Circle K - Yelm (Yelm & Killion), WA - USTSHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK001
CO
V
E
R
S
H
E
E
T
CIRCLE K STORES, INC.
KILLION RD SE & W YELM AVE
YELM, WASHINGTON 98597
SYMBOLS LEGENDDESIGN CODES
SHEET #SHEET NAME
TK001 COVER
TK006 EQUIPMENT LIST
TK002 GENERAL NOTES
TK301 UST PLAN AND SECTIONS
TK500 TANK SUMP DETAILS
TK102 SCHEMATIC WIRING, PIPING & DETAILS
TK504 FUEL SYSTEM DETAILS
TK201 STANDARD TANKS
API AMERICAN PETROLEUM INSTITUTE
N.C. NORMALLY CLOSED
& AND
NIP NIPPLE
@ AT
NO. NUMBER
A.C. ASPHALT CONCRETE
N.O. NORMALLY OPEN
APPROX.APPROXIMATE
N.T.S. NOT TO SCALE
AUX. AUXILIARY
N/A NOT APPLICABLE
BLU. BLUE
O.D. OUTSIDE DIAMETER
BLK. BLACK
P PRODUCT LINE
℄ CENTERLINE
PVC POLYVINYL CHLORIDE
COMB. COMBINATION
PLC. PLACES
CONN. CONNECTOR/CONNECTION
± PLUS OR MINUS
CORP. CORPORATION
# POUND OR NUMBER
CSLD CONTINUOUS STATISTICAL LEAK DETECTION
QTY. QUANTITY
ø DIAMETER
REF. REFERENCE
DIM. DIMENSION
REQD. REQUIRED
D.C. DIRECT CURRENT
RSG. RIGID STEEL GALVANIZED
DWG. DRAWING
SCH. SCHEDULE
DBL. DOUBLE
SCR'D. SCREWED
(E) EXISTING
SEC. SECTION
ELECT. ELECTRICAL
SPEC'S. SPECIFICATIONS
E.S.O. EMERGENCY SHUT OFF
S.T.P. SUBMERGED TURBINE PUMP
EMT ELECTRICAL METALLIC TUBING
TYP. TYPICAL
ELL ELBOW
U.L. UNDERWRITERS LABORATORY
EMT ELECTRICAL METALLIC TUBING
U.F.C. UNIFORM FIRE CODE
FLEX. FLEXIBLE
U.G. UNDER GROUND
FRP FIBERGLASS REINFORCED PLASTIC
U.S.T. UNDERGROUND STORAGE TANKS
FNPT FEMALE NATIONAL PIPE THREAD
UNL UNLEADED
F.G. FIBERGLASS
V VAPOR LINE
' FEET
VAC VOLT AMP CURRENT
ELD ENHANCED LEAK DETECTION
VIO. VIOLET
GAL. GALLON
V.R. VAPOR RECOVERY
GALV. GALVANIZED
WHT WHITE HEX HEXAGON
W/ WITH
H.P. HORSEPOWER
I.D. INSIDE DIAMETER
" INCH
J-BOX JUNCTION BOX
MAX. MAXIMUM
MFRS MANUFACTURERS
MNPT MALE NATIONAL PIPE THREADS
MIN. MINIMUM
NPT NATIONAL PIPE THREAD
(N) NEW
TK502 TANK TOP HARDWARE DETAILS
TK501 TANK SUMP DETAILS
TK101 SITE PIPING PLAN
TK007 EQUIPMENT LIST
TK503 DISPENSER SUMP DETAILS
TK503.1 DISPENSER SUMP DETAILS - HSD
TK505 FUEL SYSTEM DETAILS
ALL CONSTRUCTION SHALL COMPLY WITH:
2018 WASHINGTON STATE BUILDING CODE
2018 WASHING STATE FIRE CODE
2018 WASHINGTON STATE MECHANICAL CODE
2018 WASHINGTON STATE PLUMBING CODE
2020 NEC WITH WASHINGTON STATE AMENDMENTS
NFPA 30
NFPA 30A
LATEST EDITION OF API RECOMMENDED PRACTICES - 1615
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK002
GE
N
E
R
A
L
N
O
T
E
S
GENERAL NOTE:
A.CONTRACTORS MUST HAVE AT LEAST 5 YEARS EXPERIENCE INSTALLING RETAIL FUEL SYSTEMS AND COMPLY WITH
THE FOLLOWING IN ORDER TO BID ON ANY CIRCLE K PROJECT OR BE INVOLVED ON ANY CONSTRUCTION:
A.1.AMERON CERTIFICATION
A.2.NUPI CERTIFICATION
A.3.BRAVO CERTIFICATION
A.4.FLEXING CERTIFICATION
A.5.EMCO WHEATON CERTIFICATION
A.6.GILBARCO/VEEDER-ROOT CERTIFICATION
A.7.CONTAINMENT SOLUTIONS/XERXES/MODERN WELDING CERTIFICATION & COMPLY WITH INSTALLATION
INSTRUCTIONS
A.8.HAZWOPPER & TRENCH EXCAVATION TRAINING
B.IT IS REQUIRED THAT ONLY "CERTIFIED INSTALLERS" BE USED FOR INSTALLATION OF THE PIPING SYSTEM TO INSURE
THAT PROPER PIPE FABRICATION, COUPLING AND INSTALLATION PERFORMED. "CERTIFIED INSTALLERS" ARE
EQUIPPED WITH FACTORY MANUFACTURED COUPLING EQUIPMENT AND INSTALLATION TOOLS AND HAVE
RECEIVED FACTORY TRAINING BY AMERON AND NUPI REPRESENTATIVES ON THE PROPER INSTALLATION AND
TESTING PROCEDURES.
THIS ENVIRONMENTALLY SAFE, FLEXIBLE UNDERGROUND PIPING SYSTEM PROVIDES PIPING RUNS BETWEEN USTS
AND THE PRODUCT DISPENSERS
C.ALL PRODUCT PIPING IS TO BE PRIMARY FUEL OF SPECIFIED DIAMETER IN SECONDARY PIPING OF SPECIFIED
DIAMETER. PIPING TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
D.WHERE FLEX CONNECTORS ARE COMPLETELY CONTAINED (NOT IN CONTACT WITH GROUND WATER, NATIVE
SOIL OR BACKFILL MATERIAL), STAINLESS STEEL CONNECTORS ARE ACCEPTABLE. WHERE FLEX CONNECTORS ARE
NOT COMPLETELY CONTAINED ISOLATION BOOTS OR PRIME AND WARP SHALL BE USED TO SEPARATE
CONNECTOR FROM COMING INTO CONTACT WITH GROUND WATER, NATIVE SOIL OR BACKFILL MATERIAL. ALL
FLEX CONNECTORS SHALL BE INSTALLED AS STRAIGHT AS POSSIBLE.
E.THE GENERAL CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF
PIPING SYSTEM. THE GENERAL CONTRACTOR SHALL INSURE THAT GOOD WORKMANSHIP AND CONSTRUCTION
PROCEDURES ARE FOLLOWED THROUGHOUT THE INSTALLATION, REGARDLESS OF INCLUSION OR OMISSION OF
ANY APPLICABLE SUGGESTION IN THESE INSTRUCTIONS OR ON THE DRAWINGS.
F.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE INSTRUCTIONS ARE THE RESPONSIBILITY OF THE
CONTRACTOR. MANUFACTURERS SPECIALISTS ARE AVAILABLE FOR CONSULTATION. THE PRESENCE OF THE
OWNER'S OR MANUFACTURER'S REPRESENTATIVE AT AN INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR
OF THE RESPONSIBILITY FOR A PROPER INSTALLATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER
SAFEGUARDING OF THE INSTALLATION AND MATERIALS AND EQUIPMENT STORED ON THE SITE TO PREVENT THEFT,
VANDALISM OR DAMAGE.
RESPONSIBILITY NOTE:
PETROLEUM SYSTEM ELECTRICIAN IS RESPONSIBLE FOR ALL POWER WIRING, LOW VOLTAGE WIRING, ATG
SENSOR/PROBE WIRING, AND SETUP.
PETROLEUM CONTRACTOR IS RESPONSIBLE FOR DISPENSER/SYSTEM START-UP AND CALIBRATION.
ON DAY OF SYSTEM STARTUP, DATA/NETWORK SUPPLIER, PETROLEUM CONTRACTOR, PETROLEUM ELECTRICIAN, AND
CK CONSTRUCTION MANAGER MUST BE ON SITE.
PETROLEUM CONTRACTOR IS REQUIRED TO BE ON SITE FOR THE ENTIRETY OF THE FIRST DAY OF STORE OPERATION (7AM
- 6PM)
CONCRETE NOTE:
UPON INSTALLATION & APPROVALS OF NEW PIPING, CONDUIT, PLUMBING, ETC. FOR THE TANK INSTALLATION, BACKFILL
EXCAVATION AREAS WITH APPROVED BACKFILL, AND PROVIDE CONCRETE PAVING PER CIVIL. NOTE: MINIMUM
REQUIREMENTS. 8" THICK, 4000 P.S.I. MIN. REQ'D @ TANK AREAS W/ NO. 4 BARS @ 12" O.C.E.W. (TYP). PROVIDE 6" THICK
MIN. CONC W/ NO. 4'S 18" O.C.E.W. REINFORCING AT PIPING TRENCHES. FINISH SHALL BE WOOD FLOAT WITH MEDIUM
BROOM FINISH.
A MEDIUM BROOM FINISH IS REQUIRED ON THE CONCRETE PAVING LOCATED BETWEEN THE GASOLINE ISLANDS AND
THE SIDEWALK IN FRONT OF THE CIRCLE K BUILDING. CONTRACTOR TO PROVIDE TEST AREA FOR CIRCLE K
REPRESENTATIVE APPROVAL.
SETTLEMENT NOTE:
CAUTION TANK SETTLEMENT, TANK DISTORTION, OR MOVEMENT IN CONCRETE COVER SLAB CANNOT BE TOLERATED
AND IF SPECIFIED MATERIALS ARE USED AND SPECIFIED PROCEDURES ARE FOLLOWED, NO INSTALLATION FAILURE
SHOULD OCCUR, IT WILL BE PRESUMED THE CONTRACTOR HAS NOT FOLLOWED THE SPECIFIED INSTRUCTIONS AND
PROCEDURES AND THE CONTRACTOR SHALL IMMEDIATLY UNDERTAKE, AT HIS SOLE EXPENSE, ANY NECESSARY
CORRECTIVE MEASURES, AS MAY BE APPROVED BY THE CIRCLE K FIELD REPRESENTATIVE, UP TO AND INCLUDING
COMPLETE REMOVAL AND RESETTING OF ALL UNDERGROUND TANKAGE AT THE SITE. IF IT IS DETERMINED THAT
MOVEMENT, SETTLEMENT OR DISTORTION HAS BEEN CAUSED BY FACTORS BEYOND THE CONTRACTOR'S CONTROL, THE
COST OF REMEDIAL MEASURES WILL BE BORNE BY OTHERS. THE GAS INSTALLATION CONTRACTOR DOES HEREBY AGREE
TO GUARANTEE THE UNDERGROUND TANKAGE INSTALLATION AGAINST FAILURE AS OUTLINED HEREIN ABOVE, FOR A
PERIOD OF ONE (1) YEAR FROM DATE OF FINAL ACCEPTANCE.
TANK BACKFILL REQUIREMENTS
UNDERGROUND STORAGE TANK BACKFILL MUST ADHERE TO MANUFACTURER MATERIAL REQUIREMENTS AND
COMPLIANCE TO STANDARDS
POLICY
IN ORDER TO ASSURE COMPLIANCE TO UST MANUFACTURER'S REQUIREMENTS FOR UST BACKFILL MATERIALS,
PROCEDURES WILL BE FOLLOWED TO MONITOR APPROVAL BY MANUFACTURER, VERIFICATION THAT APPROVED
MATERIAL HAS BEEN DELIVERED TO THE SITE, AND DOCUMENTATION ON THE CONSISTENCY OF MATERIAL PLACED IN
THE UST EXCAVATION.
PROCEDURE
SPECIFICATIONS FOR ACCEPTABLE MATERIALS TO BE USED AS STRUCTURAL SUPPORT FOR FIBERGLASS USTS.
ROUNDED GRAVEL
WHEN USING ROUNDED GRAVEL, THE MATERIAL IS THE BE A MIX OF ROUNDED PARTICLES, SIZES BETWEEN 1/8" AND 3/4".
THE ROUNDED GRAVEL MUST CONFORM TO THE SPECIFICATIONS OF ASTM C-33, PARAGRAPH 9.1, SIZES 6, 67, OR 7. NO
MORE THAN 5% (BY WEIGHT) OF THE BACKFILL MAY PASS THROUGH A #8 SIEVE. THE MATERIAL IS TO BE WASHED,
FREE-FLOWING, AND FREE OF ICE, SNOW, AND DEBRIS.
CRUSHED STONE
WHEN USING CRUSHED STONE, THE MATERIAL IS TO BE A MIX OF ANGULAR PARTICLES, SIZES BETWEEN 1/8" AND 1/2".
THE CRUSHED STONE MUST CONFORM TO THE SPECIFICATIONS OF ASTM C-33, PARAGRAPH 9.1, SIZES 7 OR 8. NO MORE
THAN 5% (BY WEIGHT) OF THE BACKFILL MAY PASS THROUGH A #8 SIEVE. THE MATERIAL IS TO BE WASHED,
FREE-FLOWING, AND FREE OF ICE, SNOW, AND DEBRIS.
APPROVAL PROCESS
ROUNDED GRAVEL
A SAMPLE CONSISTING OF THREE (3) SEPARATE RANDOM INTERIOR STOCKPILE SAMPLES SHALL BE TAKEN AT THE
QUARRY BY THE MATERIALS TESTING COMPANY. CLEAN ONE GALLON SIZED BUCKETS (APPROXIMATE) CAN BE USED
FOR SAMPLING.
THE MATERIALS TESTING COMPANY SHALL COMPLETE A SIEVE ANALYSIS ON THIS MATERIAL AS IT HAS BEEN COMBINED.
IF THIS MATERIAL MEETS THE ASTM C-33 SPECIFICATIONS, THE ANALYSIS SHALL BE SUBMITTED TO THE TANK
MANUFACTURER FOR APPROVAL. THE TANK MANUFACTURER WILL ISSUE AN APPROVAL ON THAT SAMPLE AS
REFERENCED TO A SPECIFIC QUARRY. THIS PROCESS SHOULD TAKE ABOUT TWO DAYS.
WITH ROUNDED GRAVEL ONLY, IT WILL BE NECESSARY TO OBTAIN A NEW SAMPLE ON EACH INSTALLATION AS LONG AS
THE QUARRY REMAINS THE SAME. AN APPROVAL FROM THE TANK MANUFACTURER WILL ONLY BE NEEDED ONCE TO
DOCUMENT THE APPROVAL OF THE ROCK. IT WILL NOT BE NECESSARY TO ASK FOR APPROVAL ON ADDITIONAL
INSTALLATIONS, UNLESS THE QUARRY LOCATION CHANGES.
IT WILL BE THE TANK INSTALLATION CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT ANY MATERIAL THAT HAS BEEN
APPROVED BY THE TANK MANUFACTURER ALWAYS COMES FROM THE SAME QUARRY AND REMAINS CONSISTENT.
CRUSHED STONE
A SAMPLE CONSISTING THREE (3) SEPARATE RANDOM INTERIOR STOCKPILE SAMPLES SHALL BE TAKEN AT THE QUARRY
BY THE MATERIALS TESTING COMPANY. CLEAN ONE GALLON (APPROXIMATE) SIZED BUCKETS CAN BE USED FOR
SAMPLING.
THE MATERIALS TESTING COMPANY SHALL COMPLETE A SIEVE ANALYSIS ON THIS MATERIAL AS IS HAS BEEN COMBINED.
IF THIS MATERIAL MEETS THE ASTM C-33 SPECIFICATIONS WITH NO VARIATION, IT WILL NOT BE NECESSARY TO SUBMIT A
SIEVE ANALYSIS FOR APPROVAL BY THE TANK MANUFACTURER. IT IS NOT UNCOMMON TO RECEIVE AN ANALYSIS THAT
INDICATES MATERIAL SIZES OUTSIDE OF THE ASTM-33 STANDARD. THESE VARIABLE REPORTS WILL NEED TO BE SUBMITTED
TO THE TANK MANUFACTURER FOR APPROVAL. THIS PROCESS SHOULD TAKE ABOUT TWO DAYS.
A NEW SAMPLE AND SIEVE ANALYSIS WILL BE REQUIRED FOR EVERY LOCATION AS WELL AS AN APPROVAL FROM THE
TANK MANUFACTURER.
ON CRUSHED STONE ONLY, CIRCLE K WILL REQUIRE AN ON-SITE INSPECTION AND DOCUMENTATION BY THE TESTING
COMPANY AS TO THE CONSISTENCY OF THE MATERIAL DELIVERED TO THE SITE AND ITS SIMILARITY TO THE MATERIAL
APPROVED BY THE TANK MANUFACTURER. CIRCLE K WILL ALSO REQUIRE TESTING COMPANY DOCUMENTATION TO
VERIFY THAT THE MATERIAL PLACED IN THE TANK EXCAVATION REMAINS CONSISTENT THROUGHOUT THE BACKFILL
PROCESS.
MATERIAL DISCOVERED ON SITE THAT DOES NOT MEET THE ASTM C-33 SPECIFICATION, FOR ANY REASON, WILL BE
REMOVED AND REPLACED AT THE UST INSTALLERS EXPENSE.
TANK AND DISPENSER NOTE:
A.THE SPECIFIC SITE PLAN AND SPECIFICATIONS WILL GOVERN THE EXACT LOCATION, NUMBER, SIZE, AND TYPE OF
EQUIPMENT TO BE INSTALLED AND INSTALLATION TO BE FOLLOWED.
B.PLANS AND SPECIFICATIONS REPRESENT MINIMUM REQUIREMENTS. CONTRACTOR SHALL MAKE THE INSTALLATION
IN ACCORDANCE WITH MANUFACTURER'S, FEDERAL, STATE, AND LOCAL ORDINANCES WHEN SUCH
ORDINANCES EXCEED THESE MINIMUMS.
C.CONTRACTOR SHALL SECURE, ARRANGE FOR AND PAY FOR ALL NECESSARY PERMITS, INSPECTIONS, AND TESTS
AND INCLUDE THE COST IN THEIR BID (UNLESS SPECIFIED DIFFERENTLY IN SCOPE OF WORK).
D.THE SCOPE OF WORK OR SPECIFICATIONS WILL LIST MATERIAL AND EQUIPMENT TO BE FURNISHED BY CIRCLE K.
CONTRACTOR SHALL STORE, SAFEGUARD AND FURNISH ALL OTHER MATERIALS REQUIRED TO COMPLETE THE
INSTALLATION.
E.MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION AND OPERATIONAL TESTING OF ALL TANKS, PIPING,
DISPENSERS, AND MONITORING EQUIPMENT SHALL BE FOLLOWED TO AVOID POSSIBILITY OF DAMAGE TO
EQUIPMENT.
F.ALL INSTALLATIONS SHALL INCLUDE THE INSTALLATION OF STAGE I VAPOR RECOVERY.
G.CONTRACTOR SHALL PLACE ALL UNDERGROUND PIPING WHERE SHOWN WITH A MINIMUM NUMBER OF BENDS
AND CONTINUOUSLY PITCHED TO PROVIDE MAXIMUM SLOPE FROM RISER TO THE LOW POINT AT THE
CONNECTION. MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL ALL PRODUCT AND VENT LINES IN A COMMON
TRENCH.
H.ALL PRODUCT LINES SHALL BE DOUBLE WALL FLEX PIPE. ALL VENT LINES (UNDERGROUND) SHALL BE FIBERGLASS
UNLESS OTHERWISE NOTED. ALL PRODUCT LINES SHALL BE NUPI SMARTFLEX. ALL VENT LINES SHALL BE AMERON
DUALOY 3000/L.
I.CONTRACTOR SHALL IDENTIFY UNDERGROUND PIPING, AND VENT PIPING ONCE IT HAS BEEN BACKFILLED AND
COVERED UP SO FINISH GRADING AND CONCRETE CONTRACTOR KNOW WHERE UNDERGROUND PIPING IS
LOCATED.
PIPE TRENCH NOTE:
PIPING TRENCH LINERS SHALL BE 6oz NON-WOVEN GEOTECH FABRIC - OVERLAP TOP COURSE. CONTACT LOCAL
CIRCLE K REPRESENTATIVE FOR LOCAL REQUIREMENTS.
FINISH NOTE:
(ALL PRODUCTS ARE SHERWIN-WILLIAMS)
A.BOLLARDS:N/A - SLEEVED PER ARCH.
ISLAND FORMS (IF REQUIRED BY AHJ): AMARILLO WHITE
VENT PIPE:AMARILLO WHITE
CANOPY NOTE:
CANOPY IS A PREFAB STEEL STRUCTURE, CONTACT CIRCLE K REPRESENTATIVE FOR NAME OF MANUFACTURER, SEE
MANUFACTURER'S DRAWING FOR STRUCTURAL DESIGN AND INSTALLATION INFORMATION. SEE ARCHITECTURAL SITE
FOR LOCATION OF CANOPY AND GAS ISLANDS. THE GASOLINE CANOPY STRUCTURE IS FURNISHED AND INSTALLED BY
CIRCLE K.
INSTALLATION NOTE:
CANOPY TANKS AND BUILDING TO BE INSTALLED AT THE SAME TIME. THESE PLANS MUST BE USED IN COORDINATION
WITH SEPARATE SITE, BUILDING AND CANOPY PLANS.
CONTRACTOR NOTE:
A.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS
ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE
CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE
CODES, IT IS THE CONTRACTOR'S RESPOSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING
PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER
SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF
WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
B.THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF THE GASOLINE
USTS AND SHALL INSURE THAT GOOD WORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE
FOLLOWED REGARDLESS OF THE INCLUSION OR OMISSION OF ANY INSTRUCTION.
C.UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE AND THE MANUFACTURER'S INSTRUCTIONS ARE
THE RESPONSIBILITY OF THE CONTRACTOR. MANUFACTURER'S SPECIALISTS ARE AVAILABLE FOR CONSULTATION.
THE PRESENCE OF THE MANUFACTURER OR OBSERVER AT AN INSTALLATION SITE DOES NOT RELIVE THE
CONTRACTOR OF HIS RESPONSIBILITY FOR THE PROPER INSTALLATION OF THE TANKS.
D.QUESTIONS REGARDING INSTALLATION PROCEDURES OR TANK REPAIRS SHOULD BE DIRECTED TO THE CIRCLE K
FIELD REPRESENTATIVE.
E.GASOLINE UNDERGROUND TANKS MUST BE INSTALLED ACCORDING TO THESE INSTRUCTIONS, THE
MANUFACTURER'S INSTRUCTIONS AND NFPA 30 AND 30A UL971. LOCAL CODES MAY APPLY AND MUST BE
ADHERED TO. FAILURE TO FOLLOW THESE INSTALLATIONS INSTRUCTIONS WILL VOID THE WARRANTY AND WILL
RESULT IN TANK FAILURE. PROPER INSTALLATION OF GASOLINE USTS HELP PREVENT TANK DAMAGE AND SHOULD
INSURE LONG-TERM CORROSION-PROOF SERVICE. IT IS IMPERATIVE TO READ, UNDERSTAND AND FOLLOW THESE
INSTRUCTIONS.
F.THESE SPECIFICATIONS ARE SUPPLEMENTED BY THE RESPECTIVE TANK MANUFACTURER'S SPECIFICATIONS. THE
INSTALLATION PROCEDURE SHALL COMPLY WITH BOTH SETS OF INSTRUCTIONS AND SPECIFICATIONS. IF, IN THE
CONTRACTOR'S JUDGEMENT, THERE APPEARS TO BE A CONFLICT IN THESE SPECIFICATIONS AND THE TANK
MANUFACTURER'S INSTRUCTIONS, CONTACT THE LOCAL CIRCLE K REPRESENTATIVE FOR CLARIFICATION AND
GUIDANCE.
G.CONTRACTOR SHALL INSPECT AND CONFIRM ALL PIPING TO BE CLEAR OF ALL BEDDING MATERIAL, TRASH, ANY
TYPE OF LIQUID OR DEBRIS PRIOR TO AND AFTER INSTALLATION.
I.TANK AND PRODUCT LINE TESTING AND REPORTING REQUIRED. COORDINATE REQUIREMENTS WITH CIRCLE K
REPRESENTATIVE.
J.TANK TIGHTNESS TESTING PROCEDURES SHALL BE FOLLOWED FOR ALL TANKS BEING INSTALLED. TESTING DATA
LOG SHALL BE COMPLETED BY THE CONTRACTOR AND SUBMITTED TO THE CIRCLE K REPRESENTATIVE AFTER
TESTING IS COMPLETE. CONTRACTOR SHALL ALSO RETAIN A COPY AS PART OF THE TANK RECORDS THAT MAY BE
REQUIRED BY FEDERAL, STATE AND/OR LOCAL REGULATIONS AND CODES.
K.CONTRACTOR SHALL PROVIDE TANK EXCAVATION HOLE PROTECTION AT AL TIMES UNTIL PAVING IS IN PLACE
PER OSHA STANDARD 1910. COVERS AND/OR GUARDRAILS SHALL BE PROVIDED TO PROTECT PERSONNEL FROM
THE HAZARDS OF OPEN PITS, TANK VATS, DITCHES, ETC.
L.ALL TANK, TRANSITION, AND DISPENSER SUMPS SHALL BE COVERED DURING CONSTRUCTION TO PREVENT DEBRIS
AND WATER FROM ACCUMULATING. ANY ACCUMULATION SHALL BE REMOVED AND SUMPS KEPT CLEAN.
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK006
EQ
U
I
P
M
E
N
T
L
I
S
T
EQUIPMENT LIST
#PART DESCRIPTION MANUFACTURER MODEL NUMBER FURN.INST.REMARKS
PRODUCT TANKS
1
DOUBLEWALL FIBERGLASS UNDERGROUND STORAGE TANK CONTAINMENT SOLUTIONS
20K - 10' DIA.
20K (12K/8K SPLIT) - 10' DIA
12K - 8' DIA - DIESEL
CK GC
COMPLETE WITH FIBERGLASS TANK SUMPS, CONTAINMENT COLLARS AND
MISCELLANIOUS PARTS INCLUDING FIBERGLASS STRAPS, GALVANIZED TIE-DOWNS, AND
DEADMEN.
HYDROSTATIC INTERSTITIAL FOR ALL TANKS. NO EXCEPTIONS.
2
3
4
5
PRODUCT AND VENT PIPING
6 2" DOUBLE WALL FLEXIBLE PIPING NUPI SMARTFLEX 19TSMAXPD63R75 CK GC 246' COIL
7 2" SINGLE WALL FIBERGLASS PIPING (VENT PIPING ONLY)AMERON AMERON-DUALOY 3000/L CK GC 33' STICK LENGTH, USE GLUE KIT FOR 100% ALCOHOL COMPATIBILITY. PROTECTIVE MESH
IS REQUIRED FOR L PIPING
8
9
TANK TOP PACKAGES, CONTAINMENT SUMPS, HARDWARE, AND MANHOLES
10 FILL SPILL BUCKET EMCO WHEATON A1004EVR-317S CK GC NO DRAIN VALVES.
11 VAPOR BUCKET EMCO WHEATON A1004EVR-317A CK GC NO DRAIN VALVES.
12 SWIVEL FILL ADAPTOR EMCO WHEATON A0030-124S CK GC
13 4" FILL CAP EMCO WHEATON A0097-005 CK GC
14 SWIVEL VAPOR ADAPTOR EMCO WHEATON A0076-124S CK GC DO NOT INSTALL SWIVEL VAPOR ADAPTOR AT DIESEL.
15 VAPOR CAP EMCO WHEATON A0099-002 CK GC INSTALL A0099-002 CAP AT DIESEL VAPOR ONLY. INSTALL A0097-005 AT ALL OTHER
PRODUCTS
16 EXTRACTOR VALVE 4x4x2 (NO CAGE)EMCO WHEATON A0079-150 CK GC
17 COMPOSITE 42" MANHOLE W/CAM LOCK EMCO WHEATON A0716-042C CK GC
18 15' OVERFILL DROP TUBE EMCO WHEATON A1100EVR-056CF CK GC
19 4" x 16' SLOTTED SCH 40 PVC W/ PLUG TITAN INDUSTRIES MF-4X16WS GC GC
20 12" X 16' SLOTTED SCH 40 PVC W/ PLUG TITAN INDUSTRIES TI-PVC12X16WELL GC GC
21 12" MONITOR WELL MANHOLE EMCO WHEATON A0721-101 CK GC Steel Skirt, White Lid
22 18" MONITOR WELL MANHOLE EMCO WHEATON A0721-018 CK GC
23 18" RAINTITE BOLTED MANHOLE EMCO WHEATON A0717-018B CK GC
24 4" WELL CAP EMCO WHEATON A0720-001 CK GC
25 12" WELL CAP TITAN INDUSTRIES EM-P4120BTMPLUG CK GC
26 UNITED SIGN FILL PIPE ID TAG, DIESEL UNITED SIGN US-FPI-125D CK GC
27 UNITED SIGN FILL PIPE ID TAG, UNLEADED UNITED SIGN US-FPI-125U CK GC
28 UNITED SIGN FILL PIPE ID TAG, PREMIUM UNITED SIGN US-FPI-125P CK GC
29 UNITED SIGN FILL PIPE ID TAG, E0 UNITED SIGN US-FPI-E0 CK GC
30 UNITED SIGN VAPOR RECOVERY ID TAG UNITED SIGN US-FPI-22 CK GC
31
32
33
34
35
36
37
38
39
TURBINE
40 FE PETRO 2 HP FIXED SPEED W/ MAG SHELL FRANKLIN FUELING FE-STPM200-VL2 CK GC REFER TO TK101 FOR PUMP QTY & SIZING CHART, ORDER RISER WITH PUMP
41 4" x 24" RISER - NPT THREADED 304L STAINLESS STEEL FRANKLIN FUELING CK GC
ORDER PRE-THREADED FROM MNFR.
42 4" x 24" RISER - NPT THREADED EPOXY COATED (DIESEL ONLY)FRANKLIN FUELING FE-400168424 CK GC
43
44
45
46
47
48
49
50
51
52
53
54
TURBINE SUMP FITTINGS, PIPING, AND VENT HARDWARE
55 BRAVO 3/4 FIBERGLASS CONDUIT ENTRY 10 PACK W/ GLUE BRAVO BR-F-07-FF/BR-F-07R-FF CK GC USE BR-F-07R-FF WHEN PVC COATED CONDUIT IS USED
56 2.5" ID FIBERGLASS SUMP ENTRY FITTING FOR 2" NUPI SMARTFLEX NUPI 19SEBEFM75A CK GC
57
58 3" PIPE CLAMP BRAVO BR-T-FF-CLAMP-3 CK GC
59 ENTRY FITTING ADHESIVE KIT 7 OZ - 1 KIT PER FITTING BRAVO BR-ADHESIVE-EPOXY-KIT CK GC
60 2" X 1-1/2" F ADAPTER - SS NUPI 19SAF63112SSNPT CK GC
61 2" M ADAPTER - SS NUPI 19SAM632SSNPT CK GC
62 2" F ADAPTER - SS NUPI 19SAF632SSNPT CK GC
63 FLEX CONN 2"x24" MxM SWIVEL END OMEGAFLEX OF-2X24MMS CK GC
64 ISOLATION BOOT 3x30"CRUSHPROOF CTC-450036 CK GC
65 2" THREAD,3" WC PRESSURE VACUUM VENT HUSKY A0084-038 CK GC
66 2" ALUMINUM OPEN TANK VENT (DIESEL ONLY)HUSKY A4103-002 CK GC
67 2" BALL VALVE - STAINLESS STEEL JOMAR JI-T100-2SS CK GC
68 2" BALL VALVE - BRASS JOMAR JI-T100-2PC CK GC
69 2" STEEL PIPING & FITTINGS - 304L STAINLESS STEEL - NPT THREADED GC GC
70 2" STEEL PIPING & FITTINGS - SCH 40 BLACK STEEL - NPT THREADED (DIESEL ONLY)GC GC
71 2" STEEL PIPING & FITTINGS - SCH 40 GALVANIZED - NPT THREADED (VENT RISER ONLY)GC GC
72 2" 90 - SINGLE WALL NUPI 19SGE63 CK GC
73 2" 45 - SINGLE WALL NUPI 19SCE63 CK GC
74 2" TEE - SINGLE WALL NUPI 19STE63 CK GC
75 2" COUPLING - SINGLE WALL NUPI 19SME63 CK GC
76 2" 90 - DOUBLE WALL NUPI 19SGEDW63 CK GC WITHOUT TEST PORT
77 2" 45 - DOUBLE WALL NUPI 19SCEDW63 CK GC WITHOUT TEST PORT
78 2" TEE - DOUBLE WALL NUPI 19STEDW63 CK GC WITHOUT TEST PORT
79 2" COUPLING - DOUBLE WALL NUPI 19SMEDW63 CK GC WITHOUT TEST PORT
80 2" TERMINATION FITTING NUPI 19SETFCV63 CK GC WITH TEST PORT
#PART DESCRIPTION MANUFACTURER MODEL NUMBER FURN.INST.REMARKS
DISPENSER & DISPENSER HARDWARE
81 MULTI-PRODUCT DISPENSER GILBARCO ENCORE 700S CK GC REFER TO TK101 FOR PRODUCT QTY AND TYPE (3+1+1, 3+1, 3+0, ETC.)
82 HUSKY 3/4" UL2586 UNL W/CLP BLK W/SPLSH HUSKY HN-N10SUF-UL CK GC
83 3/4" X 8" FS FUT HOSE - BLACK CONTINENTAL/CONTITECH CT-WHP3408 CK GC
84 3/4" X 9' FS FUT HOSE - BLACK CONTINENTAL/CONTITECH CT-3409 CK GC
85 3/4" MAGNETIC BREAKAWAY HUSKY HS-8330 CK GC
86 1+6 3/4 X 3/4 MULTIPLANE SWVL HUSKY HS-0350 CK GC
87 3/4" NEW UL2586 LFD W/CLP GRN W/SPLSH HUSKY HN-N10SLF-UL CK GC
88 3/4" X 8" FS FUT HOSE - BLACK CONTINENTAL/CONTITECH CT-WHP3408 CK GC
89 3/4" X 9' FS FUT HOSE - BLACK CONTINENTAL/CONTITECH CT-3409 CK GC
90 BRAVO 1000E FIBERGLASS SUMP FOR ENCORE DISPENSER BRAVO BR-B1000-ENC CK GC ECONOMY STYLE
91 BRAVO STABILIZER BAR BRAVO BR-BRKT-1000-ENC CK GC
92 SHEAR VALVE - OPW 10 PLUS DOUBLE POPPET OPW 10P-0152 CK GC
93 FLEX CONN 1.5" x 18" MxM SWIVEL END OMEGAFLEX OF-112X18MMS CK GC
94 3/4" UNLEADED HOSE KIT HUSKY HN-011154 CK GC ORDERING OPTION - INCLUDES PARTS 82, 83, 84, 85, 86
95 3/4" DIESEL HOSE KIT HUSKY HN-011463 CK GC ORDERING OPTION - INCLUDES PARTS 85, 86, 87, 88, 89
96
97
98
99
100
101
102
103
104
MISCELLANEOUS
105 6" BOLLARD COVER POST-GUARD GREY - 48"CK GC
106 6" x 72" BOLLARDS GC GC
107 3' x 5' x 13" DISPENSER ISLAND FORMS RIVERSIDE STEEL RS-3X5X13 CK GC USE ONLY IF REQUIRED BY AUTHORITY HAVING JURISDICTION. USE STAINLESS STEEL
ISLAND FORMS IN SNOW SITES.
108 20 CHANNEL INTERCOM SYSTEM-TRADEMARK ESCO ES-941-0114 CK GC
109 CONTAINMENT LINER MPC PETROGARD X GC GC FOR PIPING AND TANK HOLES THAT REQUIRE "TERTIARY CONTAINMENT". VERIFY WITH CK
REP AT TIME OF BIDDING
110 FILTER FABRIC GSE 8 OZ GSE NW8 GC GC FOR STANDARD INSTALLATION IN TANK HOLES AND PIPING TRENCHES
111 FILTER FABRIC GSE 16 OZ GSE NW16 GC GC FOR USE WITH ROCK HOLES. INCLUDE IN BID IF ROCK EXISTS.
112
113
114
115
116
117
118
119
120
121
122
123
124
MONITORING
125 TLS450PLUS W/ TCH DISPLAY & PRINT - CK VEEDER-ROOT VR-860091-301CK CK GC
126 TLS450PLUS APPLICATION SOFTWARE - CK VEEDER-ROOT VR-333545-001CK CK GC
127 RISK MGMT LEAK DETECTION DPLLD VEEDER-ROOT VR-332972-008CK CK GC
128 UNIVERSAL SENSOR PROBE 16 INPUT MOD VEEDER-ROOT VR-332812-001CK CK GC
129 UNIVERSAL INPUT/OUTPUT INTERFACE MOD VEEDER-ROOT VR-332813-001CK CK GC
130 CSLD SOFTWARE ENHANCEMENT VEEDER-ROOT VR-332972-006CK CK GC
131 DPLLD WITHOUT SWIFTCHECK VEEDER-ROOT VR-859080-001CK CK GC
132 8' MAG PLUS TANK PROBE VEEDER-ROOT VR-846396-107CK CK GC
133 10' MAG PLUS TANK PROBE VEEDER-ROOT VR-846396-109CK CK GC
134 PHASE SEPARATION 4" GAS FLOAT KIT - 10' CABLE VEEDER-ROOT VR-886100-010CK CK GC
135 4" NEW STYLE DIESEL FLOAT KIT - 10'CABLE VEEDER-ROOT VR-846400-011CK CK GC
136 4" CAP AND RING KIT VEEDER-ROOT VR-312020-952CK CK GC
137 PIPING SUMP SENSOR VEEDER-ROOT VR-794380-208CK CK GC
138 SENSOR HOLDER FOR UDC BRAVO BR-SH-UDC CK GC
139 SENSOR HOLDER FOR TANK SUMP BRAVO BR-SH-TS CK GC
140 HYDROSTATIC RESERVOIR SENSOR WITH VENTED CAP VEEDER-ROOT VR-794380-303CK CK GC
141 EMERGENCY SHUT OFF SIGN UNITED SIGN US-MS76 GC GC
142 EMERGENCY SHUT OFF SWITCH POWER INTEGRITY PI-IA-ESOCA/T GC GC
143 OVERFILL ALARM VEEDER-ROOT VR-790091-001CK CK GC
144 OVERFILL ALARM ACKNOWLEDGEMENT SWITCH VEEDER-ROOT VR-790095-001CK CK GC
145
146
147
148
149
150
151
152
153
154
155
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK007
EQ
U
I
P
M
E
N
T
L
I
S
T
EQUIPMENT LIST
#PART DESCRIPTION MANUFACTURER MODEL NUMBER FURN.INST.REMARKS
HIGH SPEED DIESEL/DEF - DISPENSERS, CONTAINMENT, AND HANGING HARDWARE
156 ULTRA HI FLOW DISPENSER GILBARCO ENCORE 700S CK GC SEE SITE PLAN AND VERIFY NUMBER OF MASTER/SATELLITES WITH CK CONSTRUCTION
REP
157 ULTRA HI FLOW DISPENSER WITH DEF GILBARCO ENCORE 700S CK GC SEE SITE PLAN AND VERIFY NUMBER OF MASTER/SATELLITES WITH DEF WITH CK
CONSTRUCTION REP
158 UNITED SIGN FILL PIPE ID TAG, DEF UNITED SIGN FPI-XXXX CK GC
159 SHEAR VALVE - 2" SINGLE POPPET OPW 10RF-2001 CK GC FOR USE AT SATELLITE FEEDS ONLY
160 SHEAR VALVE - 2" DOUBLE POPPET OPW 10RF-2002 CK GC FOR USE AT MAINFEED ONLY
161 SHEAR VALVE - 1" DEF OPW 60V-DEF CK GC FOR DEF ONLY. USE BSPP/NPT ADAPTORS PART #'s 205900/205899 FOR FINAL
CONNECTIONS
162 ENCORE DIESEL/DEF UNDER DISPENSER SUMP BRAVO B1385-S30 CK GC FOR USE AT DISPENSERS WITH DEF. INSTALL B1000-ENC (REF. TK006) FOR DISPENSERS
WITHOUT DEF.
163 1" DEF HOSE - BLUE OPW 21GU-H12 CK GC 12' HOSE
164 STAINLESS STEEL DEF SWIVEL/RECONNECTABLE BREAKAWAY OPW 21GU-SSB CK GC COMES WITH 21GU-BCS SWIVEL COVER SLEEVE
165 1" DEF NOZZLE - BLUE OPW 21GU-040G CK GC NO MIS-FILLING DEVICE. CONFIRM WITH CK WHEN MIS-FILLING DEVICE WILL BE NEEDED.
166 1" x 8" WHIP HOSE - BLACK CONTINENTAL 20022010 CK GC
167 1" MAGNETIC BREAKAWAY DEVICE CATLOW CAM TWIST CTM100-HD CK GC
168 1" x 10' DIESEL HOSE - BLACK CONTINENTAL 20021982 CK GC
169 1" SWIVEL HUSKY 0087 CK GC
170 1" HIGH VOLUME NOZZLE - GREEN HUSKY 177610-03 CK GC
171 FLEX CONN 1" x 18" MxM SWIVEL END FRANKLIN FF10X18HMXM346 CK GC
172 1" STAINLESS STEEL BALL VALVE JOMAR T100-965 CK GC
173
174
175
176
177
178
179
180
HIGH SPEED DIESEL SERVICE ISLAND EQUIPMENT
181 ADA APPROVED FREEZE PROOF WATER HYDRANT W/ 3/4" CONNECTION MERRIL R103 CK GC 3/4" OUTLET 1" INLET X 70 - 1/2" HYDRANT
182 5HP ELECTRIC AIR COMPRESSOR CHAMPION VR5-8 - VERT/HR5-8 - HORIZONTAL CK GC INSTALL IN CK SUPPLIED CABINET AT REAR OF BUILDING OR DUMPSTER ENCLOSURE.
REFER TO TK101.
183 AIR HOSE REEL REELCRAFT D8650 ELP CK GC ORDER SIDE WIND OPTION FOR COLUMN MOUNTING
184 1/2" X 18" STAINLESS STEEL FLEX CONNECTOR GC GC
185 1/2" STAINLESS STEEL BALL VALVE GC GC
186 3/4" SCH 40 PVC GC GC FOR USE WITH WATER ONLY. REFER TO CIVIL
187 1/2" TYPE K COPPER LINE GC GC FOR USE WITH AIR ONLY
188 1/2" BRASS BALL VALVE GC GC
189 AIR COMPRESSOR FILTER CHAMPION CFL SERIES CK GC
190 AIR COMPRESSOR REGULATOR CHAMPION CK GC
191 ANGLED AIR CHUCK WESTWARD 2HKY2 CK GC ANGLED AIR CHUCK, 1/4" FEMALE NPT, 150PSI RATING
192 WATER SPOUT MILTON JE 8647 CK GC WATER SPOUT, 1/4" FEMALE NPT
193 WATER HOSE CK GC 20' LENGTH X 3/4", RED
194
195
DEF TANK HARDWARE AND COMPONENTS
196 DEF SUBMERSIBLE PUMP KIT FE PETRO FE-STP-DEF-VL2 CK GC FOR 8' DIA TANK
197 2" STAINLESS STEEL CHECK VALVE CSVE200 CK GC
198 DEF FILL BUCKET EMCO WHEATON A1005-518GW2DEF CK GC USE ONLY WHEN DIRECT BURY FILL IS SPECIFIED
199 SS 4" X 3" FILL REDUCER ADAPTER SS 64143040 CK GC USE ONLY WHEN DIRECT BURY FILL IS SPECIFIED
200 SS 3" DUST CAP SS 1401130 CK GC USE ONLY WHEN DIRECT BURY FILL IS SPECIFIED
201 DEF REMOTE FILL BOX MORRISON BROS 515SD-0200 AC CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
202 DEF OVERFILL DEVICE MORRISON BROS 9095SS-9800AV CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
203 2" DEF DRY DISCONNECT ADAPTER MORRISON BROS 927S-0200 1A CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
204 2" DEF DUST CAP MORRISON BROS 9284-0200 1C CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
205 2" STAINLESS STEEL BALL VALVE MORRISON BROS 691BSS0800 1V CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
206 2" LINE STRAINER MORRISON BROS 284S-3100 1S CK GC USE ONLY WHEN REMOTE FILL APPLICATION IS SPECIFIED
207
208
209
210
CIRCLE-K STORE
5,200 S.F.
1
100'-
0
"
13
100'
-
0
"
13
16
11
12
16
16
14
11
12
16
7
8
10
5
17
18
15
2
4
3
14
20
19
TR
A
N
S
F
O
R
M
E
R
PA
D
(
A
P
P
R
O
X
)
W
16
11
12
16
14
16
11
12
16
14
16
11
12
16
14
16
11
12
16
14
16
14
11
12
16
20
19
100'-0"
21
22
KEY SCHEDULE:
1.CIRCLE K STORE; REF. ARCH
2.REGULAR UL DOUBLE WALL UNDERGROUND STORAGE TANK; REF. TK301
3.PREMIUM UL/CK CHOICE DUAL COMPARTMENT DOUBLE WALL
UNDERGROUND STORAGE TANK; REF. TK301
4.DIESEL DOUBLE WALL UNDERGROUND STORAGE TANK; REF. TK301
5.TANK PAD ; REF. TK301
6.NOT USED.
7.OBSERVATION WELL (4"); REF. DTL. 1/TK502
8.OBSERVATION WELL (12"); REF. DTL . 2/TK502
9.2" DOUBLE WALL NUPI SMART FLEX PRODUCT PIPING
10.2" SINGLE WALL FIBERGLASS VENT PIPING. PIPE TO SLOPE AT MINIMUM
SLOPE OF 1/8" PER FOOT BACK TO TANK
11.UNDER DISPENSER CONTAINMENT SUMP; REF. TK503
12.DISPENSER; REF. TK504
13.EMERGENCY STOP BUTTON PLACED 20' MINIMUM/100' MAXIMUM FROM
DISPENSER PER NFPA 30A/LOCAL FIRE CODE; REF ELECTRICAL DWGS.
14.CANOPY COLUMN; REF. ARCH
15.VENT STACK; REF. TK504
16.BOLLARD; REF TK504
17.CANOPY; REF. ARCH
18.CANOPY APRON; REF. CIVIL
19.HSD UNDER DISPENSER CONTAINMENT SUMP; REF. TK503.1
20.HSD DISPENSER; REF. TK505.1
21.EMERGENCY STOP BUTTON PLACED 20' MINIMUM/100' MAXIMUM FROM
DISPENSER PER NFPA 30A
22.EMERGENCY STOP BUTTON PEDESTAL; REF. DTL 3/TK505
LEGEND
REGULAR UNLEADED
CIRCLE K CHOICE
DIESEL
PREMIUM UNLEADED
VENT
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK101
SI
T
E
P
I
P
I
N
G
P
L
A
N
1 SITE PIPING PLAN SCALE: 1" = 20'-0"
D
CKC
P
U
DI
S
P
E
N
S
E
R
1
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
2
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
3
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
4
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
5
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
6
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
7
L
E
A
K
D
E
T
E
C
T
O
R
3/
4
"
C
DI
S
P
E
N
S
E
R
1
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
2
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
3
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
4
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
5
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
6
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
7
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
1
P
O
W
E
R
CK STORE
12
K
D
I
E
S
E
L
(
1
0
'
D
I
A
.
)
8K CKC12K SUL
20K REGULAR
I V
S
F V
S
STP T
T F V I
STP
V
F
I
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
FSTPT
3/
4
"
C
DI
S
P
E
N
S
E
R
1
C
R
I
N
D
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
DI
S
P
E
N
S
E
R
2
C
R
I
N
D
DI
S
P
E
N
S
E
R
3
C
R
I
N
D
DI
S
P
E
N
S
E
R
4
C
R
I
N
D
DI
S
P
E
N
S
E
R
5
C
R
I
N
D
DI
S
P
E
N
S
E
R
6
C
R
I
N
D
DI
S
P
E
N
S
E
R
7
C
R
I
N
D
NOTE:
CONDUITS REQUIRED PER DISPENSER:
·(1) 3/4" FOR INTERCOM
·(1) 3/4" FOR POWER
·(1) 3/4" FOR VEEDER ROOT SENSOR IN DISPENSER SUMP
·(1) 3/4" FOR CRIND
POWER CONDUIT REQUIRED PER SUB PUMP:
·(1) 3/4" CONDUIT
LV CONDUIT REQUIRED PER TANK :
·(1) 3/4" CONDUIT TO EACH TANK AND ADJACENT PROBES
CANOPY LIGHTS, SPEAKERS, AND SIGNS:
·(4) 3/4" CONDUIT FOR LIGHTS
·(1) 3/4" CONDUIT FOR SPEAKERS
CANOPY SECURITY CAMERAS:
·(3) 1" CONDUIT
NUMBER WILL VARY BASED ON NUMBER OF DISPENSERS AND SUB
PUMPS. REFER TO TK101 FOR TYPE AND QUANTITY OF DISPENSERS.
PRODUCT PIPING
SLOPED AT 1/8" PER
FOOT TO TANKS.
PRODUCT PIPING
SLOPED AT 1/8" PER
FOOT TO TANKS.
PR
O
D
U
C
T
P
I
P
I
N
G
SL
O
P
E
D
A
T
1
/
8
"
P
E
R
FO
O
T
T
O
T
A
N
K
S
.
PR
O
D
1
B
S
T
P
P
O
W
E
R
PR
O
D
2
S
T
P
P
O
W
E
R
PR
O
D
3
S
T
P
P
O
W
E
R
PR
O
D
4
S
T
P
P
O
W
E
R
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
TA
N
K
1
M
O
N
I
T
O
R
I
N
G
TA
N
K
2
M
O
N
I
T
O
R
I
N
G
TA
N
K
3
M
O
N
I
T
O
R
I
N
G
3/4" CONDUIT
LOOPED AS SHOWN
AT ALL TANKS (TYP.)
3/
4
"
C
3/
4
"
C
3/
4
"
C
DI
S
P
E
N
S
E
R
2
P
O
W
E
R
DI
S
P
E
N
S
E
R
3
P
O
W
E
R
DI
S
P
E
N
S
E
R
4
P
O
W
E
R
DI
S
P
E
N
S
E
R
5
P
O
W
E
R
DI
S
P
E
N
S
E
R
6
P
O
W
E
R
DI
S
P
E
N
S
E
R
7
P
O
W
E
R
PR
O
D
1
A
S
T
P
P
O
W
E
R
3/
4
"
C
Xref .\XREF\xr-site.dwg
3+1+1 3+1+13+1
3+1+1
OR
VARIES
3+1
3+1+1
OR
VARIES
3+1
3+1+1
OR
VARIES
3+1
3+1+1
OR
VARIES
3+1
3+1+1
OR
VARIES
STORE ELECTRICIAN TO ROUGH IN CONDUIT AT
ELECTRICAL ROOM AND RUN TO PETROLEUM
ELECTRICIAN'S POINT OF INTERCEPTION 30'
FROM FRONT OF STORE.
ELECTRICIAN RESPONSIBILITY DELINIATION
PETROLEUM ELECTRICIAN TO INTERCEPT
CONDUIT 30' FROM FRONT OF STORE AND
COMPLETE RUNS TO DISPENSERS, CANOPY,
AND TANKS. PETROLEUM ELECTRICIAN
RESPONSIBLE FOR ALL WIRING. REFER TO
PETROLEUM ELECTRICAL DRAWINGS FOR WIRE
TYPES.
NOTE: CONDUIT ROUTING SHOWN ON THIS
PLAN IS DIAGRAMMATIC. ELECTRICIAN TO USE
BEST EFFORT TO ELIMINATE BENDS WHEN
INSTALLING CONDUIT.
1"
C
1"
C
SE
C
U
R
I
T
Y
SE
C
U
R
I
T
Y
SE
C
U
R
I
T
Y
CA
N
O
P
Y
L
I
G
H
T
I
N
G
CA
N
O
P
Y
L
I
G
H
T
I
N
G
CA
N
O
P
Y
L
I
G
H
T
I
N
G
CA
N
O
P
Y
S
P
E
A
K
E
R
S
CA
N
O
P
Y
L
I
G
H
T
I
N
G
1"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
COORDINATE WITH CK CONSTRUCTION
MANAGER TO VERIFY WHICH COLUMNS
RECEIVE CONDUITS
STP (2)
U - UNLEADED
D - DIESEL
I - INTERSTITIAL SPACE C - ELECT. CONDUIT
T - TANK LEVEL MONITOR
X - EXTRA TANK OPENING
STP - SUBMERSIBLE TURBINE PUMP
F - FILL
V - VENT
P - PREMIUM UNLEADED
LEGEND
U
CKC
D
P
V - VAPOR
VCKC - CIRCLE K CHOICE
S - SPARE
SEE SERVICE ISLAND
DETAIL ON SHEET
TK505
CANOPY ABOVE;
REF. ARCH
CK PREFERENCE FOR
DISPENSERS TO BE
INSTALLED ON GRADE.
ONLY INSTALL ON
ISLAND IF REQUIRED BY
LOCAL AHJ.
CANOPY APRON
BELOW; REF. CIVIL
SEE SERVICE ISLAND
DETAIL ON SHEET
TK504
3/
4
"
C
3/
4
"
C
3/
4
"
C
3/
4
"
C
DI
S
P
E
N
S
E
R
8
I
N
T
E
R
C
O
M
T
O
C
A
S
H
I
E
R
DI
S
P
E
N
S
E
R
8
L
E
A
K
D
E
T
E
C
T
O
R
DI
S
P
E
N
S
E
R
8
P
O
W
E
R
DI
S
P
E
N
S
E
R
8
C
R
I
N
D
HSD
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK102
SC
H
E
M
A
T
I
C
W
I
R
I
N
G
,
P
I
P
I
N
G
&
D
E
T
A
I
L
S
1 SCHEMATIC SITE PLAN SCALE: N.T.S.
wv
1'-41
2"
(TYP)
37'-83
4"
4'-61
2"5'-6"5'-6"6'-8"5'-6"5'-6"
1'-2"
NOTES:
1.TANK INTERSTICE IS FACTORY BRINE FILLED.
2.NOMINAL TANK WEIGHT : 11,300 lbs
0'
-
4
"
3'
-
0
"
Ø1
0
'
-
0
"
Ø1
0
'
-
4
"
wv
1'-41
2"
(TYP)
NOTES:
1.TANK INTERSTICE IS FACTORY BRINE FILLED.
2.SERVICE FITTING ON FLAT #11 IS FOR A VENT ONLY.
3.NOMINAL TANK WEIGHT : 12,700 lbs
Ø1
0
'
-
0
"
Ø1
0
'
-
4
"
37'-91
4"
5'-11"5'-6"2'-9"4'-11
2"2'-9"4'-11
2"5'-6"2'-7"
1'-21
2"
2'-9"
0'
-
4
"
(
T
Y
P
)
3'
-
0
"
(T
Y
P
)
C
OPTIONAL 22' PREFABRICATED CONCRETE DEADMAN2D
LIFTING LUG
A
B
C
HOLD DOWN STRAP LOCATION
ITEM QTY
C
1 2 3 4 6 7 8 10
DESCRIPTION
1
1
2
4
5 9
24'-01
4"
A
B
OPTIONAL 18" DIA. HYDROSTATIC MONITORING RESERVOIR WITH 4" NPT FITTING
4" NPT MONITOR FITTING
22'
D
0'
-
4
"
3'
-
0
"
A A
10
'
-
4
"
10
'
-
0
"
1'-21
2"1'-41
2"
(TYP.)
5'-11"4'-11
2"3'-111
2"4'-11
2"
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK201
ST
A
N
D
A
R
D
T
A
N
K
S
12K GALLON UNDERGROUND STORAGE TANK (10' DIAMETER)4320K GALLON DUAL COMPARTMENT UNDERGROUND STORAGE TANK (12K/8K SPLIT)SCALE: NTS
SCALE: NTS20K GALLON UNDERGROUND STORAGE TANK (10' DIAMETER)2112K GALLON UNDERGROUND STORAGE TANK (10' DIAMETER)SCALE: NTS
SCALE: NTS
1'
-
0
"
10
'
-
0
"
O.
D
.
3'
M
I
N
.
6'
M
A
X
UNDISTURBED SOIL
TK500
2
TK502
6
TK502
5
TK502
4
TK502
4
TANK MANUFACTURER
PROVIDED PRECAST
CONCRETE DEADMAN
SYSTEM WITH HOLD DOWN
STRAPS
TANK MANUFACTURER
PROVIDED PRECAST
CONCRETE DEADMAN
SYSTEM WITH HOLD DOWN
STRAPS
PEA GRAVEL BACKFILL
SLOPE AROUND ALL
MANWAYS (SEE DETAILS)
TIE DOWN STRAP (TYP) REFER TO
MANUFACTURER'S DRAWINGS FOR TIE
DOWN STRAP LOCATION, SPACING,
AND QUANTITY
OPTIONAL EXTENDED
SLAB FOR ASPHALT SITES
OPTIONAL EXTENDED
SLAB FOR ASPHALT SITES
ADJACENT PAVEMENT;
REF. CIVL
ADJACENT PAVEMENT;
REF. CIVL
TIE DOWN
STRAP (TYP.)
SHORE HOLE AS REQUIRED PER
GEOTECH OR SITE LIMITATIONS
FILTER FABRIC (TYP.
AT ALL SIDES) SEE
TK006
NO SLOPE
ON TANK
UNDERGROUND
STORAGE TANK
UNDERGROUND
STORAGE TANK
TK502
3
TK501
4
NOTE: INSTALL TANK LEVEL PROBE
IN STP SUMP OF ALL TANKS
EXCEPT 20K SINGLE COMP.
5"
RE
B
A
R
O
N
3"
C
H
A
I
R
S
TK502
2
TK502
1
NOTE: VERIFY DEADMAN PLACEMENT
REQUIREMENTS WITH TANK
MANUFACTURER SPECIFICATIONS
1'
-
0
"
BE
D
D
I
N
G
,
T
Y
P
.
3'-0" MIN.
TYP.
3'-0" MIN.
TYP.
10'-0"
#4 BARS @ 12" O.C.E.W. (TYP.) W/
DOUBLE MAT REINFORCING PER DTL.
2/TK301
8" THICK 4,000 PSI CONCRETE TANK
SLAB; REF. CIVIL/GEOTECH REPORT
37'-9"
3'
-
0
"
MI
N
.
3'
-
0
"
MI
N
.
3'
-
0
"
MI
N
.
3'-0"
MIN.
3'-0"
MIN.
35
'
-
1
0
"
M
I
N
.
EX
T
E
N
D
T
A
N
K
P
A
D
A
S
R
E
Q
.
T
O
F
I
L
L
A
R
E
A
B
E
T
W
E
E
N
C
A
N
O
P
Y
A
N
D
S
T
R
E
E
T
S
I
D
E
C
U
R
B
57'-1"15'-0"
OPTIONAL EXTENDED TANK PAD FOR ASPHALT SITES
15'-0"
OPTIONAL EXTENDED TANK PAD FOR ASPHALT SITES
8'
-
6
"
MI
N
.
O
F
F
C
U
R
B
4'-0"3'-0"2'-6"3'-0"1'-10"3'-0"2'-8"2'-4"3'-0"3'-0"2'-4"
3'-0"4'-8"4'-8"3'-7"2'-6"4'-4"2'-10"3'-11"
4'
-
0
"
2'
-
6
"
3'
-
0
"
2'
-
9
"
3'
-
5
"
4'
-
3
"
1'
-
0
"
1'
-
0
"
4'
-
3
"
1'
-
0
"
1'
-
0
"
4'-3"1'-0"1'-0"
DI
E
S
E
L
(
1
0
'
D
I
A
.
)
CK CHOICESUPER UL
REGULAR UL
ST
P
VA
P
O
R
STP
VA
P
O
R
SP
A
R
E
FI
L
L
ST
P
ST
P
OB
S
E
R
V
A
T
I
O
N
WE
L
L
(
1
2
"
)
OB
S
E
R
V
A
T
I
O
N
WE
L
L
(
4
"
)
TA
N
K
LE
V
E
L
MO
N
I
T
O
R
FI
L
L
IN
T
E
R
S
T
I
T
I
A
L
VAPOR
FILL
INTERSTITIAL
TANK
LEVEL
MONITOR
#4 BARS @ 12" O.C.E.W.
(TYP.)
8" THICK 4,000 PSI CONCRETE TANK SLAB, SEE SECTION
ABOVE. PROVIDE CONTROL JOINTS AT 20' MAX. SPACING
EACH WAY. REF. PLAN FOR CJ SPACING
IN
T
E
R
S
T
I
T
I
A
L
TA
N
K
LE
V
E
L
MO
N
I
T
O
R
SP
A
R
E
FI
L
L
VA
P
O
R
#4 BARS FOR
ADDITIONAL
REINFORCING AT
MANWAYS
CANOPY SIDE
STREET SIDE
8'
-
2
"
24
'
-
0
"
16'-4"
3'
-
8
"
37'-9"
12" OBSERVATION WELL
ALWAYS ON STREET SIDE
19'-0"19'-1"19'-0"
3'-0"
MIN.
17
'
-
1
1
"
17
'
-
1
1
"
C.
J
.
C.
J
.
C.J.
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK301
TY
P
I
C
A
L
U
S
T
P
L
A
N
A
N
D
S
E
C
T
I
O
N
S
1 UNDERGROUND STORAGE TANK PROFILE SCALE: NONE
2 UNDERGROUND STORAGE TANK PLAN SCALE: NONE
PRESSURE LINE LEAK
DETECTOR
48"Ø FRP CONTAINMENT COLLAR,
BY TANK MANUFACTURER
2" NIPPLE
2" NIPPLE
2" 90° ELBOW
TURBINE PUMP
4" RISER
TANK MAG SUMP SENSOR W/
SENSOR MOUNTING KIT
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" TERMINATION FITTING WITH
TEST PORT
SEAL OFF (ONE FITTING FOR EACH
CONDUIT)
JUNCTION BOX
2" ENTRY FITTING
3/4" CONDUIT BONDED ENTRY
FITTING
3/4" RIGID STEEL CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
2" FULL PORT BALL VALVE
FRP ENCLOSURE TOP W/ ROUND BODY EXTENSIONFIELD BONDED ADHESIVE JOINT
(TYP.)
22"Ø MANWAY AND COVER W/ (4) 4"
NPT TANK FITTING (PLUG UNUSED
FITTINGS)
3/4" RIGID STEEL CONDUIT FOR
PUMP POWER
3/4" CONDUIT BONDED ENTRY
FITTING
3/4" CONDUIT BONDED ENTRY
FITTING
DEEP BURIAL POLYGON FRP SUMP
BODY
3/4" RIGID STEEL CONDUIT TO
INTRINSICALLY SAFE GUTTER AT MONITOR
CONTROL PANEL
TOP OF FIBERGLASS OVERLAY
STEEL PLATE
5"
SECTION
2" TEE
NOTE:
·FOR ALL FUEL TYPES EXCEPT FOR DIESEL, ALL
COMPONENTS MUST BE SCH. 40 STAINLESS STEEL.
·FOR DIESEL, ALL COMPONENTS MUST BE BLACK
IRON.
·PRODUCT PIPING CONFIGURATION AND EXIT
POINTS MAY VARY. REFER TO TK101.
4"
MI
N
.
PEA GRAVEL BACKFILL
42"Ø MANHOLE W/ FRAME AND COVER
CONCRETE TANK SLAB
34"Ø WATERTIGHT FRP
LID
12"12"
72
7069
131
40
41 42
6867
7069
7069
7069
137 139
6
80
2" UNION
56
PLAN VIEW AT MANWAY
2" ENTRY FITTING
PRESSURE LINE LEAK
DETECTOR (AB0VE, ONE STP
ONLY)
℄ TANK
2" DOUBLE WALL
NUPI SMARTFLEX PIPE
2" TERMINATION FITTING WITH
TEST PORT
2" SS MALE NPT
ADAPTER FITTING
2" NIPPLE
2" 90° ELBOW
TURBINE PUMP
4" RISER
48"Ø FRP CONTAINMENT COLLAR,
BY TANK MANUFACTURER
FRP ENCLOSURE TOP W/ ROUND BODY
EXTENSION (TRIM FROM BOTTOM FOR FIELD
ADJUSTMENT)
22"Ø MANWAY AND
COVER W/ (4) 4" NPT
TANK FITTING (PLUG
UNUSED FITTINGS)
8"R
DEEP BURIAL
POLYGON FRP SUMP
BODY
2" TEE
DISPENSERS
TURBINE PUMP WITH SWIFT
CHECK VALVE 40
131
80
61
7069
7069
7069
40
56
6
41 42
2" DOUBLE WALL
NUPI SMARTFLEX PIPE6
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK500
TA
N
K
S
U
M
P
D
E
T
A
I
L
S
TANK SUMP DETAIL - PROFILE2 SCALE: NTS
TANK SUMP DETAIL - PLAN1 SCALE: NTS
TOP OF FIBERGLASS OVERLAY
STEEL PLATE
PRESSURE LINE LEAK
DETECTOR
42"Ø FRP CONTAINMENT COLLAR,
BY TANK MANUFACTURER
2" NIPPLE
2" 90° ELBOW
TURBINE PUMP
4" RISER
TANK MAG SUMP SENSOR W/
SENSOR MOUNTING KIT
SEAL OFF (ONE FITTING FOR EACH
CONDUIT)
EXPLOSION PROOF JUNCTION BOX
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" TERMINATION FITTING WITH TEST
PORT
3/4" CONDUIT DOUBLE ENTRY
BONDED FITTING
2" FULL PORT BALL VALVE
FRP ENCLOSURE TOP W/ ROUND BODY
EXTENSION (TRIM FROM BOTTOM FOR FIELD
ADJUSTMENT)
FIELD BONDED ADHESIVE JOINT
(TYP.)
PEA GRAVEL BACKFILL
22"Ø MANWAY AND COVER W/ (4) 4"
NPT TANK FITTING (PLUG UNUSED
FITTINGS)
3/4" CONDUIT DOUBLE ENTRY
BONDED FITTING
DEEP BURIAL POLYGON FRP SUMP
BODY
3/4" RIGID STEEL CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
5"
3/4" RIGID STEEL CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
2" NIPPLE
42"Ø MANHOLE W/ FRAME AND COVER
CONCRETE TANK SLAB
34"Ø WATERTIGHT FRP
LID
12"12"
4"
MI
N
.
72
131
40
7069
6867
7069
7069
80
6
139137
4241
TANK LEVEL MONITOR 69 70 133
NOTE:
·FOR ALL FUEL TYPES EXCEPT FOR DIESEL, ALL
COMPONENTS MUST BE SCH. 40 STAINLESS STEEL.
·FOR DIESEL, ALL COMPONENTS MUST BE BLACK
IRON.
·PRODUCT PIPING CONFIGURATION AND EXIT
POINTS MAY VARY. REFER TO TK101.
3/4" RIGID STEEL CONDUIT FOR
PUMP POWER
2" UNION
2" TERMINATION FITTING
WITH TEST PORT
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" ENTRY FITTING
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" ELBOW
TANK LEVEL MONITORPRESSURE LINE LEAK
DETECTOR (ABOVE)
℄ TANK
TURBINE PUMP
DEEP BURIAL
POLYGON FRP SUMP
BODY
22"Ø MANWAY AND
COVER W/ (4) 4" NPT
TANK FITTING (PLUG
UNUSED FITTINGS)
42"Ø DOUBLE WALL FRP
CONTAINMENT COLLAR,
BY TANK MANUFACTURER
FRP ENCLOSURE TOP W/ ROUND BODY
EXTENSION (TRIM FROM BOTTOM FOR FIELD
ADJUSTMENT)
TO
D
I
S
P
E
N
S
E
R
S
8"R2" SS MALE NPT ADAPTER
FITTING
1
61
40
131
69 70
69 70 133
80
56
6
NOTE:
·FOR ALL FUEL TYPES EXCEPT FOR DIESEL, ALL
COMPONENTS MUST BE SCH. 40 STAINLESS STEEL.
·FOR DIESEL, ALL COMPONENTS MUST BE BLACK
IRON.
·PRODUCT PIPING CONFIGURATION AND EXIT
POINTS MAY VARY. REFER TO TK101.
6
2" TERMINATION FITTING WITH
TEST PORT
2" ENTRY FITTING
PRESSURE LINE LEAK
DETECTOR (AB0VE)
2" 90° ELBOW
℄ TANK
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" NIPPLE
2" 90° ELBOW
TURBINE PUMP
4" RISER
42"Ø FRP CONTAINMENT COLLAR,
BY TANK MANUFACTURER
FRP ENCLOSURE TOP W/ ROUND BODY
EXTENSION (TRIM FROM BOTTOM FOR FIELD
ADJUSTMENT)
TO DISPENSERS
22"Ø MANWAY AND
COVER W/ (4) 4" NPT
TANK FITTING (PLUG
UNUSED FITTINGS)
8"R
DEEP BURIAL
POLYGON FRP SUMP
BODY
80
6
56
6
7069
7069
40
131
4241
NOTE:
·FOR ALL FUEL TYPES EXCEPT FOR DIESEL, ALL
COMPONENTS MUST BE SCH. 40 STAINLESS STEEL.
·FOR DIESEL, ALL COMPONENTS MUST BE BLACK
IRON.
·PRODUCT PIPING CONFIGURATION AND EXIT
POINTS MAY VARY. REFER TO TK101.
2" SS MALE NPT
ADAPTER FITTING61
PRESSURE LINE LEAK
DETECTOR
42"Ø FRP CONTAINMENT COLLAR,
BY TANK MANUFACTURER
2" NIPPLE
2" NIPPLE
2" 90° ELBOW
TURBINE PUMP
4" RISER
TANK MAG SUMP SENSOR W/
SENSOR MOUNTING KIT
SEAL OFF (ONE FITTING FOR EACH
CONDUIT)
JUNCTION BOX
TO DISPENSERS
42"Ø MANHOLE W/ FRAME AND COVER
3/4" CONDUIT DOUBLE ENTRY
BONDED FITTING
3/4" RIGID STEEL CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
2" FULL PORT BALL VALVE
CONCRETE TANK SLAB
4"
MI
N
.
FRP ENCLOSURE TOP W/ ROUND BODY
EXTENSION
FIELD BONDED ADHESIVE JOINT
(TYP.)
PEA GRAVEL BACKFILL
22"Ø MANWAY AND COVER W/ (4) 4"
NPT TANK FITTING (PLUG UNUSED
FITTINGS)
34"Ø WATERTIGHT FRP
LID
3/4" RIGID STEEL CONDUIT FOR
PUMP POWER
3/4" CONDUIT DOUBLE ENTRY
BONDED FITTING
3/4" CONDUIT DOUBLE ENTRY
BONDED FITTING
DEEP BURIAL POLYGON FRP SUMP
BODY
3/4" RIGID STEEL CONDUIT TO
INTRINSICALLY SAFE GUTTER AT MONITOR
CONTROL PANEL
TOP OF FIBERGLASS OVERLAY
STEEL PLATE
5"
12"
7069
55
7069
6867
4241
7069
40
131
55
55
55
139137
NOTE:
·FOR ALL FUEL TYPES EXCEPT FOR DIESEL, ALL
COMPONENTS MUST BE SCH. 40 STAINLESS STEEL.
·FOR DIESEL, ALL COMPONENTS MUST BE BLACK
IRON.
·PRODUCT PIPING CONFIGURATION AND EXIT
POINTS MAY VARY. REFER TO TK101.
2" UNION
2" SS MALE NPT
ADAPTER FITTING
2" ENTRY FITTING
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
2" DOUBLE WALL NUPI
SMARTFLEX PIPE
61
6
56
6
2" TERMINATION
FITTING WITH TEST PORT80
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK501
TA
N
K
S
U
M
P
D
E
T
A
I
L
S
TANK SUMP DETAIL - PROFILE4 SCALE: NTS
TANK SUMP DETAIL - PLAN3 SCALE: NTS
TANK SUMP DETAIL - PROFILE2 SCALE: NTS
TANK SUMP DETAIL - PLAN1 SCALE: NTS
12
"
MI
N
.
MIN.
2'
-
0
"
2'-0"
TANK BOTTOM
TA
N
K
E
D
G
E
12
"
8"
WELL CAP KIT
SKIRT
PEA GRAVEL
BACKFILL
24"Ø SONOTUBE
12" BENTONITE SEAL
4" SCH. 40 FACTORY
SLOTTED P.V.C. WELL
SCREENS (MAXIMUM 0.05" -
0.02" HORIZONTAL SLOTS)
PVC CAP
12"Ø MONITORING/
OBSERVATION WELL MANHOLE
CONCRETE WARPED UP 1"
ABOVE FINISH GRADE
CONCRETE
SLAB
CONCRETE
24
21
19
19
21
12
"
MI
N
.
MIN.
2'
-
0
"
2'-0"
TANK BOTTOM
TA
N
K
E
D
G
E
12
"
8"
WELL CAP KIT
SKIRT
PEA GRAVEL
BACKFILL
36"Ø SONOTUBE
12" BENTONITE SEAL
12" SCH. 40 FACTORY
SLOTTED P.V.C. WELL
SCREENS (MAXIMUM 0.05" -
0.02" HORIZONTAL SLOTS)
PVC CAP
18"Ø MONITORING/
OBSERVATION WELL MANHOLE
CONCRETE WARPED
UP 1" ABOVE FINISH
GRADE
CONCRETE
SLAB
CONCRETE
22
25
20
20
22
8"
MONITORING PROBE
CAP
ALUMINUM ADAPTOR
KIT
FACE SEAL ADAPTOR
SENSOR LEAD CABLE
SPLICED IN JUNCTION BOX
18"Ø MANWAY W/ COVER
PAINTED BLACK
INSIDE OF TANK
FLOAT KIT
TOP OF FIBERGLASS OVERLAY
STEEL PLATE
WARNING WARNING
NO FILL NO FILL
TANK LEVEL PROBE
INSTALLATION KIT
TOP CAP
3/8" NPT WEATHERPROOF
CORD GRIP
4" ALUMINUM ADAPTER
5' CHAIN W/SPLIT RINGS
SPLIT RING ATTACH TO TANK
LEVEL MONITOR
EXPLOSION PROOF
JUNCTION BOX
PEA GRAVEL BACKFILL
SEAL OFF (ONE FITTING FOR EACH
CONDUIT)
3/4" RIGID CONDUIT
LOOPED TO JUNCTION BOX
OF ADJACENT
SENSOR/PROBE
4" TANK FITTING
3/4" RIGID CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
4" RISER
CONCRETE WARPED
UP 1" ABOVE FINISH
GRADE
CONCRETE SLAB
MAG PLUS PROBE
FLOAT KIT
22
133132
135134
135134
136
4241
SST CLOSE NIPPLE
POWDER COATED FITTING
PRODUCT COVER I.D. TAG
4" TANK FITTING
STEEL PLATE
INSIDE OF TANK
4" RISER PIPE WRAPPED
W/ MASTIC TAPE
8"
CONC. WARPED UP 1" ABOVE
FINISH GRADE
PEA GRAVEL BACKFILL
DOUBLE WALL SPILL
CONTAINER
CONC. SLAB
VAPOR TOP-SEAL CAP
2" FRP BELL x FEMALE NPT
THREADED ADAPTER
SWIVEL ADAPTOR
3" FLEXIBLE CONNECTOR
ISOLATION JACKET (SHRINK TO FIT)
2" MALE x 2" MALE FLEXIBLE
CONNECTOR
2" FRP VENT LINE
PRODUCT BUCKET I.D. TAG
11
12
7
15
63
64
7
30
4241
11
11
EXTRACTOR FITTING 16
NOTE: INSTALL THREADED CAP
PLUG AT DIESEL COMPARTMENTS
ONLY PER TK006
NOTE: USE FIBERGLASS PIPING
FOR UG VENT ONLY -
FIBERGLASS VENT PIPING USED
FOR TO AVOID PIPE "BELLYING"
AS TO MITIGATE TRAPPING OF
LIQUID IN LINE.
SST CLOSE NIPPLE
POWDER COATED FITTING
PRODUCT COVER I.D. TAG
4" OPEN TELESCOPIC DROP TUBE
DIFFUSER
4" TANK FITTING
TOP OF FIBERGLASS OVERLAY
STEEL PLATE
OVERFILL PREVENTION
VALVE ASSEMBLY
4" DROP TUBE
INSIDE OF TANK
DOUBLE WALL
FIBERGLASS TANK
4" RISER PIPE WRAPPED W/ MASTIC TAPE
8"
CONC. WARPED UP 1" ABOVE
FINISH GRADE
PEA GRAVEL BACKFILL
DOUBLE WALL SPILL
CONTAINER
CONC. SLAB
FILL TOP-SEAL CAP
PRODUCT BUCKET I.D. TAG
15
18
4241
2726 2928
18
18
15
15
8"
18" DIA. MANWAY W/
COVER
SENSOR LEAD CABLE SPLICED IN
JUNCTION BOX
DOUBLE WALL
FIBERGLASS TANK
HYDROSTATIC
RESERVOIR SENSOR
INTEGRAL RESERVOIR FOR
HYDROSTATIC LEAK DETECTION
SYSTEM
PEA GRAVEL BACKFILL
4" TANK FITTING
EXPLOSION PROOF
JUNCTION BOX
RISER PIPE CAP
VENT TUBE
ADJUSTABLE LEAD
CABLE
4" RISER W/ MASTIC WRAP
CONCRETE SLAB
CONCRETE WARPED UP
1" ABOVE FINISH GRADE
THE MONITORING LIQUID SHALL BE ANTI FREEZE
SALT SOLUTION PROVIDED BY TANK
MANUFACTURER
3/4" RIGID CONDUIT LOOPED TO
JUNCTION BOX OF ADJACENT
SENSOR/PROBE
SEAL FITTING (ONE FITTING FOR EACH
CONDUIT)
4241
23
140
140
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK502
TA
N
K
T
O
P
H
A
R
D
W
A
R
E
D
E
T
A
I
L
S
1 OBSERVATION WELL DETAIL (4")SCALE: NONE 2 OBSERVATION WELL DETAIL (12")SCALE: NONE 3 TANK LEVEL MONITOR DETAIL SCALE: NONE
4 INTERSTITIAL MONITOR DETAIL SCALE: NONE 5 VAPOR RISER DETAIL SCALE: NONE 6 FILL RISER DETAIL SCALE: NONE
2" DOUBLE WALL
NUPI SMARTFLEX
PIPE
2" TERMINATION
FITTING W/ TEST
PORT
DISPENSER SUMP
STABILIZER BAR W/ MOUNTING
BRACKET (TYP.)
TK
5
0
3
3
90
2" ENTRY FITTING
80
6
56
91
NOTE:
·PROVIDE FLEXIBLE CONNECTORS AND SHEAR
VALVE ASSEMBLIES AT PRODUCT CONNECTIONS
TO DISPENSERS.
·QUANTITY AND LOCATION OF PRODUCT PIPING
MAY VARY. REFER TO TK101 FOR EXACT
CONFIGURATION
*IF DISPENSER IS NOT 3+1+1*
PLUG CKC PRODUCT LINE AT ADAPTER
FITTING WITH NPT THREADED PLUG TO
ALLOW FOR FUTURE USE.
2" SW 9072
DISPENSER
TOP OF CONCRETE,
SLOPE AWAY FROM
DISPENSER 1" OVER
1'. REF. DTL. 6/TK504
PRODUCT SHEAR
VALVE BOLTED TO
STABILIZER BAR
ASSEMBLY
DISPENSER SUMP
PEA GRAVEL
BACKFILL
1-1/2" x 18" FLEX
CONNECTOR MALE
SWIVEL x MALE
COMPACTED SOIL
UNDISTURBED SOIL
JUNCTION BOX
DISPENSER MAG SUMP
SENSOR AT EACH
DISPENSER. SPLICE
SENSOR LEAD CABLE IN
JUNCTION BOX. INSTALL
AT LOWEST POINT IN
SUMP
SEAL FITTING (ONE FITTING FOR
EACH CONDUIT)
3/4" RIGID STEEL C0NDUIT
LOOPED TO J-BOX AT
ADJACENT DISPENSER SUMP
(FOR SUMP SENSOR)
92
81
90
93
137
NUPI 2" SW TEE74
NOTE:
·PROVIDE FLEXIBLE CONNECTORS AND SHEAR
VALVE ASSEMBLIES AT PRODUCT CONNECTIONS
TO DISPENSERS.
·QUANTITY AND LOCATION OF PRODUCT PIPING
MAY VARY. REFER TO TK101 FOR EXACT
CONFIGURATION
*IF DISPENSER IS NOT 3+1+1*
PLUG CKC PRODUCT LINE AT
ADAPTER FITTING WITH NPT
THREADED PLUG TO ALLOW
FOR FUTURE USE.
NUPI 2" X 1.5"
ADAPTER FITTING
60
DISPENSER
TOP OF CONCRETE,
SLOPE AWAY FROM
DISPENSER 1" OVER
1'. REF. DTL. 6/TK504
PRODUCT SHEAR
VALVE BOLTED TO
STABILIZER BAR
ASSEMBLY
DISPENSER SUMP
PEA GRAVEL
BACKFILL
1-1/2" x 18" FLEX
CONNECTOR MALE
SWIVEL x MALE
COMPACTED SOIL
UNDISTURBED SOIL
JUNCTION BOX
DISPENSER MAG SUMP
SENSOR AT EACH
DISPENSER. SPLICE
SENSOR LEAD CABLE IN
JUNCTION BOX. INSTALL
AT LOWEST POINT IN
SUMP
SEAL FITTING (ONE FITTING FOR
EACH CONDUIT)
3/4" RIGID STEEL C0NDUIT
LOOPED TO J-BOX AT
ADJACENT DISPENSER SUMP
(FOR SUMP SENSOR)
92
81
90
93
137
NUPI 2" SW 9072
NOTE:
·PROVIDE FLEXIBLE CONNECTORS AND SHEAR
VALVE ASSEMBLIES AT PRODUCT CONNECTIONS
TO DISPENSERS.
·QUANTITY AND LOCATION OF PRODUCT PIPING
MAY VARY. REFER TO TK101 FOR EXACT
CONFIGURATION
*IF DISPENSER IS NOT 3+1+1*
PLUG CKC PRODUCT LINE AT
ADAPTER FITTING WITH NPT
THREADED PLUG TO ALLOW
FOR FUTURE USE.
NUPI 2" X 1.5"
ADAPTER FITTING
60
2" DOUBLE WALL
NUPI SMARTFLEX
PIPE
2" TERMINATION
FITTING W/ TEST
PORT
DISPENSER SUMP
STABILIZER BAR W/ MOUNTING
BRACKET (TYP.)
TK
5
0
3
4
90
2" ENTRY FITTING
80
6
56
91
NOTE:
·PROVIDE FLEXIBLE CONNECTORS AND SHEAR
VALVE ASSEMBLIES AT PRODUCT CONNECTIONS
TO DISPENSERS.
·QUANTITY AND LOCATION OF PRODUCT PIPING
MAY VARY. REFER TO TK101 FOR EXACT
CONFIGURATION
*IF DISPENSER IS NOT 3+1+1*
PLUG CKC PRODUCT LINE AT ADAPTER
FITTING WITH NPT THREADED PLUG TO
ALLOW FOR FUTURE USE.
2" SW TEE74
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK503
DI
S
P
E
N
S
E
R
S
U
M
P
D
E
T
A
I
L
S
DISPENSER SUMP SECTION (THRU & THRU)43DISPENSER SUMP SECTION (TERMINATION)SCALE: NTS
SCALE: NTSDISPENSER SUMP DETAIL (THRU & THRU)21DISPENSER SUMP DETAIL (TERMINATION)SCALE: NTS
SCALE: NTS
TK
5
0
3
.
1
3
STABILIZER BAR W/
MOUNTING BRACKET (TYP.)
PRODUCT PIPING
SUMP
2" TERMINATION
SECONDARY
CONTAINMENT
FITTING W/ TEST PORT
90
91
6
60
FROM TANK
FRP 90
2" BONDED
ENTRY FITTING56
RIGID FRP DOUBLE
WALL PRODUCT
PIPING
TO ADJ DISP.
TK
5
0
3
.
1
4
STABILIZER BAR W/
MOUNTING BRACKET (TYP.)
PRODUCT PIPING
SUMP
2" TERMINATION
SECONDARY
CONTAINMENT
FITTING W/ TEST PORT
90
91
6
60
FROM TANK
FRP 90
2" BONDED
ENTRY FITTING56
RIGID FRP DOUBLE
WALL PRODUCT
PIPING
PEA GRAVEL
BACKFILL
COMPACTED SOIL
UNDISTURBED SOIL
156
JUNCTION BOX
DISPENSER MAG SUMP
SENSOR AT EACH
DISPENSER. SPLICE
SENSOR LEAD CABLE IN
JUNCTION BOX
SEAL FITTING (ONE FITTING FOR
EACH CONDUIT)
3/4" RIGID STEEL C0NDUIT
LOOPED TO J-BOX AT
ADJACENT DISPENSER SUMP
(FOR SUMP SENSOR)
DISPENSER SUMP
2" x 18" FLEX CONNECTOR MALE
SWIVEL x MALE
DISPENSER
90
62
137
2" DOUBLE POPPET SHEAR VALVE
PRODUCT PIPE TO DISPENSER (TYP.)
2" STL. UNION (TYP.)
2" FRP TEE
NOTE: SET SHEAR POINT OF VALVES TO
BE EVEN WITH TOP OF SUMP. SECURE
SHEAR VALVES TO SUMP WITH
STABILIZER BAR KIT AND U-BOLT PER
MANUFACTURER SPECIFICATIONS
TOP OF CONCRETE,
SLOPE AWAY FROM
DISPENSER 1" OVER 1'.
REF. DTL. 2/TK505.1
PEA GRAVEL
BACKFILL
COMPACTED SOIL
UNDISTURBED SOIL
156
JUNCTION BOX
DISPENSER MAG SUMP
SENSOR AT EACH
DISPENSER. SPLICE
SENSOR LEAD CABLE IN
JUNCTION BOX
SEAL FITTING (ONE FITTING FOR
EACH CONDUIT)
3/4" RIGID STEEL C0NDUIT
LOOPED TO J-BOX AT
ADJACENT DISPENSER SUMP
(FOR SUMP SENSOR)
DISPENSER SUMP
2" x 18" FLEX CONNECTOR MALE
SWIVEL x MALE
DISPENSER
90
62
137
2" DOUBLE POPPET SHEAR VALVE
PRODUCT PIPE TO DISPENSER (TYP.)
2" STL. UNION (TYP.)
2" FRP 90
NOTE: SET SHEAR POINT OF VALVES TO
BE EVEN WITH TOP OF SUMP. SECURE
SHEAR VALVES TO SUMP WITH
STABILIZER BAR KIT AND U-BOLT PER
MANUFACTURER SPECIFICATIONS
TOP OF CONCRETE,
SLOPE AWAY FROM
DISPENSER 1" OVER 1'.
REF. DTL. 2/TK505.1
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK503.1
DI
S
P
E
N
S
E
R
S
U
M
P
D
E
T
A
I
L
S
HSD DISPENSER SUMP DETAIL (TERMINATION)43HSD DISPENSER SUMP DETAIL (THROUGH & THROUGH)SCALE: NTS
SCALE: NTSHSD DISPENSER SUMP DETAIL (TERMINATION)21HSD DISPENSER SUMP DETAIL (THROUGH & THROUGH)SCALE: NTS
SCALE: NTS
Unleaded
Price per gallon, All taxes included
Plus
Price per gallon, All taxes included
Premium
Price per gallon, All taxes included
CK Choice
Price per gallon, All taxes included
Diesel
Price per gallon, All taxes included
STRAIGHTENING HOSE
BREAKAWAY DEVICE
3/4" HOSE
NOZZLE
3/4" SWIVEL
CONCRETE DRIVE SLAB
RAISED CONCRETE SLAB
(SLOPE 1" OVER 1')
88
85
89
87
86
FUEL DISPENSER81
STRAIGHTENING HOSE
BREAKAWAY DEVICE
3/4" HOSE
NOZZLE
3/4" SWIVEL
83
85
84
82
86
CL
STREET SIDE
3'-6"
14
'
-
0
"
3'
-
1
1 2"5'
-
0
"
3'
-
1
1 2"
STORE SIDE
SE
E
C
A
N
O
P
Y
P
L
A
N
S
5'
-
0
"
4'
-
0
"
6" PIPE BOLLARD;
REF. DTL. 4/TK505
1'-9"1'-9"
LIMITS OF TYPICAL FUEL
DISPENSER
FOOTING (VARIES),
VERIFY SIZE PRIOR TO
SETTING DISPENSER
SUMP
BEGIN SLOPING AWAY
FROM DISPENSER 2" OUTSIDE
LIMITS OF CABINET TO
ENSURE NO GAPS BETWEEN
DISPENSER AND DRIVE SLAB
CL
2"
2"
END SLOPED CONCRETE
AROUND DISPENSER
3'
-
9
"
SLOPE UP 1" OVER 1'
AROUND DISPENSER
101
76
CANOPY FASCIA ABOVE
OPTIONAL MASONRY
FINISH, REF. ARCH.
STRUCTURAL COLUMN
REF. ARCH/CANOPY
PLANS
(2) 1'-4" Ø
CONCRETE FOOTING
2"Ø VENT
RISER (TYPICAL), PAINT WHITE
STEEL GALVANIZED POSTS
SECURED TO 1/4"x3"x4"
2" UNISTRUT TO BE
12
'
-
0
"
AB
O
V
E
A
D
J
A
C
E
N
T
P
A
V
E
M
E
N
T
2"X2" GALV. UNISTRUT POSTS
W/ THREADED CAPS
(TYPICAL)
℄℄℄℄
FLEXIBLE BOOTS (TYP.)
2" Ø x 24" FLEX CONNECTOR
ASSEMBLY (TYP.)
2" TEE WITH 2" TEST
PLUG (TYP. ALL
VENT RISERS)
1'-4"
6"
2"Ø FIBERGLASS VENT LINES WITH
PROTECTIVE MESH COVERING (TYP.)
1'
-
6
"
9'
-
6
"
7
63
VARIES1'-4"
1'-4"
9"
TYP.
2'
-
0
"
3'
-
0
"
PAINT ALL RISER
SUPPORTS, HARDWARE,
AND VENT PIPING WHITE
64
VENT CAPS, DO NOT PAINT
71
71
6665
NOTE:
·REFER TO TK101 FOR QUANTITY AND
PLACEMENT OF VENT PIPING ON RISER.
·DO NOT MANIFOLD VENTS. EACH TANK
TO HAVE A DEDICATED VENT LINE
℄
CAP BOTH
SUPPORTS
TANK LEVEL STICK UPPER
SUPPORT. SECURE 4" U BOLT TO
UNISTRUT.
2"x2' PVC FILL STICK HOLDER
SECURED TO UNISTRUT. CAP
PVC PIPE AT BOTTOM AND
DRILL 1/4" HOLE FOR DRAIN.
TANK LEVEL STICK MOUNTED TO
VENT STACK WHEN NOT IN USE
6"
MIN.
9"
MIN.
9"
MIN.
9"
MIN.
2 Ø DOUBLE WALL PIPES
18" MIN. PEA GRAVEL
BACKFILL ABOVE PIPES.
(VARIES BASED ON PIPE RUNS
AND SLOPES)
3'-6" MIN.
6" MIN. BEARING
TYP. BOTH SIDES
OF TRENCH 6"
6" MIN. PEA GRAVEL BED
UNDER PIPES
REF. CIVIL FOR
PAVEMENT
DESIGN
4'-6"
VARIES BASED ON WIDTH OF
TRENCH WHICH IS DETERMINED BY
NUMBER OF PRODUCT PIPES
KEYWAYKEYWAY
NOTE:
MIN. SPACING MUST BE ADHERED TO PIPE.
(MANUFACTURERS REQUIREMENT)
FILTER FABRIC
(TYP FOR ALL TRENCHES)
WIDTH OF TRENCH
FOR (4) PRODUCT LINES
6"
MIN.
6" DIA. STEEL PIPE GUARD (FILL
WITH CONCRETE)
6"
3'
-
0
"
4"
24" DIA.
3'
-
1
1
1 2"
6"
4'
-
0
"
GRAY BOLLARD COVER; REF. ARCH
CONCRETE BASE
ROUNDED CONCRETE TOP
4'
-
2
"
7'-0" MIN.
VARIES BASED ON QTY. OF VENTS
1'-0"4'-11" MIN.
VARIES BASED ON QTY.
OF VENTS
1'-0"
1'
-
0
"
2'
-
2
"
1'
-
0
"
RISER POST &
FOUNDATION (TYP, 2)
6" CONCRETE PAD
1'-0"5'-0" MIN.
VARIES BASED ON QTY. OF VENTS
1'-0"
6" BOLLARD; REF DTL.
4/TK504
VENT RISERS; REF
ELEVATION VIEW
6" CURB; REF. CIVIL
PLAN VIEW
9"
TYP.
1'-4"1'-4"
REGULAR E0 UNLEADED: LID PAINTED WHITE WITH
"0" PAINTED IN BLACK
MIDGRADE E0 UNLEADED: LID PAINTED BLUE
WITH "0" PAINTED IN BLACK
0
0
PREMIUM E0 UNLEADED: LID PAINTED RED WITH
"0" PAINTED IN BLACK0
REGULAR E10 UNLEADED: LID PAINTED WHITE
MIDGRADE E10 UNLEADED: LID PAINTED BLUE
PREMIUM E10 UNLEADED: LID PAINTED RED
E15 FUEL: LID PAINTED BROWN WITH "E15"
PAINTED IN BLACKE15
E85 FUEL: LID PAINTED BROWN WITH "E85"
PAINTED IN BLACKE85
ON-ROAD ULTRA LOW SULFUR DIESEL: LID
PAINTED YELLOW
ON-ROAD ULTRA LOW SULFUR DIESEL B20%
BIODEISEL: LID PAINTED YELLOW WITH "B20"
PAINTED IN BLACKB20
OFF-ROAD ULTRA LOW SULFUR DIESEL: LID
PAINTED YELLOW WITH "OFF" PAINTED IN REDOFF
OFF-ROAD ULTRA LOW SULFUR DIESEL: LID
PAINTED YELLOW WITH "OFF" PAINTED IN RED
AND "B20" PAINTED IN BLACK
OFFB20
BIODIESEL B100/B99.9: LID PAINTED
LIGHT BLUE
DIESEL EXHAUST FLUID: PAINT DARK BLUE
MONITORING WELL: LID PAINTED WHITE WITH
BLACK TRIANGLE
VAPOR RECOVERY: LID PAINTED ORANGE
FUEL OIL #2: LID PAINTED GREEN WITH "2"
PAINTED IN BLACK2
KEROSENE: LID PAINTED BROWN
USED OIL: LID PAINTED GRAY
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK504
FU
E
L
S
Y
S
T
E
M
D
E
T
A
I
L
S
PIPE TRENCH5 SCALE:
1/4" = 1'-0"DISPENSER ISLAND DETAIL6
SCALE: 1/2" = 1'-0"3 DISPENSER ELEVATION
1 TYPICAL FREE STANDING VENT RISER SCALE: 1/2" = 1'-0"
API COLOR CODES FOR MANWAYS2
SCALE:
1/2" = 1'-0"PIPE BOLLARD DETAIL4
SCALE: 3/4" = 1'-0"
CONCRETE DRIVE SLAB
RAISED CONCRETE SLAB
(SLOPE 1" OVER 1')
STRAIGHTENING
HOSE
BREAKAWAY
DEVICE
1" HOSE
DIESEL NOZZLE
1" SWIVEL169
170
168
167
166
DIESEL
Price per gallon, All taxes included
Unleaded Gasoline
HIGH FLO DIESEL
DISPENSER 156
LIMITS OF TYPICAL FUEL
DISPENSER
FOOTING (VARIES),
VERIFY SIZE PRIOR TO
SETTING DISPENSER
SUMP
BEGIN SLOPING AWAY
FROM DISPENSER 2" OUTSIDE
LIMITS OF CABINET TO
ENSURE NO GAPS BETWEEN
DISPENSER AND DRIVE SLAB
2"
2"
END SLOPED CONCRETE
AROUND DISPENSER
SLOPE UP 1" OVER 1'
AROUND DISPENSER
76
OPTIONAL MASONRY
FINISH, REF. ARCH.
STRUCTURAL COLUMN
REF. ARCH/CANOPY
PLANS
6" PIPE BOLLARD;
REF. DTL. 4/TK504
CL
3'-6"
20
'
-
0
"
3'
-
1
1 2"5'
-
0
"
3'
-
1
"
5'
-
0
"
CL
3'
-
9
"
CANOPY FASCIA ABOVE
STREET SIDE
3'
-
1
1 2"
5'
-
0
"
3'
-
1
"
5'
-
0
"
3'
-
9
"
CL
CL
2"
2"
SE
E
C
A
N
O
P
Y
P
L
A
N
S
STORE SIDE
6"
1'-4"
3'
-
6
"
1'-4" x 1'-4" x 3'-6"
CONCRETE FOOTING
2" x 2" GALVANIZED STEEL
PIPE SUPPORT
LIFT HERE
TO SHUT DOWN FUELING SYSTEM
STOP
FUEL PUMPSHUT DOWN
LIFT COVER PUSH BUTTON
3/4" CONDUIT
SEAL OFF FITTING
CAP
4'
-
0
"
EMERGENCY STOP BUTTON TO BE
MOUNTED BETWEEN 42-48 INCHES
ABOVE GRADE
NATURAL GROUND
SHEET NO.
1130 WEST WARNER ROAD
SUITE B
TEMPE, AZ 85284
602-728-8000
REVISIONS
DATE
KI
L
L
I
O
N
R
D
S
E
&
W
Y
E
L
M
A
V
E
YE
L
M
,
W
A
9
8
5
9
7
Drawn
Checked TLH
SW
PROTOTYPE VERSION
#
CI
R
C
L
E
K
S
T
O
R
E
PR
O
J
E
C
T
:
#
PROJECT #:A24-117
FGA22.01.24 06/22/2022
SH
E
E
T
T
I
T
L
E
:
DATE
Documents prepared by The
Dimension Group are to be used only
for the specific project and specific
use for which they are intended. Any
extension of use to other projects, by
owner or any other party, without the
expressed, written consent of The
Dimension Group is done at the user's
own risk. If used in a way other than
that specifically intended, user will
hold The Dimension Group harmless
from all claims and losses.
AR
C
H
I
T
E
C
T
U
R
E
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
M
E
P
E
N
G
I
N
E
E
R
I
N
G
10
7
5
5
S
A
N
D
H
I
L
L
R
O
A
D
,
D
A
L
L
A
S
,
T
E
X
A
S
7
5
2
3
8
TE
L
:
2
1
4
-
3
4
3
-
9
4
0
0
ww
w
.
d
i
m
e
n
s
i
o
n
g
r
p
.
c
o
m
09/04/24
TK505
FU
E
L
S
Y
S
T
E
M
D
E
T
A
I
L
S
SCALE:
1/4" = 1'-0"SG HSD DISPENSER ISLAND DETAIL1
2 HSD DISPENSER DETAIL SCALE:
1/2" = 1'-0"3 SCALE:
1/2" = 1'-0"EMERGENCY STOP BUTTON PEDESTAL