2021.0028 MU Civil Eng Approval LTR 10.19.2021
Page 1 of 2
October 19, 2021
Jerry Schuur
Schuur Brothers Construction
9709 124th Street E
Puyallup, WA 98371
RE: Civil Engineering Approval – Tahoma Blvd Apts (Application # 2021.0349.CI0011)
City of Yelm Project No. MU 2021.0028
Location: 15035 Berry Valley Rd SE Parcel # 21724420200
Dear Mr. Schuur:
The City of Yelm has completed the final review of the YCS Bus Facility Expansion located o n
Parcel 21724420200. Your application included:
Civil Plans (stamped by J. Matthew Weber, PE)
Landscape Plans (stamped by Katherine Owens, LSA)
Stormwater Site Plan (certified by J. Matthew Weber, PE)
Construction Stormwater Pollution Prevention Plan
Operations & Maintenance Manual
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the
DOE Stormwater Manual and general standards of civil engineering practice. This letter and the
signed construction drawings serve as your approval for construction. The following items need
to be addressed during the construction process.
1. You must schedule a preconstruction meeting with the City and its inspectors before
your construction begins. Prior to preconstruction meeting, provide the City with an
updated Construction SWPPP with the CESCL and on-site contact information.
2. Temporary Erosion Control Measures may not be limited to what is shown on the plans.
If adverse weather is incurred during construction addit ional erosion measure may be
required.
3. A request from the engineer of record must be presented for any changes requested to
the plans.
4. The engineering review invoice must be paid in full before the preconstruction meeting.
Page 2 of 2
5. Prior to the installation of lights not shown on civil engineering plans, submit
illumination plans that meets the requirements of the City of Yelm Municipal Code
Section 18.59.050.
At the time of project closeout the improvements will require final inspection / acceptance
before a final Certificate of Occupancy can be issued by the Building Official. This final
inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on
yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following
documents will be uploaded as required through this form;
1. As-Build Plans
2. Engineer Construction Report – Stormwater Facilities
3. Applicable O/M Manuals
4. Construction Inspection & Testing Logs
5. Special Test Results & Reports
If you have any additional questions or comments please do not hesitate to call or contact me
at derekm@yelmwa.gov or call me at (253) 278-2937.
Respectfully
City of Yelm Public Service Department - Engineering
Derek M. McCoy, PE
Civil Review Engineer
Cc: Sheri Greene, PE – AHBL Engineers, Planners, & Surveyors
Matt Weber, PE – AHBL Engineers, Planners, & Surveyors
Katherine Owens, LSA – Nature by Design, Inc