Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Circle K - Yelm (Yelm & Killion), WA - Mechanical Report
Administered by: ©2021 NEEA, All rights reserved Date: Nov 11, 2024 MECHANICAL COMPLIANCE SUMMARY 2021 WSEC Compliance Forms for Commercial Buildings including Group R1, R2, and Group R3 & R4 over 3 stories Project & Applicant Informa on Project Title Cirkle K Yelm, WA - BG #33080 - 2021 WSEC For Building Department Use: Project Address 9548 Killion Rd SE Yelm, WA 98597 Applicant Name Sean Stanton Applicant Phone 479-636-5004 Applicant Email EnergyBG@teamofchoice.com Mechanical Compliance Summary Scope - Compliance verifica on provided in this report is limited to code minimum efficiency requirements for mechanical equipment types defined in Tables C403.3.2(1) through C403.3.2(16) of the 2021 WSEC-C. This includes efficiency mul pliers for economizer excep ons. Performance criteria for addi onal energy efficiency and load management measures ARE NOT included in this report. Addi onal documenta on is required to demonstrate compliance with all other provisions of the energy code, including be er than code efficiency criteria for Sec on C406. For ques ons about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com. General Occupancy All Commercial General Building Use Type(s)Retail, Convenience Store Building Cond. Floor Area 5,192 General Project Types New Building New Building or Addi on Mechanical Scope Single Zone Systems & Equipment Altera on Mechanical Scope Project Cond. Floor Area 5,192 Floors Above Grade 1 Overall Compliance Path General Prescrip ve Mechanical Project Descrip on Mechanical Compliance Scope and Method Project Type Mechanical Scope Economizer Excep on(s) Applied? DOAS Ven la on Provided? Equipment Efficiency Compliance Verifica on New Building Single Zone Systems & Equipment Yes Yes COMPLIES Addi onal Energy Efficiency Measures (AEM) No mechanical addi onal energy efficiency measures included in project Load Management Measures (LDM) No mechanical load management measures included in project Does building include occupancy classifica ons requiring DOAS?Yes Does project include DOAS equipment?Yes Based on project scope do TSPR requirements apply?Yes Do all systems comply with Appendix D standard reference design or qualify for an excep on to TSPR?Yes Scope & Space Condi oning NEW BUILDING - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verifica on COMPLIES Single Zone Air Systems Category - Dedicated outside air system (DOAS) Air Systems Summary Informa on System/Equip ID Paired with other Systems/Equip Ven la on Airflow Control Ven la on Standard Ven la on CFM Ven la on energy recovery Energy Recovery Efficiency (%) OAU-1 Paired w/ one single zone system or equipment Constant volume IMC Ven la on 900 Yes per C403.3.5.1 DOAS ER 73.15 Air Systems & Equipment - Cooling System/ Equip ID Cooling System/Equip Type Specific Type Cooling Capacity (Btu/h) Econo Excep on Mul plier (Full) Required Cooling Efficiency (Code Min + Econo) Proposed Cooling Efficiency CE Units Efficiency Compliance Verifica on OAU-1 DX-DOAS, air cooled With energy recovery 29,000 0 5.2 6.1 ISMRE COMPLIES Air Systems & Equipment - Hea ng System /Equip ID Hea ng System/Equip Type Specific Type Hea ng Output Capacity Heat Pump Hea ng Capacity (Btu/h) Cooling Capacity (Btu/h) Required Heat Pump Hea ng Efficiency Proposed Heat Pump Hea ng Efficiency HPH Units Efficiency Compliance Verifica on 11/11/24, 4:19 PM Mechanical Compliance Summary https://waenergycodes.com/print_project_summary_form/mec?project_id=29899&form_version_id=24 1/2 (Btu/h)(Iden cal to Cooling Table) OAU-1 DOAS Energy recovery ven lator (ERV)0 0 0 COMPLIES Air Systems & Equipment Details System/Equip ID Discrete Area(s) Served Loca on In Project Documents - Plan/Detail #System/Equip Compliance Path OAU-1 1 M1.2.1 General Prescrip ve WSEC Equip Efficiency Reference Table - Cooling: Table C403.3.2(12&13) DX-DOAS Units, With & Without ER Economizer Compliance Method: Air-side economizer provided Single Zone Air Systems Category - Heat pump, packaged (PTHP, SPVHP, Room) Air Systems Summary Informa on System/Equip ID Quan ty of Items Supply Airflow Control Ven la on Standard Ven la on CFM (Total if Mul ple Items) Ven la on Air Source Paired with DOAS Ven la on energy recovery Energy Recovery Efficiency (%) RTU1 Constant volume IMC Ven la on 4000 Integral Air Systems & Equipment - Cooling System/ Equip ID Cooling System/Equip Type Specific Type Cooling Capacity per item (Btu/h) Econo Excep on Mul plier (Full) Required Cooling Efficiency (Code Min + Econo) Proposed Cooling Efficiency CE Units Efficiency Compliance Verifica on RTU1 Heat pump, terminal (PTHP)Packaged terminal HP, standard size 118,000 0 0 COMPLIES Air Systems & Equipment - Hea ng System /Equip ID Hea ng System/Equip Type Specific Type Heat Pump Hea ng Capacity per item (Btu/h) Cooling Capacity per Item (Btu/h) (Iden cal to Cooling Table) Required Heat Pump Hea ng Efficiency Proposed Heat Pump Hea ng Efficiency HPH Units Efficiency Compliance Verifica on RTU1 Heat pump, terminal (PTHP), hea ng Packaged terminal HP, standard size 115,000 118,000 0 COMPLIES Air Systems & Equipment Details System/Equip ID Discrete Area(s) Served Loca on In Project Documents - Plan/Detail #System/Equip Compliance Path RTU1 1 M1.2.3 General Prescrip ve WSEC Equip Efficiency Reference Table - Cooling: Table C403.3.2(4) Packaged Terminal, Ver cal AC & HP and Room AC Units Economizer Compliance Method: Air-side economizer provided WSEC Equip Efficiency Reference Table - Hea ng: Table C403.3.2(4) Packaged Terminal, Ver cal AC & HP and Room AC Units 11/11/24, 4:19 PM Mechanical Compliance Summary https://waenergycodes.com/print_project_summary_form/mec?project_id=29899&form_version_id=24 2/2