TIA 8-9-07_. ~~iiu, ii ~Jt1I YELM RV/BOAT AND MINI STORAGE TRAFFIC IMPACT ANALYSIS CITY OF YELM Prepared for Randy Weber c/o Hal Grubb Barghausen Consulting Engineers, Inc. 18215 72"d Ave. South Kent, WA, 98032 Prepared by Tr4A FFIL' .k'~~R T,~" 10104 - 111T" Ave. N.E. Kirkland, Washington 98033 Telephone: 425-522-4118 Fax: 425-522-4311 August 3, 2007 :~'~ NL'J/?7"N bY,~ S 7" Tf?.4 ~'F"fC ~XJ~,~ F27°S Randy Weber August 3, 2007 c/o Hal Grubb Barghausen Consulting Engineers, Inc. 18215 72"d Ave. South Kent, WA, 98032 Re: Yelm RV/Boat and Mini Storage Traffic Impact Analysis Dear Mr. Weber: We are pleased to submit this traffic impact analysis (TIA) for the proposed Yelm RV/Boat and Mini Storage located on the west side of Rhoton Road SE in the City of Yelm. A scoping report dated March 28, 2007 was submitted to the City. The City reviewed the scoping report and provided comments in a letter dated June 7, 2008 that is included in the technical appendix. The scoping letter revised the trip distribution, identified affected intersections, identified concurrency intersections, provided a background annual traffic growth rate, and a list of19 pipeline projects to be included in the analysis. This TIA is prepared per the City of Yelm Traffic Impact Analysis (TIA) Guidelines, the scoping review letter and conversations with the City staff. PROJECT DESCRIPTION Figure 1 is a vicinity map showing the location of the site and the surrounding major street network. Figure 2 shows a preliminary site plan. The project consists of 11 mini-storage units and a 1,050 sq. ft. office building for a total of 83,200 sq. ft. of gross building area on the site. Parking consists of 6 stalls for the office and 38 marked stalls for RV storage. An unmarked area is also provided for RV/boat storage.. Paved drive aisles surround each of the proposed mini storage buildings and the open RV parking areas. Figure 3 shows details of the frontage improvements proposed on Rhoten Rd. and the location of two site access driveways and Northern Pacific Rd. SE, the nearest street intersection located south of the site. The project will dedicate 8 ft. of right of way for a total of 28 ft. from the centerline. Half street improvements include a 7 ft. landscaped strip, and 5 ft. sidewalk, curb, gutter, and 7 ft. of pavement widening with tapers back to the existing pavement edge as shown in Figure 3. TRIP GENERATION The proposed Yelm RV/Boat and Mini Storage is expected to generate the vehicular trips during an average weekday and during the street traffic peak hours as shown in'the following table: Mr. Randy Weber Yelm RV/Boat and Mini Storage Page 3 TRIP GENERATION for 83,200 SF MINI-WAREHOUSE +~~~~ Time Period Trip Rate Trips Trips Total Entering Exiting 104 104 Average Weekday 2.50 208 50% 50% AM Peak Hour 0.15 59% 41% 12 PM Peak Hour 0 26 22 . 51% 49% A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (exiting or entering) inside the study site. The trip generation is calculated using the average trip rates in the Institute of Transportation Engineers (ITE) Trip Generation, Seventh Edition, for Mini-Warehouse (ITE Land Use Code 151). These trip generation values account for all site trips made by all vehicles for all purposes, including customer, employee, visitor, and service and delivery vehicle trips. TRIP DISTRIBUTION AND ASSIGNMENT Figure 4 shows the PM peak hour site trip generation and distribution for the project. The trip distribution was revised per the City scoping review letter so that only 5% of the trips are oriented north on Rhoten Rd., and 5% east on Railway Road. The distribution is based primarily on existing traffic volume patterns, the characteristics of the street network, the location of likely trip origins and destinations and expected travel times. The distribution in Figure 4 is shown through the affected intersections identified in the City scoping review letter to include the site access driveways to Rhoten Rd., Rhoten Rd. SE/Northern Pacific Rd. SE and First St./Rhoten Rd/Railway Rd. SE. These affected intersections carry at least 10 site generated trips in the peak direction or 25 total trips through an intersection per the City of Yelm Traffic Impact Analysis Guidelines. Concurrency Intersections Figure 5 shows the PM peak hour trip distribution through the 15 Concurrency intersections as identified in the City scoping review letter to include: 1. Burnett Rd./SR 510 2. Killion Rd./SR 510 3. Cullens Rd./SR 510. 4. Longmire St./SR 510 Mr. Randy Weber Yelm RV/Boat and Mini Storage Page 4 5. Mosman St./SR 507 6. First St./SR 510 7. First St./Stevens Ave. 8. Clark Rd./SR 507 9. 103`d St./SR 507 10: First St./Rhoten Rd./Railway Rd. 11.103`d St./West Rd 12. NE Creek St./SR 507/Bald Hill Rd 13. Grove Rd./103`d St. SE 14. Grove Rd./SR 507 15. Yelm Loop/SR 507 EXISTING PHYSICAL CONDITIONS Street Facilities u~d!' Figure 6 shows existing traffic control, number of street lanes and other pertinent information of the nearby streets. Rhoten Rd., Northern Pacific Rd. and Railway Rd. consist of two lanes with a shoulder. Rhoten Rd. is approximately 20 ft wide with a two ft. shoulder along the site frontage. There are sidewalks on First St. south of Railroad Road. First St. widens to three lanes with a two way left turn lane west of Stevens Ave. SE. Sight Distance Intersection sight distance. and stopping sight distance were measured at the site access driveways to Rhoten Rd. and compared to current AASHTO "Geometric Design of Highways and Streets" standards. The posted speed limit of 25 mph on Rhoten Rd. infers a design speed of 30 mph. AASHTO standards fora 30 mph design speed require an intersection sight distance of 290 ft. looking to the left from the driveway and 335 ft. looking to the right from the driveway (using an eye height of 3.5 ft. and a vehicle height of 4.25 ft.). A stopping sight distance of 200 ft. is required fora 30 mph design speed. The current AASHTO intersection sight distance and stopping sight distance requirements are met at both site access driveways assuming minor vegetation trimming or removal along the site frontage within the right of way. EXISTING TRAFFIC CONDITIONS Traffic Volumes Figure 7 shows the existing.PM peak hour traffic volumes at the study .intersections. Traffic volume turning movement count sheets for counts taken in September 2006 are included in the Technical Appendix. Level of Service Analysis LOS is a qualitative measure describing operational conditions within a traffic flow, and the perception of these conditions by drivers or passengers. These conditions Mr. Randy Weber Yelm RV/Boat and Mini Storage Page 5 include factors such as speed, delay, travel time, freedom to maneuver, traffic interruptions,. comfort, convenience, and safety. Levels of service are given letter designations, from A to F, with LOS A representing the best operating conditions (free flow, little delay) and LOS F the worst (congestion, long delays). Generally, LOS A and B are high, LOS C and D are moderate and LOS E and F are low. Table 1 shows calculated levels of service (LOS) for existing conditions at the study intersections. The LOS's were calculated using the procedures in the Transportation Research Board Highway Capacity Manual 2000. The LOS shown indicates overall intersection operation. At intersections, LOS is determined by the calculated average control delay per vehicle. The LOS and corresponding average control delay in seconds are as follows: TYPE OF INTERSECTION A B C D E F Signalized < >10.0 and >20.0 and >35.0 and >55.0 and >80. 10.0 <20.0 <35.0 <55.0 <80.0 0 Stop Sign <10. Control 0 >10 and <15 - >15 and <25 - >25 and <35 - >35 and <50 - >50 Accident History Historical accident data for the latest three year period was requested from the City of Yelm Police Department and from WSDOT°and is included in the technical appendix. No accidents were recorded at the affected intersections during this time period. For informational purposes accident history is provided in the vicinity of SR 510/SR 507/First Street intersection. We have field reviewed the.site and surrounding street system. Based on the field review there are no readily apparent safety issues. FUTURE TRAFFIC CONDITIONS WITHOUT THE PROJECT Figure 8 shows projected future PM peak hour traffic volumes without the project. These volumes include the existing traffic volumes plus background traffic growth plus pipeline project volumes. A background growth rate of 2% per year was added to the baseline traffic volumes over a two year period. The baseline existing traffic counts were therefore increased by 4% to the horizon year of 2008. Traffic volumes from 19 pipeline projects, as listed in the City scoping review letter, was then additionally added to the future traffic volumes. The pipeline project volumes and distribution were provided by the City of Yelm from previous traffic studies. Figure 8 shows the total future traffic volumes including the growth rate and pipeline traffic volumes but without the project generated volumes. Mr. Randy Weber Yelm RV/Boat and Mini Storage Page 6 FUTURE TRAFFIC CONDITIONS WITH PROJECT Figure 9 show the projected future.PM peak hour traffic volumes with the proposed project. The site-generated PM peak hour traffic volumes shown on Figure 4 were added to the projected future traffic volumes shown on Figure 8 to obtain the Figure 9 volumes. Table.1 shows the PM peak. hour calculated LOS for future with and without project conditions at the affected street intersections. The affected intersections operate at LOS C or better for future conditions. TRAFFIC MITIGATION The City of Yelm requires a Transportation Facility Charge for new development to help fund the six year transportation program. The charge is calculated by multiplying the 22 PM peak hour trips trip generated by the development by the current fee. The proponent is to provide half street frontage improvements on Rhoten Rd to City of Yelm Standards. including right of way dedication, pavement widening, planter strip, curb, gutter and sidewalk to City of Yelm Standards. Mr. Randy Weber Yelm RVlBoat and Mini Storage Page 7 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS We recommend that the Yelm RV/Boat and Mini Storage project be constructed as shown on the site plan with the following traffic impact mitigation measures: • Construct the half street frontage improvements on Rhoten Rd to City of Yelm Standards including right of way dedication, pavement widening, planter strip, curb, gutter and sidewalk. • Pay the Transportation Facility Charge based on the 22 PM peak hour trips generated by the proposal and as calculated by the City of Yelm. No other traffic mitigation should be necessary. If you have any questions, please call 425-522-4118. You may also contact us via e-mail at vince(c~nwtraffex.com or larry(c~nwtraffex.com. Very truly yours, / 1 r f'~ i f / ~...-..--~' ..f Vincent J. Geglia Larry Hobbs, P.E. Principal Principal TraffEx TraffEx Mr. Randy Weber Yelm RVlBoat and Mini Storage Page 8 ~,~ TABLE 1 PM PEAK HOUR LEVEL OF SERVICE SUMMARY INTERSECTION EXISTING FUTURE WITHOUT FUTURE WITH PROJECT PROJECT North Site Access Driveway/ NA NA A 8.8 EB Rhoten Rd. South Site Access Driveway/ NA NA A 8.7 EB Rhoten Rd. Rhoten Rd./ B 11.3 WB B 12.7 WB B 13.0 WB Northern Pacific Rd. 15` St. N/Rhoten Rd./ B 12.3 WB C 18.5 WB C 19.0 WB Railway Rd. XX Number shown is the average control delay in seconds per vehicle for the minor approach for unsignalized intersections, which determines the LOS for intersections per the Transportation Research Board Highway Capacity Manual 2000 B Indicates calculated level of service EB (eastbound) Indicates direction of the minor approach for unsignalized intersections Yelm RvlBoat and Mini-Storage Vicinity Map Figure 1 N~p-~L7Pr7, , r1~'E~'T d R.A FF %~' ~~.~"PEr4 T;1 Yeim RVIBoat and Mini-Storage Site Plan Figure 2 28' }Utf Rf1N 5" 5 jW !,. 3' LtJ~5GM9P7C '. ~ ' ~I ,._t t l ~; r~E ~ ce r*rn? ,~, a~<~~.~ , } ;~ . ~~__ _ -- r.,. ~ (y ~- ~ l FF EL=32.0 ~ ' ~ '` 4 _~ oa' {ria _~g -~ ~~ ~i ~ .~....~.~ m. ~- e, _....._-. ..~.~--~~~ ~ _ M ~ '~'"°-~""""j3?__""_ _ / ~3~I F..~..--'' il ...., ~ ~^~.~t" SAW_CUT UME '# I _ ~i~~~ '~~_, .~-' ~' raw Pn~~r~c r ~ -~}j~- ~F EL=332.t~ '~ =~=sk~~ `~ (: _ 31~ { i 9~ ,, ~ ` ~~ - ~~ ~. ~ ~ rr" _ er^"'"'~ ~A ~ ~ ~ c~ ~ d ~ - ~ ;~ : , ~ ~ b i' A ~ ~, ~ . ~'~' ~ ~ A=,rc ~ ,~ `Tl ' ~ ~ ~~' ~~ i ~ ...-.._ .._ vOR'SFI.'r - W ~ ~' _~ ~,~ ~ y ~ ~,.,,,.,__ 3e 7 e a r ~~ ~j t X31 i~ ! ~ OFFICE _~ fit'. y R ~1 .i+-~ ~~ ~~..=~~~.~ B ~-~~3~, ~ X25 ~3 _., ~ CEDIGAKJAi ~'~ ~~ ~ ~~ __ `-.~~~ ~t i i I _ _ s , i r ~ 3~.a r _.: ~ ~ ~ ~ ~ ,,.-fi~ ~ F~ E~.~ 332 t • ~ ~ `-. J F 9 2 1 ..e }a `-+. 1111.6 -'1 1 ~ ~" ~ ~ ~~ ~~~ i i ~..~ a. t C g~ .~^^..` - -_ ' r T --<_.,_ ~ ~~ ~'~ y. j- ---..___ ~ ~ ~ ~. __ __ ~~ ', .~. ~,_. _ .. - - ~.~ ..... _ ._. .~ ~ - - - - - - - ~ ..._ ~ _ 4 - - .. - .. ~ i -' ~ - Yeim RVIBoat and Mini-Storage Figure Site Frontage Details on Rhoten Rd. 3 IV IT?7Ntt', ~i fi ~ O O 1 .` °e -,0 ~.n ~ o c+ t~J Qrl~ :v ~Rhct2r R~~~ a c> a. ~ o a•~. a a ~. ,,_ a ~~~ o u-~ o a A• Y a a ~~.a ~ ; ~ a t4 u7 O do E ay'r~h.~tef1 F.'d o ° c~ 0,' 1 a ~3 a aQ ,~;Q6 Rhct~n ~d1P1 F:i~~ifir L3^ _ ~ ~., i.,' i ~li ti> ~ 3~ '~ f ~.~ ' rr' ~,,~ ~ .,~~ ~ ~. F=~ ~;~ t,') C.'~ ~ ~ ~'r ~JQIo {~ f-''v r, ~ I ~ / \ I ~" J S $ ~~ ~ ~~ ~~ :. ~ :~ ~ ,. t'~=11 ~1•-~y` ` ,r ~ ,. ~T 4 Or O ~„v`~ d ~ _ f ~,~. • ~ ~.; }-~-~ ~ ,gyp , ~~,~` ~ o a .~ ~ _ ~. 1 ~5°lQ ~~ . s~ ~'~ rt v > ~ i. ,' PJ [~r1 ~r7., i.rf la~~.,ii , _; .~ ' , -_ . {: Pf~l Peak Hour 11 E~7ter 1'1 Exit 22 Total ~. ,o ~..:.~ 14°' ~~ ~ ~~ _" ,~ .;t.~ ~' ~~ `~~~ Legend 15°lo F?reerir.~e c;' ~ro~ec. Traffic -PP.' F~;3k: ~~:_ r-:;' 'ter f ciU l?lF -;f?:~ i.ilfE•(: ir)ri Yelm RV1Boat and Mini-Storage PM Peak Hour Trip Distribution Through Affected Intersections Figure 4 T'i~~ ~ ~ ".' ?Ws ..._ 7 ~ ~ - _ _ s s, _ _ ;-_; . - \.. .. - C~0! 25°l0 ~ ~" ~~ ~ ~ , __ , . .~° %~ v- O u'7 O 0., ~ _0 0'~ 0 0 0 o u~ o 4 M a s o ~-s 0 1 O O SV O O O a o• 11 -o 0 •: - 0 0 0 0 O U7 4 0. 0 o ~ o a o a o r o o .- ~ '•, o 0--~-0 OQ ~,QO O C1 O 0.. _0 o• 13 0 o o 0 0 0 •-\ , . O ~ O 0_ 0 a ~ a o o a ~.n o O ~ O o•~~a 0 ~ - ~ - ` 0 O l~F O O O O 0, 0 ~ -• 14 - ~ o o 0 0 0 --15 Peak Hour Volume and Qirection Yelm RV1Boat and Mini-Storage PM Peak Hour Trip Distribution Through 15 Concurrency Intersections .....,,-._.._ ; ._, F__'- :_J~'~ tt,~m _. Eng. ktaa O O O 0 .' 0 3 ~ 3 0 0 000 Q ~ r o.'''_o 0' 1 ~ 0 0, 0 O O O O O O 0 0 ~- 15 2 0 , 0 0 0 0 Figure 5 O tt7 O 0.• 0 o ~ 0 0 0 ca ~ a O O O o ~ .a 10~~~9 0 0 O 6 O O O ~ 0 .2 o i 12 -a a a 0 0 0 ~'V, F? i r i'r ' T i i1,4 FF/ ~' ~`XPER T,S' t 1 ~~ 0~ Y ~i ~~ p Yelm RVlBaat and Mini-Storage Existing Conditions Figure 6 ;. v""~ .:: t ? !it ~'~ I t3 ~~' . ~~ .~ ~ 3 ~: ~ _ ~, ~~ d ~,~^~` - c~ ~-- _ ~pi CD ~- ~^" L'j ` fir. ~ ~~ ~ ~~, 2 , ~a h ..~.'` f 'i fj 'i~~. 1 .~ W'f'~ e5- ~ `~ ~~>~~ i~~~~ ~ Lams 2~ mph C; ~ ~ d' -~`~,~ ~' ~ ~~ `~ ,~ ~ ~~ ~~ ~~; ~ ° ; \~ ~~ ~~ ~ r ~~ Legend ~- Lane Use and l3irec6on Stop Sign Control - - Sidewalk g -~ ,'u4'7,4 rr-, s t~~.~ ~' Tt~q ,- ,sae E x,a~r,~ rs N O cD CJ 0'v 1/',-0 0 ~,/- 0 o ~ o P1 Dn a ~iRh iten F.'d N O Sil O 0 .' i 0-~- 0 0 ' - -' 0 o ~ o csa yin :r~',`PI ~~ Bll F'~.7 6 ifi ct 0 ~ ~ a•~3 0 o ~. .- ~~~ ~o~ CD M i inn R'd 1 Far:fr~ ~t o `'A os~ 0 _. ` ~J 0~~ D 0 "-, , -~ 72 0 o r- r`- 1st ct °VFa!h4^a,i, ~~ F-- ~' i Jam,. r M1 ~, ~ P~C~~e~~ ~~~YY~ ;~~ ~ / . , r_._. T ~ _~ I t r~ . z 1 ~ SC ~ '~~ I Y ~ a :~ ~~~~ '.A„ ~ ~~ „ ~~ ~~. ';.~ ~t' ~t Legend +'15 Peak Hourvolume aorJ C'~ireciiun Yelm RN Boat and Mini-Storage Existing PM Peak Hour Traffic Volumes ~, ~' {~~ ~" Figure 7 o r-- o a ,• o ~1 ~~-0 0 ~, ~ 0 4 n, o,~,~~ ~it~,~~ten o r~`-- o ~ ," ""~ ~} ~'(~')'0 0 .,./ 4 o rn o Irie~°,~,~;rRhoter o r- tt p- ~ ~ -1 Q Q 0 0 ~ 197 ~ ~ P CV Rh~ten Rd;Ti F' :~~~fi C3 cV O~ Q ~ ~_~ 0-~4 -o ...y. • rv.. I~~ O N e- M r ISt ~?t ~'.I; F'~l i~ ~,~.~ ;. t~ _ ~ , i,~ i f i fit=`-; (tl - _..~ ~ ~, ~ ~s- ~' ~`~~ F-- 1--- ~ ~~~ ~ ~" ..~ b~ ,>. .-: , r e, ~./ ~,fC3~~C~ ~0~~ ~ 2 r`~ ;c ~~ ~ .a , ~ ~ Y ,~ - ( ~ _ ,~- ~iY~ ,~~'~ ~~ ~Y. rte" - '~" Y i * ...... ~ ~A, :'.'~: ~ ,~ ~ r _ Legend •-15 Pe~3H '~inur':ir,I~.aine a~.il Girectior', Yelm RIV Boat and INini-Storage Future PSI Peak Hour Traffic Volumes Without Project Figure 8 o rte'- a 1 .' `'. 0 0 • ~ - 0 u, w o r- ~~-J Dr e ~~~:'F'hnt~n R~~' o co 0 0 0 0_.~_ 0 5 °- ~ •' 0 cs~ ~ o 5 dn.e~,a, Rhct~n F~d o/ co ~r O'la7/ 0 0 " ~, t/:- ` 197 O U4 N oa r- N RticsYen R~P~1 F~clbc ao a a N rtn ©_ ~ ~ o ~ a 0 '' , , .- `~ 103 o N 47 N M x- ~t C-~ r'~~Irtc'i~~tY3v Legend +1~ Peak Hour',r'olun~e and G~irectior v, .~ rte,,;, ,v ~~!- C~ ,,, a..,~„ ~, ~ f 1 JiGti f ~i `p C` _~; }~: ~~ ~,~ _. ~, ~ C_Y_ ~_ ~ ~~ ~~ ~ l ~_ ~, ' PrC~JeC$ ~9~~ ~'~' ~ L . a ',.( "~ 1 =~ ;,~, ~i Yelm R/V Beat and INini-Storage ~, C~~ _'~ ~~ ~ .- ~~~~ ~ ~~ J4 Future PM Peak Hour Traffic Volumes With Project Figure 9 TECHNICAL APPENDIX ~YT -~ ,~ ~..~-Y ~ _ ~'~~: wnse.~we~aw - June 7, 2007 Vincent Geglia, Principal TraffEx 10104 - 111 `h Ave N E Kirkland, WA 98033 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 Subject: Traffic Scoping -Yelm RV/Boat and Mini Storage Dear Mr. Geglia: We have reviewed the scoping information dated March 28, 2007 for the proposed Yelm RV/Boat and Mini Storage to be located on the wesf side of Rhoton Road SE, north of NP Road SE. The .project consists of 11 mini-storage buildings with 1,050 square feet of office space, for a total of 83,200 square feet. Two accesses from Rhoton Road are proposed. In accordance with City of Yelm TIA Guidelines, a Transportation Impact Analysis will be required for the project. Trip Generation/Distribution The Mini-Warehouse land use (LU 151) shall be used to estimate project trip generation. It is unlikely that 9% of the project trips would distribute either north on Rhoton Road or east on Railway Street. Please correct the trip distribution figure in the TIA to show 5% of project trips on each of these roadways and redistributing the rest of the trips to the south. Project Access The TIA is required to analyze the proposed driveways and identify appropriate ingress/egress design- elements that may be necessary. A full size site plan should be submitted with the TIA in order to review sight distance, access, street right-of-way limits, dimensioning to adjacent intersections, etc. Affected Intersections The affected intersections are those affected by development traffic exceeding 10 PM peak hour trips in the peak direction, or 25 trips through an intersection. When project trips are redistributed, the following intersections should be included in the Traffic Impact Analysis for the project: ® Site Accesses • Rhoton Road SE/NP Road SE • First Street/Rhoton Road SE/Railway Road SE All turning movement counts must be less than two years old. (360) 458-3835 (360) 458-3144 FAX www.ci.yelm.wa.us In addition, the City requires that the following intersections be analyzed as a. part of the concurrency review for the project: 1. Burnett Road/SR 510 2. Killion Road/SR 510 3. Cullens Road/SR 510 4. Longmire Street/SR 510 5. Mosman Street/SR 507 6. First Street/SR 510 7. First Street/Stevens Avenue 8. Clark Road/SR 507 9. 103~d Street/SR 507 10. First Street/Rhoton Road/Railway 11. 103~d Street/West Road 12. NE Creek Street/SR 507/Bald Hill Road 13. Grove Road/103~d Street SE 14. Grove Road/SR 507 15. Yelm Loop/SR 507 The above intersections shall be analyzed in the TIA if any project trip-enters the intersection. If no project trip. enters the intersection, please acknowledge that in the TIA. Horizon Year Based on City TIA guidelines, the anticipated build-out/full occupancy year for the development should be used as the analysis horizon year. Street Adequacy Analysis The TIA must address the adequacy of the streets that will serve the development and whether the condition of the streets will support the increased traffic from the proposed development. Pipeline Traffic and Background Growth The pipeline projects incorporated in the analysis shall include: 1. Berry Valley I 2. Burnett Commercial Park 3. Cherry Meadows 4. Deer Run 5. Development at Yelm (Yelm/Creek Retail) 6. Forrester Heights (24-lot single family plat on SR 507, distribution not enclosed) 7. Green Village 8. Hutch Subdivision 9. Mountain Meadows (23-lot single family plat on Burnett Road, distribution not enclosed) 10. Mountain Shadow 11. Mountain Sunrise 12. Yelm Plaza 13. Rainier View Estates (21-lot single family plat on Durant Road, distribution not enclosed) 14. Tahoma Terra (Phases 1 and 2) 15. Terra Valley 16. Walmart June 8, 2007 Page 2 of 3 17. Willow Glen Phase 3 18. Windshadow 19. Wyndstone Project traffic distribution for the above pipeline projects is enclosed. In addition to .pipeline development traffic, a background growth rate of 2% should be applied to the base year traffic volumes. Please include a separate Figure in the TIA illustrating the total pipeline development traffic. at the study intersections. Mitigation The TIA shall clearly identify potential impacts to streets, intersections, etc. that will require mitigation and may recommend improvements needed to maintain the City's adopted level of service standard. The City will identify the appropriate mitigation. A copy of the current City of Yelm TIA Guidelines can be found on the City of Yelm website at www.ci.yelm.wa.us. Please submit one hard copy and a pdf version of the TIA and all documentation, as well as an electronic copy of Synchro output and data files, to me. If you have any questions, please direct them to me, in writing. You may email electronic files to me at tamim@ci.yelm.wa.us. Sincerely, Tami Merriman Associate Planner Enclosures: Pipeline Project Distribution City of Yelm TIA Guidelines cc: Perry Shea, P.E., Shea & Carr, Inc. June 8, 2007 Page 3 of 3 Peak Hour Summary ._ , Mark Skaggs i20&1251-~3i:C Rhoton Rd N~ ~ Northern Pacific Rd Sir 5:00 PM to 6:00 PM Wednesday, September 13, 2006 ~ i O (~ s ~Q I 62 3 61 t 58 ; d ----.._...._...__. _____._ n 116 ~~ ~ # 15 n ;,, ~_ a: .~ 1a2 Northern Pacifie Ftd SE 60 138 173 198 'p C O .., O Approach PHF HV°!o Volume EB 0.00 0.0% 0 WB 0.83 3.4% 116 N8 0.95 2.5°Jo 198 SB 0.86 3.2°l0 62 Intersection 0.94 2.9°l0 376 Count Period: 3:30 PM to 6:30 PM Total Vehicle Summary a: ~. 'tit rk SkayyS 12eS> 251-c,3na Rhoton Rd N1N ~ Northern Pacific Rd S~ Wednesday, September i3, 2006 3:30 PM to 6:30 PM 95-Minute fniervat Strrnrnary 3:30 PM to 6:30 PM In Out ~ c a tit 67 ~~ ~ ~ r,. 5a n _ b a ~ ~ ,~. ~ ! Hl 3.4ao ,,,,.... .-- WtiP 0.83 i ~ l i Out u" { ~ ~. r. _ ~^.... n ~ In 0 [ i „ ~ 11G :n ~ 14Y Oat _ HV 20 ~~~_ ..m-... .~ FHr v x~ ' ~ ~. . a ,> N s9 t 3s O? Q Oui fn i ~ 173 198 a Peak Hour Summary 5: DD PM fo 6:00 PM tntcrval Start Ttm¢ Northbound ___ Rhoton Rct NYr' t T R ~ HY Southbound ~. '. ~lo•~. !:d NW l *tV Eastbound Ncnhan Pn =~GC Rd SE - ~.._ Westtwund NCriherr, p?_r.c Rtl SE~ L :_... I.'-lN Intorval Yotat 3'et PhA '-t 27 q ., - ,rr i ~ - 2r _ ^ 1 8a _ .. ui I'>,G ? '.._ r ~~ ...8 .... .,.., ~ _.. t ',~. Z3 t 95 _._. _ . -:° Pkt 't I .. 31 2 7 ' ; + _. ?t -.... 'i t 7y _. _ ,L d r G A_at i ? i ..__ 27 1 95 a30 Wh1 ~: 33 0 i ,; : i J Ji _._ ~raSWAd . _._ . _. ~ , 2 _ 1 ~ - 2( ! 1 -- 00 ... &:OU PM . ... _ _. .... U E 5 0 _... _ , t _ D ~ 0 ~ ~ -.. 2a ~ ... 7L 6aSP!,i t5 ..S I 3 7 ^7 ~ 0 ~ ! _ ?7 ~ ~ ~ - t: 83 .. Total Survey ~ 772 ~ 358 23 1, t95 ~ 0 ~ 2Sn I ~ 70 1.03Cs Peak Hour Summary 5:00 PM to 6:OD PM ~ I Northbound Y Southbound Eastbound Wostbound _ f<hoton f?d NW l10pr-..c.t ~" _ fthotor f r NbV M°sr,nern Pac;LC Rn St ._ __._ _._. Nnthem, f ~ f,t Rd_ SE - ___. Total ln ~ Out I Total ~ iN it O~ I Ja! I Mi In fhA ~ To1al : 1 Clot T~ ~ j HV .iiz Vah,ms t58 173: 37t 5 E2 -. .`..' ! 2 0 0 ; 0 ttf t62 f 255 j 4 37E ctiV 2 5°~ :. ... _., 9.0°1° _ _ 3. ~^h. 29`:5 FHF 0.05 G ~v ~1 Gp U.83 -- - 0 ua fey Northbound Southbound Eastbound Westbound ~dovement -- Rtip?an Rd N14' Rhoton R.o NW Ncnhern Pacific R ~ SE __- NcX4h:.rn Pcic fi ~ Rd SE ~ Tcrta) E T R Tcta# L T 'TCtaI - Tctai !TUtai L ~ R Volume f 60 138 tP8 SH f2 i 0 779 t t1 i6 ..:8 PHP 0.88 G 0 01 D.Oy 1 QU L'.8v `U 86 .. :, O.~ U 0 91 I p 2S...tD R .... 0.9A Roiting Hour Summary 3:30 PM to &:30 PM interval Start Tints Northbound Rhoton Rtl N1'Y ~ T t R I }~~_. Southbound Rhoton RJ M!J t r ~ M~- Eastbound N<. i Pnctlc Rs SE .. ,. ~ _ Westbountl Northern pa.~F~ !3J SE t _._. R ? tN_. Intcrvat Totai 330 PM i 63 ifl7 te^ ti E5 ~ °; =t i 97 ', 3 ? 3 338 q 1 ' u ~ , 88 € 4 'i~i~ 1"0: PAA j_6 ~ 10 _. 0 -... ~ _ M1 - 90 3 ~ _ ,70._. _ 5 P81 ~ &1 774 ~ y y ~ ~ ~ _ 07 ~ 3 ~ -. 43~ pAi A 56 r -._. ~ 9:8 1 ~ 6 ... ~... t t -~ •~ 1 '~~ 3 _._ ~ , 107 f ~r ~-. ,:&z -- 45 PM O PP 60 -- ~~ 3t -'- ~ 5 3 ~ 17v _ s 365 _ --- d u~ o.iS Pfd _._~__~.~. ~ 60 ( v3 39 T 72 ..~ 0 -„_,- ~ ... 5}I fig t ? n ~._ 2 _ 1 _ ~ 115 7 104 ~ t d 37b ".uf8 r.3t? PSd v3 72t ,, _ g< .~ , 2 - d3 _ i ~ 3 ___ 33E Peak Hour Summary /x'1.1.,1 ~._. ~arY, .~ „ ~y M1Aarx Skr -,~ t~6)2~7-..~.,30 A L+ p~ g p J ~1 1St St ~ cX ~c~l~wc'~y Yttl IY~ 5:00 PM to 6:00 PM Wednesday, September 13, 2006 2 4, tt2 j i98 i G4 8 Y 80 e ( ~ 72 n- s' 85 I I Railway Rd ME 190 77 23fi ~ 267 +» r- Approach PNF MV% Volume EB 0.00 0.0°!° 0 WB 0.63 2.5°l0 80 N8 0.93 2.2°l0 267 S8 0.81 3.5% 172 Intersection 0.91 2.7°l0 519 Count Period: 3:30 PM to 6:30 PM Tout v~n~~i~ su~,~,~~y ~ ,1~:~ <; ~1~ > ~, tEa -' ~ 1 ~ ~ ~ : F c r(r~~- ' ] ~'> ' ~ _ a ' ~ ~ ~ hiV 2.5;'0 ~ PHF D 8 l . . ~. ~, . _,..., ., . 3 3 l -0t~rk Skaggs Oul © ~ ~., 9 ~ 89 In (20E) z5t.a~. ; ~ ~~ n ~ ~ es o~n ~' ~ `~'~ ~$~ .~'~ ~ ~ ~al~lt~~~ RCI ~~ FIV G.0 t'Iih Goo ~°a'1 T ~~ n; ~; iGG ?7 ~ a Wednesday, September 13, 2006 opt to z 3:30 PM to 6:30 PM 2~- -~~' -~` Peak Nour Summary 5:00 PM to 6:40 PM 95-Minute lnterval Surnurary _ ~ ~ ~~~ 3:30 PM to 6:30 PM interva9 Northbound Southbound Start ;sl St N 'st SE N Time ~ (~ ~ R~ ttV~~~~ C T t Ml 3sGPM tli 7 6 t 35 ~ ~ i 3:45 PM ~ ~ 4 31 • ~ ~ ~ 4A0PM 3~ ~ ~ _ J . ,c .. ~_ 7 75 Fhd t ; ~ ~ . ° 0 4i0FM _.. _ 1- .,. t 1 1 a5 PM . 1 73 s 3 _ r ^D PM _ 15 ~ 1 1 i 2 5 PM ,G ~ 2 '. j i .5 Al u Z ,~ -, ~bh6 - .. _ ._ I 15 ~ ~ 4 2 ~+ ~-1 o 8:15 PM ~ d9 17 ` 3 3 _ i 28 f ~ _ 0 Total Saev€;~ ! 517 ! 190 32 ZQ ,SE 37 Eastbound Westbound Ra w.a- F.d NF Ra;l~ _,v Rd PFF Interval L R NV Tota) u 1 17 E r _._ - ~-_ i 5 _ _ t t 5 _ 1i -r ~ _ i9 A ( ti .... i .. _ .. ~ .i,__- __. 31 : I . _._ 7 141 I ,.._. ~t ~ ...- _. _' 711 t3 3 ' G i2t -F t~ 1 G ,,,t ...__ r __. to 2 .__ 4 G ... ..... 1i7 ~ 197 21 ?? 1.tD Peak Hour Summary 5:00 PM to 6:00 PM By Norihltound Sauthbannd Eastbound Westnound Apa oast! .Sf Si N , __._.. ._..-_ - _. 1St St N . _. - _._ __ RvI air Rd NF r t~7 x,: f ~':r _. _... .. -- Totai in put ?Total [ MI In Out TOkal j HV . r (n Out = Totai t in Uu', ,al , HV Va"~ ?L7 2afr t 503 i E -72 ~ 798 970 ~ 8 0 0 D fiJ 85 n5 i . 519 _. ,, - .. ....... _... _ _. PNi= 09'J 0.81 DtJO i ,..8) G.91 Qy, Northbound Southbwund ~ £asiiwund Westbound AAOV¢mrmn 1St St N __ ist Sf N - _ Ra evrv Rd NE i Ra~i.arv t,d NE __. _ _ __ ~. , _- 7 Yotat 7 R 7otaf C 7 i ~TC'33 Total i L R iTatal Volume . .. f90 I 77 287 - _ 8 36n 1i2 ~ ; J 7 8 ~8D 519 - _ _. ~.. PHF ~ -- - --_. ---- 7...5 16.T1 D.93 _ _ .5<G .. . Q.79 ~_. ___.. ,W.81 ~ --t---~-- - - ~- 000 G.>h __._..... 007 -~_83 _.. ..,_. G.91 Rot/frtg Hour Summary 3:80 PM to 6:30 PM Intorvai Slart Time Northbound 15l St N - T R N`J Southbound tst St N L T T~_ Eacttwund Ri 3 2,( Rd NF - ._ Westbound Railiap Rtl NE L _.. R ,_-_HV.... Interval Total D PM a3 tTD 51 76 5 ?9t t _ S 82 - 8 dA7 3:q $ PM ___ 9_ _,~6fi _ 1 t t2 ~ 15L _ t I I 53 5 ..4 _ 445 S.GU_PM 760 ~ 5o t t __ to 1d9 ~ [ t __, , f - ~._. 97 _- 7 i 4`i ._ 1'tB Ptd @ 15 ~. . F - ,_t 59 9 489 A'sG Ftd .1 7t ~ ~ 6 18 U'. 8~ „_ _ 77 8 i .,10 1~d~PM 8 70 - 4 ~ 5a .. _ . ~ - ~_ 79 0 2 - 5C~9 sOD Pdi ''S PM t J _ : / C~ 6 g 9 _8 ___~__~ ~ 87 5 ~ ..._ ~ - _ _ -- 7 II ._._- ~ ~ ... _ - ~ 5t9 ~ ____.... ~ ____. - , ~~ ...... X [ 7 _. ~ _.. _g .~__ _ 1 2 1...... { _...._... 17? 5130 PAd C~7 83 t o 119 6 8 g ~. 1 ~8 qcg ? :DOT-BRIODETAIL - STATE OF 4'VASHINGTON :DEPARTP~IENT OF TRANSPORTATION DATE TIME Page 1 of 2 - - -- ~' S TA NDARD ACCIDENT HIST ORY DETAIL REPORT b7 26 0' 12:08 PP;1 REPORTE D COLLISIONS THAT OCCURRED ON CURRENT ACCIDEN T LOCATION SR 507 (MILEPOST 28:21 TO 28.27) AT SR 510 SOR TED BY SR%DATE SRPv1P `UNDER 23 UNITED STATES CODE .. S ECTION 409. TH15 SR 510 MILEPOST 15.64 TO 15.67) AT SR 507 ( . 'DATA CANNOT BE USED IN DISCOVE RY ORASEVIDENCE and 1ST ST AT SR 507 & 5 10 (No Rep orted Collisions)- ~~~!``-1 i! . ."" ~~ ~.;~ C .,. I. I~,~~'a" 'ATTRIA~ JNANY ACTIONFOR DAtv1AGES AGAINST THE i~ JANUARY 1 > - , 2004 THROU - GH DECEMBER 3 1, 2006 '~'JSDOT OR THE STATE OF WASHINGTON A P U ACCDNT DIAGRAP,1 M # # # J S L SR R SRtv1P - REPORT DATE TIME ANALYSIS S I F V VEH1 VEH2 U U I .FIRST COLLISION TYPE OBJE_ CT< VEH1 CONTR ~EH2 CONTR : ~ B `~ R NUMBER DATA V N A E TYPE TYPE N R 'T STRUCK' ;CIRCUMSTANCE I, GIRCUMSTANCEI,~ 1 ~ J J. T.~ H C F E ^ € 507 28.24 R 1499993 01/06/04 14:54 6D6024AOA6 1 0 0 2 2 1 1 3 . 1 Entering at angle Other None 507 28.24 R 1499996 03/15/04 16:40 86A068BOD1 7 2 0 3 2 1 1 1 1 From same direction -both going Follow Too Closely None. straight -one stopped -rear-end 507 28.24 R C631967 07/02/04 19:45 8BO168BAD1 0 0 0 2 2 1 1 1 _.... 3 From same direction -both going straight -one stopped -rear-end 507 28.24 R 1500066 08/21/04 15:15 8BS0586AD6 1 0 0 2 2 1 1 2 1 From same direction -both going Did Not Grant RW to Vehicle None _ ..._ straight -both moving -sideswipe 507 28.24 R 1500344 09/23/04 12:44 2AC0680OD0 7 3 0 3 2 2 6 1 1 From same direction -both going Follow Too Closely None _ straight -one stopped -rear-end 507 28.24 R C646640 04/05/05 09:10 86O1688AD1 7 1 0 2 1 0 1 1 1 From same direction -both going straight -one stopped -rear-end ... . 507 28.24 R 0985638 06/07/05 10 02 4AH074ACA6 1 0 0 2 1 1 1 1 1 From same direction -all others _,. Improper Backing None 507 28.24 R 1499755 07/22/05 12:10 4DA064DOE1 7 1 0 4 2 2 1 1 1 From same direction -both going Other None straight -one stopped -rear-end 507 28.24 R 1500119 09/22/05 07:14 8BA0688OD1 7 1 0 2 2 1 5 1 1 From same direction -both going Follow Too Closely None straight -one stopped -rear-end 507 28.24 R 1499785 11/11/05 19:13 4AC138BAD1 1 0 0 2 1 1 1 2 4 From opposite direction -one left Disregard Stop and Go Light None _._.. turn -one straight 507 28.24 R C663674 02/04/06 15.45 8BO1686AD6 1 0 0 2 1 _ ..._.. 2 1 1 __.... 9 ......9 1 From same direction -both oin _. ..... __..... _........ _ straight -one stopped -rear-end 507 28.24 R C675528 09/24/06 13:18 4AO164ABA1 1 0 0 2 1 2 1 1 1 From same direction -both going straight -one stopped -rear-end 510 15.65 R C639498 08/24!04 20.30 4AO164AAA1 1 0 0 2 1 1 7 2 4 From same direction -both going straight -one stopped -rear-end 510 15.67 R C627201 04/30/04 11:00 SBO1686AD1 6- 2 0 2 2 1 1 1 1 From same direction -both going _ straight -one stopped -rear-end 51'0 15.67 R 1500343 07/09/04 14:52 - 4AH074AQA6 --- 1 0 _ 0 2 _ 6 - 12 1 1 _ 1 From same direction -all others Improper Backing None 510 15.67 R 1500064 08/14/04 02:02 2CA062CO61 7 2 0 2 - -- 2 1 1 1 ------ ------ 4 From same direction -both going --- -- Follow Too Closely ------- None straight -one stopped -rear-end 510 15.67 R 1500349 03/04/05 18:25 6AC066AOA1 1 0 0 2 1 2 1 1 g..._... 4 Same direction -- both turnin left -- Y _.. _..... Follow Too Close! None _____- ~ .---_..._-- _ -.._ __ _..._._ _ _ _ one stopped -- rear end 510 15.67 R 0985643 06/18/05 18:13 _.._._. -___-..__ 4AA064AAA1 1 _ 0 0 _ 3 _-. 2 ____. 2 1 1 _. _ ____.._ _.___ ..._ 9 .....9 1 From same direction -both oin __._...... Inattention _.. . None _ ___ _ _ _ straight -one stopped -rear-end _ 510 15.67 R 0985864 10/28/05 11:17 2CA062CO81 1 0 _ 0 2 2 _ 1 1 1 _ 1 From same direction -both going Follow Too Closely None straight -one stopped -rear-end 510 15.67 R 2369455 03/29(06 14:30 4AS054AAA6 1 0 0 2 1 1 1 1 1 From same direction -both going Did Not Grant RW to Vehicle None straight -both moving -sideswipe 510 15.67 R 2369460 04/01/06 14:54 4AS054AAA6 1 0 0 3 1 4 1 1 1 From same direction -both going _. Did Not Grant RW to Vehicle _...._ _ _ None straight -both moving -sideswipe 510 15 67 R 7499808 06/02/06 14.16 86A716DAD1 6 1 0 2 2 1 2 _... 1 Vehicle going straight hits pedestrian ............ None . Failure to Use Xwalk 510 15.67 R 2510853 08/22/06 10:10 4AB044ABA1 1 0 0 2 6 2 1 1 1 Same direction -both turning right Improper Turn None -- both moving --sideswipe DOT-BRIODETAIL STATE OF WASHINGTON -DEPARTMENT OF TRANSPORTATION DATE TIME Page 2 of 2 REPORTED COLLISIONS THAT OCCURRED ON STANDARD ACCIDENT HISTORY DETAIL REPORT 07/26/07 12;08 PM SR 507 (MILEPOST 28.21 TO 28.27) AT SR 510 CURRENT ACCIDENT LOCATION SR 510 (MILEPOST 15.64 TO 15.67) AT SR 507 SORTED BY SR/DATE/SRMP 'UNDER 23 UNITED STATES CODE -SECTION 409, THIS `DATA CANNOT BE USED IN D15COVERY OR AS EVIDENCE and 1ST ST AT SR 507 & 510 (No Reported Collisions) iO f AL NUMBER Ot~ COLLISBOPJS: 25 'AT TRIAL IN ANY ACTION FOR DAMAGES AGAINST THE JANUARY 1, 2004 THROUGH DECEMBER 31, 2006 `WSDOT OR THE STATE OF WASHINGTON A P U ACCDNT DIAGRAM M# # # J S L R SR SRMP ! / REPORT DATE TIME ANALYSIS S I F V VEH1 VEH2 U U I FIRST COLLISION TYPE /OBJECT VEH1 CONTR VEH2 CONTR E R 6 NUMBER DATA V N A E TYPE TYPE N R T STRUCK CIRCUMSTANCE 1 CIRCUMSTANCE 1 1 J J T H C F E 510 15.67 R 2510855 10/05/06 12:40 8BA068BOD1 1 0 0 2 1 2 1 1 1 From same direction -both going Follow Too Closely None straight -one stopped -rear-end 510 15.67 R 2369485 10/20/06 13:12 200062COD1 1 0 0 2 2 1 1 9 9 Same direction -- both turning left -- Follow Too Closely None one stopped -- rear end PROP POSS EVID DSABL TOTAL ALC FIXD REAR OPP ENTER OVER PEDL ,I TOTAL DMAG INJ INJ INJ INJ FATAL # OF # OF # OF REL OBJ END DIR AT TURN CYC PEDES` YEAR COLS COLS COLS COLS COLS COLS COLS INJS FTLS VEHS COLS COLS COLS COLS ANGLE COLS COLS COLS 2004 ... 9 _ 5 3 1 _ 0 4 0 9 0 20 0 U 6 U 1 0 U 0 2005 ... 8 . 5 3 0 _ 0 3 0 _ 3 0 19 0. 0 6 1 0 0 0 0 __ 2006 8 _ 7 _ 0 _ 1 0 1 0 1 0 17 0 0 4 0 0 _ 0 0_ 1 25 17 6 2 0 8 0 13 0 56 0 0 _ 16 1 1 0 0 1 HCM Unsignalized Intersection Capacity Analysis Existing PM Peak 3: Northern Pacific Rd & Rhoten Rd s/3/o7 ~ ~ • I ~ ~ I i Movement WBL WBR NBT NBR SBL SBT Lane Configurations ~ ~ Sigfi Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 115 138 60 138 4 58 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow r~ 64 147 4 62 Pedestrians Lane Width (i Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 1100 pX, platoon unblocked vC, conflicting volume 207 137 211 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 207 137 211 tC, single (s) 6:4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 84 84 100 cM capacity (veh/h) 776 909 1354 Direction; Lane # WB 1 NB 1 5B 1 Volume Total 269 211 66 Volume Left 122 0 4 Volume. Right 147 147 0 cSH 843 1700 1354 Volume to Capacity 0.32 0.12 0.00 Queue Length (ft) 34 0 0 Control Delay (s) .11:3 0:0 --0.5 Lane LOS B A Approach Delay (s) 11.3 ' -0.0 0.5 Approach LOS B Intersectiun-Summary Average Delay 5.6 Intersection Capacity Utilization 34.8°I° ICU Level of Service' A Synchro 5 Report TraffEX Page 1 HCM Unsignalized Intersection Capacity Analysis Existing PM Peak 5: Railway Rd & 1st St N 8/3/07 ~ ~ * I /~ ~ I i Moveme~il WBL WBR NBT NBR SBL SBT Lane Configurations '~, ~' Sign Gantrol Stop Free Free Grade 0% 0% 0% Volume .(veh/h) 72 9 190 77 8 164 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 Hourly flow rate (veh/h} 79 10 209 85 9 180 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent t3lockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 449 251 293 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 449 251 293 tC, single {s} B.4 6.2 4:1 tC, 2 stage (s) tF (s} 3.5 3.3 2.2 p0 queue free % 86 99 99 cM capacity (vch/h} 562 785 1262 Direction. L,3ne It WB~1 NB 1 SB 1~ Volume Total 89 293. 189 Volume Left 79 0 9 Volume Right 10 85 0 cSH 580 1700 1262 Va{ume to Capacity 0.15 0.17 0.01 Queue Length (ft) 13 0 1 Control Delay (s) 12.3 0.0 0.4 Lane LOS B A Approach Delay (s) 12.3 0.0 0.4 Approach LC~S B Intersection Sunin~ary Average Delay 2.1 Intersection Capacity Ut ilization 27.8% ICU Leve l of Service A TraffEx Synchro 5 Report Page 2 HCM Unsignalized Intersection Capacity Analysis Future Without Project PM Peak 3: Northern Pacific Rd & Rhoten Rd 8/3/07 ~ ~ * I /~ Movement WBL WBR NBT NBR SBL SBT Lane Configurations '~ _ ~` Sign. Control Stop Free Free Grade 0% 0% 0% Volume {veh/h) 197 1 78 272 4 71 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly-flow rate{veh/h} 210 1 83 289 4 76 Pedestrians Lane Width (ft} Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal {ft) 1100 pX, platoon unblocked vC, conflicting volume 312 228 372 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 312 228 372 tC, single (s) 6.4, 62 _ 4.1 tC, 2 stage (s) tF ~s} 3.5 3:3 2.2 p0 queue free % 69 100 100 cM capacity,(veh/h} 676. 809 1181 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 21'.1 372. 80 Volume Left 210 0 4 Volume Right 1 289 0" cSH 677 1700 1181 Volume to Capacity. 0.31 0.22 0.00, Queue Length (ft) 33 0 0 Control Delay (s) 1.2:7 0.0 0.5 Lane LOS B A Approach Delay (s) 12.7 0:0 0.5 Approach LOS B lra~rscctic^_5ur~imary Average Delay 4.1 Intersection Capacity Uti lization 40.5% 1CU Level of Service ` A TraffEx Synchro 5 Report Page 1 HCM Unsignalized Intersection Capacity Analysis Future Without Project PM Peak 5: Railway Rd & 1st St N 8/3/07 ~- ~ T ~ `- 1 Movement WBL ,WBR NBT NBR SBL SBT Lane Configurations '~ '~ ~' Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 103 9 342 121 8 259 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 Hourly flow rate (veh/h) 113 10 376 133 9 285 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 745 442 509 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 745 442 509 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 70 98 99 cM capacity (veh/h) 377 613 1051 Direction, Lane # WB 1 NB_9 SB 1 Volume Total 123 509 293 Volume Left 113 0 9 Volume Right 10 133 0 cSH 389 1700 1051 Volume to Capacity 0.32 0.30 0.01 Queue Length (ft) 33 0 1 Control Delay (s) 18.5 0.0 0.3 Lane LOS C A Approach Delay (s) 18.5 0.0 0.3 Approach LOS C Intersection Summary Average Delay 2.6 Intersection Capacity Uti lization 41.4% {CU Leve l of Service A TraffEx Synchro 5 Report Page 2 HCM Unsignalized Intersection Capacity Analysis Future With Project PM Peak 9: North Driveway & Rhoten Rd 8/3/07 • I Movement EBL _EBFZ NBL "NBT SBT SBR Lane Configurations ~ '~, Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h} 1 5 6 79 _ 76 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 1 5 5 86 83 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 179 83 83 vC1, stage 1 conf vol uC2, stage 2 cdrff vol vCu, unblocked vol 179 83 83 tC, single (s) 6.4 6.2 4,1 tC, 2 stage (s) tF {s) 3.5 3.3 2.2 p0 queue free % 100 99 100 cM capacity{veh/h) 807 977. 151.5 Direction, Lane-# rEB 1 NB' 1 ~ SB 1 Volume Total 7 91 83 Volume Left 1 5 0 Volume Right 5 0 D cSH 944 1515 1700 Volume to Capacity 0.01 OAO - 0,05 Queue Length (ft) 1 0 0 Control Delay {s) ' 8.8 0:5 0.0 Lane LOS A A Approach belay (s} 8,8 0.5 O.Q Approach LOS A Intersection Sumriiaiy Average Delay U. Intersection Capacity Uti lization' 15.0% 1CU' Leve l of Service.. A TraffEx Synchro 5 Report Page 4 O ~ HCM Unsignalized intersection Capacity Analysis Future With Project PM Peak 7: South Driveway & Rhoten Rd 8/3/07 ~ ~ ~ * I I i Movement EBL EBR NBL NBT 5BT SBR Lane Configurations ~ "~. _ Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 0 5 6 84 81 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (veh/h) 0 5 7 91 88 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft}' pX, platoon unblocked vC, conflicting volume 192 88 88 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 192 88 88 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s} 3.5 3.3 2.2 p0 queue free % 100 99 100 cM capacity (veh/h) 793 970 1508 Direction, Lane # EB-1 NB 1 5B 1 Volume Total 5 98 - .88 Volume Left 0 7 0 Volume Right 5 0 0 cSH 970 1508 1700 Volume to Capacity 0.01 0.00 0.05 Queue Length (ft) 0 0 0 Control Delay(} 8.7 0.5 d0 Lane LOS A A Approach De{ay (s) 8.7 0.5 0.0 Approach LOS A Intersection Summery - Average Delay 0.5 intersection Capacity Uti lization 15.4% ICU Leve tof Setl~ict; A TraffEx Synchro 5 Report Page 3 ~ A HCM Unsignalized Intersection Capacity Analysis Future With Project PM Peak 3: Northern Pacific Rd & Rhoten Rd 8/3/07 ~ ~ * I I~ Movement WBL WBR NBT NBR S[=~L ' SST Lane Configurations '~ ~' Sign Control Stop Free Free Grade 0% 0% 0% Volume (vehih} 197 2 88 272 4 81 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (veh/h) 210 2 94 289 4 86 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 333 238 383 vC1, stage 1 conf vol vC2, stage 2 conf. vol vCu, unblocked vol 333 238 383 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 68 100 100 cM capacity (veh/h) 658 798 1170 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 212 383 90 Volume Left 210 0 4 Volume Right 2 289 0 cSH 659 1700 1170 Volume to Capacity 0.32 0.23 A.00 Queue Length (ft) 35 0 0 Control Delay (s} 13.0 0.0 0.4 Lane LOS B A Approach Delay (s) 13..0 0.0 0.4 Approach LOS B -ntersection Summary Average Delay 4.1 Intersection Capacity Utilization 41.1 °lo ICU Leve l of Service A TraffEx Synchro 5 Report Page 1 V 4 HCM Unsignalized Intersection Capacity Analysis Future With Project PM Peak 5: Railway Rd & 1st St N 8/3/07 ~ °~ t ~ ~- 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations ~' '~ ~` Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 103 9 352 121.... 9 268. Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 Hourly flow rate. (veh/h) 113 10 387 133 10 295 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Nane Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 768 453 520 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 768 453 520 tC; single (s) 6.4 6.2 4.1 tC, 2 stage (s} tF (s) 3.5 3.3 2;2 p0 queue free % 69 98 99 cM capacity (veh/h) 365 604 1041 Direction, Lane # WB 1 NB 1 5B 1 Voiume Total 123 520 304 Volume Left 113 0 10 Volume Right 10 133 0 cSH 377 1700 1041 Volume to Capacity 0.33 0.31 0.01 Queue Length (ft) 35 0 1 Control Delay (s} 19.1 0.0 0.4 Lane LOS C A Approach Delay (s) 19.1 0.0 0.4 Approach LOS C Intersection Summary Average Delay 2.6 Intersection Capacity Utilization 42.0% ICU Level of Service A TraffEx Synchro 5 Report Page 2