Loading...
Jordan Bolibol - Stamped Engineering Letter FlatDomus, Donius Structural Engineering, LLO -S T{ R EJ C T U R A L P_O. Box 560 Broomfield, CO 80088 { a i N F F Ti i lei G. T. 1. C 5 0-864-7055 projects damusstfuc_com January A, 2075 71W Blue. Raven Solar 1403 North Research ih ", WIdi V 1 (]rrrn, UI. ZSWJ! Subject_ Cei-Tifiiration I etrer Bulibul FkriOuncc 151Ra Pfes+rnTT Loop SF Yelm, WA- g8597 to Whonr It May Cuncrru, A jubsite observa Gun of the condition of the cxistirrg f rarnirrg systcnr was perf urwrd by ark audit tram EPI Blur Raven 5olat as a rrqurst frnrn Donau'. STnirrura I F ngineeringr All reviaw iS based on these ohservations and the design criteria I isted helaw and urrly droned Valid if pruvidrd infurmaHupp is true and acYuratr=. On the above referenced project, the root structural training has been reviewed For additional Ioadlrig due to the Instalratlon of the solar PV addition to Lhu roof. 1 hu sLrucLurul resriuwr only applicn Lo the suCLiurr of thu roof tha is dirudiy sappurtirrg Lhw solar PV system and its supporting elements. The observed root traming Is described below. It field candltlons dlfter, contractor to rrutify engincYr pp fur to star king cunstrudiun_ Tic ruul Arur:ture ul �MP1) cunsists ul curnpusitiun shirrglu on ruui plywu4d that Is supported by pre-manuiactu red trusses that a re spaced at @ 24"o.c.. The top chords, sloped at 23 degrees, are 2M sections, Cie horrom rho rds are 2x4 sertlorm and the weh rnumber s u rc Zx4 sections. 1 he tr uss morn bu rs are conncctud by Acel gusset pl ates. The max uns upported projected horlxontol rap chord span is appmximat,-. ly fi'-4"• The existing roof fra ming syrsrem of (M P1) is judged to he adequate to withstand the load ing imposed by the insda Illation of the solar panels. No reinforcement Is necessary. 11W SpUdrlYOFtell' SUlar StLM&1U fs-Amuld bu kept at YZ" o.l_ FUr Iirrrdsiapu Lipid 48"U.c. lei pup trLiitoricntuLiun,wltll i] staggered pattern to ensure proper dlstrlbution of loads. The scope of this report Is strictly Ilmlted to an evaluatlon of the tastener attafhment, underlying framing and Supporting st ructurr on ly. 1 h u u ttu rhnocn is to the rxistirrg sir uctur a ar a rcyuir ud to be In a staggered patte rn to ensure proper dlArl bution of loading. All panersr ranking and hardware shall he installed per manufarturcr spcdficotiuros and within specified dcsigrr llm Itations. All waterprooting sha II be provided by the manutacturer. DomuS Stn,r.Tural F ngineerirrg assu mes no Fes pondhi liry for misuse or improper installation of the solar PV pa nets or ranking. ae5ijm Criteria: • Appllcable Codes = 2021 IB IRC, ASCE 7-16 • Roof Dead Load 7 psf (MP1� • Root Live Load = 20 pst • Wind Speed = 114 mph �Vult)r Exposure C • Roof Snnw I oad 25 psf ■ Attuchmcnt= 1 1014 Wood Screws wiLh 1_fS iror:h min_ cvnbcdrnu-.nT depth, at spacing shower above. 11IL-aw auntact me with arty Further questions or cancer rrs r egarding this prajvrL Sincerely, Jahn Calvert, P.E. Projer.T Fnginerzr t AL - C,4 Digitally signed by John A. Calvert Date: 20 ,01.0 10.10.20-07r00' Bolbol Yelm WA 1 Domus, Donius Structural Engineering, LLO T{ R EJC T U R A L P_O. Box 560 Broomfield, CO 80088 { a i N F F Ti i lei G. T. 1. C 5 0-864-7055 projects domusstfuc_com Untvity Leading Roof SAOvl LOW Calkull iom pg = Ground Snow Load = 2h_ll pil N = 0.7 C. Cr l Po (A.S T7 - rq 7-1) C, Fzpmure rartnr 1 (Asa --I - I Due 1-2) C, = Tfremml Fwr m = 1 (ASf3E7 TAW 7.3) I = Irr�p lance Factor = 1 pF Flat FZmf Snow Load = 75 0 psf fk = C..R (ASC.E7 Eq 7 2) C3 = Slope Factor = 100 pi = Sloped Roof Snow Load = ao psf PV Dmd Lead = 3 psf (Per Blue Raven Solitrl A PdJustad irr 1:1 I )ACrzA Mr�A :125 PST PV System Weight Waght of I'V Spleitt (I ler Blue Raven S;olar) 3.4 par X Standoff Spa nq d 00 ff Y Rtandrdf Npa anp 6 M ff 5landoll I nbulery Area = 24.33 alt Point Loads of Standoffs 73 lb Nnre- PV srandoffs era ataggared to insure pw4w dLarributian of loading Roof Live Load = 20 paf Note: Reef live load i9 romoved in area's covered by f'Y array. Roof {lead Load (MP1 ) Composition Shingle 4.00 psf I {twl I'Ipw�Yxl 7 60 psf 2M Tap Chords @ 24'o.c. U.73 psf Vaulted Ceiling U 60 psf (C.ailinn Not Vardtad) Miu4xllanwuj 0 27 psf TolaI Roof aL (MP1M 7.0 psf Pl. Adlusled 1n 21 f?pgmn SlnCA 7.63 pef Bolbal Yelm WA 2 (),N1 IT ;i Domus Stfuctural Engineering, Lt_C P.O. Bost 560 'I' ! L T 1t L c' Broomfield,CO 80038 1 ,L ]l T rti G I i c' 53G Sfr4-705� projects Odom usstruc.corn Wlnd Calculatlona Per ASCE 7•16 Components and Cladding Input Variables Wind Speed i W mph Lx�' Cawgcry c; RD01 Shape Gable Rea! Rani AciFe 73 dWFeb Mean RDDf 14eighi 24 A Elkw.bw- Wod Aim 21.311 GmundClewalion Oft Design Wind Premu re C alculatians qh 00V.rG' KZ' K7l' Kd' Ke'W2 (Fq 26 W 1) Kz ([)Pwm CDM$Dw* 0-9d ruble30.3-1) M {TopoFaphic Fadm 100 LFig 26 9 1 � Kd (Wind Lkucbxwhly FadM = QM r f abk. 26.& 1) Ke (Ground Llew� FaCM = 1-01) V (Ucagn Wind SpxxA = 110 mph (Fig. W.b4A) Risk Caleg = II Cable 1.5-1) qh 23 75 pri ShMoff Uplift Calculnflum-Porkrot Torre 1 7cne 7 zum 3 Vix ilrm. ya= 6.67 0.T7 0w 067 GGP = -1.4t� -2.41 -3.14 0.44 Up1ih Pressure = 45.1 prf -44.1 gef -58-8 psf 7.1 psf ASU Uplft F nni w _ -13.9 p9f -26.4 g9f -35-3 psf 9A psf % Standaffff Spacing = 4-0011 4.00 IF[ 2.67 ft Y9hindaHAp.-ing 908111 3N11 304ft Tlihulary Area - 24.33 sqH 12-17 sit S 11 sgfl nand I andfn at wbnrksnf 73Ih 37Ib 74lb Footing Uplift (4.60+0-SW) _ -293 lb -3W lb -272 11b Standoff VpliR Cslculstions4-andarapb /car. 1 zuic 2 Zane 3 f asihw y, = 069 a T9 0M 0.69 GCP = -IA59 -2.48 3 N. 046 Uptifl Prmmre 24 4 INf 445 iS IN r - 0.9 Pgf 7-6 PSF A8U Upkit Pn_m.Rjru �OAW�= -14.7 p9f -29.0 g9f -36.5 paf 9-b psf X 5handufl5padr%l 6-4U 11 6.00 ft 4A0 IL Y 9fandaff Ape.-ing 350fi 117511 1.75 it InbularyAim 21.O0bglt W50sgll 700sgfl dead Load on uM&rnent = 63 lb. 32 b 21 th Footing Uplift (4.SNO-M) _ 470 lb -275 lb -2431 h 9landoff UpliftChedl Ma;omum Dwe n l Ipit 300 b 61unduif Upldl Caprnaly = 4W lb 4W i.� capaeily - 300 lb demand Therefore, OK Fastener Capedty Check !-sums = 2 - m 1-' VVuud k5utws Nunberof fasteners= 2 bAKAoiunl Ucplh = 1.15 in. Pullout Capacity f er rnch = M b F.whnerC--paary fOSb wJ F.8- oR 1.'u a UC L u1 $-& bW b SW lb cip w* > 3W lb demand Therefore, OK (Fig- 30 3) (Eq. 29.4-7) (FKl 30 3} (Eq. 29.4-Y) Bollbol Yelm VVA 3 Domu -S T{ R 1JC T U R A L { a i N F F Ti i lei G. T. 1. C. Framing Clieck IMP11 Donius Structural Engineering, LLO P_O. Box 560 Broomfield, CO 80088 51}-864-7056 projects darnusstruc_com PASS w _ 72 plt 1]esd Lowd f 6 Qyl I IV Luad 3.3 pyl Snow Load 25_� psf ZO l aµ Chords @4 24'a_c. C,ovaminj� load Cnmbo (}I + S1 Meruber 5µsn = 6 - 9' Total Load 36_9 psf Member Properlfes Member Sixes S (103) 1 [inr4] Lumber Sp1Gr Member Spacing 2x4 3.06 i 36 DFtr2 @ 24'o.c. Check Banding Stress Fb (p3i) = Ft x Cd x Cl x C r (NDS Tables 4.3.1) 4 x 1.15 x 1.t� x 115 Ahmed bending Strm = 1 f8b.a µor Maximum Wmenl = W2)16 = 408-N d 0 = 4907.106 irrJf Actual Banding Stress = (Maximum Murneril) IS = 1i14U_f Pa Allowed f Actual - 69,7% Wressed - Therefore, UK Check Deflection AlmwA f}allaction (Total I oad) , :;.I' (F i [''Cil oo psi Pfrrr Nfi9} 045e Deflecrinn C. toda f qmd on IwoOnuous Span Artual Dnfleclinn (Toral I nad) W1 Ai) J (1 M511-1I) 0163 in 11497 > 11180 Therefore OK Alowed Dolfection (Live Load) = U240 0.337 in Actual Dcflec- an (Live Load) _ WLh4) J (18.a"S"1) 0.114 in Wii 'o L1240 Therefore Olt Check Shear Member Area = 5.3 W2 Fv (psi) = 100 psi (NDS Table 4A) Plluwed Shear = Fv' A = 34 b Max Shear M = w' L12 = 2421b Allowed } Actual - 2,5.7% Stressed - Therefore, OK Bolibal Yelm WA 4 Domus, Donius Structural Engineering, LLO T{ R 1JC T U R A L P_O. Box 560 Broomfield, CO 80088 { a i N F F Ti i lei G. T. 1. C'. 5 0-864-7055 projects damusstfuc_com Laterar Check Existing Weight of Effsctad Building Level Area Weight;psf wal-Ohl (Ib} Root 146ti sl 7 6 pnf $117i lb Ceiling 14W9 A ti.0 psf 8814 lb Wwd Sidiny 100 II b.0 per 20M lb {8' U' Wall Height} Inl Walls 100 ft 1 64 pal I P5%O lb Existing Weight of Effected Building 24W Ih P roposed Weight of PV Syslem Wevyhl 01 I IV System �i'er BILKA Fawn Solari 9.0 pu1 Apprux Area of i lrupa+ed FV Splern 24W A Approxim ale Total Weight of PV System e97 lb 10% Comparison 10% of Existing Building Witight [All awed1 24551b Approximate Weight of PV System (Actudl 1497 lb PeroentIncrease 3 7% 2456 1b f 0971b, Therefore OK Bolrbol Yelm WA 5 I 0mu k I- KLCT U K A L Appsndlx A- Gomm Notes GENERAL Donius Structural Engineering, LLC P_O. Box 560 Broomfield, CO 80088 51}-864-7056 projects damusstruc_com r The a tractor Shall veniy all tllmenpow property selCadCs, AI 1.111 KA CCAM-, cluvakwti arxi sac eunditxnis butui u starting work and sl►all nVify D olds; �Anrchral CrLxreenng_ LLCOT anyd6suepuricns d, NI repW CMWJLL4lrn5 npxerent I km iF, Strurheal E-n.rpwwtrq. L L C'S hest professional jutlgment based upon irTdustry SLlfrlant4 ♦ AuAAvc any eunllids Enk Hw d)aMrKjrs Wth chorus Shudurdl Ergirw-xq uq, I I t: her ". pmrp.erlinq with cnFul aidnn F L he tlrcxln rnlflla ir-M rnr IN% prc*wl Ji Irsled nn the irsr paele rrl the report IS based on fire erigineers best Xxgernent amVor prowlded by ft ATC oouncll. At U spmmc requests aW tllrrer. Pk.Lersu arltdct 4jur knnri it Dw dcaiyri crkrid mixis to be moll W. r A sits mit vrds rKA phy hilly raxludud by 6unrrrs Sbudwal EighxxLrirxl, l I 1, 1 hP arfrrmpanyinq r alail arnns and ccrtilicatiun ac pruvkkxd wrlh Dw uwk-nlandirrg That the sac bulldirrg wri r"uJruchm sLandarcLs nwh-.tan 3rr.P.pramp. Lem nr 1K)USI y standards. It Shall be the COMCM respXrSOLly to i0entily any rregularltles such as Inoanslstenk framffV conditions, waler tlamage, We damage, aacketl, split or noticeably Wee" framing members. * 1 krrrrJS Rhaidun1 l--Wrrr wmwj j, I L C w neat resfinristle rrir fmykwj L safely rrrrawres or ffqularrms r her rnmrarter sJiall rke_vgn, cmx turf and mLwOmn all safehrri safety devires KwAKU)q srrq anrF harr ragnd , aqtA t7P mAery rP.-4mnsRrle inr woof MV to aN kreaL state and federal safety mid r"h slandards, lams and regulWom. Tkle oanhaclor shah take mcessary precautions to mallrtaln and Insure ttie Integrity oT Me sbudure dunrTg c:msbrlctton. n a kirw Jlt Is FOW by One oT fhe c wWWors or SukoWactWs employees_ or any one else. "contractorwN IrKk-=fly, dlelend and hotel foie ownerantl Oarms Strudural ErKoneennq, LLC Irmm less of airy and aA such claims- * Any and all wakL'IT}I ucrring Iwll LrC pi uyklud IJy AIL' owbaOix. Nxim SUucbmal Enylneurip g, LLC is rKA it.-4 l6I:Ar= her warripnxdnq * All h fhw. re Mall lie Insrafk?d pgr manutadurer giw-11r Vwxir4.and wrlhln _ mc.ff l deilgR 1r1 Utalm% 1 hwmj5 :ihur.ft al t.rgirreenng. LLL' a55Ume5 no re5pon5iVirly Tor InoDrTeCdy Ii-PsLI P.0 haRhyare rr harrK are in:Jalk-d ouLr nl C-e. rrrdnldduror s7acc�fraGorn. USER RELJANCE • Uwws Snelural EnglrweFVV, LLC was engaged by Blue Raven Saar (L wr rr� to FW.dfXm rhos Wne :mem I h1% rffkV and the Inrormatton 1t►erean, are far me exdusNe use OP the CIIerg. This repaid hw4 rm Mim. purlxMe and spas not he relied upon. La used, by aq ellYta per m or enlity wtllKxA the wngen ccr►seril of fkrnus Slinictural EnglfwWrPg, LLC. Thkd palUes that obldrn Uus i LVA. +x the inrunualk n rwMk skan lww no iiylib ur warm w ur w-umCYy againA Dwrxn Shuclurdf Sx3rrK!L!rirrg, LLC, YIs uflicurs Em orrQYryxcs. ROOF MOUNTED ARRAYS • Ir an ana" oT a suppating slucIft Is Included In olio scope oT nark the structural assessment only applies to Me secUDn aTthe roof that Is dredly uppordng die Vopmed solar PV system. r NogmcWral ffTffbm rm be W Tor 4nldult, ctc., unkssspeMcMyshawm Wain [>rtarmdten approval V Imutimm of my additiaial iwAmL c1c. F tt Is assumed that a standard quality of oanstrucbm care was used to oorr%lrurr me arkKLV dudrng a sJuM he the corrtradors responslbllrtyto MW verrry any mid at ftwFiiing mefters sl4porEM me prgxF,-d 1JV arxyare o aA irate condition The oWradu s1hall dell Inspect W KCLstarrdard mmtrucW mown%. qqw; fit eery mr, mrM. ire dxwgP, F]c rood FKXN engineer ll any cwiprarnlmed rnateflal is Tound on site prior to slarurxl fit rnjrJnn * rr is amrmed Ihat nwP. Rave peen nn ark]ihmal kiarls (FFVAL`, nr WP egLPViK.yrl~ dcMLwrdi IiWrs of roofing, e' Q added to the Miildinq over the fixrse of "- stnidurek hntrrrp I he ronhadrr arrdkw cikYik atidll weydy tliis wrUr ULc pruprLYty urmey arxt irony I kmis S1nirhral Fngneennq. L 1 C rr aMlwmal triad hail bpe1L added to tlx-Aijduru alrudcly. F 0exlb4e utilrty omnedlons atust W and al airy 61JIkIIrrg selsmlc fdr►l. * Care slrr; Al he rakfm In eaurre Sot PV anays fla nr}t predi". drainW. of rain water. F Unless othetwsse noted, omslr=m makmal shall Ire everuy list 1buked ri plamA Lwk hair -A km-i or wors. LuaLls-.JEA rxit momd the allowable fording Tor the suppMrig ntalrbers and mew 4clrrructms. d, NI laps rir mind wxev+s at the rr}nt she• he stanlesE srewJ ,anrl insta M MI:11 lg fJ1e ffkM 113 oT the dimensional w knh oT the Treming frrcrnbers. r Ali racamms shall he a minirreim rq W .away horn any hiss panel err hinge pints_ truss plates arwx memo& eilm. meld veYrty Iriratm rrl lasienem olio to slartrg rrristnrrrrm hll Tmrrrrers Shall be pre-dMIM to avoid SpInng ensting llum ef. * Orirnus Sbudurdi Er4rLening, LLC r neat i u-il"i AL tuf dumnJE c efierK of cxknw chwMuig ri sJrdutl nn ert the F^f array lair any damage to dorwirs" decks, roofs. walkways, Iarldiscaplrg, allbffMes, pets, people, etc.. If SnOw guards are requested by W cuMormr, ndlty Dams Strucl:Lft Erkgmering. LLC. Bollbol Yelm WA 6