Loading...
19-074-RPT-CSWPPP-2025.01.06 (4364)Construction Stormwater General Permit Stormwater Pollution Prevention Plan (SWPPP) for Deutscher – Yelm Commercial Prepared for: The Washington State Department of Ecology Southwest Regional Office Permittee / Owner Developer Operator / Contractor Marijke Deutscher TBD TBD 15142 Berry Valley Road, Yelm, WA 98597 Certified Erosion and Sediment Control Lead (CESCL) Name Organization Contact Phone Number TBD TBD TBD SWPPP Prepared By Name Organization Contact Phone Number Ahmad Kamyab Hatton Godat Pantier, Inc. (360) 943-1599 SWPPP Preparation Date January 6, 2025 Project Construction Dates Activity / Phase Start Date End Date Permit Spring 2025 Fall 2026 P a g e | 1 Table of Contents 1 Project Information .............................................................................................................. 4 1.1 Existing Conditions ...................................................................................................... 4 1.2 Proposed Construction Activities .................................................................................. 4 2 Construction Stormwater Best Management Practices (BMPs) ........................................... 6 2.1 The 13 Elements .......................................................................................................... 6 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits ........................................ 6 2.1.2 Element 2: Establish Construction Access ............................................................ 6 2.1.3 Element 3: Control Flow Rates ............................................................................. 7 2.1.4 Element 4: Install Sediment Controls .................................................................... 7 2.1.5 Element 5: Stabilize Soils ..................................................................................... 8 2.1.6 Element 6: Protect Slopes..................................................................................... 9 2.1.7 Element 7: Protect Drain Inlets ............................................................................. 9 2.1.8 Element 8: Stabilize Channels and Outlets ..........................................................10 2.1.9 Element 9: Control Pollutants ...............................................................................10 2.1.10 Element 10: Control Dewatering ..........................................................................12 2.1.11 Element 11: Maintain BMPs .................................................................................12 2.1.12 Element 12: Manage the Project ..........................................................................13 2.1.13 Element 13: Protect Low Impact Development (LID) BMPs .................................15 3 Pollution Prevention Team .................................................................................................16 4 Monitoring and Sampling Requirements ............................................................................17 4.1 Site Inspection ............................................................................................................17 4.2 Stormwater Quality Sampling ......................................................................................17 4.2.1 Turbidity Sampling ...............................................................................................17 4.2.2 pH Sampling ........................................................................................................19 5 Discharges to 303(d) or Total Maximum Daily Load (TMDL) Waterbodies .........................19 5.1 303(d) Listed Waterbodies ..........................................................................................19 5.2 TMDL Waterbodies .....................................................................................................19 6 Reporting and Record Keeping ..........................................................................................20 6.1 Record Keeping ..........................................................................................................20 6.1.1 Site Log Book ......................................................................................................20 6.1.2 Records Retention ...............................................................................................20 6.1.3 Updating the SWPPP ...........................................................................................20 6.2 Reporting ....................................................................................................................20 6.2.1 Discharge Monitoring Reports ..............................................................................20 6.2.2 Notification of Noncompliance ..............................................................................21 P a g e | 2 List of Tables Table 1 – pH-Modifying Sources ...............................................................................................11 Table 2 – Team Information ......................................................................................................16 Table 3 – Turbidity Sampling Method ........................................................................................17 Table 4 – pH Sampling Method .................................................................................................19 List of Appendices Appendix/Glossary A. Site Map B. BMP Detail C. Correspondence D. Site Inspection Form E. Construction Stormwater General Permit (CSWGP) P a g e | 3 List of Acronyms and Abbreviations Acronym / Abbreviation Explanation 303(d) Section of the Clean Water Act pertaining to Impaired Waterbodies BFO Bellingham Field Office of the Department of Ecology BMP(s) Best Management Practice(s) CESCL Certified Erosion and Sediment Control Lead CO2 Carbon Dioxide CRO Central Regional Office of the Department of Ecology CSWGP Construction Stormwater General Permit CWA Clean Water Act DMR Discharge Monitoring Report DO Dissolved Oxygen Ecology Washington State Department of Ecology EPA United States Environmental Protection Agency ERO Eastern Regional Office of the Department of Ecology ERTS Environmental Report Tracking System ESC Erosion and Sediment Control GULD General Use Level Designation NPDES National Pollutant Discharge Elimination System NTU Nephelometric Turbidity Units NWRO Northwest Regional Office of the Department of Ecology pH Power of Hydrogen RCW Revised Code of Washington SPCC Spill Prevention, Control, and Countermeasure su Standard Units SWMMEW Stormwater Management Manual for Eastern Washington SWMMWW Stormwater Management Manual for Western Washington SWPPP Stormwater Pollution Prevention Plan TESC Temporary Erosion and Sediment Control SWRO Southwest Regional Office of the Department of Ecology TMDL Total Maximum Daily Load VFO Vancouver Field Office of the Department of Ecology WAC Washington Administrative Code WSDOT Washington Department of Transportation WWHM Western Washington Hydrology Model P a g e | 4 1 Project Information Project/Site Name: Deutscher – Yelm Commercial Street/Location: 15152 Berry Valley Road City: Yelm State: WA Zip code: 98597 Subdivision: N/A Receiving waterbody: Thompson Creek 1.1 Existing Conditions Total acreage (including support activities such as off-site equipment staging yards, material storage areas, borrow areas). Total acreage: 5.36 Disturbed acreage: 2.85 Existing structures: Day Care Building Landscape topography: The site is generally flat, with slopes ranging from 1% to 3%. Drainage patterns: In the current condition stormwater runoff in undeveloped areas sheet flow on-site and infiltrate through native soils. The majority of the project surrounding areas are developed and there is no off-site stormwater runoff to the property. Existing Vegetation: The site Phase 2 area are cleared previously for construction, and it is covered with native grass. Critical Areas (wetlands, streams, high erosion risk, steep or difficult to stabilize slopes): The site is located within category I Critical Aquifer Recharge Area and is in the ten-year time of travel zone for a Group A well owned by the City of Yelm. List of known impairments for 303(d) listed or Total Maximum Daily Load (TMDL) for the receiving waterbody: N/A 1.2 Proposed Construction Activities Description of site development (example: subdivision): Commercial buildings Description of construction activities (example: site preparation, demolition, excavation): Clearing, grubbing, installation of new utilities, parking lot, stormwater facilities, and landscaping. Description of site drainage including flow from and onto adjacent properties. Must be consistent with Site Map in Appendix A: Stormwater runoff for the entire site was designed and constructed with Phase 1 “Yelm Day Care” construction. Runoff from Phase 2 roof areas will be connected to 2 infiltration trenches for 100% infiltration onsite and runoff from paved parking areas as well as sidewalks will be connected to the existing infiltration pond for 100% infiltration. Description of final stabilization (example: extent of revegetation, paving, landscaping): At project completion, the property will contain 3 commercial buildings, paved parking areas, sidewalks, landscaping areas, associated utilities. P a g e | 5 Contaminated Site Information: Proposed activities regarding contaminated soils or groundwater (example: on-site treatment system, authorized sanitary sewer discharge): N/A