O S E D R O W REPLACE PAVING TO EXISTING ROW. MATCH EXISTING GRADE AT ROW VARIES 3.3%-9% 2% CO N S T R U C T I O N C L VARIES 16'-10' (STA 17+87 to 18+37) 10' CL PROFILE GRADE 2%2% 16' FL O W L I N E 7' LANDSCAPE 5' SIDEWALK 2' SHOULDER PROPOSED 8" WATER (STA 21+00 AND UP) 42 " M I N , T Y P 10' 18 " M I N POTENTIAL FUTURE 2" SEWER FORCE MAIN AT EXISTING DRIVEWAYS SLOPE TO EXISTING GRADE WITH MATERIALS MATCHING EXISTING 2:1 DOWN TO DITCH/CULVERT 2:1 UP TO EXISTING GRADE 2:1 MAX TO MATCH EXISTING GRADE STORM SYSTEM AS REQUIRED VARIES 3.3-3.6' EX R O A D CL & C R O W N EX I S T I N G R O W PR O P O S E D R O W VARIES 19.4'-19.7' VARIES 56'-24' EX I S T I N G R O W EXISTING ROAD PAVEMENT 10.6' EXISTING ROAD PAVEMENT 8.8' 23' 0.25' HMA CI. 1/2" PG 64-22 0.17' CSTC 0.67' GRAVEL BASE COMPACTED SUBGRADE POTENTIAL FUTURE 2" SEWER FORCE MAIN POTENTIAL FUTURE 2" SEWER FORCE MAIN 3' 1.5' 12" CULVERT PROPOSED 8" WATER (STA 17+87 TO STA 21+00) 5' 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-ROAD&PROF.dwg C2.3 8 ROAD SECTIONS A NOT TO SCALE BERRY VALLEY RD (STA 17+87 TO STA 21+94) B NOT TO SCALE BERRY VALLEY RD (STA 22+22 TO 23+60) AND (STA 25+72 TO STA 31+60) C NOT TO SCALE BERRY VALLEY RD (STA 21+94 TO 22+22) AND (STA 23+60 TO STA 25+72) Preliminary 10/09/2024 8:56:12 AM TRACT 'K' 1 3 + 0 0 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 2 4 L F 8 " C 9 0 0 P V C 39L F 8 " C 9 0 0 P V C 380LF 8" C900 PVC 23LF 8" C900 PVC 86LF 8" C 9 0 0 P V C 320 325 330 335 340 345 320 325 330 335 340 345 33 0 . 0 6 14+00 32 9 . 8 8 32 9 . 6 9 14+50 32 9 . 5 1 32 9 . 3 2 15+00 32 9 . 1 3 32 8 . 9 5 15+50 32 8 . 7 6 32 8 . 5 8 16+00 32 8 . 3 9 32 8 . 2 1 16+50 32 8 . 0 5 32 7 . 9 6 17+00 32 7 . 9 4 32 7 . 9 7 17+50 32 8 . 0 7 32 8 . 2 3 18+00 32 8 . 4 2 32 8 . 6 1 18+50 32 8 . 8 0 32 8 . 9 9 19+00 32 9 . 1 8 32 9 . 3 7 19+50 32 9 . 5 9 32 9 . 8 4 20+00 33 0 . 1 2 33 0 . 3 9 20+50 33 0 . 6 6 33 0 . 9 4 0.74%0.76% 1.10% 1LF 8" C900 PVC N GRAPHIC SCALE 0 50 100 FEET 1" = 50 FEET 25 BERRY VALLEY ROAD SE PROFILE (STA. 13+50 - STA. 21+00) HORIZ. 1"=50', VERT. 1"=5' BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 13+50 - STA. 21+00) 1"=50' BERRY VALLEY ROAD SE EXISTING ELEVATION @ CL OF ROAD PROPOSED ELEVATION @ CL OF ROAD EXISTING GRADE @ CL OF ROAD PROPOSED GRADE @ CL OF ROAD EXISTING 24" CULVERTS PROPOSED HEADWALL PROPOSED HEADWALL WETLAND BUFFER EDGE OF WETLAND (THOMPSON CREEK) EXISTING 24" CULVERTS SE E C3 . 2 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-WATR.dwg C3.1 9 BERRY VALLEY ROAD WATER PLAN & PROFILE SE E O N S I T E I M P R O V E M E N T S PE R M I T # Preliminary 10/09/2024 8:56:12 AM 2 0 + 0 0 2 1 + 0 0 22+0023+0024+0025+0026+0027+0028+0029+0030+0031+0031+63 STA:21+06.41, 3.63' R 976LF 8" C900 PVC 86 L F 8 " C 9 0 0 P V C 49L F 8 " C 9 0 0 P V C 320 325 330 335 340 345 320 325 330 335 340 345 21+00 33 1 . 1 6 33 1 . 2 6 21+50 33 1 . 2 6 33 1 . 1 5 22+00 33 0 . 9 3 33 0 . 6 0 22+50 33 0 . 2 2 32 9 . 8 4 23+00 32 9 . 4 6 32 9 . 1 0 23+50 32 8 . 7 9 32 8 . 5 4 24+00 32 8 . 3 4 32 8 . 2 1 24+50 32 8 . 1 4 32 8 . 1 2 25+00 32 8 . 1 6 32 8 . 2 7 25+50 32 8 . 4 3 32 8 . 6 5 26+00 32 8 . 9 3 32 9 . 2 5 26+50 32 9 . 5 8 32 9 . 9 2 27+00 33 0 . 3 4 33 0 . 8 1 27+50 33 1 . 2 8 33 1 . 7 5 28+00 33 2 . 2 2 33 2 . 6 9 28+50 33 3 . 1 2 33 3 . 4 5 29+00 33 3 . 6 8 33 3 . 8 4 29+50 33 3 . 9 9 33 4 . 1 5 30+00 33 4 . 3 1 33 4 . 4 7 30+50 33 4 . 6 5 33 4 . 9 2 31+00 33 5 . 2 7 33 5 . 6 4 31+50 33 5 . 9 7 31+59.55 33 6 . 0 7 1.10% 1.49% 0.63% 1.88% 1.52% 1.31% GRADE BREAK STA: 31+59.55 ELEV: 336.07 N GRAPHIC SCALE 0 50 100 FEET 1" = 50 FEET 25 BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 21+00 - STA. 31+60) 1"=50' BERRY VALLEY ROAD SE SEE C3.1 EXISTING ELEVATION @ CL OF ROAD PROPOSED ELEVATION @ CL OF ROAD EXISTING GRADE @ CL OF ROAD PROPOSED GRADE @ CL OF ROAD BERRY VALLEY ROAD SE PLAN - NEIGHBORHOOD COLLECTOR (STA. 21+00 - STA. 31+60) 1"=50' 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-WATR.dwg C3.2 10 BERRY VALLEY ROAD WATER PLAN & PROFILE Preliminary 10/09/2024 8:56:13 AM 1.ALL WORKMANSHIP AND MATERIAL SHALL BE IN ACCORDANCE WITH CITY OF YELM STANDARDS AND THE MOST CURRENT COPY OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. 2.ALL WORK IN CITY RIGHT-OF-WAY REQUIRES A PERMIT FROM THE CITY OF YELM. PRIOR TO ANY WORK COMMENCING, THE GENERAL CONTRACTOR SHALL ARRANGE FOR A PRECONSTRUCTION MEETING TO BE ATTENDED BY ALL MAJOR CONTRACTORS, REPRESENTATIVES OF INVOLVED UTILITIES, AND THE CITY OF YELM. THE CONTRACTOR IS RESPONSIBLE TO HAVE A SET OF APPROVED PLANS AT THE MEETING. 3.WATER MAINS SHALL MEET THE FOLLOWING SPECIFICATIONS: 3.1.POLYVINYL CHLORIDE (PVC) PIPE (UNDER 4 INCHES): PIPE MATERIAL SHALL BE PVC 1120, PVC 1220, OR PVC 2120, AND HAVE MINIMUM WALL THICKNESS EQUAL TO OR LESS THAN THE STANDARD DIMENSION RATIO (SDR) OF 21, AND MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATIONS SECTION 9-30.1(5)B. 3.2.POLYVINYL CHLORIDE (PVC) PIPE (4 THROUGH 12 INCHES): SHALL MEET THE REQUIREMENTS OF AWWA C900, CLASS 150 WALL THICKNESS EQUAL TO OR GREATER THAN THE SDR OF 18, AND MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATIONS SECTION 9-30.1(5)A. 3.3.POLYVINYL CHLORIDE (PVC) PIPE (14 THROUGH 20 INCHES): SHALL MEET THE REQUIREMENTS OF AWWA C905 WALL THICKNESS EQUAL TO OR GREATER THAN THE SDR OF 18. 3.4.DUCTILE IRON PIPE (DIP): DIP SHALL CONFORM TO AWWA C151 CLASS 50 OR GREATER, AND SHALL BE 1/16-INCH CEMENT LINED AND SEALED IN ACCORDANCE WITH ANSI/AWWA C104/A21.4-90, AND MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATIONS SECTION 9- 30.2.(1). SIX-INCH FIRE HYDRANT SPOOLS SHALL BE CLASS 52. 4.GATE VALVES SHALL BE RESILIENT WEDGE, NRS (NON RISING STEM) WITH O-RINGS SEALS. VALVE ENDS SHALL BE MECHANICAL JOINT OR ANSI FLANGES. VALVES SHALL CONFORM TO AWWA 509-80. VALVES SHALL BE MUELLER, M & H, KENNEDY, CLOW R/W OR WATEROUS SERIES 500. EXISTING VALVES TO BE OPERATED BY CITY EMPLOYEES ONLY. 5.HYDRANTS SHALL BE M & H RELIANT STYLE 929, MUELLER CENTURION, OR CLOW MEDALLION OR AVK. HYDRANTS SHALL BE BAGGED UNTIL SYSTEM IS APPROVED. FIRE FLOW TESTING SHALL BE CONDUCTED PRIOR TO ACCEPTANCE. 6.ALL LINES SHALL BE CHLORINATED AND TESTED IN CONFORMANCE WITH THE ABOVE REFERENCED SPECIFICATION (NOTE 1). 7.ALL PIPE AND SERVICES SHALL BE INSTALLED WITH CONTINUOUS TRACER TAPE INSTALLED 12" TO 18" UNDER THE FINAL GROUND SURFACE. THE MARKER SHALL BE PLASTIC NON-BIODEGRADABLE, METAL CORE OR BACKING MARKED WATER 2-INCH-WIDE MINIMUM, WHICH CAN BE DETECTED BY A STANDARD METAL DETECTOR. TAPE SHALL BE TERRA TAPE "D" OR APPROVED EQUAL. IN ADDITION TO TRACER TAPE, INSTALL 14 GAUGE HEAVY DUTY DIRECT BURY COATED COPPER WIRE (PAIGE "UF" SINGLE CONDUCTOR OR EQUAL), WRAPPED AROUND THE PIPE, BROUGHT UP AND TIED OFF AT VALVE BODY. ALL WIRE CONNECTIONS SHALL USE WIRE NUTS AND A DBR SPLICE KIT, MANUFACTURED BY 3-M OR APPROVED EQUAL. ALL LOCATOR WIRE FOR SERVICE PIPE SHALL BE CONNECTED TO THE LOCATOR WIRE ON THE WATER MAIN. 8.PROVIDE TRAFFIC CONTROL PLAN(S) AS REQUIRED IN ACCORDANCE WITH MUTCD. 9.ALL WATER MAINS SHALL BE STAKED FOR GRADES AND ALIGNMENT BY AN ENGINEERING OR SURVEYING FIRM CAPABLE OF PERFORMING SUCH WORK. 10.ALL SERVICE LINE LOCATIONS SHALL BE MARKED ON THE FACE OF THE CURB WITH AN EMBOSSED "W" 1/4 INCH INTO CONCRETE. 11.CALL UNDERGROUND LOCATE AT 1-800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATIONS. 12.THE CITY WILL BE GIVEN 72 HOURS NOTICE PRIOR TO SCHEDULING A SHUTDOWN. WHERE CONNECTIONS REQUIRE "FIELD VERIFICATION", CONNECTION POINTS WILL BE EXPOSED BY CONTRACTOR AND FITTINGS VERIFIED 48 HOURS PRIOR TO DISTRIBUTING SHUT-DOWN NOTICES. 13.AT ANY CONNECTION TO AN EXISTING LINE WHERE A NEW VALVE IS NOT INSTALLED, THE EXISTING VALVE MUST BE PRESSURE TESTED TO CITY STANDARDS PRIOR TO CONNECTION. IF AN EXISTING VALVE FAILS TO PASS THE TEST, THE CONTRACTOR SHALL MAKE THE NECESSARY PROVISIONS TO TEST THE NEW LINE PRIOR TO CONNECTION TO THE EXISTING SYSTEM OR INSTALL A NEW VALVE. 14.AFTER COMPLETION OF ALL ITEMS SHOWN ON THESE PLANS AND BEFORE ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL OBTAIN A “PUNCH LIST” PREPARED BY THE CITY’S INSPECTOR DETAILING REMAINING ITEMS OF WORK TO BE COMPLETED. ALL ITEMS OF WORK SHOWN ON THESE PLANS SHALL BE COMPLETED TO THE SATISFACTION OF THE CITY PRIOR TO ACCEPTANCE OF THE WATER SYSTEM AND PROVISION OF WATER SERVICE. 15.A COPY OF THESE APPROVED PLANS AND APPLICABLE CITY DEVELOPER SPECIFICATIONS AND DETAILS SHALL BE ONSITE DURING CONSTRUCTION. 16.ANY REVISIONS MADE TO THESE PLANS MUST BE REVIEWED BY THE DEVELOPER’S ENGINEER AND THE CITY OF YELM PRIOR TO ANY IMPLEMENTATION IN THE FIELD. THE CITY SHALL NOT BE RESPONSIBLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. GENERAL NOTES (WATER MAIN INSTALLATION) 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-WATR-DETL.dwg C3.3 11 WATER NOTES AND DETAILS Preliminary 10/09/2024 8:56:13 AM DATE: April 17, 2024 FILENAME: \\ahbl.com\data\PROJECTS\2022\2220471\10_CIV\CAD\_OFFSITE\2220471-SH-WATR-DETL.dwg C3.4 12 WATER NOTES AND DETAILS 1 2 3 4 TEL FAX www.ahbl.comWEBTELFAXwww.ahbl.comWEBTELFAXwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 16 JMWGCHMCH 10/8/2024 PERMIT SET 2210919.10 P.O. BOX 73790 PUYALLUP, WA 98373-0790 COPPER RIDGE, LLC THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS A PORTION OF THE SE 1/4 OF THE NE 1/4 OF SEC. 23 , AND A PORTION OF THE SW 1/4 OF THE NW 1/4 OF SEC. 24 TWN. 17 N., RGE. 1 E., W.M., CITY OF YELM, THURSTON COUNTY, WASHINGTON THE SUMMIT AT THOMPSON CREEK OFFSITE IMPROVEMENTS Know what's below. before you dig.Call R APPLICATION # 2024.00XX Preliminary 10/09/2024 8:56:13 AM