Loading...
Mt.Sunrise 2 Revised Preliminary Punchlist for Sound BuiltHomes City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   March 9, 2009 Sound Built Homes 12915 Canyon Road East Puyallup, WA 98328 RE: Mountain Sunrise Phase 2 – Pre Punchlist City of Yelm Project No. SUB-02-8329-YL Dear Mr. Cline: Our department has conducted a brief drive thru on the above mentioned project. The following items were discovered during this brief drive thru, these items must be completed first, before we call for a final walk thru and inspection of the project. Clean up entire project of all garbage, debris and left over materials and plastic strung out from material piles. Remove Rock and concrete piles. This is a hazardous condition along with being a safety and liability issue. Clean up storm ponds and cut down weeds. Replace dead trees around storm pond 7 to 10 trees are dead. Remove street signs post near intersection of 91st and Wilkensen Rd. Relocate utility box in driveway. Remove construction lot signs. Fix and lower exposed irrigation line on pond access road. Remove metal fence stakes next to sidewalk on 91st. Please complete 100% of the above items before contacting our department for a final walk thru and inspection. If you have any questions or comments, please call me at (360) 458-8423 and I will be happy to further assist you. Respectfully City of Yelm Community Development Steve Harrington Engineering / Civil Inspector