Mt.Sunrise 2 Preliminary Punchlist for Sound BuiltHomes
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
October 14, 2008
Sound Built Homes
12915 Canyon Road East
Puyallup, WA 98328
RE: Mountain Sunrise Phase 2 – Pre Punchlist
City of Yelm Project No. SUB-02-8329-YL
Dear Mr. Clime:
Our department has conducted a brief drive thru on the above mentioned project. The following items were discovered during this brief drive thru, these items must be completed first,
before we call for a final walk thru and inspection of the project.
Fix all broken sidewalk, curb & gutter.
Clean up entire project of all garbage, debris and left over materials.
Clean up all planter strips of weeds and re-hydroseed.
Clean and sweep streets.
Clean up all Rock and concrete piles.
Remove all sox’s from storm drain catch basins and clean out catch basins.
Clean and sweep sidewalks.
Re-grade storm ponds and access road to storm ponds.
Clean up storm ponds and cut down weeds, grass and wild growing trees.
Replace dead trees around storm pond.
Cut down wild growing trees and weeds in right of way.
Repair broken fence.
Put street signs back in place.
Please complete 100% of the above items before contacting our department for a final walk thru and inspection. If you have any questions or comments, please call me at (360) 458-8423
and I will be happy to further assist you.
Respectfully
City of Yelm Community Development
Steve Harrington
Engineering / Civil Inspector