Loading...
FW Yelm RV Boat Review Ltr #2IPM.Note FW: Yelm RV/Boat Review Ltr #2 FW: Steve Harrington Karen Bennett Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB Yelm RV/Boat Review Ltr #2 EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB Steve Harrington Yelm RV/Boat Review Ltr #2 Karen T. Bennett Permit Coordinator/Admin Support City of Yelm/Community Development PO Box 479, Yelm, WA 98597 360-458-3835 karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us> ________________________________ From: Karen Bennett Sent: Thursday, June 26, 2008 1:51 PM To: Karen Bennett Subject: RE: Yelm RV/Boat Review Ltr #2 Opppps Karen T. Bennett Permit Coordinator/Admin Support City of Yelm/Community Development PO Box 479, Yelm, WA 98597 360-458-3835 karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us> ________________________________ From: Karen Bennett Sent: Thursday, June 26, 2008 10:14 AM To: Steve Harrington Subject: Yelm RV/Boat Review Ltr #2 O.K. I’m done. It’s now up to you. A breeze of relief has swept over me. Huhhhhhhh. Smile, K Karen T. Bennett Permit Coordinator/Admin Support City of Yelm/Community Development PO Box 479, Yelm, WA 98597 360-458-3835 karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F579A35C@server1.ci.yelm.wa.us> FW%3A Yelm RV?Boat Review Ltr %232.EML Steve Harrington 11.0 07-0276 Review Ltr #2 062508 07-0276 Review Ltr _2 062508 Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us 458-8423 Community Development Steve Harrington Steve Harrington steveh 07-0276 Review Ltr #2 062508.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 June 25, 2008 Hal P. Grubb, P.E. Barghausen Consulting Engineers, Inc. 18215 72nd Avenue South Kent, WA 98032 RE: Yelm RV/Boat & Mini Storage - City of Yelm Project No. SPR-07-0276-YL Second Review of Civil Construction Documents Dear Hal: The City of Yelm has completed the second review of the proposed Yelm RV/Boat & Mini Storage. Your application included: Revised Civil Engineering Plans, including landscape plans Revised Strom Drainage Report We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Water Comments: The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of Yelm has received the payment in full for the fire hydrant locks. Will there be an irrigation system? (Reuse or Potable) If so please place the irrigation meter by the potable water meter. The irrigation service will require a backflow assembly behind the meter, if potable water is used. Please add City of Yelm Detail 6-17 to Sh.C6 Sewer Comments: I did see the requested step tank pump size called out or shown on sheet C7. I could not find a hose bib located or called out within 50’ of step tank. Sheet C7. Note # 9, should it read 12” (not 12.)   Miscellaneous Items: The revised landscape plans shows Type II landscaping along the property line on Rhoton Rd. The Green Zelkova trees located on either side of the entrance are located within the required 8 foot landscape. Please replace those with two Kousa Dogwood trees. Please note that the Right-of-Way dedication deed and the Waiver of Protest for the deferral of frontage improvements will be required prior to Civil Plan Approval. The developer shall provide and record a “protective well covenant” meeting the standards of the Thurston County Health Department restricting any contaminant sources within the 100-foot well radius of the well located on the property to the north of this site. Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us. Community Development Department Respectfully, Steve Harrington Engineering Civil Inspector Page 2 of 2 (360) 458-8438 (360) 458-3144 FAX www.ci.yelm.wa.us .doc 07-0276 Review Ltr #2 062508.doc 07-0276 Review Ltr #2 062508.doc image004.gif .gif image004.gif image004.gif image/gif image004.gif@01C8D793.A333E270 oledata.mso