FW Yelm RV Boat Review Ltr #2IPM.Note
FW: Yelm RV/Boat Review Ltr #2
FW:
Steve Harrington
Karen Bennett
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB
Yelm RV/Boat Review Ltr #2
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Karen Bennett
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB
Steve Harrington
Yelm RV/Boat Review Ltr #2
Karen T. Bennett
Permit Coordinator/Admin Support
City of Yelm/Community Development
PO Box 479, Yelm, WA 98597
360-458-3835
karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us>
________________________________
From: Karen Bennett
Sent: Thursday, June 26, 2008 1:51 PM
To: Karen Bennett
Subject: RE: Yelm RV/Boat Review Ltr #2
Opppps
Karen T. Bennett
Permit Coordinator/Admin Support
City of Yelm/Community Development
PO Box 479, Yelm, WA 98597
360-458-3835
karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us>
________________________________
From: Karen Bennett
Sent: Thursday, June 26, 2008 10:14 AM
To: Steve Harrington
Subject: Yelm RV/Boat Review Ltr #2
O.K. I’m done. It’s now up to you. A breeze of relief has swept over
me. Huhhhhhhh. Smile, K
Karen T. Bennett
Permit Coordinator/Admin Support
City of Yelm/Community Development
PO Box 479, Yelm, WA 98597
360-458-3835
karenb@ci.yelm.wa.us <mailto:karenb@ci.yelm.wa.us>
<DC90029353CCCD468AA2A2858FFCD8F579A35C@server1.ci.yelm.wa.us>
FW%3A Yelm RV?Boat Review Ltr %232.EML
Steve Harrington
11.0
07-0276 Review Ltr #2 062508
07-0276 Review Ltr _2 062508
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
458-8423
Community Development
Steve Harrington
Steve Harrington
steveh
07-0276 Review Ltr #2 062508.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
June 25, 2008
Hal P. Grubb, P.E.
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South
Kent, WA 98032
RE: Yelm RV/Boat & Mini Storage - City of Yelm Project No. SPR-07-0276-YL
Second Review of Civil Construction Documents
Dear Hal:
The City of Yelm has completed the second review of the proposed Yelm RV/Boat & Mini Storage. Your application included:
Revised Civil Engineering Plans, including landscape plans
Revised Strom Drainage Report
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments
need to be addressed before the plans may be approved for construction. Our comments are summarized below:
Water Comments:
The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until the City of
Yelm has received the payment in full for the fire hydrant locks.
Will there be an irrigation system? (Reuse or Potable) If so please place the irrigation meter by the potable water meter. The irrigation service will require a backflow assembly behind
the meter, if potable water is used.
Please add City of Yelm Detail 6-17 to Sh.C6
Sewer Comments:
I did see the requested step tank pump size called out or shown on sheet C7.
I could not find a hose bib located or called out within 50’ of step tank.
Sheet C7. Note # 9, should it read 12” (not 12.)
Miscellaneous Items:
The revised landscape plans shows Type II landscaping along the property line on Rhoton Rd. The Green Zelkova trees located on either side of the entrance are located within the required
8 foot landscape. Please replace those with two Kousa Dogwood trees.
Please note that the Right-of-Way dedication deed and the Waiver of Protest for the deferral of frontage improvements will be required prior to Civil Plan Approval.
The developer shall provide and record a “protective well covenant” meeting the standards of the Thurston County Health Department restricting any contaminant sources within the 100-foot
well radius of the well located on the property to the north of this site.
Please review and revise the plans to address the above referenced comments. When the project is resubmitted you will need to submit 4 sets of plans, 2 stormwater reports. The project
engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our
review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at steveh@ci.yelm.wa.us.
Community Development Department
Respectfully,
Steve Harrington
Engineering Civil Inspector
Page 2 of 2
(360) 458-8438
(360) 458-3144 FAX
www.ci.yelm.wa.us
.doc
07-0276 Review Ltr #2 062508.doc
07-0276 Review Ltr #2 062508.doc
image004.gif
.gif
image004.gif
image004.gif
image/gif
image004.gif@01C8D793.A333E270
oledata.mso