Loading...
01 Mechanical Plans Dec 27SEAL Ai r S y s t e m s En g i n e e r i n g I n c . R SHEET SHEET TITLE © COPYRIGHT 2024 - ASEI, INC. ALL RIGHTS RESERVED ASEI NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T OF 4 DECEMBER 27, 2024 4466 BSR IN D I G O U R G E N T C A R E - Y E L M TE N A N T I M P R O V E M E N T 93 7 W Y E L M A V E YE L M , W A 9 8 5 9 7 HVAC PLAN TENANT IMPROVEMENT M-1 DESIGN BY:JW Mechanical Sheet Index Sheet Title M-1 HVAC Notes & Schedules M-2 HVAC Plan Tenant Improvement M-3 HVAC Plan Roof GENERAL NOTES 1.All duct sizes shown are clear inside dimensions. 2.All duct gauges and supports per 2021 International Mechanical Code and SMACNA Duct Construction Manual. 3.All duct transverse seams and longitudinal joints shall be sealed. All ductwork is constructed and sealed per 2021 IMC. OSA ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC. 4.ASEI to air balance all systems to within 10% of design airflow upon project completion. 5.All duct systems on this project are low pressure. 6.Insulate supply and return duct work where not located in conditioned space with minimum R-6 Johns Manville Permacote Linacoustic R-300 liner or wrap. Insulate all outside air ducts with minimum R-8 Johns Manville Permacote Linacoustic R-300 liner or wrap. COORDINATION NOTES General Contractor 1.General Contractor to cut and provide openings for all rooftop, ceiling, floor, and wall penetrations, including weatherproof sealing. ASEI to provide size and location. 2.General Contractor to provide framed openings where required for all mechanical penetrations, including headers if required. General Contractor to verify penetration locations with ASEI before framing openings. 3.General Contractor to furr in ductwork as required. 4.General Contractor to provide all demolition, patching and painting as required for mechanical work. 5.General Contractor to provide service access per code to all mechanical equipment. 6.General Contractor to level all factory curbs provided by ASEI, provide all cant strips and curb insulation, and seal against leaks. 7.General Contractor to provide structure for mounting and hanging members of mechanical equipment. 8.General Contractor to provide all cutting of t-bar ceiling and extra material as required for HVAC installation. Electrical Contractor 1.Electrical Contractor to provide all electrical connections, disconnects, and motor starters for mechanical equipment. 2.Electrical Contractor to verify equipment sizes, loads and locations with ASEI mechanical plan and with field conditions. 3.Electrical Contractor to install all line voltage wiring and conduit. 4.Low voltage electrical work for HVAC to be provided by ASEI. COMPLETION Provide Test and Balance Report, Equipment Startup Test Reports, Operation and Maintenance Manuals, and As-built Record Drawings, as applicable, to Owner upon Project Completion. Scope of Work: ·Furnish and install: Energy Recovery Ventilator (ERV) for code required ventilation ·Furnish and install: All ductwork, GRDs (grilles, registers, diffusers), dampers, duct liner and insulation, thermostats, and control wiring piping associated with HVAC systems. ·CTS. Check, test, and start HVAC equipment to ensure it is operating properly. ·In house air test and balance with final report. ·Provide owner's manual and instructions. ·One-year warranty on all materials installed and workmanship. M-4 Ventilation Calculation ENERGY RECOVERY VENTILATOR SCHEDULE Lossnay Tag Make and Model Core Type Airflow (cfm)Max ESP (INWG) Nominal Recovery Effectiveness (Extra High Fan Speed) Voltage / Phase MCA / MOCP Weight LBS Notes / OptionsSensibleSummerWinter ERV-1 Lossnay LGH-F380RVX2-E Fixed Permeable Cross Plate 300 0.5 65%50%63%208 / 230V 1-Phase 4.3 / 15 75 1,2,3 Notes & Options: 1. ERV to Interlock with time clock for existing rooftop HVAC unit. 2. Hang ERV-1 from floor framing. Utilize spring isolators. 3. Use factory filters. Grille, Register & Diffuser Schedule I.D. No.Mfr. & Model Type Install Neck Size Material CD-1 Titus MCD Modular Core Diffuser Lay-in 6" x 6"Steel CD-2 Titus MCD Modular Core Diffuser Surface Mt 8" x 8"Steel CD-3 Titus MCD Modular Core Diffuser Lay-in 8" x 8"Steel CD-4 Titus MCD Modular Core Diffuser Lay-in 10" x 10"Steel RG-1 Titus 50F Eggcrate Grille Lay-in 6" x 6"Aluminum RG-2 Titus 50F Eggcrate Grille Lay-in 8" x 8"Aluminum RG-3 Titus 50F Eggcrate Grille Lay-in 10" x 10"Aluminum RG-4 Titus 50F Eggcrate Grille Lay-in 18" x 18"Aluminum RG-5 Titus 50F Eggcrate Grille Lay-in 22" x 22"Aluminum EG-1 Titus 50F Eggcrate Grille Lay-in 6" x 6"Aluminum EG-2 Titus 50F Eggcrate Grille Surface Mt 6" x 6"Aluminum EG-3 Titus 50F Eggcrate Grille Lay-in 8" x 8"Aluminum TG-1 Titus 50F Eggcrate Grille Lay-in 22" x 12"Aluminum Zone Damper Schedule I.D. No.Mfr.Model Size CFM MD-1 Zonex STCD 12 x 12 795 MD-2 Zonex STCD 14 x 14 1025 MD-3 Zonex STCD 10 x 10 490 MD-4 Zonex STCD 12 x 10 560 MD-B1 Zonex STCDBP 18 x 16 2870 Thermostat Schedule I.D. No.Mfr. & Model Type Notes T1 ,T2, T3, T4 Honeywell TH8320R1003 Seven day programmable with night setback Mount @ 48" A.F.F. NOTE: Programmable stats are capable of 5 degree deadband and have 2 occupied/2 unoccupied schedules for seven days per week. Thermostat & Controller Schedule I.D. No.Mfr. & Model Type Unit Served Notes Quantity T PAR-41MAAU Seven day programmable with night setback HP-1B Deluxe MA Remote Controller 1 NOTE: Programmable T-stats are capable of 5 degree deadband and have 2 occupied/2 unoccupied schedules for seven days per week. Programmable T-stats are capable of automatically adjusting the daily start time of the HVAC system in order to bring each space to the desired occupied temperature immdiately prior to schedule occupancy. Ductless Split System Indoor Unit Schedule I.D. No.Mfr.Model Electrical Data Line Op. Wt.Notes Voltage Ph.MCA MOCP Set FC-1 Mitsubishi PKA-A12HA7 E.C. to run 16/3 from o.d. unit & install ground 1/4" Liquid - 1/2" Gas 28lb 1 NOTE: 1) Per Washington State Energy Code, Section C403.3, exception 11, option a economizer is not required. Ductless Split SystemHeat Pumps Outdoor Unit Schedule I.D. No.Mfr.Model Refrigerant CFM Cooling Capacity Heating Capacity Electrical Data Total btuh SEER SEER2 Total btuh COP Voltage Ph.MCA MOCP Op. Wt. HP-1 Mitsubishi PUZ-A12NKA7 R-410a 425 12,000 20.8 19.8 14,000 4.31 208/230 1 11.0 28 93 lbs Roof Hood Schedule I.D. No.Use Manufacturer Model Size Neck Size Throat Area Velocity FPM Curb Notes RH-1 Relief Air Greenheck FGR 54" x 30"48" x 24"8 Sq. Ft.360 Yes Provide Insect Screen 45170000400 0 2'4'8' CLARITY SUITE 108 HEALING SUITE 106 UTILITY ROOM 126 KIDS SUITE 105 FAMILY SUITE 104 COMMUNITY SUITE 103 COPY 102 LOUNGE 100 REGISTRATION 100A RESTROOM 114 RESTROOM 113 POCT 115 STORAGE 116 CARE TEAM 110 HALL 109 HALL 107 HALL 125 HALL 117 IT 118 JANITOR 119 CLEAN SUPPLY 120 SOILED SUPPLY 121 STAFF LOUNGE 123 FOCUS 101 SEAL Ai r S y s t e m s En g i n e e r i n g I n c . R SHEET SHEET TITLE © COPYRIGHT 2024 - ASEI, INC. ALL RIGHTS RESERVED ASEI NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T OF 4 DECEMBER 27, 2024 4466 BSR IN D I G O U R G E N T C A R E - Y E L M TE N A N T I M P R O V E M E N T 93 7 W Y E L M A V E YE L M , W A 9 8 5 9 7 HVAC PLAN TENANT IMPROVEMENT M-2 DESIGN BY:JW 0 2'4'8' GOOSENECK DETAIL Not to scale SEAL Ai r S y s t e m s En g i n e e r i n g I n c . R SHEET SHEET TITLE © COPYRIGHT 2024 - ASEI, INC. ALL RIGHTS RESERVED ASEI NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T OF 4 DECEMBER 27, 2024 4466 BSR IN D I G O U R G E N T C A R E - Y E L M TE N A N T I M P R O V E M E N T 93 7 W Y E L M A V E YE L M , W A 9 8 5 9 7 HVAC PLAN ROOF M-3 DESIGN BY:JW SEAL Ai r S y s t e m s En g i n e e r i n g I n c . R SHEET SHEET TITLE © COPYRIGHT 2024 - ASEI, INC. ALL RIGHTS RESERVED ASEI NO. DATE REVISIONS DRAWN BY: REVIEWED BY: PR O J E C T OF 4 DECEMBER 27, 2024 4466 BSR IN D I G O U R G E N T C A R E - Y E L M TE N A N T I M P R O V E M E N T 93 7 W Y E L M A V E YE L M , W A 9 8 5 9 7 VENTILATION CALCULATION M-4 DESIGN BY:JW Ventilation Calculation Per ASHRAE 62 with ASHE Standard 170-2017 Occupancy Gross Area (ft2)Ceiling Ht.ft.Room Volume (ft3) OSA Air Changes / Hr. Total Air Changes / Hr. Occupiable Floor Area (ft²) People (Occupants 1000) Occupants Outdoor Air (CFM/Person) Outdoor Air CFM Per Occupants (A) OSA CFM (ft²) (B)OSA For AREA (ft²) Total Outdoor Air CFM Per ASHRAE 62 / 403.3.1.1 (A) + (B) Total Outdoor Air CFM Required Per ASHE Standard 170 Total Supply Air CFM Required Per ASHE Standard 170 Total Supply Air CFM Supplied # of Water Closet / Urinal Exhaust Per Water Closet / Urinal Total Exhaust Air CFM Soiled 121 70 9 630 2 10 --------21 105 105 110 Clean Supply 120 79 9 711 2 4 --------24 47 55 Focus 123 71 10 710 2 6 --------24 71 200 Clarity Suite 108 205 9 1,845 2 6 --------62 185 220 Healing Suite 106 153 9 1,377 2 6 --------46 138 150 Kids Suite 105 128 9 1,152 2 6 --------38 115 130 Family 104 128 9 1,152 2 6 --------38 115 130 Community Suite 103 128 9 1,152 2 6 --------38 115 130 Copy 122 60 ----36 4 1.0 5 5 0.06 2 7 - Staff Lounge 102 131 ----98.25 7 1.0 5 5 0.06 6 11 - Lounge 100 144 ----144 10 1.0 5 5 0.06 9 14 - Registration 100A 112 ----67.2 5 1.0 5 5 0.06 4 9 - POCT 115 89 ----53.4 5 1.0 5 5 0.06 3 8 - Care Team 110 145 ----87 5 1.0 5 5 0.06 5 10 - Hall 109 / 101 / 117 475 ----475 0 0 0 0 0.06 29 29 - Hall 107 55 ----55 0 0 0 0 0.06 3 3 - Janitor 118 40 --------0 0.12 5 5 -40 Storage 116 50 --------0 0.12 6 6 -50 Restroom 114 54 -------------1 50 50 Restroom 113 52 -------------1 50 50 Utility Room 125 137 ------------ Outdoor Air ASHRAE 62 Outdoor Air STD 170-2017 Exhaust Air Subtotal 102 291 Subtotal 300 Effectiveness 0.8 Not Req'd Due to AC/H Total Required 127 291 Total Required 300 Mechanically Provided 450 Mechanically Provided 300 qsave