Loading...
Tommy Moore Engineering Letter___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com To: BlueRavenSolar 1403NorthResearchWay,BuildingJ Orem,UT.84097 Subject: CertificationLetter MooreResidence 9224ConineStSE Yelm,WA.98597 ToWhomItMayConcern, DesignCriteria: භ ApplicableCodes=2021IBC/IRC,ASCE7Ͳ16 භ RoofDeadLoad=7psf(MP1) භ RoofLiveLoad=20psf භ WindSpeed=110mph(Vult),ExposureC භ භ Sincerely, JohnCalvert,P.E. ProjectEngineer Thescopeofthisreportisstrictlylimitedtoanevaluationofthefastenerattachment,underlyingframingandsupporting structureonly.Theattachmentstotheexistingstructurearerequiredtobeinastaggeredpatterntoensureproperdistribution ofloading.Allpanels,rackingandhardwareshallbeinstalledpermanufacturerspecificationsandwithinspecifieddesign limitations.Allwaterproofingshallbeprovidedbythemanufacturer.DomusStructuralEngineeringassumesnoresponsibility formisuseorimproperinstallationofthesolarPVpanelsorracking. Pleasecontactmewithanyfurtherquestionsorconcernsregardingthisproject.  Attachment:2Ͳ#14WoodScrewswith1.75inchmin.embedment depth,atspacingshownabove. January14,2025 Theroofstructureof(MP1)consistsofcompositionshingleonroofplywoodthatissupportedbypreͲmanufacturedtrussesthat arespacedat@24"o.c..Thetopchords,slopedat23degrees,are2x4sections,thebottomchordsare2x4sectionsandtheweb membersare2x4sections.Thetrussmembersareconnectedbysteelgussetplates.Themaxunsupportedprojectedhorizontal topchordspanisapproximately7'Ͳ0''. Theexistingroofframingsystemof(MP1)isjudgedtobeadequatetowithstandtheloadingimposedbytheinstallationofthe solarpanels.Noreinforcementisnecessary. RoofSnowLoad=20psf Thespacingofthesolarstandoffsshouldbekeptat72"o.c.forlandscapeand48"o.c.forportraitorientation,withastaggered patterntoensureproperdistributionofloads. AjobsiteobservationoftheconditionoftheexistingframingsystemwasperformedbyanauditteamofBlueRavenSolarasa requestfromDomusStructuralEngineering.Allreviewisbasedontheseobservationsandthedesigncriterialistedbelowand onlydeemedvalidifprovidedinformationistrueandaccurate. Ontheabovereferencedproject,theroofstructuralframinghasbeenreviewedforadditionalloadingduetotheinstallationof thesolarPVadditiontotheroof.Thestructuralreviewonlyappliestothesectionoftheroofthatisdirectlysupportingthesolar PVsystemanditssupportingelements.Theobservedroofframingisdescribedbelow.Iffieldconditionsdiffer,contractorto notifyengineerpriortostartingconstruction. Moore Yelm WA 1 Digitally signed by John Calvert Date: 2025.01.15 06:43:32 -07'00' ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 20.0 psf (ASCE7 - Eq 7-1) 1 (ASCE7 - Table 7-2) 1 (ASCE7 - Table 7-3) 1 20.0 psf (ASCE7 - Eq 7-2) 1.00 20.0 psf 3.26 psf 3.0 psf 4.00 ft 6.08 ft 24.33 sft 73 lb 4.00 psf 2.00 psf 0.73 psf 0.00 psf (Ceiling Not Vaulted) 0.27 psf 7.0 psf 7.6 psf PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 23 Degree Slope Point Loads of Standoffs Miscellaneous Vaulted Ceiling Total Roof DL (MP1) Roof Live Load = 20 psf Roof Plywood Roof Dead Load (MP1) Composition Shingle Note: Roof live load is removed in area's covered by PV array. Roof Snow Load Calculations pg = Ground Snow Load = Ce = Exposure Factor = pf = 0.7 Ce Ct I pg Ct = Thermal Factor = I = Importance Factor = Cs = Slope Factor = Standoff Tributary Area = ps = Cspf ps = Sloped Roof Snow Load = pf = Flat Roof Snow Load = DL Adjusted to 23 Degree Slope Gravity Loading PV System Weight Weight of PV System (Per Blue Raven Solar) X Standoff Spacing = Y Standoff Spacing = Note: PV standoffs are staggered to ensure proper distribution of loading 2x4 Top Chords @ 24"o.c. Moore Yelm WA 2 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 110 mph C Gable Roof 23 degrees 20 ft 21.3 ft 0 ft (Eq. 26.10-1) 0.90 (Table 30.3-1) 1.00 (Fig. 26.8-1) 0.85 (Table 26.6-1) 1.00 110 mph (Fig. 26.5-1A) II (Table 1.5-1) qh = 23.75 psf Zone 1 Zone 2 Zone 3 Positive ya =0.67 0.77 0.80 0.67 GCp =-1.45 -2.41 -3.10 0.44 (Fig. 30.3) Uplift Pressure =-23.1 psf -44.1 psf -58.8 psf 7.1 psf (Eq. 29.4-7) ASD Uplift Pressure =-13.8 psf -26.4 psf -35.3 psf 9.6 psf X Standoff Spacing = 4.00 ft 4.00 ft 2.67 ft Y Standoff Spacing = 6.08 ft 3.04 ft 3.04 ft Tributary Area = 24.33 sqft 12.17 sqft 8.11 sqft Dead Load on attachment = 73 lb 37 lb 24 lb Footing Uplift (0.6D+0.6W) = -293 lb -300 lb -272 lb Zone 1 Zone 2 Zone 3 Positive ya =0.69 0.79 0.80 0.69 GCp =-1.49 -2.48 -3.20 0.46 (Fig. 30.3) Uplift Pressure =-24.4 psf -46.6 psf -60.8 psf 7.6 psf (Eq. 29.4-7) ASD Uplift Pressure (0.6W)=-14.7 psf -28.0 psf -36.5 psf 9.6 psf X Standoff Spacing = 6.00 ft 6.00 ft 4.00 ft Y Standoff Spacing = 3.50 ft 1.75 ft 1.75 ft Tributary Area = 21.00 sqft 10.50 sqft 7.00 sqft Dead Load on attachment = 63 lb 32 lb 21 lb Footing Uplift (0.6D+0.6W) = -270 lb -275 lb -243 lb -300 lb 425 lb Therefore, OK Fastener =2 - #14 Wood Screws Number of Fasteners = 2 Embedment Depth = 1.75 in. Pullout Capacity Per Inch = 150 lb Fastener Capacity = 525 lb w/ F.S. of 1.5 & DOL of 1.6= 560 lb Therefore, OK Wind Calculations Maximum Design Uplift = Design Wind Pressure Calculations qh = 0.00256 * Kz * Kzt * Kd * Ke * V^2 Kz (Exposure Coefficient) = Kzt (Topographic Factor) = Wind Speed Exposure Category Roof Shape Roof Slope Effective Wind Area PerASCE7Ͳ16ComponentsandCladding Input Variables Fastener Capacity Check Mean Roof Height Ground Elevation Kd (Wind Directionality Factor) = 560 lb capacity > 300 lb demand Ke (Ground Elevation Factor) = V (Design Wind Speed) = Risk Category = Standoff Uplift Calculations-Portrait Standoff Uplift Calculations-Landscape Standoff Uplift Check Standoff Uplift Capacity = 425 lb capacity > 300 lb demand Moore Yelm WA 3 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com (MP1)PASS Dead Load 7.6 psf PV Load 3.3 psf Snow Load 20.0 psf Governing Load Combo = DL + SL Total Load 30.9 psf Fb (psi) = f'b x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.5 x 1.15 Allowed Bending Stress = 1785.3 psi (wL^2) / 8 = 378.0791 ft# = 4536.95 in# Actual Bending Stress = (Maximum Moment) / S = 1481.5 psi L/180 (E = 1600000 psi Per NDS) = 0.466 in Deflection Criteria Based on = (w*L^4) / (185*E*I) = = L/519 > L/180 Therefore OK Allowed Deflection (Live Load) =L/240 0.35 in (w*L^4) / (185*E*I) L/800 > L/240 Therefore OK Member Area = Fv (psi) = 180 psi (NDS Table 4A) Allowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 216 lb Check Bending Stress (True Dimensions) Continuous Span 0.162 in 0.105 in Member Properties Member Size 2x4 S (in^3) 3.06 DF#2 Member Spacing @ 24"o.c. Maximum Moment = Check Deflection I (in^4) 5.36 Lumber Sp/Gr Actual Deflection (Live Load) = Allowed Deflection (Total Load) = Actual Deflection (Total Load) = Allowed > Actual -- 83% Stressed -- Therefore, OK 945 lb Allowed > Actual -- 22.9% Stressed -- Therefore, OK 5.3 in^2 Check Shear w = 62 plf 2x4 Top Chords @ 24"o.c. Member Span = 7' - 0" Framing Check Moore Yelm WA 4 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Level Area Weight (psf) Weight (lb) Roof 2010 sf 7.6 psf 15284 lb Ceiling 2010 sf 6.0 psf 12059 lb Wood Siding 100 ft 5.0 psf 2000 lb (8'-0" Wall Height) Int. Walls 100 ft 6.4 psf 2560 lb 31902 lb 3.0 psf 213 sf 639 lb 3190 lb 639 lb 2.0% Lateral Check 3190 lb > 639 lb, Therefore OK Existing Weight of Effected Building Existing Weight of Effected Building Proposed Weight of PV System Weight of PV System (Per Blue Raven Solar) Approx. Area of Proposed PV System Approximate Total Weight of PV System 10% Comparison 10% of Existing Building Weight (Allowed) Approximate Weight of PV System (Actual) Percent Increase Moore Yelm WA 5 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Appendix A: General Notes GENERAL Ɣ The contractor shall verify all dimensions, property setbacks, AHJ/HOA CC&R's, elevations and site conditions before starting work and shall notify Domus Structural Engineering, LLC of any discrepancies. Ɣ All report conclusions represent Domus Structural Engineering, LLC's best professional judgment based upon industry standards. Ɣ Resolve any conflicts on the drawings with Domus Structural Engineering, LLC before proceeding with construction. Ɣ The design criteria used for this project & listed on the first page of the report is based on the engineers best judgement and/or provided by the ATC council. AHJ specific requests may differ. Please contact our team if the design criteria needs to be modified. Ɣ A site visit was not physically conducted by Domus Structural Engineering, LLC. The accompanying calculations and certification are provided with the understanding that the site building and construction standards meet an acceptable level of industry standards. It shall be the contractors responsibility to identify any irregularities such as inconsistent framing conditions, water damage, fire damage, cracked, split or noticeably deflecting framing members. Ɣ Domus Structural Engineering, LLC is not responsible for enforcing safety measures or regulations. The contractor shall design, construct, and maintain all safety devices including shoring and bracing, and shall be solely responsible for conforming to all local, state and federal safety and health standards, laws and regulations. The contractor shall take necessary precautions to maintain and insure the integrity of the structure during construction. If a lawsuit is filed by one of the contractor's or subcontractor's employees, or any one else, the contractor will indemnify, defend and hold the owner and Domus Structural Engineering, LLC harmless of any and all such claims. Ɣ Any and all waterproofing shall be provided by the contractor. Domus Structural Engineering, LLC is not responsible for waterproofing. Ɣ All hardware shall be installed per manufacturer specifications and within specified design limitations. Domus Structural Engineering, LLC assumes no responsibility for incorrectly installed hardware or hardware installed outside of the manfacturer specifications. USER RELIANCE Ɣ Domus Structural Engineering, LLC was engaged by Blue Raven Solar (Client) to perform this assessment. This report and the information therein, are for the exclusive use of the Client. This report has no other purpose and shall not be relied upon, or used, by any other person or entity without the written consent of Domus Structural Engineering, LLC. Third parties that obtain this report, or the information within shall have no rights of recourse or recovery against Domus Structural Engineering, LLC, its officers or employees. ROOF MOUNTED ARRAYS Ɣ If an analysis of a supporting stucture is included in our scope of work, the structural assessment only applies to the section of the roof that is directly supporting the proposed solar PV system. Ɣ No structural members can be cut for conduit, etc., unless specifically shown. Obtain prior written approval for installation of any additional conduit, etc. Ɣ It is assumed that a standard quality of construction care was used to construct the original building. It shall be the contractors responsibility to field verify any and all framing members supporting the proposed PV array are in adequate condition. The contractor shall field inspect for sub-standard construction means, signs of dry rot, mold, fire damage, etc. and notify engineer if any compromised material is found on site prior to starting construction. Ɣ It is assumed that there have been no additional loads (HVAC or MEP equipment, additional layers of roofing, etc) added to the building over the course of the structure's histroy. The contractor and/or client shall verify this with the property owner and notify Domus Structural Engineering, LLC if additional load has been added to the structure already. Ɣ Flexible utility connections must be used at any building seismic joint. Ɣ Care should be taken to ensure that PV arrays do not preclude drainage of rain water. Ɣ Unless otherwise noted, construction material shall be evenly distributed if placed on framed floors or roofs. Loads shall not exceed the allowable loading for the supporting members and their connections. Ɣ All lags or wood screws at the roof shall be stainless steel and installed withing the middle 1/3 of the dimensional width of the framing members. Ɣ All fasteners shall be a minimum of 6" away from any truss panel or hinge joints, truss plates and/or member ends. Field verify location of fasteners prior to starting construction. All fasteners shall be pre-drilled to avoid splitting existing lumber. Ɣ Domus Structural Engineering, LLC is not responsible for downslope effects of snow shedding or sliding off of the PV array nor any damage to downslope decks, roofs, walkways, landscaping, automobiles, pets, people, etc.. If snow guards are requested by the customer, notify Domus Structural Engineering, LLC. Moore Yelm WA 6