Loading...
Firestop WM 3705 Yelm FP DrawingsX 2" PIPE ( F 4" PIPE 32 0 3 N E 6 5 T H S T S P A C E 2 VA N C O U V E R , W A 9 8 6 6 3 P : ( 3 6 0 ) 7 1 8 - 8 6 0 4 74 3 L A W N S D A L E R D ME D F O R D , O R 9 7 5 0 4 P: ( 5 4 1 ) 2 4 5 - 0 4 6 6 W A - F I R E S C L 9 2 2 O H | O R - 1 8 3 2 7 9 | C A - C 1 6 1 0 4 9 1 5 8 | C O - 2 2 - S - 0 8 9 9 3 | T X - S C R - G - 2 3 7 9 7 9 7 | A Z - 3 3 0 4 2 7 ID - F P S C - 1 5 7 E E E E EE 1 1 2 2 3 3 4 4 5 5 6 67 8 8 9 9 10 10 11 11 12 12 13 13 A A B B C C D D E E F F G G H H J J K K 2 FP2FP2 1 EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. N 0 20'40'60' SCALE: 1"=40'-0" 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. THE FIRE PROTECTION ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR SHALL THEY BE REQUIRED TO SUPERVISE THE CONDUCT OF THE WORK, THE CONSTRUCTION PROCEDURES FOLLOWED BY THE CONTRACTOR, SUBCONTRACTORS, THEIR RESPECTIVE EMPLOYEES OR ANY OTHER PERSON AT THE JOB SITE OTHER THAN THAT OF THE ENGINEERING FIRM'S EMPLOYEES. CONTRACTOR MUST REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID. SHOULD MODIFICATIONS TO THESE PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL OF THE CHANGES FROM BOTH THE AUTHORITY HAVING JURISDICTION AND THE OWNER'S DESIGNATED REVIEW CONSULTANT IN ADDITION TO OBTAINING THE NECESSARY APPROVALS, THE CONTRACTOR MUST MAKE NOTE OF ANY FIELD OR COORDINATION CHANGES ON THE INSTALLATION DRAWINGS, AND THEN MUST PROVIDE A SET OF AS-BUILT DRAWINGS ONCE COMPLETE. CONTRACTOR MUST VERIFY ALL DROP DOWN LOCATIONS AT EXTERIOR WALLS WITH THE PROJECT MANAGER PRIOR TO INSTALLATION. ALL PIPING MUST BE COORDINATED AROUND FRAMING MEMBERS AND PROPERLY INSTALLED INSIDE THE BAR JOIST. CONTRACTOR SHALL ROUTE PIPING AROUND ALL OBSTRUCTIONS AND PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, AS DETAILED IN NFPA 13 STANDARDS AS PART OF THE FIELD COORDINATION AT NO ADDITIONAL COST TO OWNER. ALL SPRINKLER DEFLECTOR DISTANCE REQUIREMENTS SHALL BE IN ACCORDANCE TO THE STANDARDS OUTLINED IN NFPA 13. ALL PIPING PASSING THROUGH CMU WALLS SHALL BE INSTALLED WITH ONE INCH CLEARANCE ON ALL SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL CORES SHALL BE COORDINATED WITH STRUCTURAL REINFORCING. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CORING WITH PROPER CLEARANCE AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A TWO INCH CLEARANCE AROUND ALL PIPING PASSING THROUGH CONCRETE SLABS. THE SPRINKLER CONTRACTOR SHALL FILL ALL CLEARANCES WITH APPROVED MASTIC. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE WITH THE STANDARDS OUTLINED IN NFPA 13. PROVIDE ALL NECESSARY OFFSETS, RISES OR DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS, CLEARANCES, ETC. ARCHITECTURAL AND ELECTRICAL BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO THE CONTRACT DOCUMENTS FOR LOCATIONS, SIZES AND QUANTITIES OF OTHER TRADE WORK. SPRINKLER SPACING SHALL BE PER NFPA 13 UNLESS OTHERWISE NOTED ON PLANS AND/ OR PROTECTION CRITERIA LEGEND. INTERFACE SPRINKLER SYSTEM WITH FIRE PROTECTION SUPERVISORY SYSTEM. ALL MATERIALS SHALL BE UL LISTED OR FM APPROVED. SPRINKLER PIPE SHALL BE MANUFACTURED TO STANDARDS RECOGNIZED BY NFPA 13., THREADED PIPE SHALL HAVE A CORROSION RESISTANCE RATING OF 1.0 OR GREATER. CRIMP-TYPE COUPLINGS SHALL NOT BE USED. THREADABLE THINWALL PIPE WITH CORROSION RESISTANCE RATING OF LESS THAN 1.0 SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, MODEL NO. PBA248, ELECTRIC BELL BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE AS REQUIRED BY AUTHORITIES HAVING JURISDICTION. PROVIDE NEW DOUBLE POLE VANE TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI. SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. MOUNT WATER FLOW INDICATORS NO HIGHER THAN 6 FEET ABOVE FINISH FLOOR. ALL SPRINKLER SYSTEMS THAT ARE TO BE MODIFIED SHALL BE HYDROSTATICALLY TESTED PER NFPA 13 PRIOR TO SPRINKLER SYSTEM MODIFICATION AND SHALL BE RE-HYDROSTATICALLY TESTED AFTER COMPLETION OF WORK. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE ANY ATTACHMENTS TO THE METAL ROOF DECK OR JOIST BRIDGING. SAMMY SCREWS ARE NOT PERMITTED. CEILING FLANGES ARE NOT PERMITTED. PROVIDE RETAINING STRAPS ON HANGERS WHERE REQUIRED. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER HEAD LOCATIONS AND PIPE ROUTING SUCH THAT THEY DO NOT INTERFERE WITH NOR RECEIVE DAMAGE FROM THE NORMAL OPERATIONS OF THE AREA. THE CONTRACTOR SHALL DIVERT ALL DRAINS AND INSPECTORS TEST CONNECTION DISCHARGE AWAY FROM FINISHED SURFACES AND PIPE TO APPROVED DRAIN LOCATIONS. ROUTE DISCHARGE TO NEARBY GREENSPACE OR STORM WATER DRAIN BY USE OF BACKWASH HOSE.. THE CONTRACTOR WILL BE BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR CLEANING OF RUST STAINS ON PAVEMENT,/CONCRETE DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM DRAINS. 1. 2. 3. 4. 5. 6. THE DESIGN SHOWN ON THESE CONTRACT DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY THE AUTHORITY HAVING JURISDICTION AND TO PROVIDE GUIDANCE FOR BIDDING. SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS REQUIRED BY CONTRACT DOCUMENTS TO THE OWNERS DESIGNATED REVIEWERS. BASE SPRINKLER DESIGN UPON THESE DRAWINGS AND AS REQUIRED BY THE SPECIFICATIONS. SHOP DRAWINGS MUST INCLUDE ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATIONS METHODS, MATERIAL DATA, AND ADDITIONAL INFORMATION NECESSARY TO CLARIFY THE INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZE, SPRINKLER SPACING, AND SYSTEM CONFIGURATION AS SHOWN. ALTERNATE MATERIALS MUST BE SENT TO THE FIRE PROTECTION ENGINEER OF RECORD OR VIA THE RFI PROCESS AND MUST BE APPROVED IN RECORD DOCUMENTS PRIOR TO BID. COORDINATE LOCATIONS OF FIRE PROTECTION COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, TEST POINTS, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS. OBSTRUCTION TO SPRINKLER DISCHARGE MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION; ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. SUBMIT A REQUEST FOR INFORMATION FOR QUESTIONS REGARDING THE FIRE PROTECTION DOCUMENTS PER RFI PROCESS LOCATED IN THE FIRE PROTECTION SPECIFICATIONS. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. REFER TO MECHANICAL DRAWINGS FOR NEUTRALIZATION WALL PENETRATION DETAIL. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE FIRE STOPPED WITH AN APPROVED MATERIAL PER METHODS REQUIRED BY PROJECT SPECIFICATIONS AND THE AUTHORITY HAVING JURISDICTION. GENERAL NOTES CONT.GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. UNLESS INDICATED OTHERWISE, DISCONNECT AND REMOVE ALL EXISTING FIRE PROTECTION COMPONENTS NOT INTENDED TO BE REUSED. DISCONNECT, RELOCATE, AND RECONNECT EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT WHERE REQUIRED. NOTE CAREFULLY THAT THE FIRE PROTECTION DRAWINGS ARE INTENDED TO INDICATE, ONLY DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL CHARACTER AND LOCATIONS OF THE WORK INCLUDED. PROVIDE ALL WORK OBVIOUSLY INTENDED, BUT HAVING MINOR DETAILS OMITTED OR NOT SHOWN. COMPLETE AS REQUIRED TO PERFORM THE FUNCTIONS INTENDED. FOLLOW THE CONTRACT DOCUMENTS FOR BUILDING DETAILS AND FIT THE WORK OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS THERETO. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO AN APPROVED DUMPING SITE AND CLEAN ALL FIRE PROTECTION WORK PRIOR THE PROJECT COMPLETION. PERFORM ALL WORK ACCORDING TO THE PROJECT PHASING SCHEDULE INFORMATION FOR THIS PROJECT. PROVIDE ALL NECESSARY FIRE PROTECTION WORK, TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER MEANS NECESSARY, TO CONFORM TO THE REQUIRED CONSTRUCTION PHASING OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ADJACENT SURFACES LEFT UNUSED AFTER EXISTING SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND VACATED FROM THESE HOLES. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE PROJECT. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE. THE CONTRACTOR SHALL PROPERLY NOTIFY THE LANDLORD. THE LESSOR AND THE ADJACENT TENANTS A MINIMUM OF 48 HOURS IN ADVANCE BEFORE PROCEEDING WITH THIS WORK. ALL WORK SHALL BE SCHEDULED IN ADVANCE. FIRE SPRINKLER PIPING AND DEMOLITION NOTES NFPA STANDARDS EDITION NFPA 13 2018 REFER TO SHEET T1 FOR APPLICABLE CODES APPLICABLE CODES SHEET NUMBER SHEET NAME FP1 OVERALL FIRE SPRINKLER PLAN FP2 ENLARGED FIRE SPRINKLER PLAN SHEET INDEX 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION, VERIFICATION AND PROVISION OF A FIRE WATCH SUBJECT TO THE REQUIREMENTS OF THE LOCAL JURISDICTION. ALL FIRE WATCH COSTS INCURRED AS A RESULT OF THIS PROJECT SHALL BE INCLUDED IN THE PROJECT BID AS A SEPARATE LINE ITEM. COORDINATION AND VERIFICATION AS TO WHEN A FIRE WATCH MAY BE NEEDED SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL REQUEST THE STORE MANAGER TO NOTIFY ALARM CENTRAL OF THE SYSTEM(S) BEING SHUT OFF FOR WORK AND THE DURATION OF THE SHUT OFF. THE GENERAL CONTRACTOR SHALL CALL DIRECT TO THE FIRE DEPARTMENT AND ADVISE THAT THE FIRE ALARM SYSTEM IS IN TEST. AT THE END OF EACH NIGHTS WORK, THE GENERAL CONTRACTOR SHALL CALL DIRECT TO THE FIRE DEPARTMENT AND ALARM CENTRAL TO ADVISE WORK IS COMPLETE. (FIRST FIRE WATCH OPTION) A FIRE WATCH SHALL BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. THE APPROVED FIRE WATCH SHALL BE CONDUCTED BY A DEDICATED, TRAINED WALMART EMPLOYEE WHOSE SOLE RESPONSIBILITY WILL BE TO PERFORM HOURLY PATROLS OF THE PREMISES AND KEEP WATCH FOR FIRES AND WILL NEED TO DOCUMENT THEIR WALK AND REPORT BACK TO THE GENERAL CONTRACTOR AND WALMART MANAGEMENT. THIS PERSON SHALL BE PROVIDED WITH AT LEAST ONE APPROVED MEANS FOR NOTIFICATION TO THE FIRE DEPARTMENT. (SECOND FIRE WATCH OPTION) A FIRE WATCH SHALL BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. THE FIRE SPRINKLER CONTRACTOR SHALL HIRE AN APPROVED OFF-DUTY FIRE FIGHTER TO PERFORM THE REQUIRED FIRE WATCH. FIRE WATCH PERSONNEL SHALL BE PROVIDED WITH AT LEAST ON APPROVED MEANS FOR NOTIFICATION OF THE FIRE DEPARTMENT AND THEIR SOLE DUTY SHALL BE TO PERFORM CONSTANT PATROLS AND WATCH FOR THE OCCURRENCE OF FIRE. FOR HOT WORK OPERATIONS, A FIRE WATCH SHALL BE POSTED FOR THE DURATION OF THE WORK AND 30 MINUTES THEREAFTER. ONLY (1) ONE SYSTEM IS PERMITTED TO BE SHUT DOWN AT ONE TIME. ANY FIRE DEPARTMENT FEES FOR FAILURE TO FOLLOW PROCEDURES WILL BE AT THE GENERAL CONTRACTORS EXPENSE. REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, DEMOLITION, REMODELING OR ALTERATIONS AND ADDITIONS TO THE WALMART. ALL EXITS SHALL NOT BE BLOCKED, REDUCED OR OTHERWISE MADE INOPERABLE WHICH ALSO INCLUDES THE EXIT ACCESS, THE EXIT AND EXIT DISCHARGE TO THE PUBLIC WAY. TEMPORARY MEANS OF EGRESS ARE ALLOWED. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE END OF EACH WORKDAY. SYSTEM IMPAIRMENT REQUIREMENTS THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING AND PROVIDING THE AHJ AND THE ENGINEER OF RECORD HYDRAULIC CALCULATIONS FOR THIS PROJECT. THE ENGINEER OF RECORD WILL NOT BE RESPONSIBLE FOR PROVIDING THE HYDRAULIC CALCULATIONS. NEW HYDRAULIC PLACARDS SHALL BE PROVIDED AND PERMANENTLY ATTACHED ON EACH APPLICABLE RISER IN ACCORDANCE WITH NFPA 13. HYDRAULIC CALCULATION SPRINKLER SYMBOL LEGEND WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVALENT TO THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED. CONCEAL DRY PEND 200WHITETY3555TYCO DS-C1" SYMBOL SIZE MFR S.I.N.MAKE FINISH K-FACTORSTYLE TEMP TY3251TYCO TY-B1/2"WHITE 155 5.6 EXISTING PENDENTVARIESVARIES VARIES VARIES VARIES VARIES VARIESDEMO ------ ------ ----- ----- EXISTING PENDENT VARIES VARIES RECESSED STYLE 10 TY9226TYCO ESFR1" BRASS 212PENDENT EXISTING UPRIGHTVARIES VARIES VARIES VARIES VARIESBRASS VARIES VARIES VARIESDEMO ------ ------ ----- ----- EXISTING UPRIGHT PENDENTMATCH EXISTING TYCO MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING TY5332TYCO SW-203/4"WHITE 200 ECOH SIDEWALL TY3355TYCO DS-11" WHITE 286 HSW 401 ESC TY3351TYCO RFII1/2" WHITE 200 CONCEAL PENDENT TY3251TYCO TY-B1/2"WHITE 286 RECESSED STYLE 10 PENDENT TY5255TYCO DS-21"WHITE 286 401 ESC DRY PEND VARIES VARIESDEMO ------ ----- ----- EXISTING SIDEWALL ------ UPRIGHTMATCH EXISTING TYCO MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING TY52513/4"TYCO ELO-231B BRASS 286 OWNER FURNISHED SPRINKLERS AND ACCESSORIES WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING" THE CONTRACTOR SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVLIENT TO THE EXISTING TO REMAIN SPRINKLERS.SUBSTITUTIONS WILL NOT BE PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL INFORMATION. WHERE SPRINKLERS ARE INSTALLED BELOW OBSTRUCTIONS (REFRIGERATION PIPING, RTUs, CABLE TRAYS, ETC.) THESE SPRINKLERS SHALL BE REPLACED WITH SPRINKLERS MATCHING THE NEW SPRINKLERS BEING INSTALLED AT THE ROOF DECK LEVEL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER FURNISHED SPRINKLERS DURING INSTALLATION. TO REPLACE DAMAGED SPRINKLERS CONTACT HAINES, JONES, CADBURY 1-800-459-7099. 1" TYCO TY3555WHITE CONCEEALED DRY PENDANT2005.6 SYMBOL SIZE MFR MAKE S.I.N.FINISH STYLETEMPK-FACTOR 4 QTY DS-C EXISTING HSWVARIESVARIES VARIES VARIES VARIESBRASS VARIES 5.6 5.6 5.6 5.6 11.2 11.2 11.2 25.2 DRY PEND 200WHITETY5255TYCO DS-21"11.2 SYMBOL LEGEND SPRINKLER RISER TRAPEZE HANGER HANGER RISER NIPPLE/DROP NIPPLE HYDRAULIC REFERENCE NODE POINT SYMBOL DESCRIPTION CAP NEW SPRINKLER PIPE EXISTING SPRINKLER PIPE DEMOLISHED SPRINKLER PIPE XXX INSPECTOR'S TEST/AUXILIARY DRAIN NEW CONNECTION FIRE DEPARTMENT CONNECTION PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED PER NFPA 13 IN EXISTING SPRINKLER CABINET FOR ANY NEW SPRINKLERS INSTALLED. PLUG 1/32" = 1'-0" 1 OVERALL FIRE PROTECTION PLAN PROTO: J OB NUMBER: Y ELM, WA 24-6X 1.23 STORE NO : 03705 - 1003 CA P - X ISSUE BLOCK 32 0 3 N E 6 5 T H S T S P A C E 2 VA N C O U V E R , W A 9 8 6 6 3 P : ( 3 6 0 ) 7 1 8 - 8 6 0 4 74 3 L A W N S D A L E R D ME D F O R D , O R 9 7 5 0 4 P: ( 5 4 1 ) 2 4 5 - 0 4 6 6 W A - F I R E S C L 9 2 2 O H | O R - 1 8 3 2 7 9 | C A - C 1 6 1 0 4 9 1 5 8 | C O - 2 2 - S - 0 8 9 9 3 | T X - S C R - G - 2 3 7 9 7 9 7 | A Z - 3 3 0 4 2 7 ID - F P S C - 1 5 7 PROTO: J OB NUMBER: Y ELM, WA 24-6X 1.23 STORE NO : 03705 - 1003 CA P - X ISSUE BLOCK E E EE E E E E EE 1 1 2 2 3 3 G G H H J J (E)3" (E )1-1/4" 10'-0" 2' - 3 " (E ) 1 " 11 ' - 6 " (E )1-1/4" 2' - 3 " (E ) 1 " 11 ' - 6 " TYP13.912 1 1 2 2 3 3 G G H H J J (E)3" (E )1-1/4" 10'-0" 2' - 3 " (E ) 1 " 11 ' - 6 " (E )1-1/4" 2' - 3 " (E ) 1 " 11 ' - 6 " TYP13.9733 FP2 SUPPLY FROM WET PIPE SPRINKLER SYSTEM TEE WITH PLUG 1" DRY SPRINKLER DROP DOW CORNING 739 PLASTIC ADHESIVE FREEZER/COOLER CEILING OPEN-CELL POLYETHYLENE FOAM BACKER ROD SPRINKLER CUP 2 3/4" OPTION A NOTE: CONTRACTOR TO SEAL DRY PENDENT SPRINKLERS AT FREEZER/COOLER USING ONE OF THE OPTIONS ABOVE. NO OTHER SEALANTS ARE PERMITTED MI N 6 " TY P MIN CASING LENGTH 12" TY P 1. 2. 3. 4. CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED CEILING PANEL. LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS. INSTALL DRY PENDENT SPRINKLER PER MANUFACTURER'S INSTALLATION REQUIREMENTS. COMPLETELY FILL ANNULAR CEILING OPENING BETWEEN THE ESCUTCHEON AND TOP OF CEILING PANEL WITH OPEN-CELL POLYETHYLENE FOAM BACKER ROD. EXPANDED FOAM IS NOT PERMITTED. INJECT DOW CORNING 739 PLASTIC ADHESIVE SEALANT INTO AND AROUND THE TOP OF THE FREEZER/COOLER CEILING CORE OPENING IN ACCORDANCE WITH SEALANT MANUFACTURER'S INSTRUCTIONS. OPTION "A" INSTALLATION PROCEDURE TYCO MODEL TY5255 WITH FLUSH ESCUTCHEON (NO SUBSTITUTIONS) EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. KEYNOTES 13.912 REMOVE EXISTING DRY PENDENT SPRINKLERS FROM COOLERS/FREEZERS. PLUG ALL OUTLETS NOT INTENDED FOR REUSE. SEAL ALL COOLER/FREEZER PANEL PENETRATIONS IN ACCORDANCE WITH X-FPX. 13.973 PROVIDE NEW DRY CONCEALED PENDENT SPRINKLERS AS SHOWN AND CONNECT TO EXISTING OVERHEAD SYSTEM. REF X-FPX. COORDINATE WITH LOCATION OF LIGHTS AND EVAPORATOR UNITS. NOT MORE THAN ONE SPRINKLER SHALL BE SUPPLIED BY A 1" PIPE OR CONNECTION. EXISTING CEILING LEVEL SPRINKLER PROTECTION SHALL REMAIN. ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. 1/8" = 1'-0" 1 FIRE PROTECTION DEMOLITION PLAN 1/8" = 1'-0" 2 FIRE PROTECTION PLAN NTS3WALK-IN DRY PENDENT SHEET:FP2 ENLARGED FIRE SPRINKLER PLAN