Firestop WM 3705 Yelm FP DrawingsX 2" PIPE (
F 4" PIPE
32
0
3
N
E
6
5
T
H
S
T
S
P
A
C
E
2
VA
N
C
O
U
V
E
R
,
W
A
9
8
6
6
3
P
:
(
3
6
0
)
7
1
8
-
8
6
0
4
74
3
L
A
W
N
S
D
A
L
E
R
D
ME
D
F
O
R
D
,
O
R
9
7
5
0
4
P:
(
5
4
1
)
2
4
5
-
0
4
6
6
W
A
-
F
I
R
E
S
C
L
9
2
2
O
H
|
O
R
-
1
8
3
2
7
9
|
C
A
-
C
1
6
1
0
4
9
1
5
8
|
C
O
-
2
2
-
S
-
0
8
9
9
3
|
T
X
-
S
C
R
-
G
-
2
3
7
9
7
9
7
|
A
Z
-
3
3
0
4
2
7
ID
-
F
P
S
C
-
1
5
7
E
E
E
E
EE
1
1
2
2
3
3
4
4
5
5
6
67
8
8
9
9
10
10
11
11
12
12
13
13
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
2
FP2FP2
1
EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
N 0 20'40'60'
SCALE: 1"=40'-0"
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
THE FIRE PROTECTION ENGINEER OF RECORD
SHALL NOT BE RESPONSIBLE FOR THE
CONTRACTOR'S FAILURE TO CARRY OUT THE
CONSTRUCTION WORK IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS, NOR SHALL THEY BE
REQUIRED TO SUPERVISE THE CONDUCT OF THE
WORK, THE CONSTRUCTION PROCEDURES
FOLLOWED BY THE CONTRACTOR,
SUBCONTRACTORS, THEIR RESPECTIVE
EMPLOYEES OR ANY OTHER PERSON AT THE JOB
SITE OTHER THAN THAT OF THE ENGINEERING
FIRM'S EMPLOYEES.
CONTRACTOR MUST REVIEW ALL CONSTRUCTION
DOCUMENTS PRIOR TO BID. SHOULD
MODIFICATIONS TO THESE PLANS BECOME
NECESSARY TO PROPERLY COORDINATE THE
SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE
CONTRACTOR'S RESPONSIBILITY TO OBTAIN
APPROVAL OF THE CHANGES FROM BOTH THE
AUTHORITY HAVING JURISDICTION AND THE
OWNER'S DESIGNATED REVIEW CONSULTANT IN
ADDITION TO OBTAINING THE NECESSARY
APPROVALS, THE CONTRACTOR MUST MAKE NOTE
OF ANY FIELD OR COORDINATION CHANGES ON THE
INSTALLATION DRAWINGS, AND THEN MUST
PROVIDE A SET OF AS-BUILT DRAWINGS ONCE
COMPLETE.
CONTRACTOR MUST VERIFY ALL DROP DOWN
LOCATIONS AT EXTERIOR WALLS WITH THE
PROJECT MANAGER PRIOR TO INSTALLATION.
ALL PIPING MUST BE COORDINATED AROUND
FRAMING MEMBERS AND PROPERLY INSTALLED
INSIDE THE BAR JOIST.
CONTRACTOR SHALL ROUTE PIPING AROUND ALL
OBSTRUCTIONS AND PROVIDE SPRINKLER
PROTECTION UNDER OBSTRUCTIONS, AS DETAILED
IN NFPA 13 STANDARDS AS PART OF THE FIELD
COORDINATION AT NO ADDITIONAL COST TO
OWNER.
ALL SPRINKLER DEFLECTOR DISTANCE
REQUIREMENTS SHALL BE IN ACCORDANCE TO THE
STANDARDS OUTLINED IN NFPA 13.
ALL PIPING PASSING THROUGH CMU WALLS SHALL
BE INSTALLED WITH ONE INCH CLEARANCE ON ALL
SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL
CORES SHALL BE COORDINATED WITH STRUCTURAL
REINFORCING. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL CORING WITH PROPER CLEARANCE
AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL
BE RESPONSIBLE FOR PROVIDING A TWO INCH
CLEARANCE AROUND ALL PIPING PASSING
THROUGH CONCRETE SLABS. THE SPRINKLER
CONTRACTOR SHALL FILL ALL CLEARANCES WITH
APPROVED MASTIC.
PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE
WITH THE STANDARDS OUTLINED IN NFPA 13.
PROVIDE ALL NECESSARY OFFSETS, RISES OR
DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED
BY BUILDING CONDITIONS.
EXAMINE THE JOB CONDITIONS AND VERIFY ALL
MEASUREMENTS, DISTANCES, ELEVATIONS,
CLEARANCES, ETC.
ARCHITECTURAL AND ELECTRICAL BACKGROUND
INFORMATION IS SHOWN FOR COORDINATION
PURPOSES ONLY. REFER TO THE CONTRACT
DOCUMENTS FOR LOCATIONS, SIZES AND
QUANTITIES OF OTHER TRADE WORK.
SPRINKLER SPACING SHALL BE PER NFPA 13
UNLESS OTHERWISE NOTED ON PLANS AND/ OR
PROTECTION CRITERIA LEGEND.
INTERFACE SPRINKLER SYSTEM WITH FIRE
PROTECTION SUPERVISORY SYSTEM.
ALL MATERIALS SHALL BE UL LISTED OR FM
APPROVED. SPRINKLER PIPE SHALL BE
MANUFACTURED TO STANDARDS RECOGNIZED BY
NFPA 13., THREADED PIPE SHALL HAVE A
CORROSION RESISTANCE RATING OF 1.0 OR
GREATER. CRIMP-TYPE COUPLINGS SHALL NOT BE
USED. THREADABLE THINWALL PIPE WITH
CORROSION RESISTANCE RATING OF LESS THAN 1.0
SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS.
IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL,
MODEL NO. PBA248, ELECTRIC BELL BY POTTER
ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE
AS REQUIRED BY AUTHORITIES HAVING
JURISDICTION. PROVIDE NEW DOUBLE POLE VANE
TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY
POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI.
SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS.
MOUNT WATER FLOW INDICATORS NO HIGHER THAN
6 FEET ABOVE FINISH FLOOR.
ALL SPRINKLER SYSTEMS THAT ARE TO BE
MODIFIED SHALL BE HYDROSTATICALLY TESTED PER
NFPA 13 PRIOR TO SPRINKLER SYSTEM
MODIFICATION AND SHALL BE RE-HYDROSTATICALLY
TESTED AFTER COMPLETION OF WORK.
DO NOT HANG OR SUPPORT ANY LOADS OR MAKE
ANY ATTACHMENTS TO THE METAL ROOF DECK OR
JOIST BRIDGING.
SAMMY SCREWS ARE NOT PERMITTED.
CEILING FLANGES ARE NOT PERMITTED.
PROVIDE RETAINING STRAPS ON HANGERS WHERE
REQUIRED.
CONTRACTOR IS TO COORDINATE FINAL SPRINKLER
HEAD LOCATIONS AND PIPE ROUTING SUCH THAT
THEY DO NOT INTERFERE WITH NOR RECEIVE
DAMAGE FROM THE NORMAL OPERATIONS OF THE
AREA.
THE CONTRACTOR SHALL DIVERT ALL DRAINS AND
INSPECTORS TEST CONNECTION DISCHARGE AWAY
FROM FINISHED SURFACES AND PIPE TO APPROVED
DRAIN LOCATIONS. ROUTE DISCHARGE TO NEARBY
GREENSPACE OR STORM WATER DRAIN BY USE OF
BACKWASH HOSE.. THE CONTRACTOR WILL BE
BACKCHARGED FOR ANY REPAIR, REPLACEMENT,
OR CLEANING OF RUST STAINS ON
PAVEMENT,/CONCRETE DUE TO WATER DISCHARGE
FROM SPRINKLER SYSTEM DRAINS.
1.
2.
3.
4.
5.
6.
THE DESIGN SHOWN ON THESE CONTRACT
DOCUMENTS HAS BEEN PREPARED FOR APPROVAL
BY THE AUTHORITY HAVING JURISDICTION AND TO
PROVIDE GUIDANCE FOR BIDDING. SUBMIT
COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS
REQUIRED BY CONTRACT DOCUMENTS TO THE
OWNERS DESIGNATED REVIEWERS. BASE
SPRINKLER DESIGN UPON THESE DRAWINGS AND
AS REQUIRED BY THE SPECIFICATIONS. SHOP
DRAWINGS MUST INCLUDE ELEVATIONS, HANGER
LOCATIONS, PIPE LENGTHS, DIMENSIONS,
FABRICATIONS METHODS, MATERIAL DATA, AND
ADDITIONAL INFORMATION NECESSARY TO CLARIFY
THE INTENT OF INSTALLATION. CONTRACTOR SHALL
PROVIDE PIPE SIZE, SPRINKLER SPACING, AND
SYSTEM CONFIGURATION AS SHOWN. ALTERNATE
MATERIALS MUST BE SENT TO THE FIRE
PROTECTION ENGINEER OF RECORD OR VIA THE RFI
PROCESS AND MUST BE APPROVED IN RECORD
DOCUMENTS PRIOR TO BID.
COORDINATE LOCATIONS OF FIRE PROTECTION
COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS,
TEST POINTS, ETC. WITH ARCHITECTURAL,
STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS. OBSTRUCTION TO SPRINKLER
DISCHARGE MUST BE CONSIDERED DURING SHOP
DRAWING PRODUCTION AND INSTALLATION;
ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO
ADDITIONAL COST TO OWNER. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
CONTRACTOR MUST VISIT THE BUILDING SITE TO
DETERMINE THE FULL EXTENT OF THE EXISTING
FIRE PROTECTION WORK AND EXISTING
CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE
DISCONNECTIONS, REMOVALS, RELOCATIONS
AND/OR RECONNECTIONS OF EXISTING FIRE
PROTECTION EQUIPMENT REQUIRED, AND
CONDITIONS IN THE PROPOSAL FOR THIS PROJECT.
NO EXTRA COMPENSATION WILL BE PAID FOR LACK
OF SUCH DETERMINATION, FAMILIARIZATION,
AND/OR ALLOWANCE.
SUBMIT A REQUEST FOR INFORMATION FOR
QUESTIONS REGARDING THE FIRE PROTECTION
DOCUMENTS PER RFI PROCESS LOCATED IN THE
FIRE PROTECTION SPECIFICATIONS.
NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN
ON THE ARCHITECTURAL DRAWINGS. REFER TO
MECHANICAL DRAWINGS FOR NEUTRALIZATION
WALL PENETRATION DETAIL.
PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE
FIRE STOPPED WITH AN APPROVED MATERIAL PER
METHODS REQUIRED BY PROJECT SPECIFICATIONS
AND THE AUTHORITY HAVING JURISDICTION.
GENERAL NOTES CONT.GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
CONTRACTOR MUST VISIT THE BUILDING SITE TO
DETERMINE THE FULL EXTENT OF THE EXISTING FIRE
PROTECTION WORK AND EXISTING CONDITIONS,
BECOME TOTALLY FAMILIAR WITH THE
DISCONNECTIONS, REMOVALS, RELOCATIONS
AND/OR RECONNECTIONS OF EXISTING FIRE
PROTECTION EQUIPMENT REQUIRED, AND
CONDITIONS IN THE PROPOSAL FOR THIS PROJECT.
NO EXTRA COMPENSATION WILL BE PAID FOR LACK
OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR
ALLOWANCE.
UNLESS INDICATED OTHERWISE, DISCONNECT AND
REMOVE ALL EXISTING FIRE PROTECTION
COMPONENTS NOT INTENDED TO BE REUSED.
DISCONNECT, RELOCATE, AND RECONNECT
EXISTING FIRE PROTECTION SYSTEMS AND
EQUIPMENT WHERE REQUIRED.
NOTE CAREFULLY THAT THE FIRE PROTECTION
DRAWINGS ARE INTENDED TO INDICATE, ONLY
DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL
CHARACTER AND LOCATIONS OF THE WORK
INCLUDED. PROVIDE ALL WORK OBVIOUSLY
INTENDED, BUT HAVING MINOR DETAILS OMITTED OR
NOT SHOWN. COMPLETE AS REQUIRED TO
PERFORM THE FUNCTIONS INTENDED. FOLLOW THE
CONTRACT DOCUMENTS FOR BUILDING DETAILS
AND FIT THE WORK OF THE FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS THERETO.
REMOVE ALL DEMOLITION MATERIALS AND DEBRIS
TO AN APPROVED DUMPING SITE AND CLEAN ALL
FIRE PROTECTION WORK PRIOR THE PROJECT
COMPLETION.
PERFORM ALL WORK ACCORDING TO THE PROJECT
PHASING SCHEDULE INFORMATION FOR THIS
PROJECT. PROVIDE ALL NECESSARY FIRE
PROTECTION WORK, TEMPORARY AND/OR
OTHERWISE, AND USE WHATEVER MEANS
NECESSARY, TO CONFORM TO THE REQUIRED
CONSTRUCTION PHASING OF THE PROJECT.
CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR
REPLACING ITEMS DAMAGED DURING DEMOLITION
AND CONSTRUCTION.
CONTRACTOR SHALL PATCH ALL HOLES TO MATCH
ADJACENT SURFACES LEFT UNUSED AFTER EXISTING
SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND
VACATED FROM THESE HOLES.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
MAINTAINING FIRE DEPARTMENT ACCESS ROADS
THROUGHOUT THE PROJECT.
SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE
DEMOLITION SHALL BE LEFT IN SERVICE.
THE CONTRACTOR SHALL PROPERLY NOTIFY THE
LANDLORD. THE LESSOR AND THE ADJACENT
TENANTS A MINIMUM OF 48 HOURS IN ADVANCE
BEFORE PROCEEDING WITH THIS WORK. ALL WORK
SHALL BE SCHEDULED IN ADVANCE.
FIRE SPRINKLER PIPING AND
DEMOLITION NOTES
NFPA STANDARDS EDITION
NFPA 13 2018
REFER TO SHEET T1 FOR APPLICABLE CODES
APPLICABLE CODES
SHEET NUMBER SHEET NAME
FP1 OVERALL FIRE
SPRINKLER PLAN
FP2 ENLARGED FIRE
SPRINKLER PLAN
SHEET INDEX
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
THE CONTRACTOR IS RESPONSIBLE FOR THE
COORDINATION, VERIFICATION AND PROVISION OF A
FIRE WATCH SUBJECT TO THE REQUIREMENTS OF
THE LOCAL JURISDICTION. ALL FIRE WATCH COSTS
INCURRED AS A RESULT OF THIS PROJECT SHALL BE
INCLUDED IN THE PROJECT BID AS A SEPARATE LINE
ITEM. COORDINATION AND VERIFICATION AS TO
WHEN A FIRE WATCH MAY BE NEEDED SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
THE GENERAL CONTRACTOR SHALL REQUEST THE
STORE MANAGER TO NOTIFY ALARM CENTRAL OF
THE SYSTEM(S) BEING SHUT OFF FOR WORK AND
THE DURATION OF THE SHUT OFF.
THE GENERAL CONTRACTOR SHALL CALL DIRECT TO
THE FIRE DEPARTMENT AND ADVISE THAT THE FIRE
ALARM SYSTEM IS IN TEST.
AT THE END OF EACH NIGHTS WORK, THE GENERAL
CONTRACTOR SHALL CALL DIRECT TO THE FIRE
DEPARTMENT AND ALARM CENTRAL TO ADVISE
WORK IS COMPLETE.
(FIRST FIRE WATCH OPTION) A FIRE WATCH SHALL BE
REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS
IMPAIRED OR OTHERWISE DOWN FOR ALTERATION.
THE APPROVED FIRE WATCH SHALL BE CONDUCTED
BY A DEDICATED, TRAINED WALMART EMPLOYEE
WHOSE SOLE RESPONSIBILITY WILL BE TO PERFORM
HOURLY PATROLS OF THE PREMISES AND KEEP
WATCH FOR FIRES AND WILL NEED TO DOCUMENT
THEIR WALK AND REPORT BACK TO THE GENERAL
CONTRACTOR AND WALMART MANAGEMENT. THIS
PERSON SHALL BE PROVIDED WITH AT LEAST ONE
APPROVED MEANS FOR NOTIFICATION TO THE FIRE
DEPARTMENT.
(SECOND FIRE WATCH OPTION) A FIRE WATCH SHALL
BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM
IS IMPAIRED OR OTHERWISE DOWN FOR
ALTERATION. THE FIRE SPRINKLER CONTRACTOR
SHALL HIRE AN APPROVED OFF-DUTY FIRE FIGHTER
TO PERFORM THE REQUIRED FIRE WATCH. FIRE
WATCH PERSONNEL SHALL BE PROVIDED WITH AT
LEAST ON APPROVED MEANS FOR NOTIFICATION OF
THE FIRE DEPARTMENT AND THEIR SOLE DUTY SHALL
BE TO PERFORM CONSTANT PATROLS AND WATCH
FOR THE OCCURRENCE OF FIRE. FOR HOT WORK
OPERATIONS, A FIRE WATCH SHALL BE POSTED FOR
THE DURATION OF THE WORK AND 30 MINUTES
THEREAFTER.
ONLY (1) ONE SYSTEM IS PERMITTED TO BE SHUT
DOWN AT ONE TIME.
ANY FIRE DEPARTMENT FEES FOR FAILURE TO
FOLLOW PROCEDURES WILL BE AT THE GENERAL
CONTRACTORS EXPENSE.
REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED
AT ALL TIMES DURING CONSTRUCTION, DEMOLITION,
REMODELING OR ALTERATIONS AND ADDITIONS TO
THE WALMART. ALL EXITS SHALL NOT BE BLOCKED,
REDUCED OR OTHERWISE MADE INOPERABLE WHICH
ALSO INCLUDES THE EXIT ACCESS, THE EXIT AND
EXIT DISCHARGE TO THE PUBLIC WAY. TEMPORARY
MEANS OF EGRESS ARE ALLOWED.
ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE
END OF EACH WORKDAY.
SYSTEM IMPAIRMENT
REQUIREMENTS
THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING
AND PROVIDING THE AHJ AND THE ENGINEER OF
RECORD HYDRAULIC CALCULATIONS FOR THIS
PROJECT. THE ENGINEER OF RECORD WILL NOT BE
RESPONSIBLE FOR PROVIDING THE HYDRAULIC
CALCULATIONS.
NEW HYDRAULIC PLACARDS SHALL BE PROVIDED AND
PERMANENTLY ATTACHED ON EACH APPLICABLE
RISER IN ACCORDANCE WITH NFPA 13.
HYDRAULIC CALCULATION
SPRINKLER SYMBOL LEGEND
WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR
SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVALENT TO
THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED.
CONCEAL
DRY PEND 200WHITETY3555TYCO DS-C1"
SYMBOL SIZE MFR S.I.N.MAKE FINISH K-FACTORSTYLE TEMP
TY3251TYCO TY-B1/2"WHITE 155 5.6
EXISTING
PENDENTVARIESVARIES VARIES VARIES VARIES
VARIES VARIESDEMO ------
------
----- -----
EXISTING
PENDENT
VARIES VARIES
RECESSED
STYLE 10
TY9226TYCO ESFR1" BRASS 212PENDENT
EXISTING
UPRIGHTVARIES VARIES VARIES VARIES VARIESBRASS VARIES
VARIES VARIESDEMO ------ ------ ----- -----
EXISTING
UPRIGHT
PENDENTMATCH
EXISTING TYCO MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
TY5332TYCO SW-203/4"WHITE 200
ECOH
SIDEWALL
TY3355TYCO DS-11" WHITE 286
HSW 401
ESC
TY3351TYCO RFII1/2" WHITE 200
CONCEAL
PENDENT
TY3251TYCO TY-B1/2"WHITE 286
RECESSED
STYLE 10
PENDENT
TY5255TYCO DS-21"WHITE 286
401 ESC
DRY PEND
VARIES VARIESDEMO ------ ----- -----
EXISTING
SIDEWALL
------
UPRIGHTMATCH
EXISTING TYCO MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
TY52513/4"TYCO ELO-231B BRASS 286
OWNER FURNISHED SPRINKLERS AND
ACCESSORIES
WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING" THE CONTRACTOR
SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVLIENT
TO THE EXISTING TO REMAIN SPRINKLERS.SUBSTITUTIONS WILL NOT BE
PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL
INFORMATION.
WHERE SPRINKLERS ARE INSTALLED BELOW OBSTRUCTIONS (REFRIGERATION
PIPING, RTUs, CABLE TRAYS, ETC.) THESE SPRINKLERS SHALL BE REPLACED WITH
SPRINKLERS MATCHING THE NEW SPRINKLERS BEING INSTALLED AT THE ROOF
DECK LEVEL.
THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER
FURNISHED SPRINKLERS DURING INSTALLATION. TO REPLACE DAMAGED
SPRINKLERS CONTACT HAINES, JONES, CADBURY 1-800-459-7099.
1" TYCO TY3555WHITE CONCEEALED
DRY PENDANT2005.6
SYMBOL SIZE MFR MAKE S.I.N.FINISH STYLETEMPK-FACTOR
4
QTY
DS-C
EXISTING
HSWVARIESVARIES VARIES VARIES VARIESBRASS VARIES
5.6
5.6
5.6
5.6
11.2
11.2
11.2
25.2
DRY PEND 200WHITETY5255TYCO DS-21"11.2
SYMBOL LEGEND
SPRINKLER RISER
TRAPEZE HANGER
HANGER
RISER NIPPLE/DROP NIPPLE
HYDRAULIC REFERENCE NODE POINT
SYMBOL DESCRIPTION
CAP
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE
DEMOLISHED SPRINKLER PIPE
XXX
INSPECTOR'S TEST/AUXILIARY DRAIN
NEW CONNECTION
FIRE DEPARTMENT CONNECTION
PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED PER
NFPA 13 IN EXISTING SPRINKLER CABINET FOR ANY
NEW SPRINKLERS INSTALLED.
PLUG
1/32" = 1'-0" 1 OVERALL FIRE PROTECTION PLAN
PROTO:
J
OB
NUMBER:
Y
ELM, WA
24-6X
1.23
STORE NO
: 03705 - 1003
CA
P
-
X
ISSUE BLOCK
32
0
3
N
E
6
5
T
H
S
T
S
P
A
C
E
2
VA
N
C
O
U
V
E
R
,
W
A
9
8
6
6
3
P
:
(
3
6
0
)
7
1
8
-
8
6
0
4
74
3
L
A
W
N
S
D
A
L
E
R
D
ME
D
F
O
R
D
,
O
R
9
7
5
0
4
P:
(
5
4
1
)
2
4
5
-
0
4
6
6
W
A
-
F
I
R
E
S
C
L
9
2
2
O
H
|
O
R
-
1
8
3
2
7
9
|
C
A
-
C
1
6
1
0
4
9
1
5
8
|
C
O
-
2
2
-
S
-
0
8
9
9
3
|
T
X
-
S
C
R
-
G
-
2
3
7
9
7
9
7
|
A
Z
-
3
3
0
4
2
7
ID
-
F
P
S
C
-
1
5
7
PROTO:
J
OB
NUMBER:
Y
ELM, WA
24-6X
1.23
STORE NO
: 03705 - 1003
CA
P
-
X
ISSUE BLOCK
E
E
EE
E
E
E
E
EE
1
1
2
2
3
3
G G
H H
J J
(E)3"
(E
)1-1/4"
10'-0"
2'
-
3
"
(E
)
1
"
11
'
-
6
"
(E
)1-1/4"
2'
-
3
"
(E
)
1
"
11
'
-
6
"
TYP13.912
1
1
2
2
3
3
G G
H H
J J
(E)3"
(E
)1-1/4"
10'-0"
2'
-
3
"
(E
)
1
"
11
'
-
6
"
(E
)1-1/4"
2'
-
3
"
(E
)
1
"
11
'
-
6
"
TYP13.9733
FP2
SUPPLY FROM WET PIPE
SPRINKLER SYSTEM
TEE WITH PLUG
1" DRY
SPRINKLER
DROP
DOW CORNING 739
PLASTIC ADHESIVE
FREEZER/COOLER
CEILING
OPEN-CELL
POLYETHYLENE
FOAM BACKER ROD
SPRINKLER CUP
2 3/4"
OPTION A
NOTE: CONTRACTOR TO SEAL DRY PENDENT SPRINKLERS AT FREEZER/COOLER USING ONE OF THE OPTIONS ABOVE. NO OTHER SEALANTS ARE PERMITTED
MI
N
6
"
TY
P
MIN CASING LENGTH 12"
TY
P
1.
2.
3.
4.
CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED
CEILING PANEL. LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION
IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE
SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS.
INSTALL DRY PENDENT SPRINKLER PER MANUFACTURER'S INSTALLATION
REQUIREMENTS.
COMPLETELY FILL ANNULAR CEILING OPENING BETWEEN THE ESCUTCHEON
AND TOP OF CEILING PANEL WITH OPEN-CELL POLYETHYLENE FOAM
BACKER ROD. EXPANDED FOAM IS NOT PERMITTED.
INJECT DOW CORNING 739 PLASTIC ADHESIVE SEALANT INTO AND AROUND
THE TOP OF THE FREEZER/COOLER CEILING CORE OPENING IN
ACCORDANCE WITH SEALANT MANUFACTURER'S INSTRUCTIONS.
OPTION "A" INSTALLATION PROCEDURE
TYCO MODEL TY5255
WITH FLUSH ESCUTCHEON
(NO SUBSTITUTIONS)
EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
KEYNOTES
13.912 REMOVE EXISTING DRY PENDENT SPRINKLERS
FROM COOLERS/FREEZERS. PLUG ALL OUTLETS
NOT INTENDED FOR REUSE. SEAL ALL
COOLER/FREEZER PANEL PENETRATIONS IN
ACCORDANCE WITH X-FPX.
13.973 PROVIDE NEW DRY CONCEALED PENDENT
SPRINKLERS AS SHOWN AND CONNECT TO
EXISTING OVERHEAD SYSTEM. REF X-FPX.
COORDINATE WITH LOCATION OF LIGHTS AND
EVAPORATOR UNITS. NOT MORE THAN ONE
SPRINKLER SHALL BE SUPPLIED BY A 1" PIPE OR
CONNECTION. EXISTING CEILING LEVEL
SPRINKLER PROTECTION SHALL REMAIN.
ADDITIONAL SPRINKLERS MAY BE REQUIRED AT
NO ADDITIONAL COST TO OWNER.
1/8" = 1'-0" 1 FIRE PROTECTION DEMOLITION PLAN
1/8" = 1'-0" 2 FIRE PROTECTION PLAN
NTS3WALK-IN DRY PENDENT
SHEET:FP2
ENLARGED
FIRE
SPRINKLER
PLAN