Loading...
WM 03705-1003 Yelm, WA - CAPXREF3E E E E EE 1 1 2 2 3 3 4 4 5 5 6 67 8 8 9 9 10 10 11 11 12 12 13 13 A A B B C C D D E E F F G G H H J J K K 1 D1F1 1 1 FP1 1 BASR1 1 R1 t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.T1 TITLE SHEET WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM SCOPE OF WORK SUMMARY NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST VENDORS IN IDENTIFYING EQUIPMENT NEEDS. IT IS NOT INTENDED FOR USE BY CONTRACTOR TO CAPTURE ALL SCOPE ISSUES. REFER TO PLANS AND SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL INFORMATION. CODE COMPLIANCE NOTE TO BIDDING CONTRACTORS THE AWARDED CONTRACTOR SHALL BE RESPONSIBLE FOR THE ENTIRE SCOPE OF WORK INDICATED ON THESE PLANS, THE ASSOCIATED SPECIFICATIONS AND WALMART SCOPE OF WORK DOCUMENT. THIS CAPITAL EXPENDITURE SHALL BE COMPLETED AS A "TURN KEY" PROJECT BY THE AWARDED CONTRACTOR AND SHALL INCLUDE BUT NOT LIMITED TO ALL SHEETS ON THIS PRINT: HVAC, REFRIGERATION, PLUMBING, ELECTRICAL EMS CONTROLS SYSTEMS, ARCHITECTURAL AND STRUCTURAL DISCIPLINES. CONSTRUCTION PHASING GENERAL REQUIREMENTS 1 THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE BASED ON LIMITED INFORMATION PROVIDED BY WALMART AND A LIMITED SITE OBSERVATION SURVEY; THE DESIGN PROFESSIONAL CANNOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE EXISTING CONDITIONS ILLUSTRATED. 2 THE CONTRACTOR IS TO INSPECT THE STORE PRIOR TO COMMENCING WITH ANY WORK AND NOTIFY THE WALMART MECHANICAL CONSTRUCTION MANAGER OF ANY DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING CONDITIONS. 3 ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL GOVERNING BUILDING CODE, NATIONAL ELECTRIC CODE, ADA-ADAAGS, OSHA REGULATIONS, AND ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION. 4 THE CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS. THE FAILURE TO ACQUAINT HIMSELF WITH ALL DRAWINGS AND SPECIFICATIONS DOES NOT RELIEVE THE CONTRACTOR'S RESPONSIBILITY OF PERFORMING HIS WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED DUE TO FAILURE TO FAMILIARIZE WORKERS WITH ALL DRAWINGS AND SPECIFICATIONS. 5 THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM WALMART PREMISES. 6 ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS DURING THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE. CONTRACTOR SHALL PAY WALMART THE COST FOR ALL DAMAGED MERCHANDISE. 7 THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING, HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT. CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES WITH WALMART HVAC/REFRIGERATION ADMINISTRATOR. CONTRACTOR SHALL PROVIDE EITHER ON-SITE STORAGE CONTAINERS, COORDINATE EQUIPMENT LAYDOWN AREA ON-SITE, AND/OR OFF-SITE STORAGE FOR OWNER FURNISHED EQUIPMENT AND ANY OTHER CONSTRUCTION ITEMS. CONTRACTOR SHALL COORDINATE LOCATION OF ANY ON-SITE STORAGE CONTAINERS AND/OR EQUIPMENT LAYDOWN AREA WITH WALMART STORE MANAGEMENT PRIOR TO PLACEMENT. CONTRACTOR IS RESPONSIBLE FOR SECURITY AND CONDITION OF OWNER FURNISHED EQUIPMENT KEPT IN STORAGE AND SHALL PROVIDE PERSONNEL TO RECEIVE AND MOVE EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS IN A TIMELY MANNER. 8 THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE BUILDING SECURE OF PERSONS, ENVIRONMENTAL ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM THE WALMART STORE MANAGER PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL. 9 THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR IN THE NEW ADDITION. 10 REMOVE ANY EXISTING ITEMS, SERVICES, SIGNAGE, FINISHES/OR SURFACES AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. 11 PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES. 12 REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS SHOWN OR NOT SHOWN ON THE DRAWINGS. 13 RESET EXISTING EQUIPMENT OR RELATED ITEMS INCLUDING SIGNAGE AS REQUIRED FOR PROPER OPERATION. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH, AND/OR RE-PAINT AS NECESSARY TO BLEND WITH ADJACENT SURFACES. 14 CONSULT WALMART MECHANICAL CONSTRUCTION MANAGER FOR COMPLETE APPLICABLE SCOPE OF WORK. THE CONTRACTOR SHALL MAINTAIN THE REQUIRED NUMBER OF EXITS WITHIN THE STORE. MAINTAIN EXIT INFORMATION SAFETY BOARD SAFETY BOARDS AND OR POSTED CONSTRUCTION SCHEDULES ARE REQUIRED ON CERTAIN CAP-X PROJECTS DEPENDING ON THE PROJECT TYPE. CAP-X PROJECTS WILL BE LISTED AS ONE OF THE FOLLOWING TYPES: COMBO, REF-1, REF-2, REF-3, REF-4, HVAC-1, HVAC-2, HVAC-3, OR HVAC-4. REF-1 / REF-2 / COMBO: INFORMATION SAFETY BOARD REQUIRED W/ POSTED CONSTRUCTION SCHEDULE REF-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED CONSTRUCTION SCHEDULE REF-4: NOT REQUIRED HVAC-1: INFORMATION SAFETY BOARD REQUIRED W/ POSTED CONSTRUCTION SCHEDULE HVAC-2: INFORMATION SAFETY BOARD REQUIRED W/ POSTED CONSTRUCTION SCHEDULE HVAC-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED CONSTRUCTION SCHEDULE HVAC-4: NOT REQUIRED REFER TO THE MECHANICAL CONSTRUCTION PROJECT SPECIFICATION MANUAL SECTION 01500 -TEMPORARY FACILITIES AND CONTROLS FOR COMPLETE TEMPORARY FACILITY AND CONTROLS FOR COMPLETE TEMPORARY FACILITY REQUIREMENTS. PHASING NOTES ARE INTENDED TO BE USED AS A GENERAL GUIDE TO THE CONSTRUCTION AND PHASING OF PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL AREAS OF PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER AND WALMART STORE MANAGER PRIOR TO AND DURING CONSTRUCTION. ALL DRAWINGS ARE IN COMPLIANCE WITH THE FOLLOWING CODES: THE INTERNATIONAL BUILDING CODE, 2021 EDITION; AMENDED BY CHAPTERS 51-50 AND 51-51 WAC THE INTERNATIONAL FIRE CODE, 2021 EDITION; AMENDED BY CHAPTER 51-54A WAC THE INTERNATIONAL MECHANICAL CODE, 2021 EDITION; AMENDED BY CHAPTER 51-52 WAC THE NATIONAL ELECTRICAL CODE, 2023 EDITION THE WASHINGTON STATE ENERGY CODE, 2021 EDITION USE AND OCCUPANCY GROUP: M CONSTRUCTION TYPE: V BUILDING AREA: UNCHANGED OCCUPANT LOAD: UNCHANGED FIRE PROTECTION: YES REFRIGERATION CAP-X REF3 STORE #3705 - 1003 YELM, WA USMV-043985 1/32" = 1'-0" 1 KEY PLAN THIS IS A CAP-X REF PROJECT. REFER TO SPECIFICATIONS SECTION 1500 FOR ADDITIONAL INFORMATION REGARDING REQUIRED JOB SITE TEMPORARY FACILITIES. THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1/2 (HALF) SIZE" DOCUMENTS. SCALES SHOWN APPLY TO ORIGINAL "FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE DRAWINGS, FIELD VERIFY ALL DIMENSIONS. SIGNS AND EMERGENCY LIGHTING AT ALL TIMES, AS REQUIRED BY THE LOCAL BUILDING OFFICIAL. 15 WALMART SHALL OCCUPY THE BUILDING DURING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WITH WALMART STORE MANAGER AND THE WALMART MECHANICAL CONSTRUCTION MANAGER ALL CONSTRUCTION PROCEDURES WHICH WILL INTERFERE WITH THE NORMAL DAILY OPERATIONS OF THE STORE. 16 THE CONTRACTOR SHALL OBTAIN PERMISSION FROM WALMART FOR ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH APPROPRIATE FORCES. 17 ALL CAP-X/SPECIAL REFRIGERATION PROJECTS ARE TO BE BID AS NIGHT WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS TO BE CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK MAY BE ALLOWED DURING REGULAR WORKING HOURS TO FACILITATE COMPLETION SCHEDULES. WORK WILL ONLY BE PERMITTED DURING REGULAR WORKING HOURS WITH THE WALMART STORE MANAGEMENT'S AND/OR WALMART MECHANICAL CONSTRUCTION MANAGER'S PERMISSION. WORK TO BE PERFORMED ON THE EXTERIOR OF THE BUILDING, ROOFTOP, BACK ROOM, BEHIND DUST WALLS, AND WORK THAT DOES NOT SIGNIFICANTLY INTERFERE WITH STORE OPERATIONS MAY BE ALLOWED WITH THE WALMART STORE MANAGEMENT'S AND/OR WALMART MECHANICAL CONSTRUCTION MANAGER'S PERMISSION. THE CONTRACTOR SHALL PAY FOR ADDITIONAL SECURITY PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS REQUIRED BY WALMART STORE MANAGEMENT. CONTRACTOR SHALL PROVIDE ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS REQUIRED TO MAINTAIN A SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT NIGHT. THE CONTRACTOR SHALL PREPARE, AND DELIVER TO WALMART STORE MANAGEMENT, A SCHEDULE OF WORK FOR THE ENTIRE PROJECT SCOPE OF WORK. THIS SCHEDULE WILL INCLUDE ALL PHASES OF WORK TO BE PERFORMED AND SHALL LIST THE START AND COMPLETION TIMES FOR EACH PHASE OF WORK. THE CONTRACTOR SHALL UPDATE THIS SCHEDULE WEEKLY AS CONSTRUCTION PROGRESSES. 18 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER OF RECORD ON DEVIATIONS IN INSTALLATION AND CONSTRUCTION OF FIXTURES, PIPING, AND OTHER ITEMS SPECIFIED IN THESE CONSTRUCTION DOCUMENTS. 19 SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS DURING NON-CONSTRUCTION HOURS. PROVIDE ALL NECESSARY TEMPORARY BARRIERS AND COVERS CAPABLE OF WITHSTANDING SHOPPING CART TRAFFIC AND CUSTOMER INTERACTION TO PREVENT CUSTOMER ACCESS OR EXPOSURE TO ANY CONSTRUCTION RELATED HAZARDS. COORDINATE WITH WALMART STORE MANAGER. 20 FURNISH AND INSTALL SEISMIC BRACING BASED ON APPROPRIATE SEISMIC ZONE REQUIREMENTS PER SMACNA PUBLISHED SEISMIC DETAILS AND LOCAL AND NATIONAL CODES. CONTRACTOR'S RESPONSIBILITY INCLUDES STRUCTURAL ENGINEER'S CERTIFICATION ON DETAILS SUBMITTED FOR PERMITTING. 21 CONTRACTOR SHALL PAINT ALL NEW CONDUIT, DUCT, PLUMBING PIPING, SPRINKLER PIPING, AND SUPPORTS EXPOSED TO SALES FLOOR WITHOUT EXCEPTIONS. MATCH CEILING OR ADJACENT WALL COLOR (WHERE APPLICABLE). CONDUIT AND PIPING SHALL BE PAINTED PRIOR TO INSTALLATION. 22 REFER TO SPECIFICATION SECTIONS 01600 -PRODUCT REQUIREMENTS AND APPENDIX A -PRODUCTS AND WORK BY OWNER OR SEPARATE CONTRACTOR. THESE SECTIONS INCLUDE SPECIFIC INFORMATION REGARDING ITEMS AND SERVICES TO BE FURNISHED AND INSTALLED BY INDIVIDUALS OTHER THAN THE CONTRACTOR. 23 REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO WALMART AND THE ENGINEER PRIOR TO MAKING ANY STRUCTURAL MODIFICATIONS OR ORDERING OF ANY MATERIALS. 24 IT IS IMPERATIVE THAT THE ROOF FRAMING, DECKING AND ROOFING SYSTEM BE COMPLETED IMMEDIATELY UPON THE DEMOLITION OF ANY PORTION OF AN EXTERIOR WALL OR MAKING ANY OPENINGS IN THE ROOF TO ELIMINATE POTENTIAL WATER DAMAGE OR MOISTURE INFILTRATION. THE CONTRACTOR SHALL KEEP THE BUILDING WATERTIGHT AT ALL TIMES. 25 THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS OF THE ENGINEER FOR VERIFICATIONS, RESPONSES, AND SUBMISSIONS. ALL ADJACENT BUILDINGS (IF APPLICABLE) SHALL REMAIN IN SERVICE DURING DEMOLITION/CONSTRUCTION. 26 MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY STREETS TO BE CLEANED IMMEDIATELY. 27 BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. PERMITTING REQUIREMENTS AND CONTACT INFO UPON NOTIFICATION OF CONTRACT AWARD, CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD'S PERMIT COORDINATOR REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO CONTACTING PERMIT COORDINATOR TO VERIFY BUILDING PERMIT STATUS. WHEN NECESSARY, THE CONTRACTOR SHALL DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION PERMITS. UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO COMPLETE ADDITIONAL PERMITTING REQUIREMENTS FOR OR SUBMIT ADDITIONAL PLAN SETS FOR REVIEW TO ADDITIONAL LOCAL, COUNTY, STATE, AND/OR FEDERAL AUTHORITIES WHICH MAY NOT BE LOCATED WITHIN THE LOCAL AHJ’S OFFICES. SUBMIT ANY PLAN REVIEW COMMENTS OR QUESTIONS THROUGH THE WALMART APPROVED RFI PROCESS. CONTRACTOR SHALL OBTAIN PERMIT(S) THE GREATER OF 10 WORKING DAYS OR 2 WEEKS PRIOR TO THE START OF CONSTRUCTION TO AVOID UNNECESSARY DELAYS AND ADDITIONAL ENGINEERING FEES. CONTRACTOR SHALL PICK UP AND PAY FOR ANY REQUIRED PERMIT(S) AND ALL ANCILLARY FEES. COST OF REQUIRED PERMIT(S) WILL BE DETERMINED AT THE TIME OF PERMIT ISSUANCE. EXACT AMOUNT SHALL BE COORDINATED WITH THE WALMART CONSTRUCTION MANAGER. CONTRACTOR SHALL EMAIL A COPY OF PERMIT(S) WHEN OBTAINED TO PERMIT COORDINATOR LISTED BELOW. CONTRACTOR SHALL UPLOAD A COPY OF PERMIT(S) WHEN OBTAINED TO EVOCO WORKSPACE SUPPORT FOLDER. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL EMAIL APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO PERMIT COORDINATOR LISTED BELOW. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL UPLOAD APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO EVOCO WORKSPACE SUPPORT FOLDER. CONTACT EMAIL PHONE VENDOR CONTACT REQUIREMENTS CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERIES DATES/TIMES WITH EVERY VENDOR FURNISHING EQUIPMENT OR SERVICES, OR TO CHANGE ANY DATES OR DELIVERIES. CONTRACTOR MUST CONTACT WALMART CONSTRUCTION MANAGER LISTED BELOW. VENDOR CONTACT INFORMATION IS AVAILABLE IN THE GCC EQUIPMENT PLATFORM AND IN THE PROJECT SPECIFICATIONS. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. PROJECT VENDORS WALMART CONTACT LIST CONTACT PHONE AND/OR EMAIL TITLE STORE MANAGER CONSTRUCTION MANAGER WALMART PROJECT MANAGER PROJECT SITE ADDRESS STREET:17100 STATE ROUTE 507 SE CITY:YELM STATE:WA COUNTY:THURSTON COUNTY KELLY BOAZ O: 479-204-1494 C: 479-644-7338 kboaz@walmart.com ICE CREAM FREEZER SCOPE OF WORK: REPLACE ICE CREAM FREEZER . ADD HCR DOOR. REPLACE ICE CREAM FREEZER DOOR ADD LEAK DETECTION. KPS GLOBAL LLC RIDG-U-RACK INC COPELAND COLD CHAIN LP HONEYWELL INTERNATIONAL INC PARKER HANNIFIN PROGASKET SOLUTIONS LLC ERIC MILLS Eric.Mills@hargis.biz 206-436-0413 INDEX OF DRAWINGS REFERENCE SHEET NUMBER SHEET NAME T1 TITLE SHEET N1 RESPONSIBILITY MATRICES N2 EDGE PROTECTION FIXTURE SHEET NUMBER SHEET NAME D1 DEMOLITION PLAN F1 FIXTURE PLANS AND SCHEDULES FIRE PROTECTION SHEET NUMBER SHEET NAME FP1 OVERALL FIRE SPRINKLER PLAN FP2 ENLARGED FIRE SPRINKLER PLAN REFRIGERATION SHEET NUMBER SHEET NAME BASR1 BUILDING AUTOMATION SYSTEM BASR2 BUILDING AUTOMATION SYSTEM BASR3 BUILDING AUTOMATION SYSTEM R1 REFRIGERATION PLAN AND PIPING SCHEDULES R2 REFRIGERATION SCHEDULES AND DETAILS R3 REFRIGERATION DETAILS R4 REFRIGERATION SUBMITTALS SR1 SEISMIC RESTRAINT ELECTRICAL CANDICE SINGH 360-400-8050 store-mgr.s03705@stores.us.wal- mart.com SHEET NUMBER SHEET NAME RE1 REFRIGERATION ELECTRICAL PLAN BILL PARDUE C: 916-300-4294 bpardue@mksvs.net ISSUE BLOCK t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION N1 RESPONSIBILITY MATRICES WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM MC MECHANICAL CONTRACTOR AND SUB-CONTRACTORS WTC WATER TREATMENT CONTRACTOR AES SUPPLIER OF AHU ADAPTER CURBS, RTU ADAPTER CURBS AND WALMART'S EQUIPMENT SALVAGE PARTNER WMT WALMART PS WALK-IN BOX PANEL SUPPLIER OEM ORIGINAL RACK EQUIPMENT MANUFACTURER, ORIGINAL CASE EQUIPMENT MANUFACTURER, AHU MANUFACTURER, RTU MANUFACTURER EMS EMS VENDOR GC GENERAL CONTRACTOR AND SUB-CONTRACTORS RC REFRIGERATION CONTRACTOR AND SUB-CONTRACTORS ABBREVIATION DESCRIPTION MATRIX LEGEND 60 LOOSEN AND RE-TIGHTEN OR REMOVE AND RE-INSTALL UTILITIES (CONDENSATE PIPING, CONDUITS, J-BOX, FIRE SUPPRESSION, ETC.) AS REQUIRED IN ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT GC RC GC RC GC RC 59 CLEAR SITE OF ALL TOOLS, UNUSED INSTALLATION MATERIALS AND TRASH. RC/PS RC/PS RC/PS RC/PS RC/PS RC/PS 58 SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS AS REQUIRED BY THE END OF COMMISSIONING WEEK. COMPLETED VERISAE FORMS ARE TO BE EMAILED TO MCEQUIP@WALMART.COM.RC RC RC RC RC RC 57 AFTER ALL CHANGES HAVE BEEN MADE TO A RACK, REMOVE ANY COMPRESSOR SUCTION FILTERS / SOCKS AND REPLACE THE RACK LIQUID LINE FILTERS. LEAVE THE OLD FILTERS / DRIERS IN THE RACK HOUSE TO BE INSPECTED BY THE MCM. RC RC RC RC RC RC 56 SHUT DOWN AND ARRANGE FOR THE REMOVAL OF ANY TEMPORARY, REFRIGERATED STORAGE. WMT WMT WMT WMT WMT WMT 55 REMOVE THE OLD LEGENDS AND INSTALL REPLACEMENT LEGENDS AS SUPPLIED BY THE EOR / OEM. PROVIDE TYPEWRITTEN SCHEDULES FOR ANY AFFECTED ELECTRICAL PANELS.RC RC RC RC RC RC 54 HAUL OFF ALL OF THE OLD WALK-IN PANELS FROM SITE (IF APPLICABLE). NOTE: QUICK REFRIGERATION TO HAUL OFF ALL WALK-IN BOX PANELS FROM TEXAS PROJECTS.GC/PS RC/PS GC/PS RC/PS GC/PS RC/PS 53 RESTOCK PRODUCT BACK INTO THE WALK-IN BOX. WMT WMT WMT WMT WMT WMT 52 HAND OVER THE COMPLETED WALK-IN BOX TO THE STORE. (WALK-IN BOX MUST BE CLEAN, AT OPERATIONAL TEMPERATURE AND FULLY FUNCTIONAL)GC RC GC RC GC RC 51 CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED AND MECHANICAL JOINTS INSTALLED OR DISTURBED DURING THE PROJECT.RC RC RC RC RC RC 50 INSTALL CIRCUIT LABELS TO THE WALK-IN BOX, CONTROLLERS AND EVAPORATORS AS REQUIRED. RC RC RC RC RC RC 49 ANCHOR RACKING AS INDICATED ON THE PLANS. GC RC GC RC GC RC 48 INSTALL SHELVING / RACKING AS INDICATED ON THE PLANS. RE-INSTALL RACKING AS NECESSARY. WMT RC WMT RC WMT RC 47 REINSTALL / RECOMMISSION THE APX REPEATER DEVICE.WMT WMT WMT WMT WMT WMT 46 NOTIFY WMT BUILDING CONTROLS THAT THE WALK-IN BOX IS RUNNING AND ONLINE. RC RC RC RC RC RC 45 FURNISH CONTROLS SUPPORT TO THE INSTALLING CONTRACTOR. N/A N/A N/A N/A EMS EMS 44 CARRY OUT ANY CONTROLS PARAMETER CHANGES AND PERFORM REMOTE CHECKOUT. N/A N/A N/A N/A RC RC 43 CARRY OUT ANY CONTROLS PARAMETER CHANGES. N/A N/A N/A N/A EMS EMS 42 FIELD-INSTALL AND START-UP HCR AIR DOORS AS REQUIRED. N/A N/A N/A N/A PS PS 41 FURNISH HCR AIR DOOR AS REQUIRED. N/A N/A N/A N/A PS/WMT PS/WMT 40 COMMISSION THE EVAPORATORS, VALVES AND CONTROLS AS REQUIRED. CHECK AND ADJUST MECHANICAL TXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR SETTINGS PER LEGEND.N/A N/A N/A N/A RC RC 39 SWITCH ON THE REFRIGERATION, LIGHTING AND OTHER SYSTEMS WITHIN THE WALK-IN. RC RC RC RC RC RC 38 INSTALL / MODIFY ALL UTILITIES FOR FINAL BOX CONFIGURATION. (CONDENSATE PIPING, CONDUITS, J-BOX, LIGHTING, FIRE SUPPRESSION ETC.) INSTALL CONDUIT FOR APX CABLING. SEAL ALL PENETRATIONS PER SPECS GC RC GC RC GC RC 37 INSTALL AND COMMISSION REFRIGERANT LEAK DETECTION SYSTEM AS NOTED ON THE PROJECT PRINTS. N/A N/A N/A N/A RC RC 36 EVACUATE AND PRESSURE TEST THE EVAPORATORS AND ANY PIPING MODIFIED DURING THE WORK. N/A N/A N/A N/A RC RC 35 INSTALL THE EVAPORATORS (MECHANICAL, ELECTRICAL, PLUMBING AND CONTROLS) AND CONTROL PANELS AS DETAILED ON THE PRINTS.N/A N/A N/A N/A RC RC 34 INSTALL PROTECTION DEVICES AS INDICATED ON THE PRINTS. REINSTALL ANY EXISTING PROTECTION DEVICES OR STRUCTURES AS REQUIRED. ENSURE THAT ANY UNDISTURBED PROTECTION DEVICES ARE FIXED SECURELY. GC RC GC RC GC RC 33 REATTACH ANY ITEMS PREVIOUSLY MOUNTED TO THE EXTERIOR OF THE WALK-IN BOX THAT WERE TEMPORARILY SUPPORTED DURING THE WALK-IN BOX REPLACEMENT. (FOR EXAMPLE PANEL BOARDS, EMS BACKBOARDS ETC.) N/A N/A N/A N/A GC RC 32 RETRIEVE ANY FALL PROTECTION NETTING FROM THE ROOF MEMBERS, AND REATTACH IT TO THE TOP OF THE WALK-IN BOX AS DESCRIBED ON THE PRINTS.N/A N/A N/A N/A GC RC 31 INSTALL NEW WALK-IN BOX. HANG THE DOOR AND ENSURE THAT ALL HARDWARE FUNCTIONS CORRECTLY. N/A N/A N/A N/A PS PS 30 REPLACE THE WOODEN THERMAL BREAKS AS NECESSARY. N/A N/A N/A N/A GC RC 29 PROVIDE SUPPORT FOR ANY ITEMS THAT MAY BE MOUNTED TO THE EXTERIOR OF THE WALK-IN BOX THAT WILL REMAIN IN SERVICE DURING THE BOX REPLACEMENT. (FOR EXAMPLE PANEL BOARDS, EMS BACKBOARDS ETC.) N/A N/A N/A N/A GC RC 28 DISCONNECT ANY FALL PROTECTION NETTING FROM THE TOP OF THE WALK-IN BOX. LEAVING IT ATTACHED TO THE ROOF MEMBERS, STOW IT OUT OF THE WAY FOR FUTURE RE-USE. DEMOLISH AND REMOVE THE EXISTING WALK-IN BOX AS NOTED ON THE PROJECT PRINTS. N/A N/A N/A N/A PS PS 27 CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR RELINING THE BOX THAT IS BEING REPAIRED. RE-LINE THE WALK-IN BOX AND BATTEN / SEAL THE CEILING JOINTS WITHIN THE BOX AFFECTED.N/A N/A PS PS N/A N/A 26 CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR BATTEN / SEALING OF THE WALL JOINTS WITHIN THE BOX THAT IS BEING REPAIRED. CARRY OUT THE BATTEN AND SEAL PROCESS.PS PS N/A N/A N/A N/A 25 FILL ANY GAPS IN THE PANEL JOINTS WITH SEALANT OR EXPANDABLE FOAM PRIOR TO TAPING THE JOINT. PS PS PS PS N/A N/A 24 REMOVE THE REFRIGERATION EVAPORATOR(S) FROM THE AFFECTED WALK-IN BOX AS NEEDED. N/A N/A GC RC GC RC 23 REMOVE THE APX REPEATER FROM THE WALK-IN BOX THAT IS BEING IMPACTED. STORE THE DEVICE FOR REUSE FOLLOWING COMPLETION OF THE WALK-IN WORK.GC RC GC RC GC RC 22 REMOVE ALL UTILITIES (CONDENSATE PIPING, CONDUITS, J-BOX, LIGHTING, FIRE SUPPRESSION ETC.) IN ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT.N/A N/A GC RC GC RC 21 REMOVE ANY PROTECTION DEVICES / STRUCTURES THAT W ILL IMPEDE THE COMPLETION OF THE WORK. GC RC GC RC GC RC 20 REMOVE ALL OF THE RACKING FROM INSIDE THE WALK-IN BOX THAT IS BEING IMPACTED. WMT RC WMT RC WMT RC 19 SHUT DOWN THE WALK-IN BOX THAT IS BEING IMPACTED. NOTE: ALLOW LOW TEMP ROOMS TO "DEFROST" FOR A PERIOD OF 72 HOURS TO ENSURE ALL ICE HAS MELTED FROM THE PANELS. ICE MELT NEEDS TO BE KEPT CLEARED THROUGHOUT THIS TIME TO ENSURE THAT WATER IS NOT REABSORBED BY THE PANELS. RC RC RC RC RC RC 18 REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE WALK-IN BOX THAT IS BEING IMPACTED. WMT WMT WMT WMT WMT WMT 17 NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISE THEM WHICH SYSTEM AND WHICH WALK-IN BOX WILL BE IMPACTED BY THE WORK.RC RC RC RC RC RC 16 NOTIFY THE EMS VENDOR 24 HRS. IN ADVANCE OF THE WORK - TELL THEM WHICH WALK-IN BOXES ARE BEING IMPACTED.RC RC RC RC RC RC 15 FURNISH TEMPORARY REFRIGERATED STORAGE AS NECESSARY. WMT WMT WMT WMT WMT WMT 14 OBTAIN HOT WORK PERMITS AS REQUIRED. GC RC GC RC GC RC 13 COORDINATE THE INSTALLATION TIME WITH STORE MANAGEMENT. GC RC GC RC GC RC 12 PREFABRICATE AS MUCH OF THE PIPE WORK AND ELECTRICAL CONDUIT AS POSSIBLE AND MOUNT ANY DEVICES IN ORDER TO REDUCE THE AMOUNT OF "DOWN TIME" NEEDED TO COMPLETE THE INSTALLATION.RC RC RC RC RC RC 11 TERMINATE POWER CABLES TO THE EVAPORATOR CONTROL PANEL. RC RC RC RC RC RC 10 FURNISH AND INSTALL ALL ELECTRICAL POWER CABLING FROM POWER SOURCE TO THE EVAPORATOR CONTROL PANEL IF NECESSARY.GC RC GC RC GC RC 9 INSTALL AND TERMINATE CONTROLS WIRING (24 VOLTS OR LESS) AS DETAILED ON THE PRINTS. RC RC RC RC RC RC 8 FURNISH ALL CONTROLS CABLING AS NECESSARY TO COMPLETE THE WORK. (24 VOLTS OR LESS) EMS EMS EMS EMS EMS EMS 7 FIELD-INSTALL ALL REFRIGERATION VALVES. RC RC RC RC RC RC 6 FURNISH ALL ISOLATION VALVES. RC RC RC RC 5 FURNISH ALL FIELD-INSTALLED REFRIGERATION VALVES. OEM/WMT OEM/WMT OEM/WMT OEM/WMT OEM/WMT OEM/WMT 4 FURNISH AND INSTALL ALL (REFRIGERANT AND DRAIN) PIPING. RC RC RC RC RC RC 3 DEPENDING ON THE SCOPE OF WORK, FURNISH EVAPORATOR CONTROL PANELS EMS/WMT EMS/WMT EMS/WMT EMS/WMT EMS/WMT EMS/WMT 2 DEPENDING ON THE SCOPE OF WORK, FURNISH EVAPORATORS AS REQUIRED. OEM/WMT OEM/WMT OEM/WMT OEM/WMT OEM/WMT OEM/WMT 1 DEPENDING ON THE SCOPE OF WORK, FURNISH BATTEN AND SEAL, RELINE OR WALK-IN PANELS MATERIALS. PS/WMT PS/WMT PS/WMT PS/WMT PS/WMT PS/WMT REMODEL CAPEX REMODEL CAPEX REMODEL CAPEX BATTEN AND SEAL RELINE REPLACE EVAPORATOR/BOX# SCOPE OF WORK RESPONSIBLE PARTY ***NOTE*** THIS DOCUMENT IS INTENDED TO DESCRIBE IMPORTANT ELEMENTS OF THIS PROJECT AND TO DEFINE THE RESPONSIBLE PARTIES FOR THIS WORK STREAM. IT IS NOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION OR A COMPLETE SCOPE OF WORK. IT SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL, DETAILED INFORMATION IN THE WALMART REALTY ONE BEST WAY STANDARDS LIBRARY, AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER. WALK-IN BOX PROJECTS ISSUE BLOCK NOTE WALK-IN PANEL NETTING SYSTEM REF SPECS CUT OPENING IN NETTING NO LARGER THAN 1" GREATER THAN PENETRATION LASH NETTING AT ALL CUT PENETRATIONS, REF SPECS ATTACH BOTTOM OF NETTING AT EACH SIDE OF SPLICE WITH #10 x 3" WOOD SCREWS AND #10 WASHERS THROUGH GROMMETS, ADD GROMMETS AS NEEDED REF MEPFR FOR DUCT, CONDUIT, AND PIPING LOCATIONS AND SIZES EXTERIOR WALL EXISTING ROOF SYSTEM EXISTING STRUCTURE SECURELY FASTEN WEB STRAP THROUGH EVERY JOIST PANEL POINT, 6'-0" OC MAX INSTALL NETTING 60º MAX IN RELATION TO HORIZONTAL WALK-IN CEILING PANELS WEB STRAP REF SPEC NET SYSTEM REF SPEC ATTACH BOTTOM NET WEBBING TO WALK-IN PANEL BLOCKING AT 2'-0" OC THROUGH INTEGRAL GROMMETS WITH #10 x 3" WOOD SCREWS AND #10 WASHERS AT 3/4" FROM EDGE OF WALK-IN PANEL WALK-IN PANEL GREATER THAN 2"GREATER THAN 6" SECURELY FASTEN WEB STRAP THROUGH EVERY JOIST PANEL POINT, 6'-0" OC MAX 6 0 . 0 0 ° M A X 6 0 . 0 0 ° M A X 60.00° M AX EXISTING ROOF SYSTEM EXISTING STRUCTURE SECURELY FASTEN WEB STRAP THROUGH EVERY JOIST PANEL POINT, 6'-0" OC MAX INSTALL NETTING 60º MAX IN RELATION TO HORIZONTAL WALK-IN CEILING PANELS WEB STRAP REF SPEC NET SYSTEM REF SPEC ATTACH BOTTOM NET WEBBING TO WALK-IN PANEL BLOCKING AT 2'-0" OC THROUGH INTEGRAL GROMMETS WITH #10 x 3" WOOD SCREWS AND #10 WASHERS AT 3/4" FROM EDGE OF WALK-IN PANEL CEILING AS SCHEDULED WALK-IN PANEL ALTERNATE CONDITION 6 0 . 0 4 ° M A X WHERE NETTING HEIGHT IS LESS THAN 5', GATHER NETTING AT STRUCTURE TO ENSURE FULL TENSION FROM WALK-IN PANEL TO JOIST TYPICAL WEB STRAP ATTACHMENT AT JOIST THROUGH JOIST PANEL POINT CEILING TILES OMITTED FOR CLARITY NET SYSTEM REF SPECS INSTALL NETTING WITHOUT SLACK TOP WEB STRAP AT CORNER FOR LOWER NET TOP WEB STRAP AT CORNER FOR UPPER NET INSIDE CORNER AT SPLIT ELEVATION (TRANSVERSE NET ATTACHMENT) INSIDE CORNER AT SPLIT ELEVATION (PARALLEL NET ATTACHMENT) AT CORNERS PROVIDE ONE WEB STRAP TO TENSION NET AT TOP CHORD AND ONE FROM JOIST PANEL POINT TO FOOTMAN LOOP AT WALK-IN PANEL ATTACH FOOTMAN LOOP WITH (2) #10 x 3" WOOD SCREWS CENTERED ON WOOD BLOCKING 3/4" FROM EDGE OF WALK-IN BOX, PLACE SCREW ATTACHMENT 1" MIN FROM END OF BOX, REF SPEC LOOP WEB STRAP THROUGH EYE BOLT 1/2" SLEEVE ANCHOR WITH 3/8" ROD COUPLING WITH 1 1/2" MIN EMBEDMENT AND A 3/8" EYEBOLT REF SPEC WEAVE CONTINUOUS WEB STRAP THROUGH NETTING AT EACH OPEN END PROVIDING 6" MIN OF NET BEYOND STRAP GATHER NETTING AT CORNERS AND SECURE WITH LASHING TIES, REF SPECS CONTINUOUS WEB STRAP FROM 2" FOOTMAN LOOP AT WALK-IN PANEL THROUGH JOIST PANEL POINT AT ALL INSIDE AND OUTSIDE CORNERS AND NET TERMINATIONS CENTER OPENING IN NETTING WITH OPENING IN CEILING GRID ATTACH BOTTOM NET WEBBING TO WALK-IN PANEL BLOCKING AT 24" OC THROUGH INTEGRAL GROMMETS WITH (1) #10 x 3" WOOD SCREW AND #10 WASHERS 3/4" FROM EDGE OF WALK-IN PANEL P1001 UNISTRUT WHERE REQ'D FOR NET ATTACHMENT, LOCATE WITHIN 3" OF JOIST PANEL POINTS WEAVE CONTINUOUS WEB STRAP THROUGH NETTING AT EACH OPEN END, TYP ATTACH WEB STRAPS TO UNISTRUT USING 5/16" EYEBOLT FASTENED TO UNISTRUT WITH 5/16" NUTS AND WASHERS WALL ANCHOR NOTIFY WALMART PROJECT MANAGER IF ANY EXISTING WALK-IN BOXES DO NOT HAVE EDGE PROTECTION PRESENT AT THE LOCATIONS SHOWN PRIOR TO THE COMMENCEMENT OF THE PROJECT -ADD MISSING EDGE PROTECTION AND COORDINATE WITH AOR TO PROVIDE NECESSARY DETAILS AND SPECS GREATER THAN 6" WALK-IN EDGE WALK-IN AGAINST WALL WALK-IN ADJACENT TO WALK-IN WALK-IN ADJACENT TO COOLER OF A DIFFERENT HEIGHT WALK-IN ADJACENT TO CEILING WALK-IN BOX WALK-IN BOX WALK-IN BOX WALK-IN BOX WALK-IN BOXCEILING TILE WALL NETTING NETTING NETTING NETTING NETTING GREATER THAN 2" GREATER THAN 2" t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION N2 EDGE PROTECTION WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM 1/2" = 1'-0" 4 NETTING PENETRATIONS 3/8" = 1'-0" 5 NET SYSTEM ATTACHMENT PARALLEL TO STRUCTURE 3/8" = 1'-0" 2 NET SYSTEM ATTACHMENT PERPENDICULAR TO STRUCTURE 1/4" = 1'-0" 1 NET SYSTEM ON WALK-IN BOX 1/2" = 1'-0" 3 EDGE PROTECTION EDGE PROTECTION NET SYSTEM SUPPLIER: WALMART APPROVED INSTALLERS: EDGE PROTECTION NET SYSTEM NOTES EDGE PROTECTION NET SYSTEM IS EXISTING TO REMAIN ABOVE WALK-INS BEING REPLACED. CONTRACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE DETACHMENT AND/OR DEMOLITION OF EDGE PROTECTION NET SYSTEM AS NECESSARY FOR DEMOLITION OF WALK-INS PRIOR TO START OF DEMOLITION. CONTRACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE RE-ATTACHMENT AND/OR RE-INSTALLATION OF EDGE PROTECTION NET SYSTEM ABOVE WALK-INS BEING REPLACED AFTER CONSTRUCTION OF WALK-INS IS COMPLETE. EDGE PROTECTION NET SYSTEM IS FURNISHED BY OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER APPROVED INSTALLERS AND OWNER EDGE PROTECTION NET SYSTEM SUPPLIER FOR ACQUISITION OF ANY NEW REQUIRED COMPONENTS. REF SPECIFICATION 13300 FOR EDGE PROTECTION NET SYSTEM. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVING THE EDGE PROTECTION NET SYSTEM WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER. HAINES, JONES, & CADBURY APOLLO JEFF ORNS IL, IN, KY, NC, OH, TN, VA, & WV CAN TIM BARRY CT, DE, MA, MD, ME, NH, NJ, NY, PA, RI, & VT GM NORTHRUP JASON FARMAKIS MI, MN, ND, SD, & WI GREATER SOUTHWEST CONSTRUCTORS JOHN WILKINSON AR, LA, OK, & TX MICHAEL STRAIN BUILDERS SHERI COLVELL AK, AZ, CA, HI, ID, MT, NM, NV, OR, UT, WA, & WY NEWCO BILL BROWN AL, FL, GA, MS, & SC QUAL-SERV JOSH PADGETT CO, IA, KS, MO, & NE (800) 459-7099 WMT@hjcinc.com (479) 601-9484 jeff.orns@apolloretail.com (201) 996-9287 tlbarry@can-usa.net (952) 226-3090 jfarmakis@gmnorthrup.com (817) 596-3513 jwilkinson@centurytel.net (760) 751-5050 Sheri@msbuilders.com (352) 735-3877 bill@newcoconstruction.com (479) 459-6349 jpadgett@qualservsolutions.com ISSUE BLOCK NOTE E E E EE 1 1 2 2 3 3 4 4 G G H H J J ICE CREAM FREEZER GROCERY FREEZER 2.21 TYP 2.32 2.32 DAIRY COOLER 2.20 2.19 C-1 BML220C (REPLACE) EXISTING CONDENSATE HEADER TO REMAIN. REPAIR ANY DAMAGE TO HEADER AFTER WALK-IN REPLACEMENT IS COMPLETE. PROVIDE DUST WALL PROTECTION AT ALL DEMOLISHED WALLS BETWEEN ADJACENT SPACES DURING CONSTRUCTION. 2 D1 CAP CIRCUIT C1 LIQUID AND SUCTION LINES FOR REUSE. 2.32 EXISTING PIPING TO REMAIN. NOT ALL PIPING SHOWN. TYP; UNO. C1 2.272.15 2.27 SALES DEMO AREA ROOF DECK COORDINATE WITH SPECS ANCHOR AT 24" OC 2 x 4 AT 24" OC WALL TO BE REMOVED INSTALL CONT LAYER 6 MIL POLY SHEETS TAPE ALL JOINTS 1/2" CD PLYWOOD 4'-0" x 8'-0" HORIZONTAL PROVIDE 2x4 NAILER AT ALL JOINTS CONTINUE PLYWOOD TO DECK DO NOT USE DUST WALL TO SHORE ROOF JOISTS 6'-0" LOAD BEARING 4'-0" ELSEWHERE NOTES: 1. INSTALL TEMPORARY WALL IN SECTIONS APPROX 40'-0" PER DAY (COORDINATE WITH STORE MANAGER AND WALMART CONSTRUCTION MANAGER) 2. LOCATE VERTICAL 2x4'S AS NOT TO INTERFERE WITH CEILING GRID OR LIGHT FIXTURES 3. LOCATE HORIZONTAL 2x4 AT 2" ABOVE CEILING EXCEPT LIGHT FIXTURE LOCATIONS 4. SCREW PLYWOOD (MAX SPACING 12" OC) PAINT DUST WALLS TO MATCH ADJACENT IF DUST WALLS TO BE IN PLACE MORE THAN TWO WEEKS -COORDINATE WITH WALMART CONSTRUCTION MANAGER 2 x 4 TREATED WOOD SILL PLATE t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.D1 DEMOLITION PLAN WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM DEMOLITION REQUIREMENTS 1 ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS. 2 THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FLOORS, AND ELECTRICAL ITEMS INCLUDING CONDUITS AS SHOWN ON DRAWING OR AS REQUIRED FOR THE INSTALLATION OF NEW WORK FOR A COMPLETE JOB. 3 WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISHED CEILING. SHOW ALL ABANDONED AND CAPPED UTILITIES ON AS-BUILTS, DRAWINGS, AND RECORDED DOCUMENTS. 4 IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION DURING THE REMOVAL OF STRUCTURAL ITEMS AND NEW CONSTRUCTION. 5 THE CONTRACTOR SHALL RETAIN A REGISTERED PROFESSIONAL ENGINEER TO DESIGN THE SHORING AND SPECIFY DEMOLITION PROCEDURES. 6 IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS AND METHODS OF DEMOLITION AND NEW CONSTRUCTION. PRIOR TO THE EXCAVATION OF FOUNDATIONS ADJACENT TO THE EXISTING STRUCTURE, PROVIDE ADEQUATE SUPPORT FOR THE SUB-BASE TO PREVENT UNDERMINING. 7 DURING DEMOLITION AND RECONSTRUCTION, THE CONTRACTOR SHALL COORDINATE WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER ANY REQUIRED SAFETY BARRIERS OR BARRICADES AND DUST WALLS. REFER TO THE WALMART MECHANICAL CONSTRUCTION MANAGER FOR PHASING AND SCHEDULING DEMOLITION AND NEW CONSTRUCTION. 8 DISPOSAL OF ALL DECOMMISSIONED EQUIPMENT, NOT APPORTIONED TO WALMART'S DESIGNATED SALVAGE VENDOR, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN ACCORDANCE WITH LOCAL CODES AND ANY GOVERNMENTAL REGULATIONS; REFER TO WALMART DIRECTIVES AND SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE PICK-UP DATE WITH THE DESIGNATED SALVAGE VENDOR, PREPARE AND LOAD THE DESIGNATED SALVAGE ITEMS, KEEPING THEM INTACT AND IN ACCORDANCE WITH LOCAL CODES AND ANY GOVERNMENTAL REGULATIONS; REFER TO WALMART DIRECTIVES AND SPECIFICATIONS. ITEMS TO BE SALVAGED BY WALMART'S DESIGNATED SALVAGE VENDOR SHALL BE LIMITED TO: VARIABLE FREQUENCY DRIVES, CONDENSING UNITS, CONDENSERS, EVAPORATORS, COPPER PIPING, ROOF TOP UNITS, AIR HANDLING UNITS, AND COMPRESSOR HOUSES. 8-TX DISPOSAL OF ALL DECOMMISSIONED EQUIPMENT, NOT APPORTIONED TO WALMART'S DESIGNATED SALVAGE VENDOR, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN ACCORDANCE WITH LOCAL CODES AND ANY GOVERNMENTAL REGULATIONS; REFER TO WALMART DIRECTIVES AND SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE PICK-UP DATE WITH THE DESIGNATED SALVAGE VENDOR, PREPARE AND LOAD THE DESIGNATED SALVAGE ITEMS, KEEPING THEM INTACT AND IN ACCORDANCE WITH LOCAL CODES AND ANY GOVERNMENTAL REGULATIONS; REFER TO WALMART DIRECTIVES AND SPECIFICATIONS. ITEMS TO BE SALVAGED BY WALMART'S DESIGNATED SALVAGE VENDOR SHALL BE LIMITED TO: REFRIGERATED CASES AS DESIGNATED BY THE WALMART CONSTRUCTION MANAGER, WALK-IN PANELS, MCCUE RAILING, VARIABLE FREQUENCY DRIVES, CONDENSING UNITS, CONDENSERS, EVAPORATORS, COPPER PIPING, ROOF TOP UNITS, AIR HANDLING UNITS, AND COMPRESSOR HOUSES. 9 REFER TO SPECIFICATIONS SECTION 1500 FOR ADDITIONAL INFORMATION REGARDING STORMWATER RUNOFF CONTROL. 10.CONDUCT ALL DEMOLITION AND REMOVAL OF DEBRIS AS REQUIRED TO ENSURE MINIMUM INTERFERENCE WITH BUILDING/SITE FACILITIES AND OPERATIONS. 11.NOTES INDICATING DEMOLITION WORK ARE NOT CONFINED SOLELY TO THE DEMOLITION PLANS. THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS, INCLUSIVE OF SCHEDULES AND SPECIFICATIONS, TO DETERMINE FULL EXTENT OF DEMOLITION WORK. DEMOLITION NOTES 1.REMOVAL OF ANY SALVAGE EQUIPMENT OR DEBRIS IS PROHIBITED. THIS INCLUDES THE SALE OF COPPER, ALUMINUM, OR ANY RELATED MATERIALS. 2.WHERE APPLICABLE WALK-IN PANEL MANUFACTURER SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK-IN PANELS AND DOORS TO BE REPLACED. 3.DURING DEMOLITION AND RECONSTRUCTION PHASES, COORDINATE LOCATION OF ALL DUST WALLS AND SECURITY ENCLOSURES WITH WALMART STORE MANAGER. REFER TO DUST WALL DETAIL. 4.ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO STARTING ANY DEMOLITION OR CONSTRUCTION. 5.PATCH/REPAIR FLOOR COVERING AS REQUIRED AFTER INSTALLATION OF NEW CASES. MATCH EXISTING FLOORING TYPE, COLOR, PATTERN, AND FINISH. CONSTRUCTION LEGEND EXISTING TO REMAIN DEMOLISHED AREA TO BE DEMOLISHED KEYNOTES 2.15 REMOVE EXISTING DOOR PROTECTION. 2.19 EDGE PROTECTION NET SYSTEM IS EXISTING TO REMAIN ABOVE WALK-IN BEING DEMOLISHED. CONTRACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE DETACHMENT AND/OR DEMOLITION OF EDGE PROTECTION NET SYSTEM AS NECESSARY FOR DEMOLITION OF WALK-IN PRIOR TO START OF DEMOLITION. REFER TO EDGE PROTECTION NET SYSTEM NOTES. COORDINATE ALL WORK INVOLVING THE EDGE PROTECTION NET SYSTEM WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER. 2.20 REPLACE WALK-IN IN SAME LOCATION. COOLER PANEL MANUFACTURER TO DEMOLISH EXISTING WALK-IN. CONTRACTOR TO DEMOLISH EXISTING EVAPORATOR, PIPING, CONDENSATE PIPING, CURBS/FLOOR RAILING, DOOR GUARDS, FLOORING, PLUMBING, ELECTRICAL, DUCTWORK, AND DRY WALL AS REQUIRED. CONTRACTOR TO REMOVE RACKING AFTER STORE HAS REMOVED ALL MERCHANDISE. 2.21 CONTRACTOR TO REMOVE EXISTING STEEL RACKING IN WALK-INS. COORDINATE DISPOSAL OR SALVAGE OF RACKING WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER. 2.27 REMOVE EXISTING PIPE BOLLARDS. GRIND DOWN FLUSH WITH FLOOR SLAB. PATCH AND REPAIR FLOOR AS NECESSARY. 2.32 CONTRACTOR TO TEMPORARILY REMOVE EXISTING STEEL RACKING AS NECESSARY TO PERFORM WORK INDICATED. COORDINATE STORAGE OF STEEL RACKING DURING CONSTRUCTION WITH WALMART MECHANICAL CONSTRUCTION MANAGER. 1/8" = 1'-0" 1 DEMOLTION PLAN NTS2DUST WALL SECTION ISSUE BLOCK NOTE E E E E EE 1 1 2 2 3 3 4 4 G G H H J J NETTING ETR. ICE CREAM FREEZER 12' R5003.000 GROCERY FREEZER 11.24 DAIRY COOLER 11.23 TYP 60"x90" SLIDING DOOR WITH STRIP CURTAIN. 11.29 REPLACED EXISTING SLIDING 48"x84" DOOR 11.21 TYP11.32 WALK-IN DOORS, WINDOWS, HARDWARE, WALL LINER MATERIALS, ETC. SHALL BE FURNISHED AND INSTALLED BY COOLER PANEL MANUFACTURER. 18 ' - 2 " 18' - 0" FREEZER DIMENSIONS ARE NOMINAL OUTSIDE DIMENSIONS. COOLER PANEL MANUFACTURER TO FIELD VERIFY EXACT WALK-IN SIZES. 32" GALVANIZED STEEL BOLLARD, 4" OD FURNISHED BY OWNER, INSTALLED BY GC 2 F1 4 F1 3 F1 6 F1 TYP; UNO CONTRACTOR SHALL FURNISH AND INSTALL STAINLESS STEEL TRIM TO CLOSE ANY GAPS THAT ARE LEFT BETWEEN WALK- IN AND WALLS AND/OR CEILINGS AFTER WALK-IN INSTALLION IS COMPLETED BY THE WALK-IN PANEL MANUFACTURER. 5 F1 NEW STEEL ANGLE. HCR PCAV DOOR R0700.001 RA5000; TYP. PREMANUFACTURED COOLER/FREEZER PANEL, NIC6" x 4" x 3/8" CONTINUOUS STEEL ANGLE PAINT. SAFTEY YELLOW OSHA STANDARD. 1/2" DIA x 2-1/2" CONCRETE SCREW ANCHOR AT 12" OC PROVIDE 2-1/2" DEEP HOLE IN SLAB AND INSTALL ANCHOR TO SNUG TIGHT CONCRETE SLAB REF TO PROCTECTOR ANGLE DETAIL FOR MORE STEEL ANGLE PLACEMENT, VERIFY LOCATIONS FOR ADDITIONAL ANGLES NOT SHOWN ON PLANS WITH WALMART CONSTRUCTION MANAGER 5" REF 3 -F1 REF 3 -F1 REF 3 -F1 ANGLE AT PUSH SIDE OF INTERIOR DOOR ANGLE AT CORNERS ANGLE AT PULL SIDE OF INTERIOR DOOR INTERIOR DOOR 6 x 4 x 3/8" CONT STEEL ANGLE PROVIDE SMOOTH EDGE INTERIOR DOOR PROVIDE SMOOTH EDGE WALL 6 x 4 x 3/8" CONT STEEL ANGLE 6 x 4 x 3/8" CONT STEEL ANGLE WALL 6" MI N 1' - 6 " 6" MI N 1' - 0 " 10 " 10" #4 x 6" AT 24" OC WITH 2" EMBED 6" x 6" CONC. CURB SEALANT PREMANUFACTURED COOLER/FREEZER PANEL, NIC SL O P E 1/ 2 " POLYETHYLENE BETWEEN CURB AND COOLER WALL 1' - 4 " STEEL BOLLARD, REF FLOOR PLANS FOR TYPE AND LOCATION STEEL ANGLE, REF FLOOR PLANS FOR TYPE AND EXACT LOCATION WALK-IN PANEL WALL AND DOOR BY OWNER, REF FLOOR PLAN FOR DOOR TYPE AIR DOOR REF PLANS FOR LOCATION. EXTERIOR WALK-IN INTERIOR WALK-IN CURBS, REF FLOOR PLANS FOR TYPE, SIZE, NUMBER AND EXACT LOCATION, TYP NOTE: 1. SEALED CONCRETE CURBS ARE TO BE FORMED AFTER WALLS, WALK-INS, ETC ARE IN PLACE, USING FACE OF WALL OR WALK-IN PANEL AS SIDE FORM 2. TYP DETAIL, REF PLAN FOR DOOR ORIENTATION 3. FOR WATERPROOFING, CL #6 SCREWS AT MAX 9" OC EACH SIDE, EVENLY SPACE FASTENERS PROVIDE 1" TOE KICK RETURN EACH SIDE CONT CLEAR COATED 20 GA GALVANIZED STEEL INFILL PANEL WITH HEMMED EDGES SET IN A BED OF SEALANT EACH SIDE FV 1" 1" FV FV REFRIGERATED CASES FV HE I G H T O F P A N E L T O M A T C H A D J A C E N T C A S E S FOR OPENINGS OVER 24" IN WIDTH INSTALL BACKUP FRAMING PER DETAIL AND FASTEN TO HORIZONTAL FRAMING MEMBERS AT MAX 9" OC WITH #6 SCREWS, EVENLY SPACE FASTENERS PLAN AT FRONT OF CASE AND WALL REFRIGERATED CASE PLAN AT FRONT OF CASE AND END OF WALL 1" MAX FASTENER AT PARTITION 1/2" MAX FASTENER AT CASE PLAN AT CASES REFRIGERATED CASE FRONT FR O N T REFRIGERATED CASE FRONT 1/2" MAX FASTENER TYP PLAN AT REAR OF CASE AND WALL REFRIGERATED CASE FR O N T PARTITION OR WALL 1" MAX FASTENER AT PARTITION 1/2" MAX FASTENER AT CASE PARTITION OR WALL PLAN AT WALK-IN PARTITION OR WALL 1/2" MAX FASTENER TYP WALK-IN PANEL PARTITION OR WALL REFRIGERATED CASE FRONT 1/2" MAX FASTENER 1/2" MAX FASTENER (PLAN VIEW) SECTION AT TOP OF CASE AND WALL REFRIGERATED CASECLOSURE PANEL 1/2" MAX FASTENER PARTITION OR WALL CLOSURE PANEL CLOSURE PANEL CLOSURE PANEL CLOSURE PANEL CLOSURE PANEL TY P 1" OV E R L A P TYP 1" OVERLAP TYP 1" OVERLAP TYP 1" OVERLAP TY P 1" OV E R L A P NOTES: 1. REFRIGERATION CONTRACTOR TO PROVIDE GALVANIZED CLOSURE PANELS AT ALL VERTICAL GAPS AND AT ALL HORIZONTAL GAPS 52" OR LOWER AFF BETWEEN REFRIGERATED CASE, WALLS, AND/OR EQUIPMENT 2. PROVIDE SS CLOSURE PANELS LOCATED IN PREP AREAS 3. REF FLOOR PLANS FOR ALL PARTITION TYPES AND LOCATIONS 4. EASE EXPOSED EDGES TO SMALL UNIFORM RADIUS 5. SET CLOSURE PANEL IN A BED OF SEALANT EACH SIDE 6. FASTEN CLOSURE PANELS WITH #6 PAN HEAD SCREWS AT 9" OC 7. CLOSURE PANELS TO BE FASTENED ONLY TO BACK OF REFRIGERATED CASE OR END PANEL SKINS AS INDICATED IN DRAWINGS t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.F1 FIXTURE PLANS AND SCHEDULES WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM GENERAL NOTES 1.DIMENSIONS OF REFRIGERATED CASES ARE TO THE OUTERMOST POINTS OF THE CASES; ENDCAPS AND BUMPERS ARE CONSIDERED PART OF THE CASE, WHERE THEY OCCUR. DIMENSIONS ON THE FIXTURE PLANS ARE FOR LAYOUT OF OWNER-FURNISHED ITEMS ONLY AND ARE NOT TO BE USED FOR LOCATION OF WALLS AND OTHER CONTRACTOR BUILT ITEMS. 2.CONTRACTOR SHALL FURNISH AND INSTALL STAINLESS STEEL TRIM TO CLOSE ANY GAPS THAT ARE LEFT BETWEEN THE END CASES AND LONG CASE RUNS AFTER THE CASES ARE SET IN THEIR FINAL POSITION. 3.CASES FURNISHED BY WALMART, INSTALLED BY CONTRACTOR. ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO STARTING ANY DEMOLITION OR CONSTRUCTION. 4.WALK-IN COOLERS/FREEZERS FURNISHED AND INSTALLED BY COOLER PANEL MANUFACTURER. ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO STARTING ANY DEMOLITION OR CONSTRUCTION. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR MISCELLANEOUS WALK-IN COOLER/FREEZER WORK INCLUDING BUT NOT LIMITED TO EVAPORATORS, ELECTRICAL, EMS, SPRINKLER PENDANTS, CURBS, SANITARY COVE BASE, THRESHOLDS, FLOOR REPAIR AND RACKING. 6.PROPER INSTALLATION OF JOINT SEALANTS IS CRITICAL TO MEETING WALMART QUALITY ASSURANCE STANDARDS. PROVIDE SEALANTS IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS. REFERENCE SPECIFICATIONS FOR SEALANT SCHEDULE. 7.ALL JOINTS BETWEEN DISSIMILAR MATERIALS SHALL BE SEALED AS REQUIRED FOR A COMPLETE AND PROPER INSTALLATION, REGARDLESS OF WHETHER SHOWN ON THE DRAWINGS OR INDICATED IN THE SPECIFICATIONS. SUCH JOINTS NOT SHOWN OR SCHEDULED SHALL BE SEALED WITH SEALANTS CONSISTENT WITH SPECIFIED MATERIALS OR AS RECOMMENDED BY THE MANUFACTURER FOR THE SPECIFIC APPLICATION. 8.INTERIOR SEALANTS USED IN FOOD PREPARATION AREAS SHALL MEET THE REQUIREMENTS FOR USE IN USDA REGULATED FACILITIES. 9.INSTALL CONTINUOUS USDA APPROVED SEALANT AT ALL JOINTS BETWEEN MATERIALS ON WALLS AND FLOORS IN FOOD PREPARATION COOLER AND FREEZER AREAS. 10.ALL FIXED (NON-MOVEABLE) EQUIPMENT INCLUDING SINKS, OVENS, AND REFRIGERATED EQUIPMENT SHALL BE SEALED TO THE WALLS. BASE OR LEGS SHALL BE SET IN A BED OF SEALANT WITH EXCESS REMOVED. MOVEABLE EQUIPMENT SHALL NOT BE SEALED. 11.ROUTE ALL UTILITY SERVICE LINES (PIPES AND CONDUIT) WITHIN STUD WALLS WHEREVER POSSIBLE. ON COOLER/FREEZER PANELS IN FOOD PREP AREAS WHERE UTILITIES MUST BE EXPOSED, CONTRACTOR TO HAVE THE OPTION OF THE FOLLOWING: A.SURFACE MOUNT UTILITIES WITH NON- CORROSIVE ANCHORS; SEAL BOTH SIDES OF PIPE/CONDUIT TO PANEL CONTINUOUSLY WITH SEALANT. B.INSTALL UTILITIES 1/2" OFF FACE OF PANEL TO ALLOW FOR CLEANING; USE ONLY NON- CORROSIVE MATERIALS FOR SPACERS AND ANCHORS. C.COVER UTILITIES WITH 20 GAUGE STAINLESS STEEL BENT PLATES MOUNTED TO WALL WITH NON-CORROSIVE ANCHORS; APPLY CONTINUOUS SEALANT ALONG EDGES AND JOINTS. CONSTRUCTION LEGEND NEW WALL CONSTRUCTION NEW COOLER WALL CONSTRUCTION CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERIES DATES/TIMES WITH EVERY VENDOR LISTED BELOW, OR TO CHANGE ANY DATES OR DELIVERIES, CONTRACTOR MUST CONTACT WALMART CONSTRUCTION MANAGER, THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. EQUIPMENT SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL SUPPLIED BY INSTALLED BY FINAL CONNECT HORIZONTAL SLIDING WALK-IN DOOR WITH STRIP CURTAIN (60X90) VARIES VARIES OW HORIZONTAL SLIDING WALK-IN DOOR WITHOUT STRIP CURTAIN (48X60) VARIES VARIES OW R0700.005 PUSH THROUGH VESTIBULE (72X108) KPS GLOBAL PCAV OW R5003.000 WALK-IN PANELS KPS GLOBAL LLC <varies> OW RA5000 RACK INDUSTRIAL RIDG-U-RACK INC UNKNOWN OW KEYNOTES 11.21 EDGE PROTECTION NET SYSTEM IS EXISTING TO REMAIN ABOVE WALK-IN BEING REPLACED. CONTRACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE RE-ATTACHMENT AND/OR RE-INSTALLATION OF EDGE PROTECTION NET SYSTEM ABOVE WALK-IN BEING REPLACED AFTER CONSTRUCTION OF WALK-IN IS COMPLETE. REFER TO EDGE PROTECTION NET SYSTEM NOTES. COORDINATE ALL WORK INVOLVING THE EDGE PROTECTION NET SYSTEM WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER. COOLER/FREEZER WALK-INS, DOORS, WINDOWS, HARDWARE, WALL LINER, MATERIALS, ETC. SHALL BE FURNISHED AND INSTALLED BY COOLER PANEL MANUFACTURER. 11.23 CONTRACTOR TO RESET STEEL RACKING IN WALK-INS. THIS INCLUDES LABOR AND MATERIAL TO DRILL AND PIN RACKING TO THE FLOOR AS PER THE MANUFACTURERS SPECIFICATIONS. COORDINATE LOCATIONS WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER. STEEL AND GRID SUPPLIED BY WALMART. 11.24 6" WIDE x 6" HIGH CONTINUOUS CONCRETE CURB AT BASE OF WALK-IN. 11.29 PATCH AND REPAIR EPOXY FLOOR AS NECESSARY. PROVIDE SMOOTH TRANSITION AT DOORWAYS. MATCH EXISTING FLOOR FINISHES. 11.32 CONTRACTOR TO RESET TEMPORARILY REMOVED STEEL RACKING. THIS INCLUDES LABOR AND MATERIAL TO DRILL AND PIN RACKING TO THE FLOOR AS PER THE MANUFACTURERS SPECIFICATIONS. COORDINATE LOCATIONS WITH WALMART MECHANICAL CONSTRUCTION MANAGER. EXISTING TO REMAIN DEMOLISHED AREA TO BE DEMOLISHED ABBREVIATION KEY GC -CONTRACTOR OW -WALMART V -VENDOR 1/8" = 1'-0" 1 FIXTURE PLAN 1" = 1'-0" 3 PROTECTOR ANGLE INSTALLTION 1/2" = 1'-0" 6 PROTECTOR ANGLE 1" = 1'-0" 4 CONCRETE CURB DETAIL 1/2" = 1'-0" 2 COOLER/FREEZER SLIDING DOOR NTS5CLOSURE PANEL DETAIL V V V V V C C C C C - - ISSUE BLOCK NOTE E E E E EE 1 1 2 2 3 3 4 4 5 5 6 67 8 8 9 9 10 10 11 11 12 12 13 13 A A B B C C D D E E F F G G H H J J K K 2 FP2FP2 1 t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.FP1 OVERALL FIRE SPRINKLER PLAN WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM N 0 20'40'60' SCALE: 1"=40'-0" 7. THE FIRE PROTECTION ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR SHALL THEY BE REQUIRED TO SUPERVISE THE CONDUCT OF THE WORK, THE CONSTRUCTION PROCEDURES FOLLOWED BY THE CONTRACTOR, SUBCONTRACTORS, THEIR RESPECTIVE EMPLOYEES OR ANY OTHER PERSON AT THE JOB SITE OTHER THAN THAT OF THE ENGINEERING FIRM'S EMPLOYEES. 8. CONTRACTOR MUST REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID. SHOULD MODIFICATIONS TO THESE PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL OF THE CHANGES FROM BOTH THE AUTHORITY HAVING JURISDICTION AND THE OWNER'S DESIGNATED REVIEW CONSULTANT IN ADDITION TO OBTAINING THE NECESSARY APPROVALS, THE CONTRACTOR MUST MAKE NOTE OF ANY FIELD OR COORDINATION CHANGES ON THE INSTALLATION DRAWINGS, AND THEN MUST PROVIDE A SET OF AS-BUILT DRAWINGS ONCE COMPLETE. 9. CONTRACTOR MUST VERIFY ALL DROP DOWN LOCATIONS AT EXTERIOR WALLS WITH THE PROJECT MANAGER PRIOR TO INSTALLATION. 10. ALL PIPING MUST BE COORDINATED AROUND FRAMING MEMBERS AND PROPERLY INSTALLED INSIDE THE BAR JOIST. 11. CONTRACTOR SHALL ROUTE PIPING AROUND ALL OBSTRUCTIONS AND PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, AS DETAILED IN NFPA 13 STANDARDS AS PART OF THE FIELD COORDINATION AT NO ADDITIONAL COST TO OWNER. 12. ALL SPRINKLER DEFLECTOR DISTANCE REQUIREMENTS SHALL BE IN ACCORDANCE TO THE STANDARDS OUTLINED IN NFPA 13. 13. ALL PIPING PASSING THROUGH CMU WALLS SHALL BE INSTALLED WITH ONE INCH CLEARANCE ON ALL SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL CORES SHALL BE COORDINATED WITH STRUCTURAL REINFORCING. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CORING WITH PROPER CLEARANCE AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A TWO INCH CLEARANCE AROUND ALL PIPING PASSING THROUGH CONCRETE SLABS. THE SPRINKLER CONTRACTOR SHALL FILL ALL CLEARANCES WITH APPROVED MASTIC. 14. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE WITH THE STANDARDS OUTLINED IN NFPA 13. 15. PROVIDE ALL NECESSARY OFFSETS, RISES OR DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS. 16. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS, CLEARANCES, ETC. 17. ARCHITECTURAL AND ELECTRICAL BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO THE CONTRACT DOCUMENTS FOR LOCATIONS, SIZES AND QUANTITIES OF OTHER TRADE WORK. 18. SPRINKLER SPACING SHALL BE PER NFPA 13 UNLESS OTHERWISE NOTED ON PLANS AND/ OR PROTECTION CRITERIA LEGEND. 19. INTERFACE SPRINKLER SYSTEM WITH FIRE PROTECTION SUPERVISORY SYSTEM. 20. ALL MATERIALS SHALL BE UL LISTED OR FM APPROVED. SPRINKLER PIPE SHALL BE MANUFACTURED TO STANDARDS RECOGNIZED BY NFPA 13., THREADED PIPE SHALL HAVE A CORROSION RESISTANCE RATING OF 1.0 OR GREATER. CRIMP-TYPE COUPLINGS SHALL NOT BE USED. THREADABLE THINWALL PIPE WITH CORROSION RESISTANCE RATING OF LESS THAN 1.0 SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. 21. IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, MODEL NO. PBA248, ELECTRIC BELL BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE AS REQUIRED BY AUTHORITIES HAVING JURISDICTION. PROVIDE NEW DOUBLE POLE VANE TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI. SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. MOUNT WATER FLOW INDICATORS NO HIGHER THAN 6 FEET ABOVE FINISH FLOOR. 22. ALL SPRINKLER SYSTEMS THAT ARE TO BE MODIFIED SHALL BE HYDROSTATICALLY TESTED PER NFPA 13 PRIOR TO SPRINKLER SYSTEM MODIFICATION AND SHALL BE RE-HYDROSTATICALLY TESTED AFTER COMPLETION OF WORK. 23. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE ANY ATTACHMENTS TO THE METAL ROOF DECK OR JOIST BRIDGING. 24. SAMMY SCREWS ARE NOT PERMITTED. 25. CEILING FLANGES ARE NOT PERMITTED. 26. PROVIDE RETAINING STRAPS ON HANGERS WHERE REQUIRED. 27. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER HEAD LOCATIONS AND PIPE ROUTING SUCH THAT THEY DO NOT INTERFERE WITH NOR RECEIVE DAMAGE FROM THE NORMAL OPERATIONS OF THE AREA. 28. THE CONTRACTOR SHALL DIVERT ALL DRAINS AND INSPECTORS TEST CONNECTION DISCHARGE AWAY FROM FINISHED SURFACES AND PIPE TO APPROVED DRAIN LOCATIONS. ROUTE DISCHARGE TO NEARBY GREENSPACE OR STORM WATER DRAIN BY USE OF BACKWASH HOSE.. THE CONTRACTOR WILL BE BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR CLEANING OF RUST STAINS ON PAVEMENT,/CONCRETE DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM DRAINS. 1. THE DESIGN SHOWN ON THESE CONTRACT DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY THE AUTHORITY HAVING JURISDICTION AND TO PROVIDE GUIDANCE FOR BIDDING. SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS REQUIRED BY CONTRACT DOCUMENTS TO THE OWNERS DESIGNATED REVIEWERS. BASE SPRINKLER DESIGN UPON THESE DRAWINGS AND AS REQUIRED BY THE SPECIFICATIONS. SHOP DRAWINGS MUST INCLUDE ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATIONS METHODS, MATERIAL DATA, AND ADDITIONAL INFORMATION NECESSARY TO CLARIFY THE INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZE, SPRINKLER SPACING, AND SYSTEM CONFIGURATION AS SHOWN. ALTERNATE MATERIALS MUST BE SENT TO THE FIRE PROTECTION ENGINEER OF RECORD OR VIA THE RFI PROCESS AND MUST BE APPROVED IN RECORD DOCUMENTS PRIOR TO BID. 2. COORDINATE LOCATIONS OF FIRE PROTECTION COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, TEST POINTS, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS. OBSTRUCTION TO SPRINKLER DISCHARGE MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION; ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 3. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. 4. SUBMIT A REQUEST FOR INFORMATION FOR QUESTIONS REGARDING THE FIRE PROTECTION DOCUMENTS PER RFI PROCESS LOCATED IN THE FIRE PROTECTION SPECIFICATIONS. 5. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. REFER TO MECHANICAL DRAWINGS FOR NEUTRALIZATION WALL PENETRATION DETAIL. 6. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE FIRE STOPPED WITH AN APPROVED MATERIAL PER METHODS REQUIRED BY PROJECT SPECIFICATIONS AND THE AUTHORITY HAVING JURISDICTION. GENERAL NOTES CONT.GENERAL NOTES 1. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. 2. UNLESS INDICATED OTHERWISE, DISCONNECT AND REMOVE ALL EXISTING FIRE PROTECTION COMPONENTS NOT INTENDED TO BE REUSED. 3. DISCONNECT, RELOCATE, AND RECONNECT EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT WHERE REQUIRED. 4. NOTE CAREFULLY THAT THE FIRE PROTECTION DRAWINGS ARE INTENDED TO INDICATE, ONLY DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL CHARACTER AND LOCATIONS OF THE WORK INCLUDED. PROVIDE ALL WORK OBVIOUSLY INTENDED, BUT HAVING MINOR DETAILS OMITTED OR NOT SHOWN. COMPLETE AS REQUIRED TO PERFORM THE FUNCTIONS INTENDED. FOLLOW THE CONTRACT DOCUMENTS FOR BUILDING DETAILS AND FIT THE WORK OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS THERETO. 5. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO AN APPROVED DUMPING SITE AND CLEAN ALL FIRE PROTECTION WORK PRIOR THE PROJECT COMPLETION. 6. PERFORM ALL WORK ACCORDING TO THE PROJECT PHASING SCHEDULE INFORMATION FOR THIS PROJECT. PROVIDE ALL NECESSARY FIRE PROTECTION WORK, TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER MEANS NECESSARY, TO CONFORM TO THE REQUIRED CONSTRUCTION PHASING OF THE PROJECT. 7. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION. 8. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ADJACENT SURFACES LEFT UNUSED AFTER EXISTING SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND VACATED FROM THESE HOLES. 9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE PROJECT. 10. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE. 11. THE CONTRACTOR SHALL PROPERLY NOTIFY THE LANDLORD. THE LESSOR AND THE ADJACENT TENANTS A MINIMUM OF 48 HOURS IN ADVANCE BEFORE PROCEEDING WITH THIS WORK. ALL WORK SHALL BE SCHEDULED IN ADVANCE. FIRE SPRINKLER PIPING AND DEMOLITION NOTES NFPA STANDARDS EDITION NFPA 13 2018 REFER TO SHEET T1 FOR APPLICABLE CODES APPLICABLE CODES SHEET NUMBER SHEET NAME FP1 OVERALL FIRE SPRINKLER PLAN FP2 ENLARGED FIRE SPRINKLER PLAN SHEET INDEX 1. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION, VERIFICATION AND PROVISION OF A FIRE WATCH SUBJECT TO THE REQUIREMENTS OF THE LOCAL JURISDICTION. ALL FIRE WATCH COSTS INCURRED AS A RESULT OF THIS PROJECT SHALL BE INCLUDED IN THE PROJECT BID AS A SEPARATE LINE ITEM. COORDINATION AND VERIFICATION AS TO WHEN A FIRE WATCH MAY BE NEEDED SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 2. THE GENERAL CONTRACTOR SHALL REQUEST THE STORE MANAGER TO NOTIFY ALARM CENTRAL OF THE SYSTEM(S) BEING SHUT OFF FOR WORK AND THE DURATION OF THE SHUT OFF. 3. THE GENERAL CONTRACTOR SHALL CALL DIRECT TO THE FIRE DEPARTMENT AND ADVISE THAT THE FIRE ALARM SYSTEM IS IN TEST. 4. AT THE END OF EACH NIGHTS WORK, THE GENERAL CONTRACTOR SHALL CALL DIRECT TO THE FIRE DEPARTMENT AND ALARM CENTRAL TO ADVISE WORK IS COMPLETE. 5. (FIRST FIRE WATCH OPTION) A FIRE WATCH SHALL BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. THE APPROVED FIRE WATCH SHALL BE CONDUCTED BY A DEDICATED, TRAINED WALMART EMPLOYEE WHOSE SOLE RESPONSIBILITY WILL BE TO PERFORM HOURLY PATROLS OF THE PREMISES AND KEEP WATCH FOR FIRES AND WILL NEED TO DOCUMENT THEIR WALK AND REPORT BACK TO THE GENERAL CONTRACTOR AND WALMART MANAGEMENT. THIS PERSON SHALL BE PROVIDED WITH AT LEAST ONE APPROVED MEANS FOR NOTIFICATION TO THE FIRE DEPARTMENT. 6. (SECOND FIRE WATCH OPTION) A FIRE WATCH SHALL BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. THE FIRE SPRINKLER CONTRACTOR SHALL HIRE AN APPROVED OFF-DUTY FIRE FIGHTER TO PERFORM THE REQUIRED FIRE WATCH. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH AT LEAST ON APPROVED MEANS FOR NOTIFICATION OF THE FIRE DEPARTMENT AND THEIR SOLE DUTY SHALL BE TO PERFORM CONSTANT PATROLS AND WATCH FOR THE OCCURRENCE OF FIRE. FOR HOT WORK OPERATIONS, A FIRE WATCH SHALL BE POSTED FOR THE DURATION OF THE WORK AND 30 MINUTES THEREAFTER. 7. ONLY (1) ONE SYSTEM IS PERMITTED TO BE SHUT DOWN AT ONE TIME. 8. ANY FIRE DEPARTMENT FEES FOR FAILURE TO FOLLOW PROCEDURES WILL BE AT THE GENERAL CONTRACTORS EXPENSE. 9. REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, DEMOLITION, REMODELING OR ALTERATIONS AND ADDITIONS TO THE WALMART. ALL EXITS SHALL NOT BE BLOCKED, REDUCED OR OTHERWISE MADE INOPERABLE WHICH ALSO INCLUDES THE EXIT ACCESS, THE EXIT AND EXIT DISCHARGE TO THE PUBLIC WAY. TEMPORARY MEANS OF EGRESS ARE ALLOWED. 10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE END OF EACH WORKDAY. SYSTEM IMPAIRMENT REQUIREMENTS THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING AND PROVIDING THE AHJ AND THE ENGINEER OF RECORD HYDRAULIC CALCULATIONS FOR THIS PROJECT. THE ENGINEER OF RECORD WILL NOT BE RESPONSIBLE FOR PROVIDING THE HYDRAULIC CALCULATIONS. NEW HYDRAULIC PLACARDS SHALL BE PROVIDED AND PERMANENTLY ATTACHED ON EACH APPLICABLE RISER IN ACCORDANCE WITH NFPA 13. HYDRAULIC CALCULATION SPRINKLER SYMBOL LEGEND WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVALENT TO THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED. CONCEAL DRY PEND 200WHITETY3555TYCO DS-C1" SYMBOL SIZE MFR S.I.N.MAKE FINISH K-FACTORSTYLETEMP TY3251TYCO TY-B1/2"WHITE 155 5.6 EXISTING PENDENTVARIESVARIES VARIES VARIES VARIES VARIES VARIESDEMO ------ ------ ----- ----- EXISTING PENDENT VARIES VARIES RECESSED STYLE 10 TY9226TYCO ESFR1"BRASS 212PENDENT EXISTING UPRIGHTVARIESVARIES VARIES VARIES VARIESBRASS VARIES VARIES VARIESDEMO ------ ----------- ----- EXISTING UPRIGHT PENDENTMATCH EXISTING TYCO MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING TY5332TYCO SW-203/4"WHITE 200 ECOH SIDEWALL TY3355TYCODS-11"WHITE 286 HSW 401 ESC TY3351TYCO RFII1/2"WHITE 200 CONCEAL PENDENT TY3251TYCO TY-B1/2"WHITE 286 RECESSED STYLE 10 PENDENT TY5255TYCO DS-21"WHITE 286 401 ESC DRY PEND VARIES VARIESDEMO ----------- ----- EXISTING SIDEWALL ------ UPRIGHTMATCH EXISTING TYCO MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING TY52513/4"TYCO ELO-231B BRASS 286 OWNER FURNISHED SPRINKLERS AND ACCESSORIES WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING" THE CONTRACTOR SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVLIENT TO THE EXISTING TO REMAIN SPRINKLERS.SUBSTITUTIONS WILL NOT BE PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL INFORMATION. WHERE SPRINKLERS ARE INSTALLED BELOW OBSTRUCTIONS (REFRIGERATION PIPING, RTUs, CABLE TRAYS, ETC.) THESE SPRINKLERS SHALL BE REPLACED WITH SPRINKLERS MATCHING THE NEW SPRINKLERS BEING INSTALLED AT THE ROOF DECK LEVEL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER FURNISHED SPRINKLERS DURING INSTALLATION. TO REPLACE DAMAGED SPRINKLERS CONTACT HAINES, JONES, CADBURY 1-800-459-7099. 1" TYCO TY3555WHITE CONCEEALED DRY PENDANT2005.6 SYMBOL SIZE MFR MAKE S.I.N.FINISH STYLETEMPK-FACTOR 4 QTY DS-C EXISTING HSWVARIESVARIES VARIES VARIES VARIESBRASS VARIES 5.6 5.6 5.6 5.6 11.2 11.2 11.2 25.2 DRY PEND 200WHITETY5255TYCO DS-21" 11.2 SYMBOL LEGEND SPRINKLER RISER TRAPEZE HANGER HANGER RISER NIPPLE/DROP NIPPLE HYDRAULIC REFERENCE NODE POINT SYMBOL DESCRIPTION CAP NEW SPRINKLER PIPE EXISTING SPRINKLER PIPE DEMOLISHED SPRINKLER PIPE XXX INSPECTOR'S TEST/AUXILIARY DRAIN NEW CONNECTION FIRE DEPARTMENT CONNECTION PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED PER NFPA 13 IN EXISTING SPRINKLER CABINET FOR ANY NEW SPRINKLERS INSTALLED. PLUG 1/32" = 1'-0" 1 OVERALL FIRE PROTECTION PLAN ISSUE BLOCK NOTE E EE EE E E E E EE 1 1 2 2 3 3 G G H H J J (E)3" (E ) 1 -1/ 4 " 10'-0" 2' -3" (E ) 1 " 11 ' -6" (E ) 1 -1/ 4 " 2' -3" (E ) 1 " 11 ' -6" TYP13.912 1 1 2 2 3 3 G G H H J J (E)3" (E ) 1 -1/ 4 " 10'-0" 2' -3" (E ) 1 " 11 ' -6" (E ) 1 -1/ 4 " 2' -3" (E ) 1 " 11 ' -6" TYP13.973 3 FP2 SUPPLY FROM WET PIPE SPRINKLER SYSTEM TEE WITH PLUG 1" DRY SPRINKLER DROP DOW CORNING 739 PLASTIC ADHESIVE FREEZER/COOLER CEILING OPEN-CELL POLYETHYLENE FOAM BACKER ROD SPRINKLER CUP 1" DRY SPRINKLER DROP SUPPLY FROM WET PIPE SPRINKLER SYSTEM TEE WITH PLUG SPRINKLER CUP FREEZER/COOLER CEILING 2 NYLON STRAP TIES (INSTALL OPPOSITE DIRECTIONS) TYCO RUBBER SEAL BOOT MODEL DSB-2 SEALANT PER BOOT MANUFACTURER 2 3/4" OPTION A OPTION B NOTE: CONTRACTOR TO SEAL DRY PENDENT SPRINKLERS AT FREEZER/COOLER USING ONE OF THE OPTIONS ABOVE. NO OTHER SEALANTS ARE PERMITTED MI N 6 " TY P MI N C A S I N G L E N G T H 1 2 " TY P MI N 6 " TY P MI N C A S I N G L E N G T H 1 2 " TY P 1. CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED CEILING PANEL. LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS. 2. INSTALL DRY PENDENT SPRINKLER PER MANUFACTURER'S INSTALLATION REQUIREMENTS. 3. COMPLETELY FILL ANNULAR CEILING OPENING BETWEEN THE ESCUTCHEON AND TOP OF CEILING PANEL WITH OPEN-CELL POLYETHYLENE FOAM BACKER ROD. EXPANDED FOAM IS NOT PERMITTED. 4. INJECT DOW CORNING 739 PLASTIC ADHESIVE SEALANT INTO AND AROUND THE TOP OF THE FREEZER/COOLER CEILING CORE OPENING IN ACCORDANCE WITH SEALANT MANUFACTURER'S INSTRUCTIONS. 1. CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED CEILING PANEL. LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS 2. INSTALL TYCO DRY PENDENT SPRINKLER PER MANUFACTURER'S INSTALLATION REQUIREMENTS. INSERT BOOT PRIOR TO MAKE-UP WITH PIPING. 3. COMPLETELY SEAL INTERFACE BETWEEN BOOT FLANGE AND TOP OF FREEZER/COOLER PANEL WITH ADHESIVE PROVIDED WITH BOOT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 4. APPLY STRAP TIES ON BOOT AROUND DRY SPRINKLER BARREL PER MANUFACTURER'S INSTRUCTIONS. OPTION "A" INSTALLATION PROCEDURE OPTION "B" INSTALLATION PROCEDURE TYCO MODEL TY5255 WITH FLUSH ESCUTCHEON (NO SUBSTITUTIONS) 2 3/4" TYCO MODEL TY5255 WITH FLUSH ESCUTCHEON (NO SUBSTITUTIONS) t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.FP2 ENLARGED FIRE SPRINKLER PLAN WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM KEYNOTES 13.912 REMOVE EXISTING DRY PENDENT SPRINKLERS FROM COOLERS/FREEZERS. PLUG ALL OUTLETS NOT INTENDED FOR REUSE. SEAL ALL COOLER/FREEZER PANEL PENETRATIONS IN ACCORDANCE WITH X-FPX. 13.973 PROVIDE NEW DRY CONCEALED PENDENT SPRINKLERS AS SHOWN AND CONNECT TO EXISTING OVERHEAD SYSTEM. REF X-FPX. COORDINATE WITH LOCATION OF LIGHTS AND EVAPORATOR UNITS. NOT MORE THAN ONE SPRINKLER SHALL BE SUPPLIED BY A 1" PIPE OR CONNECTION. EXISTING CEILING LEVEL SPRINKLER PROTECTION SHALL REMAIN. ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. 1/8" = 1'-0" 1 FIRE PROTECTION DEMOLITION PLAN 1/8" = 1'-0" 2 FIRE PROTECTION PLAN NTS3WALK-IN DRY PENDENT ISSUE BLOCK NOTE XIO-8U-1 SCHEDULE U1/A1 SENSOR C-1 LEAK (N,DI, FI) U1/A2 SENSOR C-1 LEAK (N,AI, FI) U1/A3 SENSOR SPARE U1/A4 SENSOR SPARE U1/A5 SENSOR SPARE U1/A6 SENSOR SPARE U1/A7 SENSOR SPARE U1/A8 SENSOR SPARE 1 1 2 2 3 3 4 4 C C D D E E F F G G H H J J ICE CREAM FREEZER GROCERY FREEZER DAIRY COOLER MEAT COOLER SEAFOOD FREEZER SALES EDC4 EXISTING ES1, LDP, AND CIMS MOUNTED ON EXISTING BAS BACKBOARD IN EDC4. LABEL ALL NEW AND EXISTING LEAK DETECTION ZONES. LABEL ALL SPARE ZONES AS SPARE. MOUNT OWNER FURNISHED XIO ON BAS BACKBAORD. REFER TO XIO SCHEDULES AND BAS ONE-LINE DIAGRAM. WIRE HORN/STROBE TO ICE CREAM FREEZER. C-1 MOUNT OWNER FURNISHED SPORLAN GATEWAY ROUTER ON BAS BACKBAORD. REFER TO BAS ONE-LINE DIAGRAM. EXISTING CIMS MOUNTED ON EXISTING BAS BACKBOARD ABOVE MEAT COOLER. 5 BASR1 3 BASR1 6 BASR1 1 BASR2 2 BASR3 1 BASR3 3 BASR3 2 BASR1 INSTALL BOTTOM OF CONTROLLER ENCLOSURE 84" AFF MINIMUM ON COOLER/FREEZER. REF PLANS FOR QUANTITY AND LOCATION. COORDINATE PANEL LOCATION WITH DOOR OPENING, PROTECTION, AND RACKING. DO NOT MOUNT ENCLOSURES BELOW REFRIGERATION EQUIPMENT OR PLUMBING LINES. VERIFY WITH WALMART MECHANICAL CONSTRUCTION MANAGER THAT ENCLOSURES ARE LOCATED IN AN ACCESSIBLE SPACE. INSTALL TEMPERATURE SENSOR CABLE AND VALVE CONTROL WIRING AND CABLING IN CONDUIT FROM TOP OF COOLER/FREEZER TO WALK-IN CONTROLLER ENCLOSURE. FOR CABLE RUNS >25', REFER TO BAS VENDOR INSTRUCTIONS. TYP. CONTROLLER ENCLOSURE OWNER FURNISHED, INSTALLED BY CONTRACTOR. ENCLOSURES CONTAIN ONE CONTROLLER AND REMOTE DISPLAY. PROVIDE A CUSTOM, DIGITALLY PRINTED AND HIGH-DURABILITY LAMINATED LABEL MOUNTED ON CONTROLLER ENCLOSURES INDICATING THE REFRIGERATION CIRCUIT(S) SERVED BY THE CONTROLLERS WITHIN. LETTERING SHALL BE WHITE, MINIMUM OF 3/4" HIGH, ON A BLACK BACKGROUND. 11.30.17 SIDE VIEW DEFROST TERMINATION SENSOR MOUNTED IN SENSOR WELL ON END PLATE, 1 PER ELECTRIC DEFROST COIL. CONNECT TO APPLICABLE EVAPORATOR MODULE. TO SINGLE COIL PIPING OR MULTIPLE COIL PARALLEL PIPING FOR MULTIPLE COIL REVERSE RETURN PIPING EVAP FAN/ COIL UNIT SUPPLY RETURN 12.05.17 PROVIDE CEILING MOUNTED WP JUNCTION BOX WITH THREADED HUBS AND GASKETED COVERPLATE. SEAL TOP OF JUNCTION BOX TO COOLER/FREEER CEILING WITH SILICONE SEALANT, TYP. COOLER/FREEZER BOX CEILING PROVIDE CONDULET AT CEILING PENETRATION FILLED WITH SILICONE SEALANT, TYP 1" EMT CONDUIT PENETRATION SEALED WITH SILICONE SEALANT, TYP PROVIDE EMT CONDUIT AND WIRING TO NEXT COIL CONTROL JUNCTION BOXES ON SAME SYSTEM WHEN MULTIPLE COILS ARE IN SAME COOLER/FREEZER BOX. CONDUIT AND WIRING SAME SIZE AND QUANTITY AS WIRING TO PANEL. COIL CONTROL CONDUIT SHALL BE 1". TYPICAL COIL NOTE: DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN, OFFSET TO SIDE. PROVIDE 1" LIQUID-TIGHT FLEXIBLE METAL CONDUIT TO KNOCKOUT ON UNIT. FINAL CONNECTION TO COIL BY RC, TYP. PROVIDE 1" EMT CONDUIT TO WALK-IN COIL CONTROLLER FOR COIL CONTROL WIRING NOTE: THE CONDUIT AND WIRING IN THIS DETAIL IS FOR LOW VOLTAGE AND CONTROL VOLTAGE WIRING ONLY. EVAPORATOR COIL POWER LINE VOLTAGE WIRING SHALL BE INSTALLED IN SEPARATE CONDUIT. REFER TO ELECTRICAL. SECURE SENSING ELEMENT AND CABLE WITH (2) NYLON MOUNTING BRACKETS (PANDUIT #PP2S-S10-X) AT RIGHT ANGLES TO EACH OTHER. PLACE BULB APPROX. 3" OFF CENTER IN MAXIMUM RETURN AIR STREAM. MOUNT BRACKET WITH EXISTING FAN SHROUD MOUNTING SCREW. DO NOT DRILL HOLE IN DRAIN PAN TO MOUNT BRACKETS. CABLE TO EXTEND TO COIL ON HINGED SIDE OF DRAIN PAN. CONDUIT AND SENSOR CABLE TO BUILDING AUTOMATION SYSTEM. (TYP) CEILING OF BOX 1/4" PENETRATION THRU ROOF FOR SENSOR LEADS. SEAL INSIDE AND OUT WITH SILICONE OR EXPANDING FOAM AND SEALANT. CEILING OF BOX 6" DUAL COIL EVAPORATOR RETURN AIR TEMPERATURE SENSOR INSTALLATION INSTALL SENSOR AT COIL MIDPOINT, CENTERED ON COIL LENGTH. CONDULET AT CEILING PENETRATION FILLED WITH SEALANT REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR ALL FIELD INSTALLED ITEMS. BAS CONTRACTOR SHALL CARRY OUT ALL FURNISHING, INSTALLATION, AND WIRE TERMINATIONS UNLESS NOTED OTHERWISE. S L OWNER- FURNISHED RETURN AIR TEMP SENSOR INSTALL AND TERMINATE WIRING BETWEEN FACTORY-INSTALLED EEV AND BAS CONTROLLER. INSTALL WIRING FROM EEPR AND LLSV TO BAS CONTROLLER. REFER TO WALK-IN CONTROLLER WIRING DETAIL FOR TERMINATIONS PROVIDE 1/4" SCH 40 PLASTIC PLUMBER'S SUPPLY TUBE WITH CAPPED END. DRILL HOLE TO RUN SENSOR LEAD THROUGH. ROUTE REFRIGERATION SENSOR AND EEV WIRING TO KNOCKOUT. REFERENCE EVAPORATOR COIL SENSOR WIRING PROVISIONS DETAIL FOR CONTINUATION. PROVIDE JUNCTION BOX WITH FLEXIBLE CONDUIT OR SEALTITE AT CEILING FOR EEPR AND LLSV. INSTALL SENSOR AND WIRING BETWEEN SUCTION TEMPERATURE SENSOR AND KE2 CONTROLLER. INSTALL AND TERMINATE WIRING BETWEEN REFRIGERATION CONTRACTOR- INSTALLED PRESSURE TRANSDUCER AND KE2 CONTROLLER E RL RD RP N FI FA M DI AI EXISTING BAS DEVICE, SENSOR, OR WIRE FOR REUSE. EXISTING BAS DEVICE OR SENSOR TO RELOCATE AND RECONNECT. INSTALL NEW CABLE FOR RELOCATED DEVICE OR SENSOR AS NECESSARY. REDESIGNATED BAS DEVICE OR SENSOR. REPLACED BAS DEVICE OR SENSOR. NEW BAS DEVICE OR SENSOR. NEW FIELD INSTALLED BAS DEVICE, SENSOR, OR WIRE. NEW FACTORY INSTALLED BAS DEVICE, SENSOR, OR WIRE. BAS DEVICE OR SENSOR USED FOR MONITORING ONLY. DIGITAL INPUT. ANALOG INPUT. BAS ONE-LINE AND SCHEDULE NOTES REFRIGERATION BAS ONE-LINE REFLECTS THE INTENDED DESIGN BASED ON NEW CASES AND EXISTING SYSTEM NUMBERS. VERIFY ALL EXISTING CONDITION AND LOCATION OF ALL BAS EQUIPMENT PRIOR TO ROUGH-IN. WIRE LEGEND WIR-1010 (TAN CABLE 18-2, 20-2 TWISTED PAIR) WIR-2020 (BLUE CABLE 22-2 TWISTED PAIR) NOTE: 1.) NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE ARE PRESENT AT EACH REFRIGERATION GATEWAY. REFER TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO EACH REFRIGERATION GATEWAY. UNLESS NOTED OTHERWISE, DEVICES AND CABLING SHOWN IN THIS ONE-LINE DIAGRAM ARE VENDOR FURNISHED; REFRIGERATION BUILDING AUTOMATION CONTRACTOR TO INSTALL CABLING AND DEVICES AND MAKE FINAL TERMINATIONS. REFER TO PLANS FOR DEVICE LOCATIONS. COORDINATE WITH LEGACY BAS VENDOR (NOVAR) FOR THE REPROGRAMMING OF THEIR RACK CONTROLLER WITH THE REMOVAL OF CIRCUITS FROM THEIR CONTROL. VERIFY DEFROST SCHEDULES ARE COORDINATED BETWEEN THE EXISTING RACK CONTROLLER AND THE NEW CASE CONTROLS. ES-1 COMMUNICATION PORT LCD (IF APPLICABLE) / BACNET LOOP SPECTRUM (NOVARnet) / BACNET LOOP COM1 COM2 COM MODULE 1 COMMUNICATION PORT SPECTRUM (NOVARnet) / BACNET LOOP SPECTRUM (NOVARnet) / BACNET LOOP COM3 COM4 COMMUNICATION PORT SPECTRUM (NOVARnet) / BACNET LOOP COM5 COM6 SPECTRUM (NOVARnet) / BACNET LOOP COM MODULE 2 NOTES: 1.ALL CABLE WIR-2020 UNLESS NOTED OTHERWISE. 2.ALL WIR-1010 AND WIR-2020 CABLE FURNISHED BY OWNER FOR INSTALLATION BY CONTRACTOR. 3.ALL OTHER CABLE FURNISHED AND INSTALLED BY CONTRACTOR. IF WIRING LENGTH BETWEEN DEVICES EXCEEDS 328', OBTAIN SPORLAN-APPROVED NETWORK SWITCH TO INCREASE MAXIMUM WIRING LENGTH TO 650'. INSTALL ONE ADDITIONAL SWITCH FOR EACH SUBSEQUENT INCREMENT OF 325' OF RUN BETWEEN DEVICES. EXISTING 'ES-1' REFRIGERATION GATEWAY CAT5E COM1 COM2 COM3 COM4 ES1 REMOTE LCD SCREEN REFER TO WALK-IN COIL CONTROLLER WIRING DETAIL. TYP EXISTING ES1 REMOTE LCD SCREEN. BUILDING AUTOMATION CONTRACTOR TO PROVIDE RS-485 BACNET CABLE TO FIRST CASE/COIL CONTROLLER ON A COMM LOOP ONLY. TYP. OWNER-FURNISHED SPORLAN GATEWAY ROUTER LOCATED ON BAS BACKBOARD. TYP. CAT5E ETHERNET CABLE OR GREATER BETWEEN ROUTER AND S3C CONTROLLER. TYP OF ALL CABLING BETWEEN SGR, SNS, AND S3C. REFER TO MANUFACTURER INSTRUCTIONS FOR SPECIFIC REQUIREMENTS. S3C (C-1) COM5 COM6 EDC4 SGR XIO-8U-1 BUILDING AUTOMATION CONTRACTOR TO PROVIED RS-485 CABLE FROM BACKBOARD TO XIO. TYP. DIGITAL AND ANALOG SIGNAL CABLING FOR EACH LEAK DETECTION ZONE ROUTED TO LEAK DETECTION PANEL INSIDE STORE. REFER TO PLANS FOR LEAK DETECTION PANEL LOCATION AND LEAK DETECTION ZONE DEVICES ONE-LINE DIAGRAM. REFER TO XIO SCHEDULES. TYP. XIO SCHEDULE(S) SITE VERIFY OPEN COM AND UTILIZE. TYP. EXISTING KE2 COM LOOP. EXISTING SGR / S3C COM LOOP. t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.BASR1 BUILDING AUTOMATION SYSTEM WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM 1/16" = 1'-0" 1 REFRIGERATION BUILDING AUTOMATION PLAN OWNER FURNISHED REFRIGERATION CONTROLS EQUIPMENT VENDOR VENDOR SAP # Type QTY NOTES COPELAND COLD CHAIN LP 1000214394 Horn Strobe 3 COPELAND COLD CHAIN LP 1000214394 MRLDS 1 COPELAND COLD CHAIN LP 1000214394 Zone Alarm 1 HONEYWELL INTERNATIONAL INC 1000211094 1 XIO Enclosure 1 PARKER HANNIFIN 1000929314 #983629 Sporlan S3C enclosure 1 PARKER HANNIFIN 1000929314 Sporlan Gateway Router (SGR) 1 PROGASKET SOLUTIONS LLC 1000412309 LD_SENSOR_COVER 1 1. BAS CONTRACTOR SHALL CONTACT THE BAS SUPPLIER(S) TO OBTAIN A CURRENT MODULE CONFIGURATION PRINTOUT BEFORE TERMINATING SENSOR LEADS AT INPUT MODULES. THE REQUEST FOR THE CONFIGURATION PRINTOUT SHALL BE MADE PRIOR TO THE INSTALLATION OF BAS CABLES. WIRING TERMINATIONS SHALL BE LANDED ACCORDING TO THE BAS SUPPLIER CONFIGURATION SHEETS. 2. BAS CONTRACTOR SHALL PROVIDE COMPLETED REFRIGERATION SENSOR INPUT VERIFICATION FORMS TO THE BAS SUPPLIER(S) AT THE BEGINNING OF THE REFRIGERATION EQUIPMENT STARTUP. BAS INSTALLER SHALL PROVIDE ASSISTANCE TO THE BAS SUPPLIER(S) FOR SPOT CHECKING OF SENSORS FOR ACCURACY. 3. ALL BAS CABLE ON THE SALES FLOOR SHALL BE ROUTED IN CONDUIT AND CONCEALED FROM VIEW AND ROUTED ALONGSIDE OTHER PIPING OR CONDUIT AS MUCH AS POSSIBLE. 4. BAS CONTRACTOR SHALL BE PRESENT AND AVAILABLE TO RESOLVE ISSUES AND PROVIDE REFRIGERATION STARTUP ASSISTANCE UNTIL RELEASED BY THE BAS SUPPLIER AND WALMART MECHANICAL CONSTRUCTION MANAGER. 5. DURING THE REFRIGERATION STARTUP, BAS CONTRACTOR SHALL COMPLETE ALL UNRESOLVED REFRIGERATION WORK PRIOR TO WORKING ON OTHER BAS INSTALLATION ITEMS. 6. WHEN THE BAS SUPPLIER IS NOT SCHEDULED TO PERFORM THE ON SITE REFRIGERATION STARTUP, THE BUILDING AUTOMATION CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL CHECKS AND TEST TO ENSURE A FULLY FUNCTIONAL REFRIGERATION CONTROL SYSTEM. CONTACT THE BAS SUPPLIER FOR THE BLANK TEST VERIFICATION FORMS AND INSTRUCTIONS FOR COMPLETING. ALL COMPLETED TEST VERIFICATION FORMS SHALL BE RETURNED TO THE WALMART MECHANICAL CONSTRUCTION MANAGER. 7. REFER TO ARCHITECTURAL DRAWINGS FOR PIPING INSTALLATION AND SEALING REQUIREMENTS FOR DEVICES SHOWN ON COOLER/FREEZER PANELS. DO NOT INSTALL PIPING WITHIN COOLER/FREEZER PANELS. 8. ROUTE ALL UTILITY SERVICE LINES (PIPES AND CONDUIT) WITHIN STUD WALLS WHEREVER POSSIBLE. ON COOLER/FREEZER PANELS IN FOOD PREP AREAS WHERE UTILITIES MUST BE EXPOSED, CONTRACTOR TO HAVE THE OPTION OF THE FOLLOWING: A. SURFACE MOUNT UTILITIES WITH NON- CORROSIVE ANCHORS; SEAL BOTH SIDES OF PIPE/CONDUIT TO PANEL CONTINUOUSLY WITH SEALANT. B. INSTALL UTILITIES 1/2" OFF FACE OF PANEL TO ALLOW FOR CLEANING; USE ONLY NON- CORROSIVE MATERIALS FOR SPACERS AND ANCHORS. C. COVER UTILITIES WITH 20 GAUGE STAINLESS STEEL BENT PLATES MOUNTED TO WALL WITH NON-CORROSIVE ANCHORS; APPLY CONTINUOUS SEALANT ALONG EDGES AND JOINTS. 9. REFERENCE ARCHITECTURAL DEMOLITION PLANS FOR FULL EXTENT OF DEMOLITION WORK REQUIRED. GENERAL REFRIGERATION BAS NOTES 03.12.18 ALL DEMOLISHED NOVAR BAS EQUIPMENT SHALL BE RETURNED TO WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. EQUIPMENT TO BE RETURNED INCLUDES: EXECUTIVE CONTROLLER(S), IOM(S), CIM(S), CCM(S), ETC. PROVIDE DOCUMENTATION FOR ALL EQUIPMENT REMOVED IN ACCORDANCE WITH SPECIFICATIONS AND REQUIRED CLOSE-OUT DOCUMENTS. BAS EQUIPMENT SALVAGE REQUIREMENTS 11.02.15 WHERE EXISTING REFRIGERATION CHASES ARE BEING REMOVED, ANY DAMAGED OR IMPROPERLY SUPPORTED BAS CONDUITS WITHIN CHASE SHALL BE REPAIRED OR REPLACED AS REQUIRED. ANY EXISTING BAS CABLING WITHIN CHASE NOT INSTALLED IN CONDUIT SHALL BE RE-ROUTED THROUGH NEW CONDUIT. FINAL APPROVAL BY WALMART CONSTRUCTION MANAGER. REFERENCE ARCHITECTURAL DRAWINGS FOR REFRIGERATION CHASES BEING REMOVED. REFRIGERATION NETWORK GATEWAYE2E BUILDING AUTOMATION SYSTEMBAS TEMPERATURETEMP VARIABLE FREQUENCY DRIVEVFD BACKBOARD NEW EQUIPMENT EXISTING EQUIPMENT FACTORY INSTALLED EQUIPMENT EQUIPMENT TO BE DEMOLISHED CASE INPUT MODULEM REFRIGERATION CIRCUIT PRESSURE TRANSDUCER DUAL TEMP SWITCH RELAY IN BOX RELAY IN BOX & CONTACTOR PANEL LEAK DETECTION PANEL LEAK DETECTION SENSOR AUDIO\VISUAL ALARM ZONE ALARM SILENCE PANEL REFRIGERATION CASE/CIRCUIT CONTROLLER (SPORLAN) LDP L ZA X-# DTS RIB S C-## S3C CONTACTOR RIB/C-## REFRIG BAS SYMBOLS 12.21.18 P TEMPERATURE SENSOR 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS OR BUILDING AUTOMATION CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. SPORLAN GATEWAY ROUTERSGR SPORLAN NETWORK SWITCHSNS REFRIGERATION CASE/CIRCUIT CONTROLLER (OPUS)RCC REFRIGERATION GATEWAYXCM.20R 40 AMP KE2 CONTROLLERKE2-40 XIO ENCLOSUREXIO NTS4 WALK-IN COOLER/FREEZER COIL CONTROLLER ENCLOSURE MOUNTING (SPORLAN/KE2) NTS5ELECTRIC DEFROST TERMINATION SENSOR NTS6EVAPORATOR COIL SENSOR WIRING PROVISIONS NTS3WALK-IN EVAPORATOR CONTROL DEVICE LOCATION AND INSTALLATION NTS2REFRIGERATION BAS ONE-LINE DIAGRAM (NOVAR/SPORLAN) ISSUE BLOCK NOTE PR E S S U R E T R A N S D U C E R CO I L 1 DE F R O S T T E R M I N A T I O N RE T U R N A I R CO I L O U T L E T (S U C T I O N L I N E ) EE V 1 WALK-IN CONTROLLER ENCLOSURE POWER. REFRIGERATION CONTRACTOR TO CONNECT TO 120V COIL FAN CIRCUIT OR DEDICATED CONTROL POWER CIRCUIT PROVIDED BY ELECTRICAL CONTRACTOR REFER TO ELECTRICAL. DAIRY COOLER OR SIMILAR WALK-INS: REFRIGERATION CONTRACTOR TO TERMINATE WIRING WHERE APPLICABLE. REFER TO ELECTRICAL. REFRIGERATION CONTRACTOR TO TERMINATE DEFROST AND FAN WIRING PROVIDED BY ELECTRICAL CONTRACTOR REFER TO ELECTRICAL. FACTORY INSTALLED TERMINAL BLOCK AT EVERY WALK-IN CONTROLLER ENCLOSURE. TYP PROVIDE 20' #22 AWG 2 CONDUCTOR WIRE. TYP EEPR:ONE PER CIRCUIT BAS CONTRACTOR TO INSTALL #18 AWG 4 (OR #14 AWG 4 FOR RUNS OVER 250 FT) CONDUCTOR CABLE TO EEPR VALVES. BAS CONTRACTOR TO TERMINATE WIRING AT EEPR AND AT THE CONTROLLER. WIRE FURNISHED BY OWNER. REFER TO REFRIGERATION. THIS DETAIL IS A SCHEMATIC REPRESENTATION AND MAY NOT REFLECT ALL WALK-IN COIL CONTROLLER CONFIGURATIONS. REFERENCE MANUFACTURER FOR FACTORY INSTALLED COMPONENT INFORMATION. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR FACTORY WIRING DIAGRAMS, FIELD WIRING TERMINATIONS, AND RS485 BACNET WIRING DETAILS. SENSORS AND TRANSDUCERS: OWNER-FUNISHED WITH CONTROLLER ENCLOSURE. BAS CONTRACTOR TO INSTALL SENSORS AND TERMINATE WIRING FROM THE CONTROLLER TO THE SENSORS AND TRANSDUCER, TYP. REFER TO MANUFACTURER'S INSTRUCTIONS. EXTEND WIRING AS REQUIRED. REFER TO REFRIGERATION FOR WALK-IN EVAPORATOR COIL QUANTITY, LOCATION, AND DEFROST TYPE (ELECTRIC OR OFF-TIME). CAT-5 ETHERNET CABLE TO NEXT CONTROLLER ON COMM LOOP. REFER TO ONE-LINE DIAGRAM. CAT-5 ETHERNET CABLE FROM PREVIOUS CONTROLLER ON COMM LOOP. REFER TO ONE-LINE DIAGRAM. RS-485 COMM WIRING FROM ES1 TO FIRST CASE/COIL CONTROLLER ON COMM LOOP. REFER TO ONE-LINE DIAGRAM. LLSV:TERMINATE 120VAC LIQUID LINE SOLENOID VALVE WIRING ((2)#12 W/(1) 12 GND)) AT WALK-IN COIL CONTROLLER. REFER TO ELECTRICAL. LIQUID LINE SOLENOID VALVE IS PROVIDED BY THE REFRIGERAITON MANUFACTURER. EE P R LL S V LLSV EEPR SD SPORLAN S3C COIL CONTROLLER COMM WIRING STEPPER VALVE DRIVER (COIL 2) STEPPER VALVE DRIVER (COIL 3) BUILDING AUTOMATION SYSTEM CONTRACTOR TO PROVIDE RS-485 COMM WIRING TO FIRST CASE/COIL CONTROLLER ON COMM LOOP AND CAT-5 ETHERNET CABLE BETWEEN CONTROLLERS THEREAFTER. (COIL 1) STEPPER VALVE DRIVER QUANTITY DETERMINED BY WALK-IN EVAPORATOR COIL QUANTITY. (1) OR (2) EVAPORATORS EQUALS (1) VALVE DRIVER. (3) EVAPORATORS EQUALS (2) VALVE DRIVERS. FR O M E L E C T R I C A L P A N E L . RE F E R T O E L E C T R I C A L . TO E V A P O R A T O R C O I L . RE F E R T O E L E C T R I C A L . FR O M E L E C T R I C A L P A N E L . RE F E R T O E L E C T R I C A L . TO E V A P O R A T O R C O I L . RE F E R T O E L E C T R I C A L . FA N S DE F R O S T LI G H T S FACTORY INSTALLED COIL FAN RELAY. NE U T R A L S CO I L 2 CO I L 3 SD SD DE F R O S T T E R M I N A T I O N RE T U R N A I R EE V 2 DE F R O S T T E R M I N A T I O N RE T U R N A I R EE V 3 S PR E S S U R E T R A N S D U C E R PR E S S U R E T R A N S D U C E R SS CO I L O U T L E T (S U C T I O N L I N E ) CO I L O U T L E T (S U C T I O N L I N E ) EEV EEV EEV EEV:VALVE FACTORY INSTALLED, ONE PER COIL. BAS CONTRACTOR TO INSTALL #22 AWG 4 CONDUCTOR WIRE TO EEV VALVES. BAS CONTRACTOR TO TERMINATE WIRING AT EEV AND AT THE CONTROLLER. WIRE FURNISHED BY OWNER. REFER TO REFRIGERATION SCHEDULES FOR QUANTITY AND CIRCUIT NAME. P P P PROVIDE 20' #18 AWG 4 CONDUCTOR WIRE. TYP t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.BASR2 BUILDING AUTOMATION SYSTEM WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM NTS1WALK-IN CONTROLLER WIRING (SPORLAN, EEV, WITH EEPR) ISSUE BLOCK NOTE 15A Di g i t a l O u t s 1 - 3 D i g i t a l O u t p u t s 4 - 8 Di g i t a l O u t 1 1 - 1 5 Di g i t a l O u t 9 - 1 0 Te r m Tx Rx gnd TxRx Tx Rx Te r m g n d V n r CA N B u s 98 9 9 1 0 0 1 0 1 1 0 2 1 0 3 1 0 4 1 0 5 93 PW R ON FU S E 5 X 2 0 TxRx Te r m gnd CA N B u s 30 LAN PW R ON ALARM 11.02.15 HORN/STROBE LIGHT +84" AFF MRLDS LEAK DETECTOR SENSOR MOUNTED INSIDE WALK-IN +18" AFF SEAL ALL WALK-IN PENETRATIONS WITH SILICONE SEALANT. TYP PROVIDE 1" EMT STUB UP TO STRUCTURE TOP OF FREEZER OR COOLER BAR JOIST USE DOOR BOLLARD TO PROTECT SENSOR. (DO NOT BLOCK COVER REMOVAL OR SENSOR ACCESS) SUPPORT ALL CONDUITS AND BOXES PER N.E.C. ZONE ALARM SILENCE PANEL. +48" AFF SIDE VIEWFRONT VIEW BACK VIEW PROVIDE SENSOR CONNECTION IN 1/2" CONDUIT ALONG EXTERIOR OF BOX. MRLDS LEAK SENSOR CABLE. HORN/STROBE ALARM PANEL CABLE. ZONE ALARM SILENCE PANEL CABLE. 1/2" EMT WITH COMP. FITTINGS & MINERALLAC STRAPS 1/2" SEALTITE DRIP LOOP (MUST ENTER EXISTING K.O. IN BOTTOM OF SENSOR) REFRIGERANT SENSOR, HORN/ STROBE DEVICES, AND ZONE ALARM SILENCE PANEL FURNISHED BY LEAK DETECTION VENDOR. PROVIDE AN ENGRAVED PLASTIC LABEL READING "REFRIGERANT LEAK" ADJACENT TO EACH LEAK DETECTION HORN STROBE. LETTERING SHALL BE BLACK, MINIMUM OF 1/4" HIGH, ON A WHITE BACKGROUND. BELDEN 9418 18/4 AWG SHLD. CABLE WITH DRAIN/GROUND WIRE. TYP PROVIDE AN ENGRAVED PLASTIC LABEL INDICATING ZONE SERVED BY ALARM SILENCE PANEL. LETTERING SHALL BE BLACK, MINIMUM OF 1/4" HIGH, ON A WHITE BACKGROUND. COORDINATE LEAK DETECTION SENSOR INSTALLATION LOCATION WITH WALK-IN RACKING PANEL POWER INDICATOR LIGHT ZONE MRLDS POWER INDICATOR LIGHT. TYP DIXELL iPRO CONTROL SCREEN UNINTERRUPTED POWER SUPPLY (UPS) READY INDICATOR LIGHT. OFF = <20% BATTERY REMAINING. DOOR TO BASE BRAIDED GROUND STRAP (6" MAX). CPC #135-1004 OR EQUAL. CONNECTS POINTS INSIDE PANEL. 3/8" 6-32 STUD PROTRUDES INTO ENCLOSURE. INCLUDES STAR WASHER AND NUT. WALL-MOUNTED LEAK DETECTION PANEL. 20.75"x 27 3/8" BAS Cmn BAS Zn2 SIl BAS Zn3 Sil BAS Zn4 Sil BAS Zn5 Sil BAS Zn6 Sil 24VAC Out NO Contacts ZONE ALARM, LIGHT & SILENCE 22/2 CABLE OR EQUIVALENT BAS Zn1 SIl SENSOR 1 1-5V IN SENSOR -IN SENSOR 1 SHIELD iPRO ANALOG OUT1 - iPRO ANALOG OUT1 + MRLDS 1 24VAC PWR MRLDS 1 24VAC PWR HRN/STROBE 24VAC N HORN OUT 24VAC HOT STROBE OUT 24VAC HOT HRN/STROBE 24VAC HOT ZONE 1 AUX DRY CONTACT OUT -NC ZONE 1 AUX DRY CONTACT OUT - C ZONE 1 AUX DRY CONTACT OUT - NO BAS ZONE SILENCE COMMON HORN/STROBE (24VAC) SIGNAL STROBE MRLDS LEAK DETECTION SENSOR BACKPLATE REPEAT PER ZONE FRONT "LEAK DETECTION PANEL" VIEW INSIDE "LEAK DETECTION PANEL" VIEW ZONE 1 GAS (+) LEAK DETECTION PANEL FURNISHED BY LEAK DETECTION VENDOR. SEAL ALL PENETRATIONS WITH SILICONE SEALANT PROVIDE 1" EMT STUB UP TO STRUCTURE INSTALL LEAK DETECTION PANEL (LDP) 42" AFF SEAL BASE OF LDP WITH SILICONE SEALANT LEAK DETECTION DEVICE WIRING PER LEAK DETECTION ZONE. TYP 18/4 CABLE OR EQUIVALENT WIR-2020 OR EQUIVALENT. CABLE FURNISHED AND INSTALLED BY BAS CONTRACTOR. 18/4 CABLE OR EQUIVALENT 18/4 CABLE OR EQUIVALENT ZONE 1 DRY CONTACT OUT -NC ZONE 1 DRY CONTACT OUT - C ZONE 1 DRY CONTACT OUT - NO 11.21.17 ZONE ALARM SILENCE PANEL MRLDS LEAK SENSOR HORN/STROBE ALARM DAISY CHAIN TO ADDITIONAL HORN/STROBES AS NECESSARY. REFER TO PLANS FOR WALK-IN HORN/STROBE QUANTITY. ANALOG WIRING TO INPUT MODULE AT RACK. DIGITAL WIRING TO INPUT MODULE AT RACK. LDP ZA L REFER TO LEAK DETECTION PANEL INSTALLATION AND WIRING DETAIL FOR CABLE TYPES. LEAK DETECTION PANEL. ONE LDP SERVES UP TO (6) LEAK DETECTION ZONES. REFER TOPLANS FOR PANEL LOCATION. COMPRESSOR HOUSE WALK-IN LEAK DETECTION ZONE XIO t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.BASR3 BUILDING AUTOMATION SYSTEM WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM REFRIGERANT LEAK CONTROL SEQUENCE OF OPERATION FOR COOLERS AND FREEZERS: THE LEAK DETECTION CONTROL MODULES, UPON REGISTERING A CONCENTRATION THAT IS: ONE-HALF OF THE IDLH OR AT THE OEL; WHICHEVER IS LESS, SHALL: 1. ACTIVATE VISUAL AND AUDIBLE ALARMS FOR THE ZONE INDICATING THE LEAK 2. ENABLE AN AUTOMATIC SHUTDOWN OF THE LLSV AND EEPR TO ISOLATE THE REFRIGERANT FLOW IN THE CIRCUIT IN ALARM. AUDIBLE / VISUAL DEVICES INSIDE COOLERS AND FREEZERS SHALL BE INSTALLED IN WEATHERPROOF JUNCTION BOXES, REFERENCE LEAK DETECTOR INSTALLATION DETAIL. AUDIBLE / VISUAL DEVICES SHALL ANNUNCIATE AT A SOUND PRESSURE LEVE THAT IS A MINIMUM OF 15 DBA ABOVE THE AMBIENT NOISE LEVEL. LEGEND OEL: OCCUPATIONAL EXPOSURE LIMIT TWA: TIME WEIGHTED AVERAGE LLSV: LIQUID LINE SOLENOID VALVE IDLH: IMMEDIATELY DANGEROUS TO LIFE OR HEALTH SPL: SOUND PRESSURE LEVEL EPR: EVAPORATOR PRESSURE REGULATOR REFRIGERATION LEAK DETECTION SEQUENCE OF OPERATIONS 11.02.15 NTS2COOLER/FREEZER LEAK DETECTION DEVICE MOUNTING NTS1LEAK DETECTION PANEL INSTALLATION AND WIRING NTS3LEAK DETECTION ZONE DEVICES ONE-LINE DIAGRAM ISSUE BLOCK NOTE E E E E EE PIPING SCHEDULE RACK LTC VERTICAL ESTIMATED PIPE HORIZONTAL SUCTION RISER TOTAL DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH ^^C1 2-1/8 1-3/8 5/8 175 1) RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY ENGINEER OF RECORD. 2) ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. 3) ALL EXISTING PIPE SIZES ARE BASED ON ORIGINAL REFRIGERATION LEGENDS ^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES THE NEED FOR A RISER. IF THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY ENGINEER OF RECORD. **** NEW PIPING ^^ NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN. REFER TO REFRIGERATION PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. 1 1 2 2 3 3 4 4 G G H H J J ICE CREAM FREEZER GROCERY FREEZER DAIRY COOLER C-1 KR64E-220 (REPLACED) EXISTING CONDENSATE HEADER TO REMAIN. 15.605 EXISTING PIPING TO REMAIN. NOT ALL PIPING SHOWN. TYP; UNO. CO CD PROVIDE RUNNING TRAP BETWEEN COOLER WALK-IN AND FREZZER WALK-IN ON COOLER SIDE. STACKED CONDENSATE PIPING. CO 15.607 HCR DOOR PROVIDED AND INSTALLED BY OTHERS, TYP. 2 R3 1 R2 5 R3 SIM 15.606 TYP15.604 C1 15.638 t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.R1 REFRIGERATION PLAN AND PIPING SCHEDULES WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM KEYNOTES 15.604 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING AND BOLT PENETRATIONS THROUGH COOLER/FREEZER BOX WALLS OR CEILINGS. 15.605 SUPPORT EVAPORATORS WITH BOLTS THROUGH ROOF TO 1-5/8" X 1-5/8" X 10' LONG 14 GA. GALVANIZED UNISTRUT SPANNING THREE ROOF PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT. 15.606 CONDENSATE DRAIN; PITCH DRAIN LINES DOWN APPROXIMATELY 1" PER 10' TOWARD DRAIN. PROVIDE COPPER PIPING WITH ELECTRIC HEAT TAPE AND INSULATION ON ALL CONDENSATE LINES EXPOSED TO FREEZING TEMPERATURES. 15.607 SEE SCHEDULES FOR EVAPORATOR TYPES, SIZES, AND CAPACITIES; CONTROL METHOD; AND ALL REFRIGERATION PIPING SIZES, ETC. 15.638 REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL LIQUID LINE SOLENOID, EVAPORATOR PRESSURE REGULATOR, AND FULL PORT ISOLATION BALL VALVES IN A SERVICE ACCESSIBLE LOCATION ON TOP OF WALK-IN BOX. COORDINATE LOCATION WITH EDGE PROTECTION SYSTEM. REFER TO REFRIGERATION SUBMITTALS / SCHEDULES FOR EXACT REQUIREMENTS. PROVIDE VALVE LOCATION IDENTIFICATION TAG OF ENGRAVED PLASTIC. REMOVE THE EXISTING CIRCUIT CONTROL VALVES AT THE COMPRESSOR HOUSE AS REQUIRED. CIRCUIT NUMBER (CIRCUIT INFO) REFRIGERATION PIPING (BELOW) TYPICALTYP 10.12.17 ##.#### CONNECT TO EXISTING CONTINUATION ELBOW -TURNED DOWN CONDENSATE DRAIN LINE (CD) CLEANOUTS (CO) EVAPORATOR COIL REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) CO (DETAIL REFERENCE)DETAIL NUMBER EXISTING TO REMAINETR # X# X-## # XXX ELBOW TURNED UP ISOLATION VALVE REFRIGERATION SYMBOLS QUANTITY / MODEL NUMBER SHEET NUMBER DEMO REFRIGERATION PIPING GENERAL NOTES 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERANT LINES, WITH A SINGLE LINE SHOWN INDICATING BOTH SUCTION AND LIQUID LINE ROUTING FOR EACH SYSTEM. 2. REFRIGERATION SYSTEM INSTALLATION SHALL BE IN COMPLETE CONFORMANCE WITH SPECIFICATIONS, AND WITH ALL REQUIREMENTS OF REFRIGERATION EQUIPMENT MANUFACTURER. 3. REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO BIDDERS AND TO INDICATE DESIRED ROUTING OF REFRIGERATION LINES; CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR CORRECT INSTALLATION OF PIPING AND ACCESSORIES TO PROVIDE A COMPLETE AND FULLY OPERATING SYSTEM. 4. REFER TO SPECIFICATION 15600 FOR INSULATION THICKNESS. INSIDE DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER TO MINIMIZE AIR GAPS BETWEEN PIPING AND INSULATION. PROVIDE FACTORY PRE- MANUFACTURED FITTINGS AT ALL TRAPS AND ELBOWS. WHERE PRE-MANUFACTURED FITTINGS ARE UNAVAILABLE MITER CUT ALL FITTINGS TO ENSURE PROPER SEAL BETWEEN INSULATION SEGMENTS. 5. PIPE INSULATION SHALL MATCH EXISTING COLOR UNLESS NOTED OTHERWISE ON PLANS OR SPECIFICATIONS. 6. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 7. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME FOR A SHORT PERIOD. 8. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 10. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 11. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 12. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 13. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 14. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS WIRING AND DEVICES. 15. EXISTING REFRIGERATION PIPING MAY BE RE- USED UNLESS OTHERWISE NOTED ON PLANS. REFER TO SCHEDULES FOR PIPE SIZE REQUIREMENTS. 16. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 18. REFER TO GROCERY ARCHITECTURAL DRAWINGS FOR ADDITIONAL WORK BY REFRIGERATION CONTRACTOR. 19. COMPLETE ASSET TAGGING PROCESS FOR ALL NEW REFRIGERATED CASES. REFER TO SPECIFICATIONS. 01.31.18 REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO REFRIGERATION EQUIPMENT. EPA CLEAN AIR ACT COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608 AND CODE OF FEDERAL REGULATION TITLE 40, PART 82 WHEN ADDING OR REMOVING REFRIGERATED EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT OF REFRIGERANT RECOVERED FROM EACH UNIT, THE DATE OF DECOMMISSIONING, COMPANY NAME AND SIGNATURE OF ON-SITE SUPERVISOR.11.02.15 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS OR BUILDING AUTOMATION CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. UNLESS NOTED OTHERWISEUNO SIMILARSIM * MODIFY CIRCUIT ** NEW CASE, COIL, CIRCUIT OR VALVE **** CHANGE EXISTING PIPE SIZE AS INDICATED ^^ NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN. REFER TO REFRIGERATION PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. ^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES THE NEED FOR A RISER. IF THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY ENGINEER OF RECORD. # CONTRACTOR TO FIELD VERIFY EXISTING RISER SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH SCHEDULE, REPLACE EXISTING RISER WITH NEW SIZE AS SHOWN. PIPING SYMBOLS SEISMIC NOTES 12.20.13 REFER TO SEISMIC RESTRAINT SHEET SR1 FOR INSTALLATION DETAILS. REFER TO THE SPECIFICATIONS FOR FURTHER INFORMATION. 1/8" = 1'-0" 1 REFRIGERATION PLAN ISSUE BLOCK NOTE REFRIGERATION SCHEDULE - EXISTING RACK LTC Refrig. EMS:Novar Condenser Type:Air H/R Media: -- Subcooler Liquid Temps SG1 Comp RGT ºF:-- DESIGN DB ºF : 100 EXTERIOR DRY BULB (DB) ºF :96.6 Format: SC Store#: 03705 System Type:Weatherpac Refrigerant:R448a System Elec:460V 3Ph 60 Hz Sat. Cond. Temp ºF:115 H/R Use:--SG1 Liq Temp ºF:--SG2 Comp RGT ºF:--DESIGN WB ºF :--Based on 5 yr Extreme DB-ASHRAE Pub.:2021 Proto Size: 176 City/State:Yelm, WA Consultant:Hargis Engineers Estimated Refrigerant Charge --Defrost Elec: 208V 60 Hz 1 or 3Ph Cond Design TD ºF:15 H/R Water GPM:--SG2 Liq Temp ºF:--SG3 Comp RGT ºF:--DESIGN INTERIOR DRY BULB ºF : 75 EXTERIOR WET BULB (WB) ºF :70.6 ProtoCycle Date:--Date Prepared 04/19/24 Prepared by: Wyatt King Rack and Condenser (lbs)--Sys.Pilot Elec:208V 1Ph Summer H/R Avail: N/A H/R Glycol Type:--SG3 Liq Temp ºF:--Evap. Superheat ºF:10 DESIGN INTERIOR RH % : 55% Based on 0.4% Monthly Max WB-ASHRAE Pub.:2021 Fixture and Field Piping (lbs)--Cond. Elec: 460V 3Ph 60 Hz Winter H/R Avail: N/A H/R Glycol %:--ASHRAE Design Conditions Weather Station: Gray AFF WMO: 742071 ELEVATION ft: 300 ASHRAE Climate Zone: 3B CIRCUIT INFORMATION FIXTURE ELECTRICAL INFORMATION MISC INFORMATION Case Fixture Length / Quantity Walk-In Box Size LSHX Y or N?Evaporator Case/Lights Anti-Sweat Drain Pan & Model #Coil TXV / Sub-Circuit Load Circuit Evap. Walk-In Circuit Control Valves Defrost Defrost Heaters Fans Amps Amps Amps CKT #FT /# of Doors 2 Dr/4' 3 Dr/6' 4 Dr/8' 5 Dr/12' L W H Case/Coil Model Case/Coil Manuf. Application WI Evaps Distributor Nozzle (MBH) Load (MBH) SST Air Temp EPR LLSV Type Amps Voltage Amps Voltage (120v) (120v) (120V) Comments Equip Number CKT # *C01 18 18 12 **KRD64E-220TDAK KRACK Ice Cream Freezer **HX-6 **SER-C / **#2 -21.6 -20 -10 **CDST-9-11 **E6S140 EL 17.4 208/3 3.6 208/1 - - -WALK-IN & EVAP REPLACED - *C01 C02 10 DRS ONRZH-E HILL PHEONIX Reach-In Ice Cream - --12.3 -17 ETR SORIT-12 ME6S140 EL 30.2 208/3 5.0 120/1 ETR ETR ETR ETR ETR C02 C03 10 DRS ONRZH-E HILL PHEONIX Reach-In Ice Cream -- - 12.3 -17 ETR SORIT-12 ME6S140 EL 27.6 208/3 5.0 120/1 ETR ETR ETR ETR ETR C03 C04 2 ENDS FWE HUSSMANN Dual Temp End Cases - --4.4 -20 ETR SORIT-12DT ME6S140 EL 13.0 208/1 1.6 120/1 ETR ETR ETR ETR ETR C04 C05 24 FT FW HUSSMANN Dual Temp Coffin - --12.7 -20 ETR SORIT-12DT ME6S140 EL 30.4 208/3 6.4 120/1 ETR ETR ETR ETR ETR C05 C06 2 ENDS FWE HUSSMANN Dual Temp End Cases - --4.4 -20 ETR SORIT-12DT ME6S140 EL 13.0 208/1 1.6 120/1 ETR ETR ETR ETR ETR C06 C07 24 FT FW HUSSMANN Dual Temp Coffin - --12.7 -20 ETR SORIT-12DT ME6S140 EL 30.4 208/3 6.4 120/1 ETR ETR ETR ETR ETR C07 C08 10 DRS ONRZH-E HILL PHEONIX Reach-In Ice Cream - --12.3 -17 ETR SORIT-12 ME6S140 EL 30.2 208/3 5.0 120/1 ETR ETR ETR ETR ETR C08 C09 - - Spare - --- - - - - - - - - - - - - ETR ETR C09 Total Load: 92.7 -23 Sat. Suction Temp °F General Notes: 1.)Refrigeration OEM: Hussmann 2.)Case/Evap changes result in a net CHANGE of 0.0 MBH. LIQUID LINE FROM RACK PROVIDE NORMALLY OPEN FULL PORT BALL VALVE WITH INTEGRAL SCHRADER VALVE IN AN ACCESSIBLE LOCATION. ENSURE SCHRADER VALVE IS ORIENTATED AS SHOWN. PROVIDE INSULATION FOR BOTH VALVES. DO NOT TRAP LIQUID BY CLOSING LOOP AND CASE ISOLATION VALVES WHEN SERVICING. INSULATION SUCTION LINE TO RACK 07.07.17 INTERMEDIATE SUCTION LINE TRAP IN WALL, VOID SPACE, OR HIDDEN FROM VIEW. INTERMEDIATE TRAP SHOULD BE PLACED AT THE MIDPOINT OF ANY SUCTION LINE RISE WHICH EXCEEDS 16 FEET OR PLACED AT THE HIGHEST POINT THAT IS HIDDEN FROM VIEW. SUCTION LINE (TYP) INVERTED SUCTION LINE TRAP AT TOP OF SUCTION LINE RISER (TYP) LIQUID LINE (TYP) SUCTION LINE TRAP AT THE BASE OF THE RISER AT ALL POINTS WHERE SUCTION LINES RISES. SECURE ALL VERTICAL REFRIGERATION PIPING TO UNISTRUT MOUNTED TO THE WALL OR SECURED VIA HANGERS. REFER TO VERTICAL REFRIGERATION LINE SUPPORT DETAIL. (TYP) INSTALL VERTICAL PIPING AS COMPLETELY SELF-SUPPORTING BEFORE CONNECTING TO OTHER PIPING. REFER TO UNISTRUT PIPING SUPPORT DETAIL REFER TO LINE RACKING BEHIND REFRIGERATED CASES DETAIL OR VERTICAL FACE PIPING SUPPORT DETAIL. CONSTRUCT INTERMEDIATE SUCTION LINE TRAPS FROM PRE-MANUFACTURED TRAPS. (TYP) REDUCE RISER PIPE SIZE AFTER BASE TRAP FREEZER/COOLER BOX CEILING OR WALLPATCH HOLE WITH 26 GAUGE GALVANIZED SHEET METAL TRIM (TOP AND BOTTOM) SEAL PATCH WITH SILICONE (TYP.) EXPANDING FOAM SEALANT (TYP.) ATTACH PATCH WITH #8 X 3/4 HEX HEAD SELF TAPPING SCREWS (TYP.) SEAL FILL OPENING WITH SILICONE PROCEDURE FOR PATCHING HOLES: 1. ATTACH 26 GAUGE GALVANIZED SHEET METAL TRIM TO BOTTOM OF HOLE AND PARTIALLY TRIM TOP OF HOLE LEAVING 1" GAP AT TOP FOR EXPANDING FOAM SEALANT FILL. 2. FILL OPENING WITH EXPANDING FOAM SEALANT, LET EXPAND AND CURE AND TRIM EXCESS FOAM FROM FILL OPENING. 3. SEAL ALL EDGES AND EXPANDING FOAM SEALANT OPENING WITH SILICONE SEALANT. 4. VERIFY SPECIFIC APPLICATION WITH THE WALK-IN PANEL MANUFACTURER. 07.07.17 t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.R2 REFRIGERATION SCHEDULES AND DETAILS WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM NTS3REFRIGERATION ISOLATION VALVES NTS2 INTERMEDIATE SUCTION LINE TRAP NTS1COOLER/FREEZER BOX PENETRATION PLUG OWNER FURNISHED WALK-IN EVAPORATOR COIL SCHEDULE Manufacturer VENDOR Type VOLTAGE QTY NOTES KRACK HUSSMANN CORPORATION KR64E-220 208 V 1 GENERAL INFORMATION (ALL COILS): 1. COILS FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR. 2. INFORMATION CONTAINED WITHIN THIS SCHEDULE IS FOR OWNER'S PURCHASING REPRESENTATIVE. REFER TO REFRIGERATION SCHEDULE(S) FOR SPECIFIC INFORMATION REGARDING EQUIPMENT. 3. SUPPLIER SHALL VERIFY PRODUCT REQUIREMENTS INCLUDING BUT NOT LIMITED TO LIQUID TO SUCTION HEAT EXCHANGER, EXPANSION DEVICE TYPE, ELECTRICAL REQUIREMENTS, ETC. WITH REFRIGERATION SCHEDULE(S). NOTES: A.EVAPORATOR COIL SHALL BE FURNISHED WITH FACTORY INSTALLED VALVES, SENSORS, TRANSDUCERS, AND ALL OTHER APPURTENANCES, AS OUTLINED IN THE 15690 EQUIPMENT SPECIFICATION, INCLUDING: ELECTRONIC EXPANSION VALVE (EEV), SCHRADER VALVES (TWO IN THE SUCTION LINE, ONE IN THE LIQUID LINE, UPSTREAM OF THE EEV), SUCTION PRESSURE TRANSDUCER, AIR TEMPERATURE SENSOR, SUCTION TEMPERATURE SENSOR, DEFROST TERMINATION TEMPERATURE SENSOR AND ALL OTHER COMPONENTS. REFER TO DETAILS FOR FIELD INSTALLED CONTROL WIRING BETWEEN EVAPORATOR COIL AND WALK-IN UNIT CONTROLLER. HCR PCAV AIR CURTAIN WALMART PANEL VENDOR RC EC A, B FURNISHED BY INSTALLED BY START-UP BY ELECTRICAL BY EQUIPMENT RESPONSIBILITY NOTES HCR RESPONSIBILITY MATRIX GENERAL INFORMATION: 1. REFER TO EQUIPMENT SCHEDULED FOR EQUIPMENT INFORMATION. NOTES: A. ELECTICAL WIRING AND CONNECTIONS BY EC INCLUDING PANEL TO DISCONNECT, DISCONNECT TO CONTROLLER HEAD, INTERCONNECTIONS BETWEEN CONTROL PANEL AND AIR DOOR, AND DOOR SWITCH WIRE. ALL WIRING SHALL BE ROUTED THROUGH CONDUIT. B.START-UP OF HCR PCAV DOOR INCLUDES INSTALLATION OF DOOR SWITCH AND FOLLOWING ENTIRE HCR START-UP GUIDE. A ISSUE BLOCK NOTE EXIT WALK-IN AS SOON AS POSSIBLE AND RUN HEADER ALONG EXTERIOR OF BOX. COORDINATE HEADERS WITH FIXTURES AND EQUIPMENT OUTSIDE WALK-IN BOX. TYP WALK-INS WITH TEMPERATURES BELOW FREEZING USE COPPER PIPING WITH ELECTRIC HEAT TRACE AND INSULATION ON CONDENSATE LINES EXPOSED TO FREEZING AND WHEN OTHERWISE NOTED. TYP EACH INDIVIDUAL EVAPORATOR DRAIN MUST CONNECT DIRECTLY TO HEADER. TYP COORDINATE HEADERS WITH FIXTURES AND EQUIPMENT INSIDE WALK-IN BOX. TYP TERMINATE CONDENSATE DRAIN OVER HUB DRAIN OR SERVICE SINK WITH AIR GAP. INSTALL TRAP UPSTREAM OF HUB DRAIN OR SERVICE SINK. TYP TERMINATE COPPER DRAINS TO COMMON COPPER HEADER ONE SIZE LARGER THAN COIL DRAIN AND MAINTAIN SLOPE OF 1/8" PER 12" TOWARD DRAIN. DIRECT CONNECTION TO HEADER. TYP WALK-INS WITH TEMPERATURES ABOVE FREEZING USE 2" COMMON PVC HEADER AND MAINTAIN SLOPE OF 1/8" PER 12" TOWARD DRAIN. EACH INDIVIDUAL EVAPORATOR DRAIN MUST CONNECT DIRECTLY TO HEADER. TYP TERMINATE CONDENSATE DRAIN OVER HUB DRAIN OR SERVICE SINK WITH AIR GAP. INSTALL TRAP UPSTREAM OF HUB DRAIN OR SERVICE SINK. TYP TERMINATE COPPER DRAINS TO COMMON PVC HEADER. UTILIZE A UNION AT ALL COPPER TO PVC TRANSITIONS. TYP PROVIDE CLEANOUT FOR ALL HEADERS. TYP TERMINATE CONDENSATE DRAIN OVER HUB DRAIN OR SERVICE SINK WITH AIR GAP. INSTALL TRAP UPSTREAM OF HUB DRAIN OR SERVICE SINK. TYP WALK-INS WITH TEMPERATURES ABOVE OR BELOW FREEZING TERMINATE INDIVIDUAL COPPER DRAINS TO 2" COMMON PVC HEADER AND MAINTAIN SLOPE OF 1/8" PER 12" TOWARD DRAIN. UTILIZE A UNION AT ALL COPPER TO PVC TRANSITIONS. INSULATE COPPER PIPE OUTSIDE WALK-IN WALL PER SPECIFICATIONS INSTALL TRAP AT EACH INDIVIDUAL DRAIN UPSTREAM OF HEADER. TYP BELOW FREEZING ABOVE FREEZING PROVIDE TRAP UPSTREAM OF INDIRECT CONNECTION FROM COPPER TO PVC. REF WALK-INS WITH BELOW FREEZING PLAN VIEW. REF WALK-INS WITH TEMPERATURES ABOVE FREEZING PLAN VIEW. USE ELECTRIC HEAT TRACE AND INSULATION ON CONDENSATE LINES EXPOSED TO FREEZING AND WHEN OTHERWISE NOTED. TYPCOPPER PIPING FOR ALL INDIVIDUAL DRAINS. TYP CONDENSATE DRAINS SERVING MULTIPLE WALK-INS COORDINATE HEADERS WITH FIXTURES AND EQUIPMENT INSIDE WALK-IN BOX. TYP UTILIZE A UNION AT COPPER TO PVC TRANSITION. INSULATE COPPER PIPE OUTSIDE WALK-IN WALL PER SPECIFICATIONS PROVIDE RUNNING TRAP FOR INTERIOR CONDENSATE HEADERS RUNNING BETWEEN MULTIPLE WALK-INS OPERATING AT TEMPERATURES ABOVE FREEZING. IF A CONDENSATE PIPE FROM ONE WALK-IN MUST BE ROUTED THROUGH A WALK-IN EXPOSED TO FREEZING TEMPERATURES, USE A SEPARATE DEDICATED CONDENSATE PIPE FOR EACH WALK-IN. WHEN HEADER CANNOT RUN ALONG BOX EXTERIOR WHEN HEADER CANNOT RUN ALONG BOX EXTERIOR WHEN HEADER CANNOT RUN ALONG BOX EXTERIOR 11.17.17 S L SCHRADER VALVE WALK-IN WALL SLOPE DRILL HOLE IN COOLER/FREEZER BOX WALLS, CENTER PIPE IN OPENING, AND SEAL WITH EXPANDING FOAM. AFTER FOAM CURES, TRIM FLUSH TO PANEL. BUTT INSULATION TO THE BOUNDARY OF BOX PENETRATION. SEAL WHERE INSULATION BUTTS AGAINST THE PANEL AND AROUND PERIMETER OF INSULATION TO CREATE VAPOR BARRIER. TYP OF ALL PIPE PENETRATIONS THROUGH BOX WALL. (TYP) HOLE DIAMETER 1" GREATER THAN PIPE INSULATED WALL EXPANDING FOAM REFRIGERANT LINE SILICONE SEALANT INSTALL AND INSULATE LIQUID LINE SOLENOID, EVAPORATOR PRESSURE REGULATOR AND FULL PORT BALL VALVES ON TOP OF WALK-IN COOLER/FREEZER. MOUNT NEAR EDGE OF WALK-IN TO ALLOW SERVICE ACCESS. COORDINATE WITH EDGE PROTECTION SYSTEM.SLOPE REFRIGERANT LINES DOWN TOWARD COMPRESSORS AT 1" PER 20 FT. LOCATE HIGHEST POINT OF REFRIGERANT LINES JUST BELOW ROOF DECK OVER COIL SERVED. ROUTE THROUGH WEBS IN JOIST GIRDERS WHERE POSSIBLE. COORDINATE WITH SKYLIGHTS, HVAC, LIGHTING, CONDUIT AND FIRE PROTECTION. SEAL AROUND BOLT PENETRATIONS THRU COOLER/FREEZER BOX WALLS OR CEILINGS WITH BACKER ROD AND SEALANT. (TYP) SUPPORT EVAPORATORS WITH BOLTS THRU CEILING PANEL TO 1 5/8" X 1 5/8" X 10 FT. LONG 14 GAUGE. GALVANIZED UNISTRUT SPANNING THREE COOLER/FREEZER CEILING PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT. (TYP) FOAM TOPS OF BOLT PENETRATIONS. (TYP.) SUCTION LINE TRAP EVAP FAN/COIL UNIT PROVIDE INVERTED P-TRAP ON TOP OF ALL SUCTION RISERS PIPE INSULATION MOUNT COIL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. (TYP) SHORT RADIUS TRAP SHALL BE ONE-PIECE CONSTRUCTION. HOLD AS HIGH AS POSSIBLE REFERENCE EVAPORATOR COIL CONDENSATE PIPING DETAIL. INSTALL 3/4" LONG RADIUS DRAIN TRAP AT EACH INDIVIDUAL DRAIN UPSTREAM OF HEADER. PROVIDE COPPER CONDENSATE DRAIN PIPING FULL SIZE OF COIL DRAIN PAN CONNECTION AND SLOPE 1/8" PER 12" TOWARD DRAIN OR HEADER. DRAIN PAN UNION 11.17.17 3" MAX 3" MAX INSUGUARD OR COOPER B-LINE SNAP N' SHIELD PIPE SADDLE SECURED TO UNISTRUT. MATCH COLOR OF INSULATION. (TYP) 1 5/8"x1 5/8" GALVANIZED UNISTRUT P-1000, 6'-0" MAXIMUM ON CENTERS, 2'-0" MAXIMUM FROM ANY ELBOW. NOTE: FOR OVERHEAD LINES, UNISTRUT HORIZONTAL, TRAPEZE HUNG BOTTOM OF STRUCTURE LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS THREADED ROD TYP TOP BEAM CLAMP (TYP.) TOP CHORD OF JOIST ROOF PIPING INSULATION1/2" RETAINING NUT, UNSISTRUT P4010T 1/2" CHANNEL NUT WITH SPRING, UNISTRUT P1010 07.07.17 ELECTRICAL CONDUITS MOUNTED ON UNISTRUT SECURE UNISTRUT BY BOLTING BRACKET TO FLOOR ONLY DO NOT ATTACH UNISTRUT TO CASE REFRIGERATED CASES BETWEEN REFRIGERATED CASES BETWEEN REFRIGERATED CASE AND WALL REFER TO UNISTRUT PIPING SUPPORT DETAIL REFER TO UNISTRUT PIPING SUPPORT DETAIL Wall SECURE UNISTRUT BY BOLTING TO WALL STUD ONLY.UNISTRUT POST BASE P1887. ANCHOR WITHIN 0'-6" OF EACH END OF UNISTRUT. MAXIMUM ANCHOR SPACING OF UNITSRUT NOT TO EXCEED 8'. UP TO 8'-0" POST: P1000 ELEVATION SUCTION LINE .020" THICK PVC JACKET FOR ALL REFRIGERATION LINES EXTERIOR TO BUILDING (TYPICAL) TYPICAL LIQUID LINE PLAN INSULATION UNISTRUT INSULATION LIQUID LINE KLO-SHURE 7-SERIES STRUT MOUNTED COUPLING FOR EXPOSED PIPING. (TYPICAL OF OPTION 2) TYPICAL SUCTION LINE 1 5/8"x1 5/8" GALVANIZED UNISTRUT P-1000, 10'-0" MAXIMUM ON CENTERS REFRIGERANT SUCTION LINES SPACED 8" O.C. MOUNTED ON UNISTRUT (TYP) NOTE: MAINTAIN TIGHT SPACING BETWEEN PIPING BUTT INSULATION AGIANST PIPE SUPPORT, AND SEAL INSULATION AT EDGE OF COUPLING. (TYPICAL OF OPTION 2) OPTION 1: HIDDEN PIPING SUPPORT OPTION 2: VISIBLE PIPING SUPPORT PIPING INSULATION (BEYOND) #022 CUSH-A CLAMP FIRMLY CLAMPED TO PIPE. (TYPICAL OF OPTION 1) APPLY EXPANDING FOAM TO CLAMPS AND COVER WITH INSULATION IN A CLEAN AND WORKMAN LIKE MANNER. (TYPICAL OF OPTION 1) BOLT THREADED ROD (TYP) TOP BEAM CLAMP (TYP) OPTION 1: VERTICAL REFRIGERATION PIPING MOUNTED TO WALL OPTION 2: VERTICAL REFRIGERATION PIPING SUSPENDED VIA HANGERS 1/2" RETAINING NUT, UNISTRUT P4010T SQUARE WASHER, UNISTRUT P1064 THREADED ROD REFER TO HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL. (TYP) MAXIMUM 12" BETWEEN HIGHEST PIPING JOINT AND HORIZONTAL UNISTRUT. (TYP) 12" MAX REFER TO UNISTRUT PIPING SUPPORT DETAIL UNISTRUT POST BASE (TYP) VERTICAL PIPING SHALL BE SQUARE WITH FLOOR. (TYP) MAXIMUM 12" BETWEEM LOWEST PIPING JOINT AND HORIZONTAL UNISTRUT. (TYP) 12" MAX PROVIDE PIPE SUPPORT AT INTERMEDIATE SUCTION TRAP IF REQUIRED. BOLT TO WALL STUD ONLY REFER TO LINE RACKING BEHIND REFRIGERATED CASES DETAIL OR VERTICAL FACE PIPING SUPPORT DETAIL. REDUCE RISER PIPE SIZE AFTER BASE TRAP t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION R3 REFRIGERATION DETAILS WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM NTS5EVAPORATOR COIL CONDENSATE PIPING NTS2EVAPORATOR FAN/COIL UNIT WITH CONTROL VALVES NTS6HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL NTS4PIPE MOUNTING BEHIND REFRIGERATED CASES NTS3UNISTRUT PIPING SUPPORT DETAIL NTS1VERTICAL REFRIGERANT LINE SUPPORT ISSUE BLOCK NOTE **NEW VALVE, HEAD FAN OR OIL SEPARATOR ***ADD BAFFLE PLATE TO COMPRESSORS WITH PART NUMBER NOTED $$CHANGE COMPRESSOR FROM 06DR228 TO 06DR337 WITH NEW CONTACTOR & CCH AS PER ABOVE - RACK MAIN BREAKER FINE AS IS Rev. Revision: Date By: Refrigerant conversion from R404A to R448A4 05-31-23 LKW Changes made per EOR specifications [HUSSMANN]5 4-23-24 AWC 115 - - - 170.4 100 R448A OS4-07FAL 1-1/8" N/A Sporlan ORD-4-20 1-1/8" 1-3/8" Water 12D13B 1-5/8" 1-5/8" 1-1/8" 1-3/8" 1-3/8" DCR-969/SA-19S - A81B-7/8PX1 3/8C ME19S270 7/8" 1-1/8" Horizontal H12x60 172 -23 Suction Group REQ 92.7 -23 Suction Group AVAIL 97.0 N/A Rack Notes: Heat Reclaim Receiver Discharge Dia. x Length Lbs @ 80% PD Horiz / Vert LiquidGeneral Specifications Manif Size Drain Regulator Master Sol Drier / Sightglass Surge Solenoid Surge Ball Valve Surge Check Valve Line Size * Outside Air Temp. Rack MCA "Motors" MCA Defrost MCA Total Rej. Heat (MBH) Condensing Temp Refrigerant Type Bypass Regulator Heat Reclaim Valve Condenser Return Condenser Supply Isol Valve From Isol. Valve To Water / Air Disch. Check Valve Spun Oil Separator Disch. Regulator Manifold Size *From Receiver Subcooled Liquid Temp -150 -129.0 -139.9 MOPD Connected MCA 460/60/3 Main Stand By 208/60/3 1) A8-21 1) BTAS-417SV 2-5/8" -23 - - - - -23 Suction Group - Saturated Temp Filter Accumulator Manifold Size Suction 50% OE25S290(1) E3S120 1-1/8" 1-1/8" 1-1/8" 50% OE25S290(1) 1-1/8" - 1-1/8" 1-1/8" - - - - - - 10 460/60/3 540 - 1240 15 7 BNQ-D04-A016-4-WNW 11.0 Condenser/Split Max. Overcur Prot. FLA T.D. Model # Inverter Weight Solenoid Pump Out Sol. Isol. Valve From Check Valve From Isol. Valve To FPI VOLT RPM 15.0/175006ER75060A 43.0 33.9/150.0 4045A 8 1YES YES FV1 1/2190E5S130 10.0/175006DR337 34.7 19.9/114.0 2530A 10 NOYES YES FV 1 190E5S130 6.5/175006DR7250DA367A 19.3 14.1/80.0 2520A 12 1YES YES FV 1/2 190E5S130 -23 Suction Designed @ -23/115 ************************************************************** EXISTING 06DA660104 06DA660104 PS315SLRWD LTC / WP #3 HP/RPMMBTUHCompressor Model No: RLA/LRA ContCB Wire UNLHFCCH DeSuper Heat Y1037ValveBaffle Plate -23 Suction Group Loads MBTUH 92.7 ************************************************************************************************************************************************************************************************************************** LTC9 LTC8 LTC7 LTC6 LTC5 LTC4 LTC3 LTC2 LTC1 Application Heat Dist NozValve Expansion Exchr.ModelNo Sys Defrost Volts/∅Amps Fans Amps Volts/∅DEF°F Evap MBTUH Branch Riser Bran.Main Liquid SuctionLiquid Refrigeration Valves length Est. Riser Trunk Horiz Trunk Suction Branch Horiz Wal*Mart 176-2005 Supercenter #3705 Yelm, Washington 36398 Jeff Frasier 08/17/06 See Remote Manifold LTC / WP #3 460/60/3 CONYERS, GEORGIA 30013 (770)285-3100 Fax: (770)285-3076 709 SIGMAN ROAD Job #: Quote #: Store / Cust: Location: Prepared By: Date: Field Connection: Rack Voltage: ® t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.R4 REFRIGERATION SUBMITTALS HEI YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 HEI ISSUE BLOCK NO T E : F O R I N F O R M A T I O N O N L Y TH E I N F O R M A T I O N O N T H I S S H E E T I S S U P P L I E D B Y T H E OE M , A N D D E S C R I B E S T H E C O M P R E S S O R S , R A C K S , A N D HO U S E S . T H E E Q U I P M E N T W I L L B E P U R C H A S E D B Y OW N E R , A N D I S T O B E I N S T A L L E D B Y T H E R E F R I G E R A T I O N CO N T R A C T O R ; R E F E R T O S P E C I F I C A T I O N S . T H E IN F O R M A T I O N O N T H I S S H E E T I S S U B J E C T T O C H A N G E . CO N T R A C T O R S H A L L O B T A I N A N D V E R I F Y A L L A S -BU I L T IN F O R M A T I O N F R O M O E M B E F O R E I N S T A L L A T I O N . NOTE EQUIPMENT LOCATION A SEISMIC CABLE BRACE WITH HOOK ONLY SHOWN IN TWO DIRECTIONS FOR CLARITY. ADDITIONAL BRACING IS REQUIRED AS SHOWN IN PLAN VIEW BELOW. 45.00° ALLTHREAD ROD TYP SEISMIC CABLE BRACE TYP SEISMIC JOIST ATTACHMENT HARDWARE TYP 45°±15° AIRCRAFT CABLE BY SEISMIC RESTRAINT MANUFACTURER MAXIMUM 4 IN. ALLTHREAD ROD SEISMIC SOLID BRACE STEEL BRACE SEISMIC JOIST ATTACHMENT HARDWARE 45°±15° PIPE CLAMP MAY BE ROTATED TO GAIN ACCESS TO STRUCTURE ABOVE MAXIMUM 4" ALLTHREAD ROD SEISMIC CABLE BRACE HOOK TYP PIPE CLAMP MAY BE ROTATED TO GAIN ACCESS TO STRUCTURE ABOVE SEISMIC CABLE BRACE TYP 45°±15° SEISMIC JOIST ATTACHMENT HARDWARE TYP AIRCRAFT CABLE BY SEISMIC RESTRAINT MANUFACTURER SEISMIC STEEL BRACE ONLY SHOWN IN TRANSVERSE DIRECTION FOR CLARITY. ADDITIONAL BRACING IS REQUIRED AS SHOWN IN PLAN VIEW BELOW. TRAPEZE SUPPORT SEISMIC SOLID BRACE TYP PIPE CLAMP OR U-BOLT SEISMIC JOIST ATTACHMEN HARDWARE STEEL BRACE 45°±15° ALLTHREAD ROD SEISMIC CABLE BRACE WITH HOOK ATTACHMENT ONLY SHOWN IN TRANSVERSE DIRECTION FOR CLARITY. ADDITIONAL BRACING IS REQUIRED AS SHOWN IN PLAN VIEW BELOW. TRAPEZE SUPPORT PIPE CLAMP OR U-BOLT ALLTHREAD ROD TYP SEISMIC CABLE BRACE TYP SEISMIC JOIST ATTACHMENT HARDWARE TYP SEISMIC CABLE BRACE HOOK TYP 45°±15° AIRCRAFT CABLE BY SEISMIC RESTRAINT MANUFACTURER TRAPEZE SUPPORT SEISMIC SOLID BRACE TYP PIPE CLAMP OR U-BOLT SEISMIC JOIST ATTACHMEN HARDWARE STEEL BRACE 45°±15° ALLTHREAD ROD TRAPEZE SUPPORT PIPE CLAMP OR U-BOLT ALLTHREAD ROD TYP SEISMIC CABLE BRACE TYP SEISMIC JOIST ATTACHMENT HARDWARE TYP SEISMIC CABLE BRACE HOOK TYP 45°±15° AIRCRAFT CABLE BY SEISMIC RESTRAINT MANUFACTURER SEISMIC JOIST ATTACHMENT HARDWARE SEISMIC SOLID BRACE STEEL BRACE 45°±15° ALLTHREAD ROD PIPE HANGER ALLTHREAD ROD SEISMIC CABLE BRACE TYP SEISMIC CABLE BRACE HOOK TYP PIPE HANGER AIRCRAFT CABLE BY SEISMIC RESTRAINT MANUFACTURER SEISMIC JOIST ATTACHMENT HARDWARE TYP 45°±15° t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . NOT FOR CONSTRUCTION SR1 SEISMIC RESTRAINT WMK YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 EJM THE MECHANICAL, ELECTRICAL, AND REFRIGERATION SYSTEMS FOR THIS PROJECT SHALL BE SEISMICALLY RESTRAINED. THIS SHEET DEPICTS SCHEMATIC INSTALLATION DETAILS AND IS FOR INFORMATIONAL PURPOSES ONLY. SPECIFIC INSTALLATION INFORMATION REGARDING SEISMIC RESTRAINT SHALL BE OBTAINED FROM THE SEISMIC RESTRAINT MANUFACTURER. REFER TO THE SPECIFICATIONS FOR FURTHER INFORMATION. NTS9 ALL-DIRECTIONAL SEISMIC CABLE BRACE FOR SUSPENDED EQUIPMENT NTS8 LONGITUDINAL SEISMIC SOLID BRACE FOR CLEVIS SUPPORTED PIPE/CONDUIT NTS7 LONGITUDINAL SEISMIC CABLE BRACE FOR CLEVIS SUPPORTED PIPE/CONDUIT NTS6 ALL-DIRECTIONAL SEISMIC SOLID BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT NTS5 ALL-DIRECTIONAL SEISMIC CABLE BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT NTS4 TRANSVERSE SEISMIC SOLID BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT NTS3 TRANSVERSE SEISMIC CABLE BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT NTS2 TRANSVERSE SEISMIC SOLID BRACE FOR CLEVIS SUPPORTED PIPE/CONDUIT NTS1 TRANSVERSE SEISMIC CABLE BRACE FOR CLEVIS SUPPORTED PIPE/CONDUIT ISSUE BLOCK NOTE E E E E EE C J 1 H J ED CF 16.725 C-1 H4B1-37,39,41 16.530 24 16.780A 16.145 22(CF) (ED)33 PROVIDE CEILING MOUNTED MANUAL SWITCH 'HUBBELL' CLASS HBLDS3 OR 'EATON' CLASS AHDS30, IF OVER 30 AMPS PROVIDE 'HUBBELL' CLASS HBLDS6 OR 'EATON' AHDS60, WITH NEMA 4 WATERTIGHT NON-METALLIC ENCLOSURE FOR CONNECTION OF EVAPORATOR COIL FANS (CF) AND/OR ELECTRIC DEFROST (ED), (WHERE SHOWN ON DRAWINGS). PROVIDE PLACARD ON CEILING DETAILING PURPOSE OF EACH MANUAL SWITCH AND THE ELECTRICAL SOURCE (PANEL AND CIRCUIT NUMBER). NOTE: DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN, OFFSET TO SIDE. TYPICAL COIL EMT CONDUIT AND WIRING TO NEXT COIL POWER JUNCTION BOX ON SAME SYSTEM WHEN MULTIPLE COILS ARE IN SAME COOLER/FREEZER BOX. POWER CONDUIT AND WIRING SAME SIZE AND QUANTITY AS WIRING TO PANEL. 1" EMT CONDUIT PENETRATION SEALED WITH SILICONE SEALANT. NOTE: TAP DEFROST CIRCUIT IN JUNCTION BOX WITH #10 AWG FOR CONNECTION TO UNIT. MAXIMUM LENGTH OF TAP CONDUCTOR 18" CONDULET AT CEILING PENETRATION FILLED WITH SILICONE COIL FAN/DEFROST POWER EMT CONDUIT AND WIRING TO DESIGNATED PANEL VIA WALK-IN FAN/DEFROST CONTROL DEVICE. FINAL CONNECTION BY RC. COOLER/FREEZER BOX CEILING CEILING MOUNTED WP JUNCTION BOX WITH THREADED HUBS AND GASKETED COVERPLATE. SEAL TOP OF JUNCTION BOX TO COOLER/FREEZER CEILING WITH SILICONE SEALANT. 1" LIQUID-TIGHT FLEXIBLE METAL CONDUIT TO KNOCKOUT ON UNIT. FINAL CONNECTION TO COIL BY RC. t w 12 0 1 t h i r d a v e n u e , s u i t e 6 0 0 se a t t l e , w a s h i n g t o n 9 8 1 0 1 20 6 . 4 4 8 . 3 3 7 6 h a r g i s . b i z E N G I N E E R S SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE: CO N S U L T A N T S ST I P U L A T I O N F O R R E U S E PR O T O : JO B N U M B E R : TH I S D R A W I N G W A S P R E P A R E D F O R US E O N A S P E C I F I C S I T E A T : CO N T E M P O R A N E O U S L Y W I T H I T S I S S U E DA T E O N A N D I T I S N O T SU I T A B L E F O R U S E O N A D I F F E R E N T PR O J E C T S I T E O R A T A L A T E R T I M E . U S E OF T H I S D R A W I N G F O R R E F E R E N C E O R EX A M P L E O N A N O T H E R P R O J E C T RE Q U I R E S T H E S E R V I C E S O F P R O P E R L Y LI C E N S E D A R C H I T E C T S A N D E N G I N E E R S . RE P R O D U C T I O N O F T H I S D R A W I N G F O R RE U S E O N A N O T H E R P R O J E C T I S N O T AU T H O R I Z E D A N D M A Y B E C O N T R A R Y T O TH E L A W . EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.RE1 REFRIGERATION ELECTRICAL PLAN AT YE L M , W A 24 - 6 X 1 . 2 3 YE L M , W A 04 / 2 5 / 2 4 04/25/24 ST O R E N O : 0 3 7 0 5 - 10 0 3 CA P - X 03/29/24 RS ISSUE BLOCK 1/8" = 1'-0" 1 REFRIGERATION ELECTRICAL PLAN 12" = 1'-0" 2 EVAPORATOR COIL WIRING 1. COORDINATE ALL WORK WITH REFRIGERATION CONTRACTOR (R.C.) PRIOR TO INSTALLATION. 2. REFRIGERATED CASES: E.C. SHALL PROVIDE CONDUIT AND WIRE FOR REFRIGERATED CASE FANS, LIGHTS AND ANTI-SWEAT HEATERS, AND (IF APPLICABLE) ELECTRICAL DEFROST. PROVIDE ADEQUATE CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND LABEL EACH CIRCUIT WITH BRANCH CIRCUIT DESIGNATION AND REFRIGERATION SYSTEM NUMBER FOR FINAL TERMINATION AT CASE BY R.C. REF CASE CONNECTION WIRING DETAIL. 3. IF NEW CASES ARE PROVIDED WITH A FACTORY INSTALLED TERMINAL STRIP AND JUMPERS FOR CONNECTION TO A SINGLE CIRCUIT FOR 120V CASE LOADS. RC SHALL REMOVE FACTORY INSTALLED JUMPERS AS REQUIRED TO UTILIZE EXISTING SEPARATE 120V FAN/LIGHT/ANTI-SWEAT CIRCUITS AS INDICATED ON PLANS AND/OR PANELBOARD SCHEDULES. ANY EXISTING ANTI-SWEAT CONTROL (SWEATMISER) SHALL BE BY-PASSED. CASES UTILIZING ELECTRICAL DEFROST WILL BE PROVIDED WITH SEPARATE 208V TERMINATIONS AT THE TERMINAL STRIP FOR CONNECTION TO THE 208V ELECTRIC DEFROST CIRCUIT. RC SHALL MAKE FINAL TERMINATIONS OF 120V AND 208V POWER CIRCUIT(S) AT CASE TERMINAL STRIP. REFER TO CASE CONNECTION SCHEMATIC ON REFRIGERATION SHEETS. 4. WALK-IN UNITS: PROVIDE CONDUIT AND WIRE FOR EVAPORATOR COIL FANS (CF) AND (IF APPLICABLE) ELECTRIC DEFROST (ED). PROVIDE ADEQUATE CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND LABEL EACH CIRCUIT WITH BRANCH CIRCUIT DESIGNATION AND REFRIGERATION SYSTEM NUMBER FOR FINAL TERMINATION AT COIL BY R.C. REF EVAPORATOR COIL WIRING DETAIL. 5. ROUTE REFRIGERATED CASE AND WALK-IN UNIT COIL FAN, LIGHTS, ANTI-SWEAT AND DEFROST BRANCH CIRCUITS TO WIREWAYS PROVIDED AT REFRIGERATION EQUIPMENT AND/OR PANELBOARDS AS REQUIRED. 6. REFRIGERATED CASE WIRING COMPARTMENT REPRESENTED ON DRAWING BY JUNCTION BOX. 7. KEEP PENETRATIONS THROUGH WALK-IN UNITS TO A MINIMUM. ROUTE ALL CONDUITS SERVING FREEZERS AND COOLERS ON INSIDE OF BOX. 8. ALL CONDUITS INSTALLED ON TOP OF WALK-IN UNITS SHALL BE A MINIMUM OF 6" FROM ANY EDGE TO ALLOW SPACE FOR EDGE PROTECTION NETTING. DO NOT ROUTE CONDUITS ABOVE THE CEILING GRID ACCESS UNLESS CONDUITS ARE INSTALLED IN JOIST SPACE, REF ARCH. 9. UNDERSLAB CIRCUITS SHALL NOT BE ROUTED UNDER WALK-IN FREEZERS AND SHALL BE ROUTED ABOVE REFRIGERANT LINES WHERE THEY CROSS. 10. CIRCUITS FOR REFRIGERATED CASES SERVED BY UNDERSLAB REFRIGERATION PIPING ARE TO BE ROUTED UNDERSLAB AND EXTENDED TO THE FIRST CASE IN EACH SYSTEM. WIRING AND CONDUIT FOR SLAVE WIRING BETWEEN CASES SHALL BE PROVIDED BY R.C. REFER TO UNDERSLAB CASE CONNECTION WIRING DETAIL. 11. ALL UNDERSLAB CONDUITS SHALL BE 3/4" MIN. 12. CIRCUITS FOR REFRIGERATED CASES SERVED BY OVERHEAD REFRIGERATION PIPING ARE TO BE ROUTED DOWN FROM STRUCTURE AT THE SAME LOCATION AS THE REFRIGERATION PIPING AND EXTENDED TO THE FIRST CASE IN EACH SYSTEM. WIRE AND CONDUIT FOR SLAVE WIRING BETWEEN CASES SHALL BE PROVIDED BY THE R.C. REFER TO OVERHEAD CASE CONNECTION WIRING DETAIL. 13. ON GROUPS OF THREE OR MORE REFRIGERATED CASES WITH ELECTRIC DEFROST, R.C. SHALL CONNECT CASES TO CREATE A THREE-PHASE HEATER CIRCUIT. HEATER LOADS SHALL BE BALANCED BETWEEN PHASES AS EVENLY AS POSSIBLE. REF CASE DEFROST WIRING DETAIL. 14. PROVIDE A SEPARATE NEUTRAL FOR EACH NEW BRANCH CIRCUIT SERVING REFRIGERATED CASES OR WALK-IN UNITS AS INDICATED ON PLANS. 15. PROVIDE CIRCUIT BREAKER LOCKING DEVICE (LOCK- OFF FOR MAINTENANCE) ON NEW AND/OR EXISTING CIRCUIT BREAKERS SERVING REFRIGERATED CASES. 16. REFERENCE ARCHITECTURAL DEMOLITION PLANS FOR FULL EXTENT OF DEMOLITION WORK REQUIRED. GENERAL REFRIGERATION ELECTRICAL NOTES 12.21.18 ALL CONDUCTOR SIZES ARE BASED ON 75 DEG C RATED TERMINATIONS AND TYP THHN/THWN-2 INSULATION; FOR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 75 DEG C. MODIFY SIZES ACCORDING TO NFPA 70. CIRCUIT SCHEDULE XXXX INDICATE WIRE SIZE FOR CIRCUIT HERE. AS REQUIRED FOR CASE/COIL FAN AND DEFROST FED FROM RACK CONTROLLERS. KEYNOTES 16.145 CONNECT CIRCUIT(S) TO EXISTING BRANCH CIRCUITRY. MINIMUM WIRE SIZE AND PANELBOARD CIRCUIT ARE NOTED. VERIFY SIZE, RATING AND CONDITION OF EXISTING BRANCH CIRCUIT CONDUIT AND WIRE PRIOR TO USE TO ENSURE THAT THEY MEET REQUIRED SIZE, AND ALL U.L. RATINGS AND REPLACE AS REQUIRED. 16.530 AIR DOOR AND CONTROL PANEL: PROVIDE POWER FROM DISCONNECT TO AIR DOOR CONTROL PANEL. PROVIDE AND INSTALL ALL INTERCONNECT WIRING BETWEEN THE CONTROL PANEL, AIR CURTAIN AND DOOR INTERLOCK SWITCH PER MANUFACTURER’S INSTRUCTIONS. 16.725 ROUTE COIL FAN (CF) AND/OR ELECTRIC DEFROST (ED) CIRCUITS FROM THE BAS CONTROLLER. FINAL TERMINATIONS AT ENCLOSURE BY R.C. 16.780A E.C. SHALL REMOVE EXISTING CONTACTOR IN RACK CABINET AND CONNECT CIRCUITRY DIRECTLY TO CIRCUIT OVERCURRENT PROTECTION DEVICE. REFRIGERATION SYSTEM EVAPORATOR FAN/DEFROST CIRCUITS SHALL BE CONTROLLED BY FACTORY INSTALLED CONTROLS IN NEW CASES OR BY FIELD INSTALLED CONTROLS AT WALK-INS. IF REQUIRED, E.C. SHALL INSTALL NEW VENDOR FURNISHED OVERCURRENT PROTECTION DEVICE FOR REFRIGERATION SYSTEM EVAPORATOR FAN/DEFROST CIRCUIT. PROVIDE A NEW NEMA 1 ENCLOSURE FOR FAN/DEFROST CIRCUIT OVERCURRENT PROTECTION DEVICE, IF NEEDED. MOUNT NEMA 1 ENCLOSURE AS CLOSE AS POSSIBLE TO EXISTING RACK CABINET. REFER TO REFRIGERATION LEGEND(S). FEEDER OR GROUND SIZE ALL CONDUIT AND CONDUCTOR SIZES ARE BASED ON EMT WITH 40% FILL, 75ºC RATED TERMINATIONS AND TYPE THHN/THWN-2 INSULATION. FOR NON-EMT CONDUIT OR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 75ºC, MODIFY SIZES ACCORDING TO NEC. FEEDER SCHEDULE 22 (2)#12, (1)#12 G, 1/2" C 24 (4)#12, (1)#12 G, 1/2" C 33 (3)#10, (1)#10 G, 1/2” C 4/23/24