Loading...
19-074-RPT-Drainage-2025.01.06 (8819) DEUTSCHER - YELM COMMERCIAL Project #2022-0096 Drainage Report Prepared for: Marijke Deutscher 1401 Marvin Road NE, Suite 307 Lacey, WA 98516 360 402 6871 almst421@comcast.net Report Date: January 6, 2025 Prepared by: Ahmad Kamyab Reviewed by: Chloe P. McIntyre, PE HATTON GODAT PANTIER 3910 Martin Way E., Suite B Olympia, WA 98506 (360) 943-1599 Project No: 19-074 Project Name: DEUTSCHER - YELM COMMERCIAL H:\Office\JOBS\2019\19-074 Deutscher-Yelm Commercial\PERMIT\Reports & Calculations\DRAINAGE I hereby state that this Drainage Control Plan for, Deutscher - Yelm Commercial located at 15152 Berry Valley Road, Yelm 98597, Thurston County, WA, has been prepared by me or under my supervision and meets the standard of care and expertise which is usual and customary in this community for professional engineers. I understand that the CITY OF YELM does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me. Signature Date Seal January 8, 2025 TABLE OF CONTENTS Section 1 – Project Description ................................................................................... 1 Vicinity Map ...................................................................................................................................... 3 Site Plan ........................................................................................................................................... 4 Basin Map ........................................................................................................................................ 5 Minimum Requirement #1: Preparation of Stormwater Site Plans ............................................... 7 Minimum Requirement #2: Construction Stormwater Pollution Prevention ................................. 7 Minimum Requirement #3: Source Control of Pollution ............................................................... 7 Minimum Requirement #4: Preservation of Natural Drainage Systems and Outfalls ................... 7 Minimum Requirement #5: On-Site Stormwater Management ..................................................... 7 Minimum Requirement #6: Runoff Treatment .............................................................................. 8 Minimum Requirement #7: Flow Control ...................................................................................... 8 Minimum Requirement #8: Wetlands Protection .......................................................................... 9 Minimum Requirement #9: Operation and Maintenance .............................................................. 9 Minimum Requirement #10: Financial Liability ............................................................................. 9 Minimum Requirement #11: Off-Site Analysis and Mitigation ...................................................... 9 Section 2 – Existing Conditions Description .............................................................. 9 Section 2.1 Topography ................................................................................................................ 9 Section 2.2 Ground Cover ............................................................................................................ 9 Section 2.3 Drainage .................................................................................................................... 9 Section 2.4 Soils ......................................................................................................................... 10 Section 2.5 Critical Areas ........................................................................................................... 10 Section 2.6 Adjacent Areas ........................................................................................................ 10 Section 2.8 Reports and Studies ................................................................................................ 10 Section 2.9 – Wells and Septic Systems ....................................................................................... 10 Section 2.10 – Fuel Tanks ............................................................................................................. 11 Section 2.11 – Analysis of 100-Year Flood .................................................................................... 11 Existing Conditions Map................................................................................................................. 12 Section 3 – Vicinity Analysis and Sub-Basin Description ....................................... 13 Section 4 – Flow Control and Water Quality Facility Sizing .................................... 14 Water Quality Treatment Facility Sizing ......................................................................................... 14 Flow Control Facility Sizing ............................................................................................................ 14 Section 5 – Aesthetic Considerations for Facilities ................................................. 15 Section 6 – Conveyance System Analysis and Design ............................................ 15 Section 7 – Covenants, Dedications and Easement ................................................. 15 Section 8 – Agreements and Guarantees .................................................................. 15 Section 9 – Other Permits or Conditions Place on the Project ............................... 15 APPENDIX 1 – Design Calculation ............................................................................. 16 APPENDIX 2 – Supplemental Reports and Information ........................................... 17 DEUTSCHER - YELM COMMERCIAL 01.06.2025 PAGE 1 DRAINAGE REPORT Section 1 – Project Description The Deutscher - Yelm Commercial project is located northeast of the intersection of Tahoma Boulevard SE and Berry Valley Road SE in the City of Yelm. The site is located in Section 24, Township 17, Range 1E Quarter SW on tax parcel numbers 21724131001 and 21724130800, separated by a portion of 21724131201. See Vicinity Map on page 3. This project will construct Phase 2 of an earlier project that completed frontage improvements along Berry Valley Road SE. Phase 2 construction includes three (3) new commercial buildings. Two of the proposed buildings will be 7,638 sf each and one building will be 15,002 sf. Construction also includes asphalt paved parking areas, sidewalks, concrete pads, and landscaping areas. See proposed Site Plan on page 4. The proposed project will require grading, building, and utility permits. Water and sewer will be provided via connection to the City of Yelm’s utilities. Zoning for the property is C-1 (Commercial). Stormwater runoff mitigation measures for the entire site were designed and constructed with Phase 1 “Yelm Day Care”. Criteria followed the Department of Ecology Stormwater Management Manual for Western Washington (SMMWW). The construction of Phase 1 allocated 1.40 acres runoff from impervious areas for the Phase 2. Phase 1 included approximately 9,600 sf Day Care building, ~31,000 sf paved private roadway, sidewalks, and parking area between Phase 1 and Phase 2, ~42,000 sf landscape and infiltration areas, as well as ~16,600 frontage improvement along the Berry Valley Rd. SE. See the attached Yelm Day Care Drainage Report in Appendix 2. Phase 2 construction consists of two (2) basins for stormwater modeling, the Phase 2 South Basin, and the Phase 2 North Basin. The northern property (parcel number 21724130800) shown on the Basin Map as the Phase 2 North Basin, is an addition to the original Phase 2 plan. In order to keep the stormwater runoff from impervious areas under 1.40 acres, Hatton Godat Pantier has separated the stormwater runoff from the 3 proposed building’s roof aeras to infiltrate in two (2) individual roof infiltration trenches. Stormwater runoff from proposed Phase 2 South and Phase 2 North basins include 1.05 acres asphalt paved parking areas, 0.02-acre concrete pads, and 0.25-acre sidewalks. The total Phase 2 runoff from pollution-generating pervious surface (PGPS) areas is 1.32 acres, well below the 1.40 acres allocated. Runoff from both basins of Phase 2 will be collected via catch basins and conveyed by stormwater pipes to the existing stormwater facilities located at the southeast corner of Day Care building for treatment and 100% infiltration. Roof runoff does not require treatment as it is non-pollution generating surface. The total Phase 2 roof areas are 0.69-acre and will be connected to two (2) roof infiltration trenches sized per Infiltration Trenches (Ecology BMP T7.20). In addition to the roof area, 0.05-acre of non-pollution generating impervious pedestrian area between buildings 1 and 2 will be conveyed to infiltration trench 1 for infiltration. All new and disturbed lawn/landscape areas will be amended per Postconstruction Soil Quality and Depth (Ecology BMP T5.13) to retain greater stormwater functions, including increased infiltration potential and treatment. A summary of pre-developed and proposed pervious and impervious areas are included in Table 1.1. See the attached Basin Map on page 5. DEUTSCHER - YELM COMMERCIAL 01.06.2025 PAGE 2 Table 1.1 – Area Summary* All areas measured in acres Pre-Developed Ph 1 Ex. Yelm Day Care Ph 2 South Basin Ph 2 North Basin Total Site Forest (A/B Flat) 2.51 1.74 1.11 5.36 100-Year Developed Flow Rate (cfs) 0.024 Developed Ph 1 Ex. Yelm Day Care Ph 2 South Basin Ph 2 North Basin Total Site Landscape/Lawn (Flat) 0.96 0.59 0.23 1.77 Road (Flat) 0.39 - - 0.39 Parking (Flat)** 0.25 0.62 0.47 1.31 Concrete Pad** - 0.01 0.01 0.02 Sidewalk (Flat)** 0.09 0.17 0.07 0.34 Frontage Improvement 0.38 - - 0.38 Roof 0.22 0.35 0.34 0.92 Pond 0.23 - - 0.23 Total 2.51 1.74 1.11 5.36 100-Year Developed Flow Rate (cfs) 0 0 0 0 *Areas reflect rounding. **Total Phase 2 PGPS impervious areas 1.35 acres, Phase 2 allowed is 1.40. DEUTSCHER - YELM COMMERCIAL 15152 BERRY VALLEY RD. SE, YELM, WA 98597 N HATTON PANTIER GODAT VICINITY MAP SITE Y E L M A V E S E / H W Y 5 1 0 KIL L I O N RD S E TA H O M A B L V D . S E BE R R Y V A L L E Y R D S E BERRY VALLEY RD SE N.T.S N.T.S