105105636_Green 38839
Bu
r
n
e
t
t
R
d
S
E
89th Way SE
8815
8818
8812
Bu
r
n
e
t
t
R
d
S
E
8823
89th Way SE
JOB SITE
Owner / Developer Contact Info
officeATTN:
Aaron Green
10718 Van Norhop St SE
Yelm, WA 98597
Aaron Green 360.259.6172
10
5
1
0
5
6
3
6
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
HP Svc/MSA
HP Main
Distribution
Job Order
Temporary
Removal
Relocation
Perm Svc
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
104362050515043223
105105636514955974
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
VAULT DETAIL (V01)
SCALE: NONE
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 40 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
2" Schedule 40 Conduit
ROADSIDE
To Excavated Dirt Pile
PRIMARY CABLE & CONDUIT ONE-LINE DIAGRAM
SCALE: NONE
CUSTOMER-SUPPLIED SERVICE TRENCH (V01-M01)
SCALE: NONE
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE (SP1-V01)
SCALE: NONE
*TRANSFORMER MUST BE 5' FROM
DRIVABLE SURFACE .
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
OVERHEAD CIRCUIT MAP
SCALE: 6"= 1 Mile
PROJECT
LOCATION
Vicinity Map (Lat,Long: 46.9592,-122.6275 )
SITE PLAN
SCALE: 1" = 40'
560013-146910
25kVA 120/240v AØ
CIRCUIT FEET ADDED: 20'
Sq. Footage: 3,000
Panel Size: 200 AMP
Heat Type:ELEC
Est. Demand: 9.8 kW
LRC: 115
% V. Drop:0.8%
% Flicker:3.9%
SITE SPECIFIC NOTES
AT P01 GRID # 560022-146902
EXIST POLE TO REMAIN
AT SP1
LOCATE, CUT & SPLICE EXIST PRI 1/0 CABLE 3-23
INST (2) 1/0 AL SOLID JACKETED SPLICES AND EXTEND BOTH
ENDS WEST ±25' INTO V01
AT V01
INST SML UNISTRUT MP HH & GNDS
SET 25kVA PM XFMR 120/240V FACING EAST 3-14
INST (2) L/B ELBOWS
INST CABLE TAG # AØ-EJG776 (SOURCE SIDE)
INST CABLE TAG # AØ-EJI279
INST (3) 6 HOLE #6-350 MCM SEC CONN BARS WITH 5/8" STUD
ADAPTERS
INST GRID # 560013-146910
AT V02
RELOCATE CABLE TAG AØ-EJG776 TO V01 (SOURCE SIDE)
RE-LABEL W/ CABLE TAG # AØ-EJI279
AT M01
PERM METER LOCATION
SP1 TO V01:
INST (2) 1/0 PRI CABLES 40' IN CUST PROVIDED TRENCH & 2" Sch40
CONDUIT, CABLE # AØ-EJI279 (TOTAL BILLABLE LGTH = ±25')
V01 TO M01:
INST 350 UG TPLX SVC ±205' IN CUST PROVIDED TRENCH &
CONDUIT (TOTAL BILLABLE LGTH = ±190')
N
FOREMAN MUST FILL IN
Compound:
CABLE #:
Manufacturer:
Year Manufactured:
EJI279
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
PSE Locates Req'd
Developer Locates Req'd Yes
No
Yes
YesFlagging Req'd
Outages Req'd
AU
D
48"42"
36"
38"
42"
Struts
FRONT
SPLICE PIT DETAIL (SP1)
SCALE: NONE
PRIMARY
SPLICES
PROPOSED
UG PRIMARY
AØ-EJG776
J.Singleton (360) 522-3156
John.Singleton@pse.com
(360) 522-3156
John Singleton
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
POWER GENERAL NOTES - RESIDENTIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's
primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will
provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER NOTE:
CUSTOMER RESPONSIBLE FOR INSTALLING CONDUIT & 3/8"
NYLON PULL ROPE. SITE MUST BE READY 1-WEEK PRIOR TO
CONSTRUCTION DATE
TOP VIEW
6'
6'
FR
O
N
T
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6247000
V01
560013-146910
MAPS & RECORDS
NOTE: Corrected Facility Locations Shown.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
REV#DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
10/18/24
M.Taylor 85-5970 10/18/24
M.Taylor 85-5970 10/18/24
REQ'D City of Yelm
Green Residence
WO_Description
8823 Burnett Rd SE Yelm, WA 98597
PSE
105105636
AS NOTED 01 of 01
THURSTON QSTHLE
SW¼,Sect13,T17,R01E
1701E051 1702E068 1701E051 YEL-25
560022-146902
25kVA 120/240v AØ
T87221 40T NA
#4
A
C
S
R
Fe
e
d
NA
560022-146902
25kVA 120/240v AØ
T87221 40T
AØ-EJG776
AØ-EJI279
INST 350MCM
UG TPLX
560013-146910
25kVA 120/240v AØ
NOTE: CUSTOMER TO STOP TRENCH
3FT FROM LOCATE MARKS
EXISTING UG
PRI CABLE
560008-146935
50kVA 120/240v AØ
560008-146935
50kVA 120/240v AØ
Fe
e
d
ENLARGEMENT DETAIL
SCALE: 1" = 10'
560013-146910
25kVA 120/240v AØ
559982-146900
25 kVA (A)