Loading...
105105636_Green 38839 Bu r n e t t R d S E 89th Way SE 8815 8818 8812 Bu r n e t t R d S E 8823 89th Way SE JOB SITE Owner / Developer Contact Info officeATTN: Aaron Green 10718 Van Norhop St SE Yelm, WA 98597 Aaron Green 360.259.6172 10 5 1 0 5 6 3 6 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. HP Svc/MSA HP Main Distribution Job Order Temporary Removal Relocation Perm Svc Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A 104362050515043223 105105636514955974 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. VAULT DETAIL (V01) SCALE: NONE Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 12" Min 18" Min 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided 2" Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile PRIMARY CABLE & CONDUIT ONE-LINE DIAGRAM SCALE: NONE CUSTOMER-SUPPLIED SERVICE TRENCH (V01-M01) SCALE: NONE CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE (SP1-V01) SCALE: NONE *TRANSFORMER MUST BE 5' FROM DRIVABLE SURFACE . TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. OVERHEAD CIRCUIT MAP SCALE: 6"= 1 Mile PROJECT LOCATION Vicinity Map (Lat,Long: 46.9592,-122.6275 ) SITE PLAN SCALE: 1" = 40' 560013-146910 25kVA 120/240v AØ CIRCUIT FEET ADDED: 20' Sq. Footage: 3,000 Panel Size: 200 AMP Heat Type:ELEC Est. Demand: 9.8 kW LRC: 115 % V. Drop:0.8% % Flicker:3.9% SITE SPECIFIC NOTES AT P01 GRID # 560022-146902 EXIST POLE TO REMAIN AT SP1 LOCATE, CUT & SPLICE EXIST PRI 1/0 CABLE 3-23 INST (2) 1/0 AL SOLID JACKETED SPLICES AND EXTEND BOTH ENDS WEST ±25' INTO V01 AT V01 INST SML UNISTRUT MP HH & GNDS SET 25kVA PM XFMR 120/240V FACING EAST 3-14 INST (2) L/B ELBOWS INST CABLE TAG # AØ-EJG776 (SOURCE SIDE) INST CABLE TAG # AØ-EJI279 INST (3) 6 HOLE #6-350 MCM SEC CONN BARS WITH 5/8" STUD ADAPTERS INST GRID # 560013-146910 AT V02 RELOCATE CABLE TAG AØ-EJG776 TO V01 (SOURCE SIDE) RE-LABEL W/ CABLE TAG # AØ-EJI279 AT M01 PERM METER LOCATION SP1 TO V01: INST (2) 1/0 PRI CABLES 40' IN CUST PROVIDED TRENCH & 2" Sch40 CONDUIT, CABLE # AØ-EJI279 (TOTAL BILLABLE LGTH = ±25') V01 TO M01: INST 350 UG TPLX SVC ±205' IN CUST PROVIDED TRENCH & CONDUIT (TOTAL BILLABLE LGTH = ±190') N FOREMAN MUST FILL IN Compound: CABLE #: Manufacturer: Year Manufactured: EJI279 SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" PSE Locates Req'd Developer Locates Req'd Yes No Yes YesFlagging Req'd Outages Req'd AU D 48"42" 36" 38" 42" Struts FRONT SPLICE PIT DETAIL (SP1) SCALE: NONE PRIMARY SPLICES PROPOSED UG PRIMARY AØ-EJG776 J.Singleton (360) 522-3156 John.Singleton@pse.com (360) 522-3156 John Singleton E-Mail: Cell Phone: Project Manager Contact Information: Manager: POWER GENERAL NOTES - RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER NOTE: CUSTOMER RESPONSIBLE FOR INSTALLING CONDUIT & 3/8" NYLON PULL ROPE. SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE TOP VIEW 6' 6' FR O N T Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/240v 6247000 V01 560013-146910 MAPS & RECORDS NOTE: Corrected Facility Locations Shown. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 10/18/24 M.Taylor 85-5970 10/18/24 M.Taylor 85-5970 10/18/24 REQ'D City of Yelm Green Residence WO_Description 8823 Burnett Rd SE Yelm, WA 98597 PSE 105105636 AS NOTED 01 of 01 THURSTON QSTHLE SW¼,Sect13,T17,R01E 1701E051 1702E068 1701E051 YEL-25 560022-146902 25kVA 120/240v AØ T87221 40T NA #4 A C S R Fe e d NA 560022-146902 25kVA 120/240v AØ T87221 40T AØ-EJG776 AØ-EJI279 INST 350MCM UG TPLX 560013-146910 25kVA 120/240v AØ NOTE: CUSTOMER TO STOP TRENCH 3FT FROM LOCATE MARKS EXISTING UG PRI CABLE 560008-146935 50kVA 120/240v AØ 560008-146935 50kVA 120/240v AØ Fe e d ENLARGEMENT DETAIL SCALE: 1" = 10' 560013-146910 25kVA 120/240v AØ 559982-146900 25 kVA (A)